Drawings.pdf
PDF 14 MB Posted
- Attached to
- Barkley Power Plant HVAC Replacement Federal contract opportunity
- Solicitation number
- W912P525QA043
About this file
This is an Adobe PDF portfolio splash screen recommending users open the document in Acrobat X or Adobe Reader X (or later versions). The image displays the Adobe PDF logo in red and white, with a button inviting users to download Adobe Reader. The document does not contain any substantive contract, solicitation, or procurement information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P525QA043 Barkley Power HVAC Replacement Solicitation.pdf | ||
| Price Schedule.pdf | ||
| US Citizen Site Visit Form MAR 2025.pdf | ||
| SOW and TSpecs_BAR AC3_RTA_08JUL2025.pdf | ||
| Foreign National Site Visit Form MAR 2025.pdf | ||
| KO Determination- Limiting Competition (Final)_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
CUI
ATTENTION
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
ATTENTION
All individuals handling this information are required to protect it from unauthorized disclosure.
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
FOR R
EFERENCE O
NLY
Q9-79/113.2
Q9-79/145.2
Q9-79/621.3
Q9-79/629.3
Q9-79/631.3
Q9-79/646.4
Q9-79/648
Q9-79/773.4
Fillable_field:
Controlled by: USACE-LRD-LRN-ECD-M CUI Category(ies): PHYSEC Distribution Statement: FEDCON POC: Keith E. Ward
Plans For
Barkley Powerhouse
Cumberland River
Lyon County
Nashville District of Engineers
US Army Corps
W912P5-25-Q-A035
July 2025
Certified Final Documents - RTA
TITLEFILE NAMEDWG. NO.
HVAC - A/C Unit #3 - Fan Room PlanQ9-M-104.dgnQ9-M-104
HVAC - A/C Unit #3 - Condenser Rack DetailsQ9-M-103.dgnQ9-M-103
HVAC - A/C Unit #3 - Piping SchematicQ9-M-102.dgnQ9-M-102
HVAC - A/C Unit #3 - Fan Room DetailsQ9-M-101.dgnQ9-M-101
Barkley Dam, Lock, & Powerhouse
General Information - Vicinity and Site Map - Q9-G-001.dgnQ9-G-001
DRAWING INDEX
FOR INFORMATION ONLY
Board No. 3
Electrical - Connection Diagram - Sheet 10 - 480 Volt Equipment Q9-79/773.4
Metal Details
Heating, Ventilation, and Air Conditioning - Hangers, Heaters, and Sheet Q9-79/648 and Details
Heating, Ventilation, and Air Conditioning - Fan and Control SchedulesQ9-79/646.4
- Sections Sheet 2
Heating, Ventilation, and Air Conditioning - Service Bay at EL. 347.0Q9-79/631.3
- Plan
Heating, Ventilation, and Air Conditioning - Service Bay at EL. 347.0Q9-79/629.3 at EL. 381.0, 366.0, & 347.0
Heating, Ventilation, and Air Conditioning - Equipment ArrangementQ9-79/621.3
Architectural - Reflected Celing PlansQ9-79/145.2
Service By Floor Plan - EL. 347.0Q9-79/113.2
TITLEDWG. NO.
HVAC - A/C Unit #3 Rep.
Kuttawa, Kentucky
Submitted:
Aidan M. Lovelace
(2.) The approval signatures appearing in the signature block on this sheet constitute approval of all drawings listed in the sheet index.
of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
(1.) This project was designed by the Nashville District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations
Note:
Steven J. Duncan, P.E.
Chief, Mechanical Section
Approved:
Zachary A. Langel, P.E.
Chief, Design Branch
Project Engineer
Approval Recommended:
2025-07-09T07:36:36-0500
LOVELACE.AIDAN.MICHAEL.1634052816
2025-07-09T11:40:38-0500
DUNCAN.STEVEN.JAMES.1541095876
2025-07-10T08:58:18-0500
LANGEL.ZACHARY.A.1381404567
D E
S C
R
IP
T
IO
N M
A
K
SHEET ID
U .S
Y
O
P
F
G
IN
W
H
B
L
JE
IV
-2
-Q -A
J
V
IL
IS
IC
.E
-X
X
IT
.T
CERTIFIED FINAL DOCUMENTS - RTA
-3
G-001
Q9
I
Q
-G
-0
.d g n
13121110987654321
A SHEET ID
®of Engineers
IG
Z
BARKLEY POWERHOUSE
AND SPILLWAY
BARKLEY DAM
(OFFICE)
OF ENGINEERS
U.S. ARMY CORP
CUMBERLAND RIVER
C LOCKL
BARKLEY D
AM P
OWERHOUSE R
OAD
BARKLEY POWERHOUSE
LYON COUNTY, KY (37.02147, -88.22115)B7
BARKLEY DAM, POWERHOUSE, & LOCK - VICINITY MAP
BARKLEY LOCK - LIVINGSTON COUNTY, KY (37.01939, -88.22508)
BARKLEY POWERHOUSE - LYON COUNTY, KY (37.02147, -88.22115)
BARKLEY DAM - LYON COUNTY, KY (37.02215, -88.22108)B1
HIGHWAY 62
R P
LAKE BARKLEY
GENERAL SHEET NOTES
DEBRIS AND EQUIPMENT.
