Drawings.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25026B0047
About this file
Summary of Construction Drawings for Replace Electrical Panels & Expand Distribution Project
This document is a comprehensive set of construction drawings (Final Construction Document Bid Set) for the Replace Electrical Panels & Expand Distribution project at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana (VA Project Number 583-22-106, located at 1481 W. 10th Street, Indianapolis, IN 46202). The project involves demolition of existing concrete and asphalt pavement, installation of electrical duct banks, pavement repair, storm sewer modifications, and limited erosion and sediment controls at the medical facility. The work includes structural electrical panel replacement and distribution system expansion, with mechanical, civil, and architectural components. The construction is phased in two stages to maintain access to Building 21 (Police) and police parking, with at least half of police parking stalls remaining open throughout. Key site requirements include contractor employee parking at a remote location (2669 Cold Springs Road), coordination with VA medical facility operations to minimize disruption, installation of temporary fencing per phase, proper management of hazardous materials (no asbestos or lead-based paint was identified in the tested work areas), and compliance with storm water pollution prevention protocols, OSHA standards, and EPA regulations.
The drawings specify extensive utility coordination requirements, including 22 test pits to confirm existing utility locations before construction begins, hand excavation in sensitive areas, protection of existing utilities (steam, water, sanitary and storm sewers, electrical, fiber optic, and geothermal lines), and installation of new electrical conduit runs with specific horizontal and vertical clearances. Concrete and asphalt work must match existing elevations and surfaces, with new pavement requiring joint sealers and proper compaction to 95-98% standard Proctor density. The contractor is responsible for design of delegated items including equipment connections, cold-formed steel framing, seismic bracing, and shoring systems, all requiring stamps from Indiana-licensed professional engineers. Construction loads, wind speeds (118 mph ultimate), seismic design category D, and snow loads (40 psf) are specified per 2024 IBC standards. The project requires strict site cleanliness, daily cleanup, proper waste management in covered containers, stable construction access measures, and restoration of disturbed areas within 14 days of completion, with turf areas restored using sod.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026B0047.docx | DOCX document | |
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing No. Title
GENERAL
GI000 COVER SHEET
HAZARDOUS MATERIALS
HA100 ASBESTOS SAMPLE LOCATIONS
HA101 LEAD-BASED PAINT SAMPLE LOCATIONS
CS502 SITE DETAILS
CU201 ELECTRICAL CONDUIT PLAN AND PROFILE
STRUCTURAL
SG001 STRUCTURAL GENERAL NOTES
SB501 TYPICAL DETAILS
FIRE ALARM
FA100 BASEMENT FLOOR PLAN -FIRE ALARM -OVERALL
FA200 BASEMENT FLOOR PLAN -FIRE ALARM
ARCHITECTURAL
AE101 ARCHITECTURAL FLOOR PLANS & SCHEDULES
MECHANICAL
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
CIVIL
CN001 NOTES, LEGEND AND LINETYPES
VI101 EXISTING CONDITIONS
CS100 STORM SEWER CLEANING AND CIRCULATION PLAN
GC101 STORM WATER POLLUTION PREVENTION PLAN, DETAILS, AND NOTES
CD101 SITE DEMOLITION PLAN
CS101 SITE / UTILITY PLAN
CS501 SITE DETAILS
M200A BASEMENT FLOOR PLAN -MECHANICAL -OVERALL
MH200 BASEMENT FLOOR PLANS -MECHANICAL
M600 MECHANICAL SCHEDULES, DETAILS, & CONTROLS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED100 BASEMENT FLOOR PLAN -ELECTRICAL -DEMO -OVERALL
ED200 BASEMENT FLOOR PLAN -ELECTRICAL -DEMO
E100 BASEMENT FLOOR PLAN -ELECTRICAL -NEW -OVERALL
E101 ELECTRICAL POWER SITE PLANS
EL200 BASEMENT FLOOR PLAN -LIGHTING
EP100 ELECTRICAL POWER ENLARGED PLANS
EP200 BASEMENT FLOOR PLAN -POWER PHASE 1 -PLANS
EP200A BASEMENT FLOOR PLAN -POWER PHASE 1 -PHASING
EP201 BASEMENT FLOOR PLAN -POWER PHASE 2 -PLANS
EP201A BASEMENT FLOOR PLAN -POWER PHASE 2 -PHASING
EP202 BASEMENT FLOOR PLAN -POWER PHASE 3 -PLANS
EP202A BASEMENT FLOOR PLAN -POWER PHASE 3 -PHASING
EP203 BASEMENT FLOOR PLAN -POWER FUTURE -PLANS
EY200 BASEMENT FLOOR PLAN -LOW VOLTAGE
E500 ONE-LINE DIAGRAM -MEDIUM VOLTAGE (BLDG. 23)
E501 ONE-LINE DIAGRAM -PHASE 1 (BLDG. 1)
E502 ONE-LINE DIAGRAM -PHASE 2 (BLDG. 1)
E503 ONE-LINE DIAGRAM -PHASE 3 (BLDG. 1)
E503B ONE-LINE DIAGRAM -PHASE 3 (BLDG. 1) -EMERGENCY
E504 ONE-LINE DIAGRAM -FUTURE (BLDG. 1)
E505 SCC RATING REVISIONS ONE-LINE DIAGRAMS
E600 ELECTRICAL DETAILS
E601 ELECTRICAL DETAILS
E602 ELECTRICAL DETAILS
E700 ELECTRICAL SCHEDULES
E701 PANEL SCHEDULES
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
6 South Old Orchard Ave, Webster Groves, MO 63119, 1 800.404.7677
06/01/2026
A u to d e s k D o c s /2
V
A I n d ia n a p o lis
E le c tr ic a l P a n e l R e p la c e m e n t
P ro je c t/
-1
.G I_
.r v t
/1
/2
:0
:0
P M
GI000
COVER SHEET REPLACE ELECTRICAL PANELS &
EXPAND DISTRIBUTION
1481 W. 10th Street, Indianapolis, IN 46202
583-22-106
01 & 23
06/01/2026 KSB MLW
23359.001
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
Richard L. Roudebush VA Medical Center Replace Electrical Panels & Expand Distribution
PROJECT NAME:
1481 W. 10th Street, Indianapolis, IN 46202
SITE ADDRESS:
VA PROJECT NUMBER:
583-22-106
VICINITY MAP:
Revisions: Date:
ASBESTOS SAMPLE LOCATIONS
HA100
PKBBLB06/01/2026
ASBESTOS LEGEND
BULK POTENTIAL ASBESTOS CONTAINING
MATERIALS SAMPLES
DESCRIPTIONS/ QUANTITIES
1-18#
Castle Hill Associates, LLC 1197 Farnsworth Rd. Suite E Waterville, OH 43566 Phone: 567-952-02121 www.castlehillassociates.com
ASBESTOS SAMPLE BUILDING 23 PLAN
ASBESTOS SAMPLE BASEMENT PARTIAL PLAN
ASBESTOS SAMPLE SUB BASEMENT PARTIAL PLAN - STEAM TUNNEL
1. THERE WERE NO ASBESTOS CONTAINING
MATERIALS FOUND TO BE PRESENT IN THE WORK
AREAS ASSOCIATED WITH THIS PROJECT.
2.
583-22-106REPLACE ELECTRICAL PANELS &
EXPAND DISTRIBUTION
1481 W. 10th Street, Indianapolis,IN 46202
A. REFER TO ASBESTOS AND HAZMAT TESTING
REPORT FOR ADDITIONAL DETAIL
POTENTIAL ASBESTOS-CONTAINING MATERIALS
(ACM) (TRANSITE CEMENT ISOLATION PANELS, ARC
FLASH PANELS, AND WIRING) MAY BE PRESENT
INSIDE EXISTING SWITCHGEAR AND TRANSFORMERS
PER THE ASBESTOS AND HAZMAT TESTING REPORT
AND SECTION 02 82 11.
