PDF 3 MB Posted
- Attached to
- Tile replacement at LBB ATCT (Lubbock, TX)
- Solicitation number
- Not on record
About this file
This appears to be an Adobe PDF portfolio landing page that provides instructions for opening the document using Adobe Acrobat X or Adobe Reader X. The page includes the Adobe PDF logo and a button to download Adobe Reader. No specific contract details are visible in this image.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
1 1
02/10/2025
MGR: ENGINEERING - FORT WORTH
LUBBOCK
LBB-1302733-A001
VMW
ATCT
REPLACE RAISED FLOOR
BASE BUILDING FLOOR PLAN
lb b -1
-a
.d w g
TERMINAL
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U
IO
PRESTON SMITH INTERNATIONAL AIRPORT
THIS DRAWING PRODUCED ON ASW REGION CAD SYSTEM
PROJECT ENGINEER
1302733
TX
01/18/2023
LBB-D-ATCT-A220
SCALE: 1/8" = 1'-0"
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
B
A
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:2
:3
M P lo tt e d y
V
-C
-E
APPROVED
-a
8 234567
117117
122 121
CORRIDOR 108
127 126129
108CORRIDOR
101103
104104
112A
106 105 104104104104
TOWER
CONTROL
E/G BUILDING
BUILDING
UPS
8' 0 8' 16'
SCALE: 1/8" = 1'-0"
AT SUPERVISOR'S
OFFICE
CONSTRUCTION NOTES:
WORK AREA INCLUDES ROOMS 112A, 112, 113, 114, 115 AND AIR TRAFFIC SUPERVISOR'S OFFICE.
WORK REQUIRED IN AIR TRAFFIC SUPERVISOR'S OFFICE INCLUDES REMOVING AND REPLACING THE CARPET
FLOOR FINISH ON THE PANELS OF THE EXISTING ACCESS FLOOR SYSTEM. WORK REQUIRED ALSO INCLUDES
REMOVING AND REPLACING THE COVE BASE. THE ACCESS FLOOR SYSTEM UNDERSTRUCTURE IN THIS ROOM
WILL NOT BE AFFECTED.
ROOM 111, THE TRACON ROOM, IS AN OPERATIONAL AREA. CONTRACTOR MUST BE SUPERVISED BY FAA
RESIDENT ENGINEER AT ALL TIMES WHILE IN THIS AREA. ACCESS IS ONLY ALLOWED FOR WORK REQUIRED
TO TRANSITION NEWLY INSTALLED ACCESS FLOORING TO EXISTING ACCESS FLOOR SYSTEM.
IS
SPACE DESIGNATIONSPACE NO.
JANITOR
TOWER LOBBY
WOMEN'S TOILET
WOMEN'S LOUNGE
WOMEN'S LAVATORY
STENO POOL
FILES
DEPUTY CHIEF
AT SECRETARY
ATCT CHIEF
TRAINING OFFICER
READY ROOM
TRAINING CONFERENCE ROOM
AT STORAGE
AT & AF TRAINING STORAGE
CORRIDOR
AF UNIT CHIEF
HVAC SPACE
TELCO ROOM
MAINTENANCE STORAGE
MAINTENANCE WORKSHOP
ELECTRONICS EQUIPMENT
TRACON ROOM
MEN'S LAVATORY
MEN'S TOILET
CORRIDOR
LOCKERS
DSO & DSS OFFICE
OPERATIONS OFFICER
PLANNING & CARTOGRAPHER
LOBBY & RECEPTION
VESTIBULE
ROOM SCHEDULE
REVISION , DATED
THIS PROJECT COPY IS BASED ON
DRAWING
lbb-1302733-a001
2025-02-19T13:51:17-0600
KEVIN D MILES
2025-02-19T10:29:53-0600
VICTORIA MICHELLE WILPITZ
ENTRANCE TO BE USED BY CONTRACTOR
NOT TO SCALE
VICINITY MAP
LBB-1302733-C001
SITE PLAN AND VICINITY MAP
-c
SCALE: 1/16" = 1'-0"
SITE PLAN
:1 lo tt e
-c
ENG/GEN BUILDING
BASE BUILDING
PATIO
ENTRY
LUBBOCK INTERNATIONAL MAP
PROJECT SITET
W
TERM BLDG
IN
E
IG
Y
PARKING
BLUEFIELD STREET
SHALLOW WATER HWY (FM 1294)
Y
REGIS STREET (FM 2641)
DOWNTOWN
TO
L K
FACILITY
ATCT/BASE BUILDING27N
DRIVEWAY
LOADING DOCK
DRAINAGE DITCH
CONTRACTOR PARKING/STAGING (5 PARKING SPOTS)
(PORT-A-POTTY, DUMPSTER, MATERIALS)
CONTRACTOR STAGING
(SEE CONSTRUCTION NOTE #3)