CONTRACTOR SHALL KEEP ALL ACCESS ROADS AND ENTERANCES FREE OF 3.
CONTRACT IS AWARDED.
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AFTER THE
IF A LAYDOWN AREA IS NEEDED, THE LOCATION WILL BE COORDINATED WITH 2.
THE EXISTING SITE CONDITIONS.
ON MARCH 2024, USING GOOGLE EARTH SOFTWARE. IMAGES MAY NOT SHOW
POWERHOUSE, AND BARKLEY LOCK WERE IMPORTED INTO MICROSTATION,
IMAGES AND LOCATION REFERENCES FOR BARKLEY DAM, BARKLEY 1.
HIGHWAY 62
SHEET KEYNOTES
BUILDING.
BARKLEY GARAGE ENTERANCE TO MOVE MATERIALS AND SUPPLIES INTO THE
CONTRACTOR WILL USE BARKLEY POWERHOUSE GARAGE ENTERANCE: 2.
AND RE-ENTRY NOTIFICATION(S).
ENTERANCE INTO SECURED ACCESS GATES WILL REQUIRE DAILY ARRIVAL
ACCESS GATE(S) WILL BE SECURED AT ALL TIMES. SECURTY ACCESS GATE: 1.
ROAD
FLOW
PRINCETONKUTTAWA
HOPKINSVILLE
CANTON
CADIZ
CLARKSVILLE
KENTUCKY
TENNESSEE
LOCK AND DAM
CHEATHAM
DOVER
PARIS
MAYFIELD
MURRAY
PADUCAH
. 7
BENTON
U.S. 79
I.C.
U.S. 68
I.C .24
KY 80
L&N
. 6
U.S. 62
I.C.
BARKLEY
PROJECT
RIVERS
GRAND
U.S . 62
EDDYVILLE
TENNESSEE
KENTUCKY
NN
VICINITY MAP
LIVINGSTON & LYON COUNTY, KYG7
1010 5
MILES
LYON COUNTY
COUNTY
LIVINGSTON
LYON COUNTY
lo t im e a te il m
:0
:4
/8
/2 c u s rs
\h x fj
\p w
\c lr
\d
\Q
-G
-0
M-101
/C
-M -1
:3
:2 e c
FURTHER DETAILS.
BE CONNECTED TO THE POWER JUNCTION BOX. SEE SPECIFICATIONS FOR
POWER JUNCTION BOX. BOTH THE AIR HANDLER AND CONDENSING UNIT WILL 7.
FOR FURTHER DETAILS.
THROUGH THE JUNCTION BOX ALONG THE BACK WALL. SEE SPECIFICATIONS
ALONG THE CELING AND/OR WALL. POWER WIRING WILL BE CONNECTED
AIR HANDLER POWER WIRING. THE AIR HANDLER POWER WIRING WILL RUN 6.
FLOOR DRAIN.
BOTTOM OF THE CONDENSER UNIT, AND DISCHARGING INTO THE ANGLED
FROM THE DRAIN PAN, DOWN THE SIDE OF THE CONDENSER UNIT, ALONG THE
A DRAIN PIPE WILL BE INSTALLED, LEADING AIR HANDLER DRAINAGE PIPE. 5.
HANDLER AND CONDENSING UNIT (TYP).
REFRIGERANT LIQUID AND SUCTION PIPING LEADING TO/FROM BOTH THE AIR 4.
UNIT (TYP.).
REFRIGERANT PIPING LEADING TO/FROM HEAT EXCHANGERS TO CONDENSING 3.
CANAL.
DRAINAGE PIPE RUNNING ALONG FLOOR AND INTO THE ANGLED FLOOR
NEW EQUIPMENT RACK WILL BE INSTALLED CLOSE TO THE WALL WITH WATER 2.
WALK UNDER ACCESS.
NEW 2" DIA. PIPING WILL BE PLACED AT LEAST 6' - 0" FROM THE GROUND FOR
DIA. PIPE WILL LEADING FROM TEE JUNCTION TO THE NEW EQUIPMENT RACK.