NO ON-SITE DISMANTLING, DISASSEMBLY, OR
OPENING OF EXISTING SWITCHGEAR OR
TRANSFORMERS SHALL BE PERFORMED WITHOUT
PRIOR ACM INSPECTION. ALL ELECTRICAL
EQUIPMENT SHALL BE REMOVED AS INTACT UNITS
WHENEVER POSSIBLE.
IF SUSPECT ASBESTOS-CONTAINING MATERIALS ARE
ENCOUNTERED DURING DEMOLITION OR IF ANY
ON-SITE DISMANTLING BECOMES NECESSARY
(INCLUDING IN EQUIPMENT THAT COULD NOT BE
SAMPLED), THE CONTRACTOR SHALL IMMEDIATELY
STOP WORK IN THE AFFECTED AREA AND NOTIFY
THE VA CONTRACTING OFFICER AND PROJECT
CONSULTANT. ASBESTOS ABATEMENT OF SUSPECT
MATERIALS LISTED INT HE ASBESTOS REPORT SHALL
BE REQUIRED PRIOR TO ANY FURTHER
DISTURBANCE AND SHALL BE PERFORMED BY A
LICENSED ASBESTOS ABATEMENT CONTRACTOR IN
ACCORDANCE WITH THE PROJECT ASBESTOS &
HAZMAT TESTING REPORT AND SPECIFICATION
SECTION 02 82 11. COORDINATION OF ELECTRICAL
OUTAGES SHALL BE REQUIRED.
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)10360 Ellison Circle
Omaha, NE 68134 Phone:
402.991.5520 www.specializedeng.com SES Project : 23359.001
01 & 23
LEAD-BASED PAINT SAMPLE
LOCATIONS
HA101
PKBBLB
LEAD-BASED PAINT SAMPLE LEGEND
LEAD-BASED PAINT CHIP SAMPLES
DESCRIPTIONS/ QUANTITIES
1-11
Castle Hill Associates, LLC 1197 Farnsworth Rd. Suite E Waterville, OH 43566 Phone: 567-952-02121 www.castlehillassociates.com
LEAD-BASED PAINT SAMPLE BUILDING 23 PLAN
LEAD-BASED PAINT SAMPLE BASEMENT PARTIAL PLAN
LEAD-BASED PAINT SAMPLE SUB BASEMENT PARTIAL PLAN - STEAM TUNNEL
1. THERE WERE NO COMPONENTS PAINTED WITH
LEAD-BASED PAINT OR COATED COMPONENTS
WITH LEAD IDENTIFIED IN THE RENOVATION
WORK AREAS.
583-22-106REPLACE ELECTRICAL PANELS &
EXPAND DISTRIBUTION
1481 W. 10th Street, Indianapolis,IN 46202
A. REFER TO ASBESTOS AND HAZMAT TESTING
REPORT FOR ADDITIONAL DETAIL
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
06/01/2026
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520 www.specializedeng.com SES Project : 23359.001
01 & 23
EXISTING PROPOSED
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
TEMPORARY CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND ELECTRIC LINE
WATER MAIN
BUILDINGS
SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF WORK
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
REVERSE CURB
543.6
TO BE
REMOVED
TO
REMAIN
BOARD FENCE
8" W/M8" W/M
TRANS.CURB
SOIL BOUNDARY
HbB HgC
WIRE FENCE
EDGE OF GRAVEL
GUARDRAIL
CIVIL LEGEND:
EDGE OF CONCRETE
LP
SANITARY SEWER CLEAN-OUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER DROP INLET
STORM SEWER CURB INLET
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
MAIL BOX
UTILITY POLE
FEATURE WALL
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
BUILDING MOUNTED LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN
8" PVC SAN. SEW.
15" HDPE
EX. CC RBF
CONCRETE MONUMENT/IRON REBAR
TBSCC-TBSIPF
UNDERGROUND GAS LINE
C3
CO
45 0
GS 45 0
TC 45 0
INV
EX.
EX.
X
CO
MB
MONVDH
EX. VDH
ABBREVIATIONS:
DRAINAGE FLOW ARROW
DETAIL LABEL
KEYNOTE REFERENCE LABEL
F
XX
LIMITS OF GRADING
LIMITS OF CLEARING
XX
XXXXX
WETLANDS
FLAG POLEF
DETAIL NO.
SHEET REFERENCE
DIRECTION OF TRAFFIC ARROWS
FEATURE WALL
33 32
TEST PIT LOCATION
A AREA OR ARC
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
ATS ACTIVE TREATMENT SYSTEM
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK, BASELINE MARKER
BMP BEST MANAGEMENT PRACTICES
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS, CONTRACT DOCUMENTS OR CHECK DAM
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CE CONSTRUCTION ENTRANCE
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND OR COMPOST FILTER SOCK
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE OR CULVERT INLET PROTECTION
CJ CONTRACTION JOINT
CL CENTERLINE, CLASS
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CN CURVE NUMBER
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPv CHANNEL PROTECTION VOLUME
CPPE CONSERVATION PRACTICE PHYSICAL EFFECTS
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE OR CONCRETE WASHOUT
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK; DESIGN-BUILD; DRAIN BASIN
DBL DOUBLE
DD DIVERSION DIKE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
ECL EROSION CONTROL LOG
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOTG FIELD OFFICE TECHNICAL GUIDE
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FS FILTER SOCK
FT FEET
FWS FLOWER WATERING STATION
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE OR INLET PROTECTION
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
M MARKER
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NCPS NATIONAL CONSERVATION PRACTICE STANDARDS
NCTCOG NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS
NE NOT EXCEEDING
NFA NET FLOOR AREA
NHCP NATIONAL HANDBOOK OF CONSERVATION PRACTICES
NIC NOT IN CONTRACT
NO NUMBER
NOI NOTICE OF INTENT
NOM NOMINAL
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
NRCP NON-REINFORCED CONCRETE PIPE
NRCS NATURAL RESOURCES CONSERVATION SERVICE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFB ORGANIC FILTER BERM
OFD OVERFLOW DRAIN
OFT ORGANIC FILTER TUBE
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OP OUTLET PROTECTION
OS OVER-SIZED
OZ OUNCE
P PERIMETER, RAINFALL DEPTH
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
POTW PUBLICLY-OWNED TREATMENT WORKS
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PTS PASSIVE TREATMENT SYSTEM
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
Qf EXTREME FLOOD VOLUME Qp OVERBANK FLOOD PROTECTION VOLUME
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCN RUNOFF CURVE NUMBER
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
REv RECHARGE VOLUME
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK OR SEDIMENT BASIN
SBL SOUTH BOUND LANE
SCF SEDIMENT CONTROL FENCE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET OR SILT FENCE
SSF SUPER SILT FENCE
SJ SCORED JOINT
SLV SLEEVE
SM SECTION MARKER
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY
ST STREET OR SEDIMENT TRAP
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
SWM STORMWATER MANAGEMENT
S/W SIDEWALK
SWPPP STORM WATER POLLUTION PREVENTION PLAN (SWP3)
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
Tc TIME OF CONCENTRATION
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE, OR TREE PROTECTION
TW TOP OF WALL
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
USACE U.S. ARMY CORPS OF ENGINEERS
USDA U.S. DEPARTMENT OF AGRICULTURE
UTIL UTILITY
V VERTICAL
VA DEPARTMENT OF VETERAN'S AFFAIRS
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WQv WATER QUALITY VOLUME
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
GENERAL NOTES:
1. PROPOSED SITE IMPROVEMENTS ASSOCIATED WITH THE RICHARD L. ROUDEBUSH VETERANS AFFAIRS MEDICAL CENTER, LOCATED IN INDIANAPOLIS, INDIANA INCLUDES, BUT IS
NOT LIMITED TO, DEMOLITION OF EXISTING CONCRETE AND ASPHALT PAVEMENT, INSTALLATION OF ELECTRICAL DUCT BANK, PAVEMENT REPAIR AND LIMITED EROSION AND
SEDIMENT CONTROLS.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. THE SUBJECT AREA IS NOT LOCATED WITHIN A MAPPED FLOOD PLAIN, PER FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA), FLOOD INSURANCE RATE MAP (FIRM) - CITY OF INDIANAPOLIS, MAP NUMBER 180159, PANEL 0143, EFFECTIVE DATE AUGUST 14, 2024.