FOR FURNITURE STORAGE
ADDITIONAL CONTRACTOR SPACE
ENTRANCE GATE
1. CONTRACTOR MAY SUBMIT ALTERNATIVE CONSTRUCTION STAGING PLAN, SUBJECT TO FAA APPROVAL.
2. CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS.
3. CONTRACTOR MUST PROVIDE ON-SITE STORAGE EQUIPPED TO ACCOMMODATE LARGE AMOUNTS OF
FURNITURE AND OTHER NON-PERMANENT ITEMS CURRENTLY LOCATED WITHIN THE WORK AREA
(ROOMS 112A, 112, 113, 114, 115, AND AIR TRAFFIC SUPERVISOR'S OFFICE). ALL NON-PERMANENT
ITEMS LOCATED ON THE EXISTING RAISED FLOOR SYSTEM MUST BE MOVED INTO ON-SITE STORAGE, AS DIRECTED BY THE FAA COR.
4. A FIELD OFFICE MUST BE PROVIDED AS A SEPARATE SPACE FOR SOLE USE OF THE FAA'S FIELD
REPRESENTATIVES. THE FIELD REPRESENTATIVE'S OFFICE SHALL BE INSTALLED ON THE SITE AT THE
TIME CONSTRUCTION BEGINS. IT SHALL REMAIN ON SITE AND USABLE UNTIL FINAL CONSTRUCTION
ACCEPTANCE INSPECTION (CAI).
5. CONTRACTOR MUST PROVIDE A STORAGE SHED OR CONNEX BOX FOR SOLE USE OF THE FAA
INSTALLATION GROUPS TO STORE NAS EQUIPMENT. MINIMUM STORAGE SHED DIMENSIONS MUST BE
25 FEET BY 10 FEET.
LEGEND:
APPROXIMATE LOCATION
AND DIMENSIONS FOR
STORAGE, STAGING, AND
OTHER TEMPORARY
FACILITIES.
TO GATE IN FENCE LINE
ALLOW FOR FAA ACCESS
SIDEWALK
UPS
USAGE)
CONTRACTOR
FOR
AREA (NOT
IN THIS
NOT SHOWN
ENTRANCE
GATE AND
EXISTING
NOTE #4)
OFFICE (SEE CONSTRUCTION
FAA FIELD REPRESENTATIVE'S
STORAGE
NOTE #5)
(SEE CONSTRUCTION
INSTALLATION GROUP
STORAGE FOR FAA
UNIT
A/C
ANTENNA
LADDER
SAFETY
8' 0 10' 40'
SCALE: 1/16" = 1'-0"
20' 30' lbb-1302733-c001
2025-02-19T13:51:02-0600
KEVIN D MILES
2025-02-19T10:29:13-0600
VICTORIA MICHELLE WILPITZ
LBB-1302733-D001
DEMOLITION
EXISTING RAISED FLOOR SYSTEM
-d
SCALE: 1/4" = 1'-0"
:5 lo tt e
RAISED FLOOR SYSTEMS MUST BE STURDY AND FREE OF TRIPPING HAZARDS.
