Drawings.pdf

PDF 2 MB Posted

Attached to
Repair Synthetic Turf, B#980, Camp Carroll
Solicitation number
W90VN9-21-R-0028
Issued by

View the file

Other files

File Type Posted
W90VN921R0028.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

R-11SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

O & M

HOUSING DIV.

REVIEWED BY

UNITED STATES ARMY GARRISON DAEGU

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

DIRECTORATE OF PUBLIC WORK

HGFEDCBA

D - 21 - 10

CHON, HYON TAE

DESIGN REVIEW SIGNATURE

ORGANIZATION

USING AGENCY

36TH SIGNAL

MASTER PLN.

ENVIRONMENTAL

NAME SIGNATURE

O&M DIV.

FIRE DEPT.

SAFETY OFFICE

DPTMS(AT/FP)

188TH MP COM.

IND. HYGENIST

HR-00517-0J

UNIT #15746, APO AP 96218-5746

DRAWING NO.

CHIEF,

DESIGN & TECH. REVIEW Br.

YI, TONG KI

AS SHOWN

1 1 OF 1R - 1

T I T L E S H E E T

TITLE SHEET

DATE: 08 APR 21

C - 12

C - 23

C - 34

S-980 (LUTHER H. STORY FIELD)

REPLACE INFIELD SYNTHETIC TURF,

PROJECT NO. HR-00517-0J, CAMP CARROLL

S-980 (LUTHER H. STORY FIELD)

REPLACE INFIELD SYNTHETIC TURF,

CAMP CARROLL

CIVIL

LOCATION PLAN

SITE LAYOUT PLAN

C - 44 4 OF 4 SYNTHETIC TURF DETAILS

LINE MARKING DETAILS

S-940 Tennis Court

S-294 Court Tennis

S-296 Court Tennis

S-165 Volleyball Court

S-980

STORY FIELD

LUTHER H.