NEW TEE JUNCTION WILL BE INSTALLED INTO EXISTING 2" PIPING. A NEW 2" 1.
LEGEND
CONTRACTOR WILL ENSURE CONUIT IS INSTALLED ALONG THE CELING.10.
DIMENSIONS AND MEASURMENTS.
APPROXIMATE. CONTRACTOR MUST FEILD VERIFY THE ACCURACY OF ALL
REFERENCE DRAWINGS. AS SUCH, THEY ARE TO BE CONSIDERED TO BE
DUCT DIMENSIONS WERE TAKEN FROM ON SITE FIELD MEASURMENTS AND 9.
CEILING.
CONTRACTOR WILL AVOID DRILLING THROUGH ANY REBAR LOCATED IN THE 8.
MANUFACTURERS REQUIREMENTS/RECOMMENDATIONS.
ALL DUCT AND CELING MOUNTED HVAC EQUIPMENT WILL BE INSTALLED PER 7.
THE EXISTING BREAKER.
ONTRACTOR IS RESPONSIBLE FOR REPLACING ALL POWER FEEDERS FROM C6.
HEATER IS CONNECTED TO THE NEW THERMOSTAT.
FOLLOWING INSTALLATION, CONTRACTOR MUST ENSURE THE EXISTING DUCT 5.
OPERATIONAL.
FOR RECONNECTING THE WIRING SO THAT ALL EQUIPMENT IS FULLY
ANY WIRING IS DISCONNECTED, THE CONTRACTOR WILL BE RESPONSIBLE
HEATER TO ACCOMIDATE THE SPACE NEEDED FOR THE NEW AIR HANDELER. IF
DURING INSTALLATION, THE CONTRACTOR CAN MOVE THE EXISTING DUCT 4.
HANDLER.
A CEILING MOUNTED DRAIN PAN, TO BE PLACED DIRECTLY UNDER THE AIR
CONTRACTOR IS RESPONSIBLE FOR THE FABRICATION AND INSTALLATION OF 3.
DRAIN PIPE, LEADING TO ANGLED FLOOR DRAIN.
UNIT. CONTRACTOR WILL ALSO INSTALL A CELING MOUNTED DRIP PAN AND
OF A CEILING MOUNTED AIR HANDLER AND FLOOR MOUNTED CONDENSING
THE NEW AIR CONDITIONING UNIT WILL BE A SPLIT SYSTEM UNIT, CONSISTING 2.
INSTALLATION.
EQUIPMENT FOR REGULAR MAINTENANCE ACTIVITIES FOLLOWING
WILL ENSURE THERE IS SUFFICIENT SPACE AROUND EACH PIECE OF
PRIOR TO INSTALLATION OF THE NEW AIR CONDITIONING UNIT, CONTRACTOR 1.
STRAINER
BALL VALVE
WATER FLOW
REDUCER
HVAC UNIT # 3 - FAN ROOM DETAILS
1" = 1'-0"D1
FLOOR DRAIN TO FLOOR DRAIN
APPROXIMATE 4" X 4" FLOOR CANAL ANGLED
W/ 1" INSULATION
EXISTING �2" PIPE
DIRECTION
(TYP.)
NEW �3" PIPE
SHUTOFF VALVE
EXISTING COOLING WATER
HALLWAY
1'-11" 6'-4"
PIPE REDUCER
3"�2" TO �NEW
W/ 1" INSULATION
EXISTING �2" PIPE
FLOOR MOUNTED
CONDENSING UNIT
2'-2"
(OVERHEAD)
AS NEEDED,
DUCT MODIFY
23" x 14" RETURN
BOX
ELECTRICAL JUNCTION
(SEE NOTE 7)
AIR HANDLER DRAINAGE PIPE
(OVERHEAD)
MODIFY AS NEEDED,
26" x 14" SUPPLY DUCT
INSTALL.
AIR HANDLER
AS NEEDED FOR
HEATER, MOVE
EXISTING DUCT
"64
1'-0"
"64 172'-7
AIR HANDLER - SIDE VIEW
1" = 1'-0"A9
CONNECTION
SUPPLY AIR
(TYP)
CONNECTION
RETURN AIR
3'-10"(TYP)
ACCESS PANEL
COMPRESSOR
CONDENSING UNIT - FRONT VIEW
1" = 1'-0"A1
AIR FAN COVERS
D1
Q9-M-103
D1
"(TYP)16
32'-4
IR
LO
EXISTING DUCT
OF EXISTING DUCT
APPROXIMATE END
AIR FLOW
IR
CEILING MOUNTED
AIR HANDLER
LOCATION
ALTERNATE DRAIN
M-102
:3
:1 e c
F.D.: FLOOR DRAIN3.