FLOOR SYSTEM MUST TIE IN TO THIS EXISTING SYSTEM. THE TRANSITION BETWEEN THE
RAISED FLOOR SYSTEM IN THIS AREA WILL NOT BE REPLACED. THE NEWLY INSTALLED RAISED
SUPPORTS, AND STRINGERS. REMOVE AND REPLACE WALL BASE.
REMOVE AND REPLACE ENTIRE RAISED FLOOR SYSTEM INCLUDING PANELS, PEDESTAL
1" 0 1" 2"
RAISED FLOOR NOT TO BE DEMOLISHED
RAISED FLOOR TO BE DEMOLISHED
LEGEND
lbb-1302733-d001
2025-02-19T13:51:29-0600
KEVIN D MILES
2025-02-19T10:28:52-0600
VICTORIA MICHELLE WILPITZ
LBB-1302733-D002
DEMOLITION
AIR TRAFFIC SUPERVISOR'S OFFICE
SCALE: 3/8" = 1'-0"
:1 lo tt e
TRACON
REPLACED.
PEDESTALS, GRID, AND TILES IN THIS AREA WILL NOT BE
EXISTING RAISED FLOOR(COVE) BASE. THE ASSOCIATED
REPLACE WALLSUPERVISOR'S OFFICE. REMOVE AND
(ACCESS) FLOOR TILES WITHIN AIR TRAFFIC
RAISEDREMOVE AND REPLACE CARPET FLOOR FINISH ON
AREA NOT INCLUDED IN SCOPE OF WORK
AREA INCLUDED IN SCOPE OF WORK
OFFICE
SUPERVISOR'S
AIR TRAFFIC
2' 0 2' 6'
SCALE: 3/8" = 1'-0"
4' lbb-1302733-d002
2025-02-19T13:51:42-0600
KEVIN D MILES
2025-02-19T10:28:38-0600
VICTORIA MICHELLE WILPITZ
FLOOR PEDESTAL
PERIMETER RAISED
GROUND CABLE
#4/0 PERIMETER
PEDESTAL
RAISED FLOOR
GRID (SRG)
SIGNAL REFERENCE
LBB-1302733-E001
RAISED FLOOR GROUNDING DETAILS
-e
RAISED FLOOR PEDESTAL GROUNDING DETAIL
PERIMETER RAISED FLOOR PEDESTAL GROUNDING DETAIL FEDERAL AVIATION ADMINISTRATION
lo tt e
-e
1. RAISED FLOOR SYSTEM MUST BE GROUNDED IN ACCORDANCE WITH
FAA-STD-019G. FAA-STD-019G PARA. 4.7.3.2(F) STATES “BONDING TO FLOOR
AND CEILING SYSTEMS: THE SRG SHALL BE BONDED TO THE RAISED
ACCESS FLOOR SYSTEM OR THE CEILING METALWORK AT INTERVALS NOT
LESS THAN 6 FT. USING MINIMUM 4 AWG BARE COPPER CONDUCTORS.”
2. BOND EVERY THIRD RAISED FLOOR PEDESTAL IN EACH DIRECTION TO
THE SRG GRID USING A #6 AWG GREEN INSULATED WITH ORANGE TRACER
COPPER CONDUCTOR AND EXOTHERMIC WELDS.
3. BOND PERIMETER RAISED FLOOR PEDESTAL TO PERIMETER GROUND
CABLE EVERY 10 FEET USING A #4 AWG GREEN WITH ORANGE TRACER
INSULATED COPPER CABLE AND EXOTHERMIC WELDS.
4. # 4/0 PERIMETER GROUND CABLE IS REQUIRED TO BE PROVIDED BY THE
CONTRACTOR, IF IT DOES NOT ALREADY EXIST.
NOTE #3 AND #4.
SEE CONSTRUCTION
NOTE #2.