3. SEE THIS SHEET FOR SITE RELATED LEGEND OF SYMBOLS AND ABBREVIATIONS USED HEREIN.
4. DUE TO THE SENSITIVE NATURE OF THE MEDICAL FACILITY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE
FREQUENTLY AS REQUIRED.
5. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE MEDICAL FACILITY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE VA COR OR OTHER VA REPRESENTATIVES ASSOCIATED WITH THE PROJECT. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY THE VA COR. ANY DISTURBED TRAFFIC ROUTES SHALL BE COORDINATED IN ADVANCE WITH THE VA.
6. AT ALL TIMES THE CONTRACTOR SHALL HAVE A PERSON WHO IS EMPLOYED BY THE PRIME CONTRACTOR AND IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
CONSTRUCTION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE PLANS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY
CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH OSHA, EPA, U.S. DEPARMENT OF LABOR, THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS, INDOT CONSTRUCTION STANDARDS AND SPECIFICATIONS, AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS
WHERE APPLICABLE.
3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLAN FOR PHASING AND
DETAILS.
4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION
AND SEDIMENTATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CHANGES OR CONDITIONS ASSOCIATED WITH THE
APPROVED PLANS FOR CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS, DRIVEWAY, PARKING AREAS, ETC... OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
8. INDIANA'S CALL BEFORE YOU DIG LAW REQUIRES THE CONTRACTOR SHALL CONTACT INDIANA ONE CALL SYSTEM, INC. AT 811 A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO ANY EXCAVATION, DEMOLITION OR OTHER EARTH DISTURBING ACTIVITIES WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. IF INDIANA 811 DOES NOT HAVE JURISDICTION TO MARK EXISTING UNDERGROUND UTILITIES THE CONTRACTOR SHALL UTILIZE A PRIVATE LOCATE SERVICE TO VERIFY THE LOCATION OF EXISTING
UNDERGROUND UTILITIES.
9. THIS PLAN DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION.
THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE VA COR.
10. THIS PLAN DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE REQUIRED FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION.
11. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
12. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
13. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES UNLESS OTHERWISE NOTED.
14. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH SPECIFICATION 31 20 11.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF VETERANS AFFAIRS
ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. THE ENGINEER OF RECORD SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE WORK AREA AT ALL TIMES. TEMPORARY BARRICADES, ROAD CLOSURE SIGNAGE, FENCES AND OTHER WARNING DEVICES SHALL BE USED TO PREVENT PUBLIC ACCESS TO CONSTRUCTION WORK AREAS. VA MAINTENANCE OPERATIONS SHALL NOT BE UNDULY IMPEDED BY THE
CONTRACTOR'S OPERATIONS.
18. THE CONTRACTOR SHALL CONFINE HIS EQUIPMENT AND OPERATIONS TO THE LIMITS OF CONSTRUCTION SHOWN. THE CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR THE
SAFETY AND SECURITY OF ALL MATERIALS AND EQUIPMENT ON SITE.
19. THE CONTRACTOR SHALL USE ONLY APPROVED ROADWAYS FOR CONSTRUCTION AND DELIVERY ACCESS. DAMAGE TO THE EXISTING ROADS SHALL BE REPAIRED AT NO COST
TO THE OWNER.
20. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR OF ANY EXISTING GROUND DAMAGE DUE TO CONSTRUCTION ACTIVITY AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. THE CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITY.
22. THE CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN ACCESS TO ALL BUILDINGS DURING CONSTRUCTION.
23. CONTRACTOR SHALL PROVIDE PHASING PLAN FOR ALL ROAD CLOSURES FOR VAMC APPROVAL. CONTRACTOR SHALL MAINTAIN CAMPUS ACCESS THROUGHOUT
CONSTRUCTION. CONTRACTOR TO PROVIDE TRAFFIC CONTROL SIGNAGE WHEN REQUIRED.
24. ALL EXCAVATION IN THE IMMEDIATE AREA OF EXISTING UTILITIES SHALL BE PERFORMED BY HAND AND WITH THE UTMOST CARE TO PROTECT EXISTING UTILITIES.
25. WORK WITH EXTREME CARE NEAR EXISTING DUCTS, CONDUITS, AND OTHER UTILITIES TO AVOID DAMAGING THEM.
26. PROTECT EXISTING SITE ELEMENTS TO REMAIN (TREES, UTILITIES, SIGNS, CURB, ETC) REPLACE IN KIND, IF DAMAGED. CONTRACTOR SHALL SALVAGE AND REPLACED ANY SITE SIGNS , FIXTURES, ETC. AS NEEDED TO COMPLETE THE INSTALLATION OF UTILITIES SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES
OR OTHER ITEMS DESIGNATED TO REMAIN.
27. TEST PITS ARE IDENTIFIED AT KNOWN EXISTING UTILITY CROSSINGS, BUT IN NO WAY LIMIT THE AMOUNT AND LOCATION OF TEST PITS REQUIRED TO BE PERFORMED BY THE CONTRACTOR. ELEVATIONS OF ALL EXISTING UTILITIES AT CROSSINGS WITH THE PROPOSED UTILITY PATHWAYS SHALL BE VERIFIED BY THE CONTRACTOR WITH A TEST PIT
PRIOR TO ANY EXCAVATION AT NO EXPENSE TO THE GOVERNMENT.
28. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED FOR CONSTRUCTION IN KIND WITHIN 14 DAY CALENDAR DAYS OF COMPLETING WORK IN THE SPECIFIC AREAS.
29. LIMITS OF DISTURBANCE ARE APPROXIMATE. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED. TURF SHALL BE RESTORED WITH A SOD ANYWHERE EXISTING
TURF IS DISTURBED.
30. WHERE OPEN CUTTING OF PAVEMENT IS REQUIRED FOR INSTALLATION OF UTILITIES, CONTRACTOR SHALL REPLACE PAVEMENT TO MATCH EXISTING MATERIALS & DEPTHS.
NEW PAVEMENT SHALL BE FLUSH WITH EXISTING PAVEMENT SURFACES. ANY PAVEMENT MARKINGS DISTURBED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED TO
ORIGINAL CONDITION BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT.
31. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY INCLUDING ALL SUBGRADE MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE REMOVED.
32. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE PRIOR TO ANY CONSTRUCTION.
33. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING THRUST BLOCKS WHICH ARE RESTRAINING EXISTING UTILITIES. EXISTING THRUST BLOCKS SHALL NOT BE UNDERMINED. ANY DISTURBED THRUST BLOCKS SHALL BE REPLACED AT NO COST TO THE GOVERNMENT.
34. EXISTING MAINS TO WHICH CONNECTIONS SHALL BE MADE ARE SIZED AND LOCATED IN ACCORDANCE WITH THE BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL VERIFY SIZE/TYPE OF CONNECTION WITH TEST PITS AT THE BEGINNING OF THE PROJECT, AND ORDER MATERIALS ACCORDINGLY.