HX-6: HEAT EXCHANGER2.
HX-5: HEAT EXCHANGER1.
PORT IS HORIZONTAL TO FLOOR.
TEES ON EITHER SIDE OF CONDENSERS SHALL BE INSTALLED SO THAT THE CAPPED 4.
FACILITATE CLEANING OF THE UNITS PER MANUFACTURER RECOMMENDATION.
PROVIDE A CAPPED PIPE CONNECTION ON BOTH SIDES OF THE CONDENSER TO 3.
THEY OPEN WHEN THE CORRESPONDING COIL IS ACTIVATED.
CONTROL ACTUATORS TO BE WIRED TO AIR HANDLER CONTROL BOARD SO THAT 2.
.FUNCTIONING
INDIVIDUAL PIECE CAN BE ISOLATED WHILE LEAVING THE REST OF THE SYSTEM
EACH STRAINER AND CONDENSER SHALL BE PLUMBED IN A MANNER SO THAT EACH 1.
2" TO 3" PIPE REDUCER
CONTROL VALVE
HEAT EXCHANGE (CONDENSER)
CAPPED TEE
EXISTING 2" PVC
NEW 3" STAINLESS STEEL PIPE
EXISTING SHUT OFF VALVE
NEW 2" TO 3" DIA. PIPE REDUCER
DIRECTION (TYP.)
EXISTING FLOOR DRAIN
F.D.
HVAC - A/C UNIT #3 - PIPING SCHEMATIC
SCALE: N.T.S.A2
NORMALLY OPEN NORMALLY OPEN
NORMALLY OPEN NORMALLY OPEN
M-103
:1 e c
EQUIPMENT RACK AND ADDITIONAL DETAILS.
SEE SPECIFICATION SECTION 05 50 13 FOR WELDING REQUIREMENTS FOR THE 2.
SECTION 05 50 13 FOR CONCRETE ANCHOR REQUIREMENTS.
SEE SPECIFICATION SCREWS ARE REQUIRED FOR EQUIPMENT RACK INSTALLATION.
4 (FOUR) ANCHOR SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS.
MOUNTING SUPPORTS AND BOLT PATTERN HEAT EXCHANGERAND BALL VALVES.
HEAT EXCHANGER(S). UPPER SECTION IS TO BE USED FOR MOUNTING STRAINERS
AND STRAPS ACCORDINGLY TO PROVIDE A SECURE MOUNTING LOCATION FOR THE
EQUIPMENT RACK LAYOUT IS SHOWN FOR REFERENCE ONLY. ADJUST SUPPORTS 1.
CAPPED TEE
9"
6"
"211'-
(TYP.)
CONDENSING UNIT
TO BE FACING THE
REFRIGERANT PORTS
UNIT (TYP.)
FROM THE CONDENSING
TO BE FACING AWAY
COOLING WATER PORTS
SEE NOTE 1
VERTICAL SUPPORTS
SEE NOTE 2 & 3
RETAINING SUPPORTS
SEE SPECIFICATIONS
CONCRETE ANCHORS (TYP.)
HEAT EXCHANGER(S) - SECTION VIEW
SCALE: 6" = 1' - 0"A1
CONDENSER RACK - PLAN VIEW
SCALE: 6" = 1' - 0"A7
EQUIPMENT RACK LAYOUT
SCALE: 1 1/2" = 1' - 0"E1
MATERIAL: SEE NOTE 1 AND SPECS.3.
MAKE: 12.
MARK 11.
NOTES:
EQUIPMENT RACK - PIPING LAYOUT
SCALE: 1 1/2" = 1' - 0"E7
PIPING SCHEMATIC - DWG #: Q9-M-1022.
SEE SCHEMATIC LAYOUT & LEGEND FOR FURTHER DETAILS1.
NOTES:
A7
E1
E1
HX-6
HX-5
M-104
:0 e c
(BTU / HR)
MAX COOLING
ACCESSORIES QTY.
120,000
FLOOR MOUNTED CONDENSING UNIT)
CEILING SUSPENDED AIR HANDLER &
SPLIT COOLING SYSTEM (INCLUDING 5,000
FLOW(CFM)
SUPPLY AIR
(V-PH-HZ)
POWER
SENSING
THERMOSTAT WITH HUMIDITY
ID TYPE (BTU/H)
MAX COOLING
TYPE
MOUNTING
QTY.