SEE CONSTRUCTION
lbb-1302733-e001
2025-02-19T13:52:46-0600
KEVIN D MILES
2025-02-19T10:28:26-0600
VICTORIA MICHELLE WILPITZ
LBB-1302733-G001
COVER PAGE AND DRAWING INDEX
-g
RAISED FLOOR GROUNDING DETAILSLBB-1302733-E001
ELECTRONIC EQUIPMENT ROOM - GROUNDING LAYOUTLBB-1302733-Q003
PHASING PLAN - SEGMENTATION OF PHASESLBB-1302733-Q002
PHASING PLAN - EQUIPMENT AND STRUCTURAL DETAILSLBB-1302733-Q001
DEMOLITION - AIR TRAFFIC SUPERVISOR'S OFFICELBB-1302733-D002
DEMOLITION - EXISTING RAISED FLOOR SYSTEMLBB-1302733-D001
BASE BUILDING FLOOR PLANLBB-1302733-A001
SITE PLAN AND VICINITY MAPLBB-1302733-C001
GENERAL - DRAWING NOTESLBB-1302733-G002
COVER PAGE AND DRAWING INDEXLBB-1302733-G001
DRAWING TITLEDRAWING NO.
INDEX OF DRAWINGS
lo tt e
LUBBOCK, TX
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
LBB AIRPORT TRAFFIC CONTROL TOWER
REPLACE RAISED FLOOR PROJECT
T OF TRANSPO
T A
IC
OF
STATES
IT
P A
TM
EN
AVIA
LA
TRAT
SI
NI
lbb-1302733-g001
2025-02-19T13:50:20-0600
KEVIN D MILES
2025-02-19T10:28:15-0600
VICTORIA MICHELLE WILPITZ
LBB-1302733-G002
GENERAL
DRAWING NOTES
MAIN DISTRIBUTION FRAMEMDF
INTERMEDIATE DISTRIBUTION FRAMEIDF
INTERNAL VOICE SWITCH REPLACEMENTIVSR
FIBER OPTICS TRANSMISSION SYSTEMFOTS
NATIONAL AIRSPACE SYSTEMNAS
JOB CONTROL NUMBERJCN
SINGLE REFERENCE GROUND GRID (SIGNAL REFERENCE GRID)SRGG
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORTLBB
TERMINAL RADAR APPROACH CONTROL FACILITYTRACON
AIRPORT TRAFFIC CONTROL TOWERATCT
RESIDENT ENGINEERRE
(RE WITH ADDITIONAL LEGAL AUTHORITIES)
CONTRACTING OFFICER'S REPRESENTATIVE
COR
FEDERAL AVIATION ADMINISTRATIONFAA
DEFINITIONACRONYM
ABBREVIATION KEY
lo tt e
RAISED FLOOR NOTES:
1.PRIOR TO CONSTRUCTION, THE CONTRACTOR MUST THOROUGHLY EXAMINE THE EXISTING SUB-FLOOR FOR
UNEVENNESS, IRREGULARITIES, CABLE OBSTRUCTIONS, DAMPNESS, ETC. AFFECTING THE QUALITY AND EXECUTION
OF WORK. THE CONTRACTOR SHALL INFORM THE FAA RE OF ANY CONDITION THAT MAY ADVERSELY AFFECT THE
QUALITY OF THE FINAL PRODUCT.
2.CONTRACTOR MUST PERFORM A SITE SURVEY OF THE RAISED FLOOR SYSTEM.
3.CONTRACTOR MUST PROVIDE A DETAILED PLAN AND MAP OF THE SEQUENCE OF REMOVAL AND REPLACEMENT
OF FLOOR TILES THAT ALIGNS WITH THE PHASING DIRECTIONS PROVIDED ON PROJECT DRAWINGS Q001 AND
Q002.
4.THE COMPLETED RAISED FLOOR SYSTEM MUST BE STURDY, RIGID, AND FREE OF VIBRATION, RATTLES, SQUEAKS, ROCKING AND OTHER NOISES OCCURRING UNDER NORMAL FOOT OR WHEELED TRAFFIC. THE FLOOR MUST NOT
EXHIBIT ANY LATERAL MOVEMENT.