35. ALL TRENCHES SHALL BE BACKFILLED AS SOON AS PRACTICABLE. OPEN TRENCHES SHALL BE KEPT TO A MINIMUM. OPEN TRENCHES SHALL BE STEEL PLATED WHEN THEY CANNOT BE IMMEDIATELY COVERED. UPON BACKFILLING THE CONTRACTOR SHALL BROOM SWEEP STREETS AND USE APPROPRIATE METHODS TO CONTROL DUST AND HOSE DOWN PAVEMENT TO KEEP SURFACES CLEAN. WHERE FIRE ACCESS MUST BE MAINTAINED ON A STREET, CONTRACTOR SHALL ASSURE A MINIMUM 15' STABILIZED ROUTE
AROUND THE EXCAVATION.
10360 ELLISON CIRCLE,
OMAHA, NE 68134
Phone: 402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
Au to de sk
D oc s:
//2
VA
In di an ap ol is
E le ct ric al P an el
R ep la ce m en t P ro je ct
/5
-1
.G I.B
_2
3.
rv t 9/
4/
1:
:2
AM
REPLACE ELECTRICAL PANELS
& EXPAND DISTRIBUTION
1481 W. 10TH STREET, INDIANAPOLIS, IN 46202
583-22-106
06/01/2026
23359
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
Revisions: Date:
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRI TY FEDERA
L
SERV I CES
GLS AR/PS
NOTES, LEGEND AND LINETYPES
CN001
CIVIL DRAWING INDEX
NO. DRAWING DRAWING TITLE
1 CN001 NOTES, LEGEND, AND LINETYPES
VI101 COMPOSITE EXISTING CONDITIONS
CS100 GENERAL CONTRACTOR CIRCULATION & STAGING PLAN
GC101 STORM WATER POLLUTIN PREVENTION PLAN, DETAILS, AND NOTES
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS501 SITE DETAILS
CS502 SITE DETAILS
GEOTHERMAL LINE
FIBER OPTIC LINE
9 CU201 ELECTRICAL CONDUIT PLAN & PROFILE
SCREEN FENCE
VA HOSPITAL
BUILDING #1
A-WING
MRI
B-WING
C-WING
D-WINGE-WING
BLDG 6
STORAGE
BLDG 19
BLDG 5
RESEARCH
ADMIN.
BLDG 22
CHILLER
PLANT
BLDG 28
PARKING STRUCTURE 20
EMPLOYEE PARKING
BLDG 21
POLICEBL
DG
MA
IN
T.
S
HO
P
X X
X
SA
SA
SA
SA
SA
X X
X
X
X
X
X
10360 ELLISON CIRCLE,
OMAHA, NE 68134
Phone: 402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
Au to de sk
D oc s:
//2
VA
In di an ap ol is
E le ct ric al P an el
R ep la ce m en t P ro je ct
/5
-1
.G I.B
_2
3.
rv t 9/
4/
1:
:2
AM
REPLACE ELECTRICAL PANELS
& EXPAND DISTRIBUTION
1481 W. 10TH STREET, INDIANAPOLIS, IN 46202
583-22-106
06/01/2026
23359
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
Revisions: Date:
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRI TY FEDERA
L
SERV I CES
GLS AR/PS
EXISTING CONDITIONS
VI101
NOTES:
1. COMPOSITE EXISTING CONDITIONS BASE MAP IS COMPRISED OF THE FOLLOWING PROVIDED
FOUR CAD FILES:
1.a. EXISING UTILITY SURVEY PREPARED BY BLOODHOUND 1.b. CU 201.DWG" FROM EHRM PROJECT 1.c. WTS_UNDERGROUND_UTILITIES_PLAN.DWG 1.d. 2022-0111-VA.DWG
2. THE CONTRACTOR SHALL ENSURE ALL WORK DONE FOR THIS PROJECT COMPLIES WITH
OSHA, EPA AND OTHER STATE AND LOCAL LAWS.
GRAPHIC LEGEND:
SUBJECT AREAS
SUBJECT AREA
APPROXIMATE PARCEL BOUNDARY
WHITE RIVER
ST. MARGARETS DRIVE
TH
S
TR
EE
T
TH
S
TR
EE
T
W . M
IC
HI
GA
N
ST
PORTO ALEGERA ST.
F-LOT
VA HOSPITAL
BUILDING #1A-WING
MRI
B-WING
C-WING
D-WINGE-WING
BLDG 6
STORAGE
BLDG 19
BLDG 5
RESEARCH
ADMIN.
BLDG 22
CHILLER
PLANT
BLDG 28
PARKING STRUCTURE 20
EMPLOYEE PARKING
BLDG 21
POLICEBL
DG
23 MA
IN
T.
S
HO
P
TR
SA
SA
SA
ST ST
SA
ST
SA
W
W
ST
ST
X
X
10360 ELLISON CIRCLE,
OMAHA, NE 68134
Phone: 402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
Au to de sk
D oc s:
//2
VA
In di an ap ol is
E le ct ric al P an el
R ep la ce m en t P ro je ct
/5
-1
.G I.B
_2
3.
rv t 9/
4/
1:
:2
AM
REPLACE ELECTRICAL PANELS
& EXPAND DISTRIBUTION
1481 W. 10TH STREET, INDIANAPOLIS, IN 46202
583-22-106
06/01/2026
23359
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
Revisions: Date:
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRI TY FEDERA
L
SERV I CES
GLS AR/PS
STORM SEWER CLEANING AND
CS100
CIRCULATION PLAN
1" = 2000'
REMOTE CONTRACTOR YARD LOCATION1
CONTRACTOR PRIMARY
CONSTRUCTION ACCESS
GRAPHIC LEGEND:
SUBJECT AREAS
REMOTE CONTRACTOR YARD ADDRESS:
2669 COLD SPRINGS ROAD, INDIANAPOLIS, IN
THIS IS A CRITICAL AREA. CONTRACTOR SHALL NOT
USE THIS AREA TO LOAD, UNLOAD, STORE OR
TRANSPORT ACROSS.
F-LOT
APPROXIMATE PARCEL BOUNDARY
ST. MARGARETS DRIVE
TH
S
TR
EE
T
TH
S
TR
EE
T
W . M
IC
HI
GA
N
ST
DR
. H
AR
VE
Y
MI
DD
LE
TO
N
W
AY
PORTO ALEGERA ST.
ACCESS FROM 10TH STREET
RICHARD L. ROUDEBUSH VAMC
SUBJECT AREA
CONTRACTOR REQUIREMENTS:
1. ALL CONTRACTOR EMPLOYEES OR SUBCONTRACTORS WILL BE
REQUIRED TO PARK AT THE VA'S COLD SPRINGS ROAD (CSR)
CAMPUS LOCATED AT 2669 COLD SPRINGS ROAD, INDIANAPOLIS, IN
46222 OR ANYWHERE AROUND THE RICHARD L. ROUDEBUSH VA
MEDICAL CENTER AT THEIR OWN EXPENSE. THE CONTRACTOR
EMPLOYEES AND SUBCONTRACTORS WILL BE REQUIRED TO CAR
POOL TO THE PROJECT SITE.
2. THE CONTRACTOR SHALL MAINTAIN TRAFFIC LANES OPEN TO ALL
PERSONNEL TO ACCESS PARKING SPACES DURING THIS WORK.
MOBILIZATION OF EQUIPMENT, PERSONNEL AND SUPPLIES SHALL BE
COMPLETED WITHOUT COMPLETE RESTRICTION OF NORMAL
VEHICLE/PEDESTRIAN TRAFFIC AND FACILITY OPERATIONS.