T-646

S-671

S-672

S-673

S-674

S -644

T-780

T-508

S-86

S -7

S -7

S -7

T -6

T -5

T -7

T -5

S-961

T-533

T -5

S-714

S -8

T-377

T-584

T -3

T-3

S-531

T-417

T-863

T-765

T-368

T-507

T-772

S-967

T-924

T-575

T-696S-603

T-928

T-691

S-102

T-521

T-558

T-989

T-342

T-681

T-343

S-965

T-116

T-504

T-315

T-385

T-617

T-661

T-693

T-766

T-764

T-768

T-769

T-271

T-763

T-160

T-299

T-414

T-413

T-104

S-153

T-120

S-954

S-994

T-653

CEMETERY

S-860 Substation Electrical

S-360 Substation Electrical

S-576 Substation Electrical

S-133 bridge Foot

T-522

Footbridge

S-990 Footbridge

T-849 Footbridge

T-986 Footbridge

GATE 2

GATE 1

GATE 4

GATE 3

Gate Access

Railroad

Gate Access Farmer

Gate Access Farmer

S-118 Electronic Sign

S-952 Electronic Sign

S-781

Flag Pole

S-390

DEAD MEMORIAL

KOREAN WAR

S-741 Land Farm

T re a tm e n t

B e d

T re a tm e n t

B e d

Pond Holding

S-730

RANGE

QUALIFICATION

ZERO AND

25M RIFLE S-725

TESTING POND

BRIDGING BOAT

AMPITHEATRE

CAC

T-729 Storage Yard

Container

S-847

S-865 Bridge

Railroad

S-300 Road Bridge

S-860 Road Bridge

S-900 Road Bridge

S-500 Road Bridge

S-861 Road Bridge

A R

K A

N S

A S

N E

B R

A S

K A A

V E

N U

E

N E

W Y

O R

K A

V E

N U

E

A R

K A

N S

A S A

V E

N U

E

O H

IO

A

V E

N U

E

G E

O R

G

IA

A

V E

N U

E

T E

X A

S A

V E

N U

E

M O

N T A N

A A

V E N

U E

AVENUE

ILLINOIS AVENUE

A R

IZ

O N

A A

V E

N U

E

TENNESSEE AVENUE

N E

B R

A S

K A A

V E

N U

E

A M

E R

IC

A N A

V E N

U E

A R

K A

N S

A S A

V E

N U

E

PENN AVENUE

M

IS

S

IS

S

IP

P I

A V

E N

U E

A V

E N

U E

OHIO AVENUE

A M

E R

IC

A N A

V E N

U E

KENTUCKY AVENUE

G E

O R

G

IA

A

V E

N U

E

FLORIDA AVENUE

MISSISSIPPI

NEVADA

N E

W

N E

B R

A S

K A A

V E

N U

E

A M

E R

IC

A N A

V E N

U E

NEW YORK AVENUE

GEORGIA AVENUE

N E

B R

A S

K A A

V E

N U

E

OREGON

A V E N

U E

A V E N

U E

A V E N

U E

Y O

R K

PENN AVENUE

T-534

T-677

T-659

T-311

T-386

T-700

T-826

T-619

T-376

S-114

T-519

T-625

S-983

S-984

S-387

T-509B

T-509-2

T-578 Vehicle Scales

T-509-1

S-284

T-115

S-401

S-269

Bus Stop 10

S-383 Bus Stop 9

S-933 Bus Stop 6

S-621 Vehicle Scales

S-701

T-369

S-378

T-89

T-513

S-669 Station

Hunter Brake

S-328

S-329

T-509C

T-503 Bus Stop 1

S-622

T-624

S-639

T-416

T-827

S-350

T-415

T-979

S-667

S-705

T-926

T-577

T-720 Bus Stop 5

T-412

T-509D

T-509A

DUMP POINT

INDUSTRIAL WASTE

RECYCLING CENTER AND S-839

S-835

S-665

S-840

S-837

S-836

S-605

S-606

S-607

S-608

S-985

S-955

S-709

S-510

S-326

S-530

S-818

S-817

S-135

S-620

S-151

S-821

S-405

T-645

S-846

T -5

S-327

S -5

S-970

S-117

S-601

S-684

S-138

S-388

S-139

S-668

S-831

S-825

S-917

S-915

S -9

S-612

S -9

S-256

S-111

S-233

S-563

S-110

S-711

T-

S-231

S-396

S-230

S-100 S-235

S-375

S -9

S-136

S-403

T-565

S-253

S-250

S-977

S-676

S-254

S-573

S-946

S-998

S-203

S-841

S-123

S-938

S-657

S-914

T-516

S-341

S-911

S-113

T-520

S-913

S-141 S-143

S-142

S-264

S-731

S-101

S -309

S -2

S -7

S -9

T -9

T -9

S -9

S -9

S -2

S -9

S -6

S-675

S-320

S -8

S -8

S -9

T -5

T -9

S-9

S -9

S -3

T-318

S -4

S -6

S -3

S -8

S-9

S -6

S -8

S -8

T-126

S-121

T-125

T-127

T-207

S -1

T-236

S -9

S -6

T-206

S -3

S -9

T -3

S -3

S-154

S -9

S -8

S-974

S-321

S-

S-910S -4

S-340

S -6

S -7

S-349

S-301

S -611

T -3

S -6

S -7

S -7

S-140

S -6

S-718

S -7

S-137

S -6

S-842

S-351

S-512

S-205

S -5

S-336

S-239

S -9

S -3

S-267

S-509

T-359

S -3

S-532

S -9

S-655

S-208

T -7

S-702

S-163

S-304

T-515

S-733

S-732

S-642

S-627

T-384

S -3

T -5

T -3

S-312

S-666