5.OPEN FLOOR AREAS MUST BE PROPERLY BARRICADED AND MUST INCLUDE WARNING SIGNAGE. BARRICADES AND
SIGNAGE MUST BE MAINTAINED AT ALL TIMES.
6.THE CONTRACTOR MUST ANTICIPATE MAKING SOME CUTOUTS AS DEEMED NECESSARY. ALL RAISED FLOOR
CUTOUTS MUST BE ACCOMPLISHED IN A NEAT AND SKILLED MANNER. THE CONTRACTOR MUST CUT PANELS AT
THE PERIMETER OF THE ROOM, ADJACENT TO ELECTRONICS EQUIPMENT, AND IN OTHER AREAS AS DESIGNATED
IN THE DRAWINGS. ALL CUTTING AND CORING OF PANELS AND FIELD FABRICATED ELEMENTS MUST BE DONE ON
THE BUILDING EXTERIOR. NO ACTIVITIES PRODUCING DUST OR PARTICULATES WILL BE ALLOWED INSIDE THE
BUILDING.
7.PRIOR TO INSTALLING THE NEW FLOOR PEDESTALS, LIGHTLY GRIND OR SAND THE SUB-FLOOR TO REMOVE ANY
OLD MATERIAL WHICH MAY AFFECT THE BONDING CHARACTERISTICS OF THE FLOOR ADHESIVE AT THE NEW
PEDESTAL LOCATIONS. VACUUM AND CLEAN THE SUB-FLOOR SURFACES BOTH DURING AND AFTER SANDING.
8.FINISHED FLOOR HEIGHT TO MATCH EXISTING. NEWLY INSTALLED RAISED FLOOR SYSTEM MUST TIE IN TO THE
EXISTING RAISED FLOOR SYSTEM INSIDE THE TRACON. THE TRANSITION FROM NEW TO EXISTING RAISED FLOOR
SYSTEMS MUST BE FREE OF TRIPPING HAZARDS. THIS TRANSITION MUST BE STURDY AND RIGID. THIS
TRANSITION MUST NOT EXHIBIT ANY LATERAL MOVEMENT.
GENERAL CONSTRUCTION NOTES:
1.THE NORMAL WORK HOURS ARE TO BE BETWEEN 1830 AND 0500 CST, MONDAY
THROUGH THURSDAY. WORK ADJACENT TO THE TRACON MAY REQUIRE ALTERNATIVE
WORK HOURS. SEE SPECIFICATIONS FOR ADDITIONAL DETAILS. FINAL DETERMINATION
WILL BE MADE BY THE FAA RESIDENT ENGINEER (RE).
2.CONTRACTOR MUST NOT TOUCH ANY SENSITIVE EQUIPMENT. CONTRACTOR MUST
REMOVE, STORE, AND REINSTALL DESKS, FILE CABINETS, TRASH / RECYCLE BINS,
HEAVY FURNITURE ETC. WITHIN THE WORK AREA. STORAGE LOCATION WILL BE
DETERMINED BY FAA RE.
3.USE EXTREME CAUTION WHILE WORKING WITH FLOOR PANELS TO AVOID DAMAGE TO
EXISTING CRITICAL EQUIPMENT AND UNDER FLOOR INSTALLATIONS. PROTECT ALL
EXISTING CABLING, FIRE DETECTION SYSTEMS, VACUUM, POWER CONDUITS, PIPING,
ETC. UNDER THE RAISED FLOOR.
4.DUST AND ODORS MUST BE CONTAINED AND/OR CONTROLLED AT ALL TIMES.
5.CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS BEFORE
FABRICATION AND/OR INSTALLATION OF BUILDING SYSTEMS. PROMPTLY NOTIFY FAA
RE OF ANY CONFLICTS.
6.REMOVE ANY DIRT, DUST, AND ANY OTHER DEBRIS FROM SUBFLOOR PRIOR TO
INSTALLATION.