3. CONTRACTOR SHALL COORDINATE ALL DUMPSTER LOCATIONS
WITH THE COR PRIOR TO START OF WORK. IF ALLOWED,
CONTRACTOR SHALL PLACE ALL DUMPSTERS IN F-LOT ;
COORDINATE DUMPSTER LOCATION WITH THE COR IF THIS IS NOT
POSSIBLE. ANY DUMPSTER WITHIN 20 FEET OF A BUILDING WILL
REMAIN COVERED WHEN NOT IN USE. CONTRACTOR SHALL USE
TEMPORARY MARKING AND SIGNS TO INDICATE DUMPSTER
PLACEMENT.
4. THE CONTRACTOR SHALL STORE MATERIALS AND EQUIPMENT ONLY
WITHIN THEIR AUTHORIZED CONSTRUCTION SITE. THE CONTRACTOR
MAY BE AUTHORIZED (AT THEIR OWN EXPENSE) ONE 20' TEMPORARY
STORAGE CONTAINER TO STORE MATERIALS AND EQUIPMENT ON-SITE
OR AT THE CSR CAMPUS, DEPENDING ON SPACE AVAILABILITY. THE
CONTRACTOR SHALL REQUEST STORAGE SPACE FOR A TEMPORARY
STORAGE CONTAINER FROM THE COR. IF APPROVED, THE COR WILL
DESIGNATE WHERE THE TEMPORARY STORAGE CONTAINER SHALL BE
LOCATED. ANY ADDITIONAL STORAGE SPACE SHALL BE LOCATED AT THE
CSR CAMPUS. THE VA IS NOT RESPONSIBLE FOR ANY DAMAGES THAT
MAY OCCUR TO THE TEMPORARY STORAGE CONTAINER WHILE ON RLR
VAMC PROPERTY. IF APPROVED, THE TEMPORARY STORAGE CONTAINER
SHALL BE:
a. LABELED INCLUDING THE COMPANY NAME, CONTACT
INFORMATION, AND PROJECT(S) NAME.
b. PAINTED IN A SINGLE COLOR, LIMITED TO NO RUST, CLEAN, WITH
NO BRANDING, ADVERTISEMENTS, OR GRAFFITI.
c. LOCKED AND LOCATED ONLY IN THE SPACE AUTHORIZED BY THE
COR.
d. USED FOR STORAGE OF MATERIALS AND EQUIPMENT FOR THE
SPECIFIC PROJECT ONLY.
e. NOT USED FOR A WORKING SPACE. ONLY WORK ASSOCIATED WITH
STORING OR PICKING OF MATERIALS IS ALLOWED.
f. CLEANED AND MAINTAINED DAILY. THE IMMEDIATE AREA (10')
AROUND THE TEMPORARY STORAGE CONTAINER SHALL BE
INSPECTED DAILY BY THE CONTRACTOR TO ENSURE TRASH AND
DEBRIS ARE REMOVED.
g. NOT USED TO STORE PROHIBITED OR ILLEGAL ITEMS, SUCH AS GUNS, CHEMICALS, HEATERS, OR MATERIALS THAT MAY REQUIRE
TEMPERATURE CONTROL.
h. REMOVED WITHIN 15 DAYS AFTER THE PROJECT CLOSEOUT OR THE
FINAL INVOICE PAYMENT.
CONSTRUCTION KEY NOTES
KEY NO. DESCRIPTION
1 AS PART OF BASE BID, ONCE UPSTREAM
CONSTRUCTION IS COMPLETE,
CONTRACTOR SHALL CLEAR DEBRIS FROM
503 LINEAR FEET OF STORM SEWER. AFTER
CLEARING, CONTRACTOR SHALL PROVIDE
VIDEO TO VA COR OF ENTIRE LENGTH OF
STORM SEWER.
EXISTING CONCRETE
EXISTING ASPHALT
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING CONCRETE
EXISTING CONCRETE
EXISTING ASPHALT
BLDG 19
BLDG 21
POLICE
BLDG 23
MAINT. SHOP
BLDG 22
W
W W
W
W
W W
W W
W W W W W W W
W
UGF
UG
F
X X X
X
X
8 69
SA
SA
SA
ST
ST ST
SA
ST
SA
ST
W W
W
W
W W
W W
W
W W
W W
W W
W
W
W
W
W
W
W
W W W
W
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
W W
W W
ST
EA
M
ST
EA
M
STEAM
STEAM
STEAM
STEAM
X X
X
X
X
X
X
X
X
X
ST
10360 ELLISON CIRCLE,
OMAHA, NE 68134
Phone: 402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
Au to de sk
D oc s:
//2
VA
In di an ap ol is
E le ct ric al P an el
R ep la ce m en t P ro je ct
/5
-1
.G I.B
_2
3.
rv t 9/
4/
1:
:2
AM
REPLACE ELECTRICAL PANELS
& EXPAND DISTRIBUTION
1481 W. 10TH STREET, INDIANAPOLIS, IN 46202
583-22-106
06/01/2026
23359
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
Revisions: Date:
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRI TY FEDERA
L
SERV I CES
GLS AR/PS
STORM WATER POLLUTION
GC101
Scale: 1" = 10'
STORM WATER POLLUTION PREVENTION PLAN1
PREVENTION PLAN, DETAILS,
CONCRETE WASHOUT2 TEMPORARY INLET PROTECTION3
CONCRETE WASHOUT
PER PHASE TEMP. INLET PROTECTION
TEMP. INLET PROTECTION
3.3 IMPLEMENTATION REQUIREMENTS
THE FOLLOWING MINIMUM STANDARDS APPLY TO ACTIVITIES PERFORMED FOR THIS
PROJECT:
1. PUBLIC ROADWAYS AND ROADWAYS NOT EXCLUSIVE TO
CONSTRUCTION TRAFFIC MUST BE KEPT CLEARED OF ACCUMULATED
SEDIMENT THAT IS A RESULT OF RUN-OFF OR TRACKING. THE
FOLLOWING MINIMUM CONDITIONS ARE APPLICABLE:
A. CLEARING OF SEDIMENT MUST NOT INCLUDE THE UTILIZATION OF
MECHANICAL METHODS THAT WILL RESULT IN MOBILIZATION OF
DUST OFF THE PROJECT SITE OR FLUSHING THE AREA WITH
WATER UNLESS THE FLUSHED WATER IS DIRECTED TO AN
APPROPRIATE SEDIMENT CONTROL MEASURE.
B. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED OF
IN A MANNER THAT IS IN ACCORDANCE WITH ALL APPLICABLE
STATUTES AND REGULATIONS.
C. SEDIMENT DISCHARGED OR TRACKED ONTO ROADWAYS THAT
ARE OPEN TO TRAFFIC MUST BE REMOVED AS DIRECTED BY A
REGULATORY AUTHORITY OR AT A MINIMUM, REMOVED BY THE
END OF THE SAME DAY.
2. PHASING OF CONSTRUCTION ACTIVITIES MUST BE USED, WHEN
FEASIBLE, TO MINIMIZE THE FOOTPRINT OF DISTURBED UNSTABLE
AREAS.
3. MINIMIZE THE GENERATION OF DUST THROUGH DUST SUPPRESSION
TECHNIQUES TO PREVENT DEPOSITION INTO WATERS OF THE STATE
AND AREAS LOCATED BEYOND THE PERMITTED BOUNDARIES OF THE
SITE.