S-420

S-973

T -3

T-580

S-679

T-996

S-925

T-997

S-931

T-631

T -2

S-131

S-919

T -3

T-521

S-395

S-397

S-918

S-944

T-195

T-196

T-198

T-197

T-194

T-199

S-119

S-739

S-3

S-647

T-261

S-164

S-626

S-58

T-130

S-717

S-402

T-572

T-189

T-406

T-193

T-958

S-88

S-348

T-581

S-265

S-640

S-953

S-411

S-664

S-654

S-344

S-511

S-982

S-968

S-929

T-155

S-972

T-582

S-771

S-95

T-409

S-948

S-916

S-947

S-957

T-192

S-956

S-719

T-762

S-770

S-162

S-161

T-317 Tower Cooling

T-923

S-93

S-922

T-814

T-812

T-569

T-635

S-995

T-810

T-280

T-811

T-633

T-103

T-813

T-637

T-636

S-741

TRAINING

CONFINED SPACE

BURN BUILDING AND

T-724

RESCUE

FIRE FIGHTING

S-845 Washrack

S-693 Washrack

S-404 Washrack

S-976 Washrack

S-939 Washrack

S-987 Washrack

S-316 Washrack

S-927 Washrack

T-6

S-703

PLANT

TREATMENT

SEWAGE

S-820

S-87

S-150

S-144

PLANT

TREATMENT

WATER

WETLAND

CAMP CARROLL

S-978 Substation Electrical

S-870

CLINIC

HEALTH/DENTAL

S

DFAC

TEMF

1 4

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

1 LOCATION PLAN

1 SCALE : 1 / 5000

LOCATION PLAN

C-1

N

GRAPHIC SCALE

(IN METERS)

SCALE: 1 :5000

0 50 100 200

S T O

R A G E

O R

G A N

IZ

A T

IO

N A L

CAMP CARROLL

THIS PROJECT

SEE SITE LAYOUT PLAN

HR-00517-0J

KU, HUN MO

PARK, WON CHAE

S-980 (LUTHER H. STORY FIELD)

REPLACE INFIELD SYNTHETIC TURF,

D - 21 - 10

8 APR 21

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

GRAPHIC SCALE

SCALE: 1 : 200

4000 8000

SCALE : 1 / 200

SITE LAYOUT PLAN

SITE LAYOUT PLAN

GENERAL NOTES:

IF REQUIRED.

DETOUR ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD

5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND

ON THE PROJECT.

BY THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK

PORTION OF THE JOB BY THE COR AND SHOULD BE APPROVED

2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY

CONTRACTING OFFICER.

CONTRACTORS EXPENSE TO THE SATISFACTION OF THE

DAMAGED BY DISMANTLING, DEMOLISHING, OR REMOVING AT THE

RESTORATION TO THEIR ORIGINAL CONDITIONS OF THE ITEMS

3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/

AND OTHER UTILITY MARKERS IN THE PROJECT LIMIT.

6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS

FROST DEPTH UNLESS OTHERWISE NOTED.

8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF

WITHOUT ANY ADDITIONAL COST.

INCLUDING FALSEWORK SUCH AS FORMWORKS AND SHORING

9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES

APPROVAL PRIOR TO COMMENCING THE WORK.

SUBMITTAL TO THE DESIGN AND TECHNICAL REVIEW BRANCH FOR

THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL

MILLIMETERS AND STATIONS AND ELEVATIONS ARE IN METERS.

UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN

SOLID SODDING WITHIN THE WORK BOUNDARY.

CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND

14.

13.

10.

11.

12.

15.

16.

SUBMISSION OF CONTRACT PROPOSAL.

AND DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO

1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS

CONSTRUCTION OPERATIONS.

AND OTHER ITEMS WHICH WILL INTERFERE WITH THE

SUCH AS UNDERGROUND ROCK BASE, EXISTING UTILITY LINES,

AND CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS,

4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED

WILL BE UTILIZED TO ACCOMPLISH THE CIVIL SCOPE OF WORK.

COMMAND" FORM AS A PART OF THIS PROJECT.THE DETAILS

DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT

O & MA PROJECT, KOREA, REVISION1, 30 OCTOBER 2015,

COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS FOR

2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT

DETAIL DRAWINGS, FOR O & MA PROJECT, KOREA, 30 NOVEMBER

7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD

PROVIDED FOR THE CONTRACTOR BY THE GOVERNMENT.

CONSTRUCTION AREA AND NO LAY DOWN AREA SHALL BE

OFFICES AND STORAGE AREAS SHALL BE WITHIN THE

LOCATION APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE FIELD

TEMPORARY FACILITIES ACCORDING TO O&MA SPEC. AT THE

CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S

THE PUBLIC AND/OR MILITARY TRAFFIC AND OPERATIONS.

NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF

AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL

NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES

CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL

LAWS AND REGULATIONS.

GOVERNMENT LEASED PROPERTY IN ACCORDANCE WITH LOCAL

DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S.

DETERMINE PROPER MATERIAL HANDING METHODS.

MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO

CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE

C-2

SHEET OF

CAMP CARROLL

PARK, WON CHAE

AS SHOWN

HR-00517-0J

KU, HUN MO

PROJECT WORK LIMIT

N

FOR KOREA, USFK PAM 200-1.

APPLICABLE KOREAN ENVIRONMENTAL GOVERNING STANDARDS

ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE

ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.

FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF

EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION

AS INDICATED AND REQUIRED.

THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED

LIMITS INDICATED, UNLESS OTHERWISE NOTED.

ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT

4.

3.

2.

1.

REMOVAL NOTES:

SCOPE OF WORK

#1 (REPAIR/MAINTENANCE)

S-980 (LUTHER H. STORY FIELD)

REPLACE INFIELD SYNTHETIC TURF,

D - 21 - 10

2 4

NOTES:

8 APR 21

S

Y N

T H

E T

IC

T U

R F

~SYNTHETIC TURF~

1.

2.

3.

3.

1.

2.

LEGEND:

EXISTING INFIELD AREA BOUNDARY

REMOVE EXISTING PITCHER’S PLATE

~LUTHER H. STORY FIELD~

REMOVE EXISTING PITCHER’S PLATE.

WITH NEW.

PITCHER’S PLATE AND BASES WITH NECESSARY ACCESSORIES

REPLACE EXISTING SOFTBALL EQUIPMENTS INCLUDING HOME PLATE,

FINISHING SURFACES SHALL BE WELL GRADED TO MAKE POSITIVE DRAINAGE SURFACES.

MARKINGS WITH NEW.

REPLACE EXISTING SYNTHETIC TURF FOR INFIELD AREA AND LINE

SEE THE NOTES AND DETAILS

WITH NEW

FOR INFIELD AREA AND LINE MARKINGS

REPLACE EXISTING SYNTHETIC TURF

WITH NEW

AND BASES WITH NECESSARY ACCESSORIES

INCLUDING HOME PLATE, PITCHER’S PLATE

REPLACE EXISTING SOFTBALL EQUIPMENTS

TURF FOR INFIELD AREA

REPLACE EXST. SYNTHETIC

DAMAGED AREA CAUSED BY COACH’S BOXES REPLACEMENT SHALL BE RESTORED WITH SYNTHETIC TURF.

AND ALL EQUIPMENTS SHALL BE CONFIRMED AND APPROVED BY FMWR BEFORE INSTALLATION.

PLATE AND BASES IN ACCORDANCE WITH W.B.S.C (WORLD BASEBALL SOFTBALL CONFEDERATION), CONTRACTOR SHALL INSTALL THE SOFTBALL EQUIPMENTS SUCH AS HOME PLATE, PITCHER’S

ITEMS TO BE REMOVED

MARKING ON FIELD

BATTER’S BOX

COACH’S BOX

B

C

EXISTING INFIELD AREA BOUNDARY

SEE DETAIL ’C’

COACH’S BOX

SEE DETAIL ’B’

BATTER’S BOX

8 APR 21

SYNTHETIC TURF LINE MARKING

SYNTHETIC TURF LINE MARKING

LINE MARKING DETAILS

SYNTETIC RUBBER COVER

MAGNETIC TYPE WITH

BASE-

SYNTETIC RUBBER COVER

MAGNETIC TYPE WITH

DOUBLE BASE-

(WHITE COLOR)

FOR FOOTBALL FIELD LINES

SYNTHETIC TURF LINE MARKINGS

FOR INFIELD AREA

(RED COLOR)

SYNTHETIC TURF

FOR BASE LINES

(WHITE COLOR)

SYNTHETIC TURF LINE MARKINGS

CONTRACTOR SHALL COODINATE WITH USING AGENCY FOR THE LOCATION OF COACH’S BOXES.

NOTES:

1.

2.

3.FINISH COLOR SHALL BE CONFIRMED, AND APPROVED BY USING AGENCY.

BASE LINES SHALL MEET AND BE MATCHED TO EXISTING BASE LINES ON THE OUTFIELD AREA.

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

SHEET OF

CAMP CARROLL

PARK, WON CHAE

AS SHOWN

HR-00517-0J

KU, HUN MO

N

S-980 (LUTHER H. STORY FIELD)

REPLACE INFIELD SYNTHETIC TURF,

D - 21 - 10

3 4 C-3

914 (3 ft)

,1

(7 ft

(3 ft

1, (3 ft

914 (3 ft) 914 (3 ft)

(6 in) (6 in)

(17 in)

2,566 (8 ft - 5 in)

45°

4,572 (15 ft)

(3 ft

NOT TO SCALE

(8 ft)

2,438

,2 (5 ft)

R 4, (1 ft)

21,336 (70 ft) (8 ft

,4

1, (7 ft

NOT TO SCALE

A

NOT TO SCALE

NOT TO SCALE

LINE MARKING DETAILS

CAMP CARROLL

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

HR-00517-0J

KU, HUN MO

PARK, WON CHAE

S-980 (LUTHER H. STORY FIELD)

REPLACE INFIELD SYNTHETIC TURF,

D - 21 - 10

4 4

SEE DETAIL ’A’

(T=60)

SYNTHECTIC TURF

(ASSUMED)

BASE COURSE

EXISTING AGGREGATE

(ASSUMED)

EXISTING CHOKE STONE

SYNTHETIC TURF DETAIL (TYP.)

NOT TO SCALE

SYNTHECTIC TURF

SEBS CHIP

SILICA SAND

SYNTHETIC TURFSECTION & DETAIL

A

(T Y P

POLYETHYLENE FIBER

(T Y P

SURFACE

TURF

SYNTHETIC

REMARKSREFERENCEITEM

FINISH SCHEDULE

* MODEL NO.: SMART 63

* DESCRIPTION: POLYETHYLENE MONO FILAMENT FIBERS

WWW.KOREAFIELD.CO.KR

:FIELDTURF S.M. CO.,LTD.

* MANUFACTURER:

* DESCRIPTION: POLYETHYLENE MONO FILAMENT FIBERS

* MODEL NO.: XM62

:HYOSUNGWORLDGREEN, CO., LTD.

* MANUFACTURER:

WWW.IWORLDGREEN.CO.KR

* DESCRIPTION: POLYETHYLENE MONO FILAMENT FIBERS

* MODEL NO.: AM60

:SPOTECH, CO., LTD.

* MANUFACTURER:

WWW.SPOTECH.KR

LISTED OR APPROVED EQUAL

* SYNTHETIC TURF SHALL BE AS

C-4

SYNTHETIC TURF DETAILS

EXISTING SYNTHETIC TURF SHALL BE CLEANED AND PROPERLY BONDED TO THE NEW SYNTHETIC TURF.

8 APR 21

NOTES:

TO MAKE PROPER POSITIVE DRAINAGE SLOPES.

THE CHOKE STONE AND AGGREGATE BASE COURSE SHALL BE ADDED AND COMPACTED AS REQUIRED

ALL LINE MARKINGS SHALL BE PERMANENTLY DONE BY BONDING COLORED SYNTHETIC TURF.

1.

2.

3.

HR-00517-0J_T01
HR-00517-0J_C01
HR-00517-0J_C02
HR-00517-0J_C03
HR-00517-0J_C04

File details come from the government source that posted it. Updated .