7.LBB ATCT IS LOCATED AT THE FOLLOWING ADDRESS: 7001 N. MLK BLVD, LUBBOCK,
TX 79403
lbb-1302733-g002
2025-02-19T13:50:32-0600
KEVIN D MILES
2025-02-19T10:28:04-0600
VICTORIA MICHELLE WILPITZ
A 05/26/2021
LBB-D-ATCT-Q020
33 2
4 2
BULLETIN BOARD FOTS DEMARC EMPTY DEMARC DEMARCPANEL E
EQUIPMENT
(WALL MOUNTED)
TELCO
PLATE
GROUND
ACU
ASOS
EQUIPMENT
(WALL MOUNTED)
PHONE
COMMUNICATOR
FIRE ALARMPANEL CC
5 5 5
PANEL CE
PANEL CF
PANEL CDP
PANEL D
PRINTER
KEYBOARD
MONITOR
ALARM
FIRE
LBB-1302733-Q001
PHASING PLAN
EQUIPMENT AND STRUCTURAL DETAILS
-q
ELECTRONIC EQUIPMENT ROOM
:4 lo tt e
ELECTRONICS EQUIPMENT ROOM
ASR-9
MODEM
SCIP
TE 8
TE 9
IDS
RACK
CCU
TE 12
TE 11
RCE
TE 13
NAV/COM
SPECIALISTS
LANCEREAST
WESTASRSPARE
RCDR
RMCF
M&C
RSM
CODEX
MTDS
MINI DEMARC
FDIO
IE
AHU-1
(LIEBERT)
AHU-2
PANEL B
ROOM
TE 10
GLASS WALL
ATIS
RVR
ILS
MAINT
TCW
ETG
PASS
ENVIRONMENTAL
COURT YARD
AF
SBS
TEST
MON
CONTL
AND
SYS
COMM
WSP
LDRCL
MAIN
PWR
PANEL CD
SWS
LT1
STARS
QCT
RDVS
IVSR1
IVSR2
TE 20
TE 21
TE 22
VHF RX
PATCH
UHF RXVSBP
ID
IV
FOTS1
FOTS2
TE 18
TE 19
4' 0 4' 8'
CABINET
I
Q
IP
GND P
BACKSIDE OF TRACON CONSOLES
SUPPLYING THE EQUIPMENT RACKS.
CONSTRUCTION. THE DISTANCE IS LIMITED BY THE LENGTH OF CABLES AND POWER CORDS
DETERMINED BY THE FAA RESIDENT ENGINEER AND TERMINAL ELECTRONICS GROUP DURING
BENEATH. THE VERTICAL DISTANCE THAT THESE RACKS MAY BE RAISED BY WILL BE
SUPPORTED IN-PLACE, OR RAISED VERTICALLY AS THE RAISED FLOOR IS REPLACED
RACKS ARE SUPPORTED BY THE RAISED FLOOR SYSTEM. THESE RACKS MUST BE
EQUIPMENT" WITHIN THE TELCO ROOM CAN NOT BE MOVED LATERALLY. THESE EQUIPMENT
MOVED LATERALLY BY FAA PERSONNEL. THE NAS EQUIPMENT RACK LABELED "TELCO
THE NAS EQUIPMENT RACKS LABELED IVSR1, IVSR2, IVSR IDF, AND MDF CAN NOT BE
CABINET IS TO BE REMOVED.
THIS MUST BE SUPPORTED IN-PLACE AS THE RAISED FLOOR IS REPLACED. EMPTY DEMARC
FOTS WALL-MOUNTED DEMARC CABINET IS SUPPORTED BY THE RAISED FLOOR SYSTEM.
ELECTRONICS EQUIPMENT ROOM (RM 112).
DIRECTLY NORTH OF THE BACKSIDE OF TRACON CONSOLES LOCATED INSIDE THE
RAISED FLOOR SYSTEM WILL TIE INTO THE EXISTING SYSTEM STARTING AT HALF FLOOR TILE
CONSOLES MUST BE SUPPORTED IN-PLACE AS RAISED FLOOR SYSTEM IS REPLACED. NEW
TRACON CONSOLES ARE SUPPORTED BY EXISTING RAISED FLOOR SYSTEM. TRACON
SYSTEM IS REPLACED.
EXISTING RAISED FLOOR SYSTEM. WALLS MUST BE SUPPORTED IN-PLACE AS RAISED FLOOR
INTERIOR WALLS SURROUNDING ROOMS 112A, 113, AND 114 ARE SUPPORTED BY THE
TILE CUTS MUST BE MADE TO TIE IN THE NEW RAISED FLOOR SYSTEM.
AIR HANDLING UNITS (AHU-1 AND AHU-2) ARE INSTALLED ON TOP OF INDIVIDUAL FRAMES.
ROOM (RM 111). NEW RAISED FLOOR SYSTEM MUST TIE INTO THE EXISTING SYSTEM.
EXISTING RAISED FLOOR SYSTEM CONTINUES BEYOND THESE WALLS INTO THE TRACON
(TELCO)
PANEL C
MCW
SSW
lbb-1302733-q001
2025-02-19T13:52:02-0600
KEVIN D MILES
2025-02-19T10:27:50-0600
VICTORIA MICHELLE WILPITZ
1 1
LBB-1302733-Q002
PHASING PLAN
SEGMENTATION OF PHASES
:0 lo tt e
SCIP
TE 8
TE 9
IDS
CCU
TE 12
TE 11
RCE
TE 13
RCDR
M&C
RSM
CODEX
IE
TE 10
ATIS
RVR
ILS
MAINT
TCW
SBS
MON
CONTL
AND
SYS
COMM
WSP
MAIN
PWR
SWS
LT1
TE 20
TE 21
TE 22
VHF RX
PATCH
UHF RXVSBP
ID
IV
FOTS1
FOTS2
TE 18
TE 19
BACKSIDE OF CAB CONSOLES
= PHASE 1 = PHASE 2 = PHASE 3
= PHASE 4
= PHASE 5 = PHASE 6
LEGEND
NOTE CALLOUT #1 REPRESENTS A GENERAL STARTING LOCATION FOR THE
WORK REQUIRED OF PHASE 1. COMMENCEMENT OF PHASE 1 MUST BE WITHIN
14 DAYS OF NOTICE TO PROCEED (NTP).
PHASING PLAN SHOWN IS A RECOMMENDATION. CONTRACTOR MAY SUBMIT A
PLAN WITH ALTERNATIVE PHASING, SUBJECT TO FAA APPROVAL. SUBSTANTIAL
COMPLETION AND COMMENCEMENT OF EACH PHASE IS DETERMINED BY THE
FAA COR.
GROUNDING REQUIREMENTS FOR EACH SECTION OF THE RAISED FLOOR SYSTEM
MUST BE COMPLETED BEFORE A PHASE IS CONSIDERED SUBSTANTIALLY
COMPLETE. REFER TO PROJECT SPECIFICATIONS FOR MORE DETAILS ABOUT
PHASED CONSTRUCTION.
ELECTRONICS EQUIPMENT ROOM
lbb-1302733-q002
2025-02-19T13:52:17-0600
KEVIN D MILES
2025-02-19T10:27:38-0600
VICTORIA MICHELLE WILPITZ
EXTINGUISHER
LIGHT
EMERGENCYPANEL D PANEL D ALARM
GAS
METER
HYDROGEN PANEL CDP
PANEL
COMMUNICATOR
FIRE ALARMPANEL CC
EXTINGUISHER
CONTROL PANEL
CP-1 AHU
LBB-1302733-Q003
GROUNDING LAYOUT
A 05/26/2021
LBB-D-ATCT-E034
:3 lo tt e
LANCEREASTWESTASRSPARE
PANEL CD
PANEL B
EMERGENCY
FIRE ALARM
BATTERY BACKUP
(FOR FIRE ALARM)
FIRE ALARM
CONTROL PANEL
MENS
A/C
DUCT
EMERGENCY
COURT YARD
GLASS WALL
CYPHER
LOCK
ETG
OUTSIDE
PANDUIT TO
RUN
VERTICAL
RAISED FLOOR
NO.3 UNDER
SUPPRESSOR
STARS GPS SURGE
MOUNTED INSIDE THIS BOX
SUPPRESSOR NO.1
BOX ON ROOF. SURGE
ON WEATHER PROOF PVC
GPS ANTENNA MOUNTED
STORAGE AREA
WORK AND
IDF
IVSR
MDF
FAA
CABINET
Q
IP
MPGP
SPGP
SPGP SPGP
SPGP
EXISTING 24' X 12' X 12" MAIN COPPER GROUND PLATE. CONTRACTOR IS REQUIRED TO
PROVIDE A SUPPLEMENTAL GROUND PATH, SUCH AS GROUNDING THE RAISED FLOOR TO
BUILDING STEEL. IF ENCOUNTERED, CONTRACTOR MUST AVOID GROUNDING TO BUILDING
STEEL COMPONENTS THAT ARE COATED IN LEAD-BASED PAINT.
EXISTING SIGNAL REFERENCE GROUND GRID (SRGG) IN THIS AREA ONLY. OUTSIDE OF THE
SRG AREA CONTRACTOR MAY BE REQUIRED TO PROVIDE A # 4/0 PERIMETER GROUND
CABLE, IF IT DOES NOT ALREADY EXIST.
CONTRACTOR MUST GROUND RAISED FLOOR SYSTEM IN ACCORDANCE WITH FAA-STD-019G.
GROUNDING LAYOUT IS SHOWN FOR REFERENCE ONLY. CONTRACTOR MUST VERIFY
EXISTING CONDITIONS.
CONTRACTOR MUST EXTEND EXISTING UNDERFLOOR SIGNAL REFERENCE GROUND GRID (SRGG) TO
THE EXTENTS INDICATED. NEW SRGG SHALL CONSIST OF A GRID OF 2-IN. WIDE COPPER STRIPS, 26
GAUGE OR THICKER, PLACED ON A 2X2-FT SQUARE GRID AND WELDED AT EACH GRID INTERSECTION.
THE SRGG PERIMETER SHALL EXTEND TO WITHIN 6-IN. OF THE ELECTRONIC EQUIPMENT AREA.
WELDS SHALL BE SMOKELESS CADWELDS OR APPROVED EQUAL.
THE RAISED FLOOR SYSTEM SHALL BE BONDED TO THE SRGG AT INTERVALS NOT LESS THAN 6 FT
USING MINIMUM 4 AWG BARE COPPER CONDUCTORS
WHERE THERE IS NO SRGG, THE RAISED FLOOR SYSTEM SHALL BE BONDED TO GROUND AT
INTERVALS NOT LESS THAN 6 FT USING MINIMUM 4 AWG BARE COPPER CONDUCTORS. 4AWG
CONDUCTORS SHALL TERMINATE AT EITHER AN SRGG OR MULTIPOINT GROUND PLATE.
SINGLE POINT GROUND CABLE
MULTIPOINT GROUND CABLE
GROUNDING PLATE (UNDER RAISED FLOOR)
SINGLE POINT GROUNDING PLATE (UNDER RAISED FLOOR)
MULTIPOINT GROUNDING PLATE (UNDER RAISED FLOOR)
(SEE CONSTRUCTION NOTE #4)
SRGG EXTENSION AREA ?
PANEL CE PANEL CF (TELCO)
PANEL C
VAC
ANTENNA
RECORDER GPS
lbb-1302733-q003
2025-02-19T13:52:36-0600
KEVIN D MILES
2025-02-19T10:27:18-0600
VICTORIA MICHELLE WILPITZ