4. STABLE CONSTRUCTION SITE ACCESS MEASURES MUST BE PROVIDED
AT ALL POINTS OF CONSTRUCTION TRAFFIC INGRESS AND EGRESS TO THE
PROJECT SITE. WHERE THE SELECTED MEASURE IS NOT EFFECTIVE, AN
ALTERNATIVE MEASURE OR ADDITIONAL CONTROLS MUST BE UTILIZED TO
MINIMIZE TRACKING. ALTERNATIVE MEASURES MAY INCLUDE, BUT ARE
NOT LIMITED TO, WHEEL WASH SYSTEMS AND RUMBLE STRIPS.
5. DURING THE PERIOD OF CONSTRUCTION ACTIVITIES, ALL STORMWATER
MANAGEMENT MEASURES NECESSARY TO MEET THE REQUIREMENTS
OF THIS PERMIT MUST BE MAINTAINED. ALTERNATIVE MEASURES MUST
BE SELECTED AND IMPLEMENTED, AS NECESSARY.
6. DISCHARGE WATER FROM DEWATERING OF GROUND WATER FROM
EXCAVATIONS, TRENCHES, FOUNDATIONS, ETC. SHOULD FOLLOW
SPECIFICATION SECTION 31 23 19 AND MUST NOT BE DISCHARGED
WHEN:
A. SEDIMENT-LADEN WATER IS NOT FIRST DIRECTED TO AN
APPROPRIATE SEDIMENT CONTROL MEASURE OR A SERIES OF
CONTROL MEASURES THAT MINIMIZES THE DISCHARGE OF THE
SEDIMENT.
B. A VISIBLE SHEEN AND/OR POLLUTANTS ARE PRESENT AT A LEVEL
THAT REQUIRES ADDITIONAL TREATMENT AND/OR AN ALTERNATE
PERMIT.
7. APPROPRIATE MEASURES MUST BE IMPLEMENTED TO ELIMINATE
WASTES OR UNUSED BUILDING MATERIALS INCLUDING, BUT NOT
LIMITED TO GARBAGE, DEBRIS, CLEANING WASTES, WASTEWATER,
CONCRETE OR CEMENTITIOUS WASHOUT WATER, MORTAR/MASONRY
PRODUCTS, SOIL STABILIZERS, LIME STABILIZATION MATERIALS, AND
OTHER SUBSTANCES FROM BEING CARRIED FROM A PROJECT SITE BY
RUN-OFF OR WIND. WASTES AND UNUSED BUILDING MATERIALS MUST
BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH ALL
APPLICABLE STATUTES AND REGULATIONS.
8. CONSTRUCTION AND DOMESTIC WASTE MUST BE MANAGED TO
PREVENT THE DISCHARGE OF POLLUTANTS AND WINDBLOWN DEBRIS.
SURPLUS PLASTIC OR HARDENED CONCRETE/CEMENTITIOUS
MATERIALS ARE NOT REQUIRED TO BE PLACED IN TRASH
RECEPTACLES AND ARE CONSIDERED CLEAN FILL THAT MAY REUSED,
DISPOSED OF ON-SITE, OR RECYCLED IN ACCORDANCE WITH
APPLICABLE STATE AND FEDERAL REGULATIONS. MANAGEMENT OF
WASTE MATERIALS MAY INCLUDE, BUT ARE NOT LIMITED TO:
A. WASTE CONTAINERS (TRASH RECEPTACLES), WHEN SELECTED
TO MANAGE WASTE, MUST BE MANAGED TO REDUCE THE
DISCHARGE OF POLLUTANTS AND BLOWING OF DEBRIS.
RECEPTACLES THAT ARE NOT APPROPRIATELY MANAGED WILL
REQUIRE ALTERNATIVES THAT INCLUDE BUT ARE NOT LIMITED
TO:
a.A COVER (E.G., LID, TARP, PLASTIC SHEETING, TEMPORARY
ROOF) TO MINIMIZE EXPOSURE OF WASTES TO
PRECIPITATION OR
ii. A SIMILARLY EFFECTIVE METHOD DESIGNED TO MINIMIZE THE
DISCHARGE OF POLLUTANTS.
B. WASTE THAT IS NOT DISPOSED OF IN TRASH RECEPTACLES MUST
BE PROTECTED FROM EXPOSURE TO THE WEATHER AND/OR
REMOVED AT THE END OF THE DAY FROM THE SITE AND
DISPOSED OF PROPERLY.
9. CONCRETE OR CEMENTITIOUS WASHOUT AREAS, WHERE WASHOUT IS
PERMISSIBLE, MUST BE IDENTIFIED FOR THE SITE AND THE LOCATIONS
CLEARLY POSTED. WASH WATER MUST BE DIRECTED INTO LEAK-PROOF
CONTAINERS OR LEAK-PROOF CONTAINMENT AREAS WHICH ARE
LOCATED AND DESIGNED TO DIVERT RUN-OFF AWAY FROM THE
MEASURE AND SIZED TO PREVENT THE DISCHARGE AND/OR OVERFLOW
OF THE WASH WATER.
10.FERTILIZER APPLICATIONS ASSOCIATED WITH THE STABILIZATION PLAN
FOR THE PROJECT MUST MEET THE FOLLOWING REQUIREMENTS:
A. APPLY FERTILIZER AT A RATE AND AMOUNT AS DETERMINED BY A
SOIL ANALYSIS OR IN ACCORDANCE WITH THE INDIANA
STORMWATER QUALITY MANUAL OR SIMILAR GUIDANCE
DOCUMENTS.
B. APPLY FERTILIZER AT AN APPROPRIATE TIME OF YEAR FOR THE
PROJECT LOCATION, TAKING INTO CONSIDERATION PROXIMITY
TO A WATERBODY, AND PREFERABLY TIMED TO COINCIDE WITH
THE PERIOD OF MAXIMUM VEGETATIVE UPTAKE AND GROWTH.
C. AVOID APPLYING FERTILIZER IMMEDIATELY PRIOR TO
PRECIPITATION EVENTS THAT ARE ANTICIPATED TO RESULT IN
STORMWATER RUN-OFF FROM THE APPLICATION AREA.
11.PROPER STORAGE AND HANDLING OF MATERIALS, SUCH AS FUELS OR
HAZARDOUS WASTES, AND SPILL PREVENTION AND CLEAN-UP
MEASURES MUST BE IMPLEMENTED TO MINIMIZE THE POTENTIAL FOR
POLLUTANTS TO CONTAMINATE SURFACE OR GROUND WATER OR
DEGRADE SOIL QUALITY. TO MEET THIS REQUIREMENT:
A. PROPER PROJECT MANAGEMENT AND THE UTILIZATION OF
APPROPRIATE MEASURES INCLUDING, BUT NOT LIMITED TO,
ELIMINATING A SOURCE OR THE EXPOSURE OF MATERIALS MUST
BE COMPLETED.
B. MANAGE THE FOLLOWING ACTIVITIES:
i. FUELING AND MAINTENANCE OF EQUIPMENT.
ii. WASHING OF EQUIPMENT AND VEHICLES.
iii.STORAGE, HANDLING, AND DISPOSAL OF CONSTRUCTION
MATERIALS, PRODUCTS, AND WASTES.
iv.APPLICATION OF PESTICIDES, HERBICIDES, INSECTICIDES, AND FERTILIZERS v.DISPENSING AND UTILIZATION OF DIESEL FUEL, OIL, HYDRAULIC FLUIDS, OTHER PETROLEUM PRODUCTS, AND
OTHER CHEMICALS.
vi.HANDLING AND DISPOSAL OF HAZARDOUS WASTES, INCLUDING, BUT NOT LIMITED TO PAINTS, SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS.
vii. WASHING OF APPLICATORS AND CONTAINERS USED FOR
PAINT, GROUT, OR OTHER MATERIALS.
