These are construction drawings for boardwalk improvements at Bodie Island Lighthouse within Cape Hatteras National Seashore, located at 8210 Bodie Island Lighthouse Road in North Carolina. The project, managed by the National Park Service (U.S. Department of Interior), encompasses demolition and reconstruction of approximately 3,300 linear feet of boardwalk with associated infrastructure improvements.
The scope of work includes removal of existing boardwalk planks, joists, piles, railing posts, and metal hardware; construction of a new boardwalk with 2x8 treated lumber planks on 2x10 joists; installation of new 1-1/4" diameter schedule 40 metal handrails with stainless steel fasteners; replacement of fiberglass piles (both single 18" diameter and double 12" diameter configurations); concrete header wall construction; and restoration of an existing comfort station structure. The project is divided into three sections with varying construction details. Base bid work covers all section 3 demo and repair, while Bid Option 1 includes demo and rebuild of Section 1. Special inspections are required for soil and foundations, concrete construction, anchoring systems, wood construction, and driven deep foundation elements per IBC standards. All materials must comply with state and local standards, and the contractor bears responsibility for field verification of existing conditions, utility coordination, erosion control, and environmental protection throughout the construction period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
054791
SEAL
John Blom Digitally signed by John Blom Date: 2025.10.10 13:44:31 -06'00'
BASE BID AND BID OPTIONS SHEET INDEX
SHEET BASE BID/
BID OPTION DESCRIPTION
Sheet List Table Sheet Title Page
Number Sheet Subset Number
GENERAL
CIVIL
John Blom Digitally signed by John Blom
13:57:36 -06'00'
Blom
13:58:29 -06'00'
A
A A
A SECTION
A DETAIL
Blom
13:59:20 -06'00'
Blom
14:00:32 -06'00'
PROJECT CONTROL: 12" BRIDGE SPIKE
NC GRID (NAD83/2011)
N: 770,547.028 E: 3,018,390.706
ELEV: 2.79'
OWNER: US GOVERNMENT
PID# 025076998
PIN# 0717-0068-5112
DB: 1907, PG: 359
SITE DATA FOR
8210 BODIE ISLAND LIGHTHOUSE RD.
PROJECT CONTROL: 12" BRIDGE SPIKE
LOCALIZED COORDINATES
N: 770,615.663 E: 3,018,752.787
ELEV: 1.58'
OWNER: US GOVERNMENT
PID# 025076998
PIN# 0717-0068-5112
DB: 1907, PG: 359
OWNER: US GOVERNMENT
PID# 025076998
PIN# 0717-0068-5112
DB: 1907, PG: 359
OWNER: US GOVERNMENT
PID# 025076998
PIN# 0717-0068-5112
DB: 1907, PG: 359
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
PLAN VIEW - STAGING AND CONSTRUCTION AREA
050' 50' 100'
SCALE OF FEET
EW EW EW
STAGING AND
CONSTRUCTION AREA
10 38 John Blom
Digitally signed by John Blom
14:01:30 -06'00'
OW
8210 BOD
PROJECT CONTROL: 12" BRIDGE SPIKE
NC GRID (NAD83/2011)
N: 770,547.028 E: 3,018,390.706
ELEV: 2.79'
PROJECT CONTROL: 12" BRIDGE SPIKE
LOCALIZED COORDINATES
N: 770,615.663 E: 3,018,752.787
ELEV: 1.58'
OWNER: US GOVERNMENT
PID# 025076998
PIN# 0717-0068-5112
DB: 1907, PG: 359
SITE DATA FOR
8210 BODIE ISLAND LIGHTHOUSE RD.
Blom
14:02:18 -06'00'
PLAN VIEW
KEY MAP
1 SECTION 1 TYPICAL CONSTRUCTION 2 COMFORT STATION CONSTRUICTION
G B
GB
John Blom Digitally signed by John Blom
14:03:02 -06'00'
1 BOARDWALK TO BATHROOM FRAMING 2 SECTION 2 TYPICAL CONSTRUCTION
G B
+7
John Blom Digitally signed by John Blom
14:03:59 -06'00'
KEYMAP
G B
John Blom Digitally signed by John Blom
14:05:03 -06'00'
B
G B
G B G B G B
John Blom Digitally signed by John Blom
14:06:33 -06'00'
G B
John Blom Digitally signed by John Blom
14:07:36 -06'00'
1 OVERALL IMAGE SECTIONS
2 BENCHES ON VIEWING PLATFORM
3 CENTERED FIBERGLASS PILES
5 DOUBLE FIBERGLASS PILES WITH METAL CABLES
4 RAILINGS AND PLANKS SECTIONS
GB
G B G B
GB
GB
G B
G B
John Blom Digitally signed by John Blom
14:08:32 -06'00'
OW
8210 BOD
OWNER: US GOVERNMENT
PID# 025076998
PIN# 0717-0068-5112
DB: 1907, PG: 359
SITE DATA FOR
8210 BODIE ISLAND LIGHTHOUSE RD.
Blom
14:09:24 -06'00'
G B
G B
G B
GB
John Blom Digitally signed by John Blom
14:10:22 -06'00'
B
+7
John Blom Digitally signed by John Blom
14:11:22 -06'00'
B
John Blom Digitally signed by John Blom
14:13:15 -06'00'
PLAN VIEW PLAN VIEW
KEYMAP
G B
G B
G B
G B
G B
G B
G B
G B
G B
G B
John Blom Digitally signed by John Blom
14:14:09 -06'00'
G B
G B
G B
GB
John Blom Digitally signed by John Blom
14:15:19 -06'00'
PLAN VIEW
KEYMAP
GB
G B G B
GB
GB
G B
G B
John Blom Digitally signed by John Blom
14:16:48 -06'00'
PROFILE VIEW - BOARDWALK
PLAN VIEW - BOARDWALK
John Blom Digitally signed by John Blom
14:17:55 -06'00'
1000 GENERAL
Blom
14:18:47 -06'00'
2000 FOUNDATION
3000 CONCRETE
Blom
14:22:12 -06'00'
5000 STRUCTURAL STEEL
6000 WOOD
7000 FIBERGLASS PILES
Blom
14:23:18 -06'00'
SPECIAL INSPECTIONS, AND TESTING SCHEDULE
SOIL AND FOUNDATIONS (IBC 1705.6)
CONCRETE CONSTRUCTION (IBC 1705.3)
ANCHORING SYSTEMS
WOOD CONSTRUCTION (IBC 1705.5)
DRIVEN DEEP FOUNDATION ELEMENTS (1705.7)
John Blom Digitally signed by John Blom
14:25:28 -06'00'
Blom
14:27:41 -06'00'
John Blom Digitally signed by John Blom
14:29:09 -06'00'
John Blom Digitally signed by John Blom
14:30:05 -06'00'
Digitally signed by John Blom
14:31:48 -06'00'
John Blom Digitally signed by John Blom
14:32:58 -06'00'
Blom
14:34:35 -06'00'
Blom
14:35:57 -06'00'
Blom
14:38:02 -06'00'
Blom
14:39:43 -06'00'
File details come from the government source that posted it. Updated .