60,000BRAZED PLATE HEAT EXCHANGER
(GPM)
FLOW RATE
WATER
STUDS
BACK
TYPE
FLOW
CURRENT
COUNTER
(DEGREE F)
INLET TEMP
COOLING WATER
OUTLET TEMP
COOLING WATER
INLET TEMP
REFRIGERANT
165 120
OUTLET TEMP
(INLET/OUTLET)
PIPE SIZE
COOLING
(INLET/OUTLET)
PIPE SIZE
2" / 2" 1-1/8" / 5/8"40
SPLIT COOLING SYSTEM (AIR HANDLER & CONDENSING UNIT)
HEAT EXCHANGER
REMARKS
1, 2, 3, 4, 5, 6, 8
1, 6, 7, 9
STAGES
COOLING
THAN 2
NO FEWER
CIRCUIT (V)
CONTROL
24460-3-60
MARK TYPE MISCELLANEOUS QTY.
PLUMBING ITEMS
OPEN AREA
MINIMUM 20 GAGE MESH STAINLESS STEEL SCREEN WITH 49%
2" PIPE CONNECTION, Y-STRAINER, THREADED CONNECTIONS,
STEEL HANDLES
NACE MR0175 COMPLIANT, STANDARD LOCKING STAINLESS
2" PIPE CONNECTION, W.O.G. 2160 PSI @ 100 DEGREE F,
ST
CV
BV
1, 3, 9
STAINLESS STEEL VALVE CONSTRUCTION
DESIGN, SPRING-RETURN CLOSED, MANUAL HAND CRANK,
ELECTRIC ACTUATOR WITH 24VDC, MAINTENANCE- FREE
2" PIPE CONNECTION, 400 PSI STATIC PRESSURE RATING,
SEE SPECIFICATIONS FOR ADDITIONAL EQUIPMENT AND REQUIREMENTS.9.
DETAILS).
REQUIREMENTS ON START-UP AND SERVICE INSTRUCTIONS FOR ADDITIONAL
CONTROL SIGNAL IS 24VDC (SEE MANUFACTURERS INSTALLATION
BOARD TO OPEN FOR COOLING. OTHERWISE, CV'S ARE TO REMAIN CLOSED.
CONTROL VALVE (CV) TO RECEIVE SIGNAL FROM AIR HANDLER CONTROL 8.
INCHES BETWEEN ALL EQUIPMENT AND DOORS.
FOLLOWING INSTALLATION, THERE MUST BE A MINIMUM CLEARANCE OF 3 7.
OF THE HEAT EXCHANGERS TO FACILITATE EASY DRAINING AND CLEANING .
THREADED CAPPED TEE CONNECTIONS WILL BE INSTALLED ON BOTH SIDES 6.
TOOLS OR MATERIALS.
DONE IN A MANNER TO MINIMIZE POTENTIAL FOR DAMAGE FROM FALLING
ROUTING OF REFRIGERANT LINES FROM AC UNIT TO CONDENSER SHALL BE 5.
RECOMMENDATIONS
BARRIER SHALL BE REPAIRED, AS PER MANUFACTURERS REQUIREMENTS AND
REQUIREMENTS AND RECOMMENDATIONS. ANY DAMAGE TO THE VAPOR
LEAST 2 INCHES OF FIBERGLASS INSULATION OR PER MANUFACTURERS
ANY NEW DUCTWORK MUST CONTAIN A CONTINUOUS VAPOR BARRIER OF AT
WILL BE MODIFIED, AS REQUIRED, FOR INSTALLATION OF NEW AC UNIT NO. 3.
EXISTING DUCTWORK, FOR BOTH THE SUPPLY AND RETURN CONNECTIONS, 4.
AND RECOMMENDATIONS.
BE INSTALLED AS PER BEST PRACTICES OR MANUFACTURER REQUIREMENTS
SHOWN DESIGN ON DRAWING Q9-M-101. LOCATION AND INSTALLATION MUST
POSITION OF ONE COMPLETE SYSTEM SHOULD BE COMPARABLE TO THE AS 3.
EXCHANGE AND EQUIPMENT RACK ASSEMBLY DETAIL SEE DWG Q9-M-103.
FOR THE ONE COMPLETE SYSTEM ARE FOUND ON DWG Q9-M-101. FOR HEAT
QUANTITIES SHOWN ARE FOR ONE COMPLETE SYSTEM. ASSEMBLY DETAILS 2.
ASSEMBLY.
AC UNIT NO. 3 AND ALL ASSOCIATED EQUIPMENT WILL BE CONSIDERED ONE 1.
ID
AC-3
TYPE CIRCUITS
General
Q9-G-001
Mechanical
Q9-M-101
Q9-M-102
Q9-M-103
Q9-M-104