12.PERSONNEL ASSOCIATED WITH THE PROJECT MUST BE INFORMED OF
THE TERMS AND CONDITIONS OF THIS PROJECT AND THE
REQUIREMENTS WITHIN THE SWP3. THE CONTRACTOR IS REQUIRED TO
DOCUMENT THIS PROCESS. INFORMATION MUST BE PROVIDED
THROUGH WRITTEN NOTIFICATION, CONTRACTS, OR OTHER MEANS (I.E.
, PRE-CONSTRUCTION MEETINGS) THAT EFFECTIVELY COMMUNICATES
THE PROVISIONS AND REQUIREMENTS OF THE PERMIT AND SWP3.
PERSONNEL MAY INCLUDE, BUT ARE NOT LIMITED TO:
A. GENERAL CONTRACTORS, CONSTRUCTION MANAGEMENT FIRMS,
GRADING OR EXCAVATING CONTRACTORS, AND TRADE INDUSTRY
REPRESENTATIVES (I.E., CONCRETE INDUSTRY) ASSOCIATED
WITH THE OVERALL PROJECT.
B. CONTRACTORS OR INDIVIDUAL LOT OPERATORS THAT HAVE
PRIMARY OVERSIGHT ON INDIVIDUAL BUILDING LOTS.
C. THOSE RESPONSIBLE FOR THE IMPLEMENTATION OF THE SWP3,
AND THE INSTALLATION, REPAIR, AND MAINTENANCE OF
STORMWATER MEASURES.
D. THOSE RESPONSIBLE FOR THE APPLICATION AND STORAGE OF
TREATMENT CHEMICALS.
E. THOSE RESPONSIBLE FOR ADMINISTERING THE
SELF-MONITORING PROGRAM (SMP).
13.IF A NOTICE IS REQUIRED, IT MUST BE POSTED NEAR THE MAIN
ENTRANCE OF THE PROJECT SITE OR AT A PUBLICLY ACCESSIBLE
LOCATION. FOR LINEAR PROJECT SITES, SUCH AS A PIPELINE OR
HIGHWAY, THE NOTICE MUST BE PLACED IN A PUBLICLY ACCESSIBLE
LOCATION NEAR THE PROJECT FIELD OFFICE.
A. THE NOTICE MUST BE MAINTAINED IN A LEGIBLE CONDITION AND
INCLUDE:
i. A COPY OF THE COMPLETED NOI OR A DOCUMENT THAT AT A
MINIMUM CONTAINS THE INFORMATION IN SECTION 5.2 (A)(1),
(A)(3), (A)(6)(A), (A)(6)(E), AND (A)(10).
ii. DOCUMENTATION CONTAINED IN SECTION 3.7 (A)(3)(A).
iii.THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM
(NPDES) PERMIT NUMBER(S), UPON RECEIPT.
iv.THE LOCATION OF THE CONSTRUCTION PLAN/SWP3 IF THE
PROJECT SITE DOES NOT HAVE AN ON-SITE LOCATION TO
STORE THE PLAN.
SITE SWPP IMPLEMENTATION REQUIREMENTS:
AND NOTES
TEMP. INLET PROTECTION
NOTES:
1. USE NONWOVEN GEOTEXTILE MATERIAL.
2. LIFT GRATE AND WRAP WITH NONWOVEN GEOTEXTILE HARDWARE
CLOTH TO COMPLETELY COVER ALL OPENINGS, SECURE WITH WIRE
TIES AND SET GRATE BACK IN PLACE.
3. STORM DRAIN INLET PROTECTION REQUIRES FREQUENT
MAINTENANCE. REMOVE ACCUMULATED SEDIMENT AFTER EACH RAIN
EVENT TO MAINTAIN FUNCTION AND AVOID PREMATURE CLOGGING. IF
INLET PROTECTION DOES NOT COMPLETELY DRAIN WITHIN 25 HOURS
AFTER A STORM EVENT, IT IS CLOGGED. WHEN THIS OCCURS,
REMOVE ACCUMULATED SEDIMENT AND CLEAN, OR REPLACE
GEOTEXTILE MATERIAL
NOTES:
1. THE WASHOUT SHALL BE INSTALLED PRIOR TO USING
MATERIALS THAT REQUIRE WASHOUT ON THIS PROJECT.
2. AS NECESSARY, SIGNS SHALL BE PLACED THROUGHOUT THE
SITE TO INDICATE THE LOCATION OF THE WASHOUT.
3. THE WASHOUT AREA WILL BE REPLACED AS NECESSARY TO
MAINTAIN CAPACITY FOR LIQUID WASTE.
4. WASHOUT RESIDUE SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF AT AN APPROVED WASTE FACILITY.
5. DO NOT WASHOUT INTO STORM DRAINS, OPEN DITCHES,
STREETS, OR STREAMS.
6. AVOID DUMPING EXCESS CONCRETE IN NON-DESIGNATED
DUMPING AREAS.
7. LOCATE WASHOUT AT LEAST 50' (15 METERS) FROM STORM
DRAIN, OPEN DITCHES, OR WATER BODIES.
8. THE WASHOUT SHALL BE USED ONLY FOR NON-HAZARDOUS
WASTES.
9. LET WASHOUT SET OR EVAPORATE BEFORE LIFTING. DO NOT
MOVE WET.
TEMP. INLET PROTECTION
TEMP. INLET PROTECTION
EX. SAN
LIFT STN.
EX. CONC.
SIDEWALK
EX
. P
VC
F
EN
CE
EX. WALL
EX. STAIRS
EX
. W
AL
L
EX. WALL
EX
. W
AL
L
EX
. C
ON
C.
S
ID
EW
AL
K
DEDUCT ALTERNATE 02
PHASE LIMIT LINES / LIMITS OF DISTURBANCE
DEMOLITION LEGEND:
CONCRETE WASHOUT
INLET PROTECTION
TRANSFORMER
PAD
HVAC
PAD
EXISTING
FLAMMABLE
STORAGE LOCKER
EX. STM EX.STM
EX.STM
INCLUDE WITH DEDUCT ALT.
INCLUDE WITH DEDUCT ALT.
FILTER BAG (FB)
(FOR TRENCHING AREA)
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE
UGEUGE
UGEUGE
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGEUGE
UGE
UGE UGE UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
W
W W
W W
W
W
W W
UGE
UGE
UG
E
UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UG
E
W W
W W W W W W W
W
UGF
UG
F
0+0
1+00
2+00
2+34
UGE UGE UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
X X X
X
X
8 69
SA
SA
SA
ST
ST ST
SA
SA
ST
W
W W
W W
W
W
W W
W W
W W
W W
W W
W
W
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM
STEAM STEAM STEAM STEAM STEAM STEAM STEAM
STEAM
STEAM
STEAM
W
X X
X
X
X
X
X
X
X
X
ST
VA HOSPITAL
BUILDING #1
A-WING
BLDG 19
BLDG 21
POLICE
BLDG 23
MAINT. SHOP
BLDG 22
CHILLER
PLANT
VA HOSPITAL
BUILDING #1
B-WING
EX. RET. WALL W/ RAILING
EX. CONCRETE
SIDEWALK
EX. STAIRS
EX
. W
AL
L
EX. SAN LIFT
STATION
EX. RET. WALL
EX
. C
ON
CR
ET
E
W
AL
K
EX. ASPHALT DRIVEWAY
WITH CONCRETE CURB/GUTTER
EX. CONCRETE WALK
EX
. W
AL
L
EX. C
ONCRETE
W
ALK
W
HANDRAIL
" S
TO
RM
EX. STM
EX. STM
10360 ELLISON CIRCLE,
OMAHA, NE 68134
Phone: 402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
Au to de sk
D oc s:
//2
VA
In di an ap ol is
E le ct ric al P an el
R ep la ce m en t P ro je ct
/5
-1
.G I.B
_2
3.
rv t 9/
4/
1:
:2
AM
REPLACE ELECTRICAL PANELS
& EXPAND DISTRIBUTION
1481 W. 10TH STREET, INDIANAPOLIS, IN 46202
583-22-106
06/01/2026
23359
FINAL CONSTRUCTION
DOCUMENT BID SET (CDBS)
Revisions: Date:
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRI TY FEDERA
L
SERV I CES
GLS AR/PS
SITE DEMOLITION PLAN
CD101
1. THE DEMOLITION PLAN IS A GENERAL GUIDE OF WHAT NEEDS TO BE DEMOLISHED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY ALL ITEMS THAT REQUIRE DEMOLITION TO COMPLETE THE
PROPOSED CONSTRUCTION.
2. WHERE A PORTION OF A CONCRETE AND ASPHALT AREA IS BEING DEMOLISHED ALL EDGES TO BE SAW
CUT. SAWCUTS WILL COMPLY WITH OSHA AND EPA REGULATIONS.
3. ALL CONCRETE AND ASPHALT REMOVAL TO INCLUDE PAVEMENT SUB BASE.
4. ALL EXISTING SITE FEATURES, UTILITIES, AND OTHER EXISTING CONDITIONS NOT PROPOSED TO BE
REMOVED OR DEMOLISHED ARE TO REMAIN OR BE REPLACED IN KIND IF DAMAGED.
5. CONTRACTOR IS REQUIRED TO USE A PRIVATE UTILITY LOCATOR AND POT HOLE TECHIQUE TO IDENTIFY
THE LOCATIONS OF ALL EXISTING UTILITIES BEFORE CONSTRUCTION BEGINS.
6. CONTRACTOR TO SHOW STEEL PLATES OVER TRENCHING WHERE NECESSARY TO ALLOW TRUCK TRAFFIC
ACCESS AT ALL TIMES.
7. CONTRACTOR SHALL PROVIDE AND MAINTAIN A TEMPORARY SECURITY FENCE FOR EACH PHASE OF THE
DEMOLITION AND CONSTRUCTION. PRIOR TO REMOVING FENCE AND THE START OF THE NEXT PHASE, THE CONTRACTOR SHALL HAVE COMPLETED ALL NECESSARY WORK AND RETURNED THE AFFECTED LIMITS OF
DISTURBANCE TO EXISTING CONDITION.
8. CONTRACTOR SHALL PROVIDE SHORING FOR EXCAVATIONS AT OR DEEPER THAN 4 FEET.
DEMOLITION NOTES:
DEMOLITION LEGEND:
EXISTING CONCRETE, SIDEWALK, AND CURB TO BE REMOVED. REMOVE
CONCRETE TO THE NEAREST JOINT, CONTRACTOR SHALL NOTE THAT THE
NEAREST JOINT MAY BE OUTSIDE THE AREA HIGHLIGHTED FOR
DEMOLITION.
EXISTING CONCRETE CURB AND GUTTER TO BE REMOVED
EXISTING ASPHALT TO BE REMOVED
EXISTING GRAVEL TO BE REMOVED
DEDUCT ALTERNATE 02
CONTRACTOR SHALL MAINTAIN AT LEAST HALF OF THE POLICE
PARKING STALLS OPEN AND BUILDING SHALL BE ACCESSIBLE AT
ALL TIMES DURING CONSTRUCTION.
PHASE LIMIT LINES / LIMITS OF DISTURBANCE
PHASE LINE
DEMOLITION KEY NOTES
DEMOLITION AND CONSTRUCTION SHALL BE COMPLETED IN TWO (2) PHASES TO MAINTAIN ACCESS
TO BUILDING 21 AND POLICE PARKING. EACH PHASE MUST BE BACK FILLED, COMPACTED TO
GRADE PRIOR TO BEGINNING NEXT PHASE. AT LEAST HALF OF THE POLICE PARKING STALLS
SHALL REMAIN OPEN AND ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION.
CONTRACTOR SHALL PROVIDE AND MAINTAIN A TEMPORARY MAN DOOR SAFETY BARRICADE.
CONTRACTOR SHALL SAW CUT ASPHALT TO A NEAT EDGE.
CONTRACTOR SHALL SAWCUT CONCRETE ALONG AND/OR UP TO NEAREST EXISTING JOINT.
EXISTING JOINT MAY BE LOCATED OUTSIDE OF THE WORK AREA DEPICTED ON THE DEMOLITION
PLAN.
REMOVE EXISTING SIDEWALK RAMP AND TRUNCATED DOME PANEL.
REMOVE CONCRETE CURB AND GUTTER BACK TO EXISTING JOINT. EXISTING JOINT MAY BE
LOCATED OUTSIDE OF THE WORK AREA DEPICTED ON THE DEMOLITION PLAN.
REMOVE PORTION OF EXISTING GUARD RAIL NECESSARY TO INSTALL ELECTRICAL CONDUIT.
CONTRACTOR SHALL PROTECT EXISTING CONCRETE STEPS NECESSARY TO INSTALL ELECTRICAL
CONDUIT. CONTRACTOR SHALL REPLACE STEPS IN KIND IF DAMAGED DURING CONSTRUCTION.
CONTRACTOR SHALL SUPPORT AND PROTECT THE EXISTING WATER VALVE THROUGHOUT
CONSTRUCTION.
CONTRACTOR SHALL PROTECT EXISTING CONDUITS LOCATED ALONG THE NORTH SIDE OF BLDG
21.
CONTRACTOR SHALL REMOVE TOPSOIL AND ENOUGH SOIL TO CONSTRUCT CONCRETE PADS.
OBTAIN SOIL SAMPLE AND HAVE GEOTECHNICAL ENGINEER DETERMINE: PROCTOR LIMITS,
MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF SUBBASE SOIL. CONTRACTOR
SHALL COMPACT AREA TO 98% MAXIMUM DRY DENSITY, STANDARD PROCTOR PER ASTM D698.
KEY NO. DESCRIPTION
NOT USED
GRAVEL TO BE REMOVED
CONTRACTOR SHALL INSTALL AND MAINTAIN A SEVEN (7') FOOT TALL TEMPORARY FENCE AND
GATE(S) PER SPECIFICATION FOR EACH PHASE OF CONSTRICTION.
CONTRACTOR TO PROTECT EXISTING ELECTRICAL PANEL AND METER.
CONTRACTOR SHALL RELOCATE FLAMMABLE STORAGE LOCKER PRIOR TO START OF
CONSTRUCTION, LOCATION TO BE COORDINATED WITH VA COR. CONTRACTOR SHALL RESET
LOCKER AT ORIGINAL LOCATION PRIOR TO END OF CONSTRUCTION
DEDUCT ALTERNATE #2. CONTRACTOR SHALL REMOVE SIDEWALK, EXPOSE AND DISCONNECT
EXISTING STORM LATERAL CONNECTION. REMOVE OBSTRUCTION. RECONNECT AND GROUT
LATERAL TO STORMLINE.
CONTRACTOR TO PROTECT EXISTING CURB AND HANDRAIL THROUGHOUT CONSTRUCTION.
CONTRACTOR SHALL CONTRACT LICENSED PROFESSIONAL SURVEYOR AND UNDERGROUND
UTILITY LOCATION COMPANY TO PERFORM TOPOGRAPHY AND UTILITY LOCATION SURVEY OF THE AREA WITHIN THE LIMITS OF DISTURBANCE AS DEFINED IN THE SITE SURVEY SPECIFICATION.
STORM LATERALS AND INVERT INFORMATION ARE SHOWN PER SHEET NUMBER C101 LAYOUT FROM
THE STORM DRAIN CLEANING PROJECT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .