Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- 140P5424R0009
About this file
This document contains drawings, specifications, and other details related to the solicitation for replacing the wastewater treatment plant at Dry Tortugas National Park. The key details are:
The solicitation number is 140P5424R0009, issued by the Department of the Interior National Park Service Southeast Region. The project involves replacing the existing wastewater treatment plant, lift stations, and associated collection system components at Fort Jefferson in Dry Tortugas National Park, Florida. The plans provide detailed drawings and specifications for the new wastewater treatment plant, lift stations, collection system piping, electrical work, and other related construction. The scope includes installing a new sequencing batch reactor treatment plant, replacing two existing lift stations, upgrading the collection system, and making other facility improvements. The drawings include architectural, civil, and electrical details. The project is subject to federal historic preservation requirements and must comply with applicable codes and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5424R0009_Amd_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P5424R0009_Amd_0001.pdf | ||
| DRTO_EXISTING_UTILITIES_0001.pdf | ||
| Sol_140P5424R0009.pdf | ||
| Wage_Determination.pdf | ||
| Specifications.pdf | ||
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PROJECT
LARGE DETACHED
MAGAZINE
OFFICERS QUARTERS
FOUNDATION RUINS
ENGINEERING OFFICERS
QUARTER'S RUINS
SMALL DETACHED
MAGAZINE
TORTUGAS
HARBOR LIGHT
B A
R R
A C
K S
F O
U N
D A
T
IO
N R
U
IN
S
FORT JEFFERSON,
GARDEN KEY
RESIDENCE QUARTERS
ENGINEERING OFFICERS
QUARTER'S RESIDENCE
CISTERN
MAIN DOCK
COAL SHED RUINS
C O
A L
S H
E D
R U
IN
S
MOAT
MOAT
ENTRANCE BRIDGE
GULF OF MEXICO
ATLANTIC OCEAN
SEAPLANE BEACH
NORTH SWIM BEACH
SOUTH SWIM BEACH
TO BUSH KEY
ATLANTIC
OCEAN
GARDEN KEY, FLORIDA
SOUTHEAST
KEY WEST
SITE LOCATION
DRY TORTUGAS NATIONAL PARK
GARDEN KEY, FLORIDA
70 MILES
GULF OF
MEXICO
FLORIDA
LOGGERHEAD KEY
SITE LOCATION
DRY TORTUGAS NATIONAL PARK
FORT JEFFERSON, GARDEN KEY
NOT TO SCALE
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECTCROFT & ASSOCIATES -
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
PMIS/PKG NO.
/2
/2
:1
:4
A
M
REPLACE WASTEWATER TREATMENT
PLANT
FORT JEFFERSON AT GARDEN KEY
DRY TORTUGAS NATIONAL PARK
SOUTHEAST MONROE FLORIDA
1 16
XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK
140P2019D0008
CIVIL:
HALE INNOVATION, LLC
MAITLAND, FLORIDA
REGION 2
DRTO 196743B
140P2019D0008
MATCH LINE MARK
DETAIL NUMBER
ELEVATION NUMBER
DRAWING NUMBER
SHEET NO. (WHERE SHOWN)
ELEVATION MARKS
X
XXXX
X
XXXX
LEGENDS & SYMBOLS:
SECTION NUMBER
XXXX
X
BUILDING SECTION
DETAIL
EXTERIOR ELEVATION
TITLES
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
SECTION NUMBER
XXXX
X
WALL SECTION
SHEET NO. (WHERE SHOWN)
XXXX
X
CENTER LINE
GENERAL NOTES:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SUPERVISION AND COORDINATION OF ALL
CONSTRUCTION PROCEDURES.
2. THESE PLANS SHOULD BE STUDIED AND USED IN THEIR
ENTIRETY AS INFORMATION VITAL TO EACH STAGE OF
CONSTRUCTION.
3. ALL WORK SHALL BE PERFORMED IN STRICT
ACCORDANCE WITH THE APPLICABLE CODES AND
ORDINANCES IN EFFECT AT THE TIME OF PERMIT. IN THE
EVENT OF A CONFLICT, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN AND BE MET.
4. ALL DIMENSIONS SHALL BE VERIFIED BY THE
CONTRACTOR AND THE CONTRACTING OFFICER MUST
BE NOTIFIED OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK.
5. WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT
SHALL APPLY TO ALL LIKE OR SIMILAR CONDITIONS,
EVEN THOUGH NOT SPECIFICALLY MARKED ON THE
DRAWINGS.
6. THE GENERAL CONTRACTOR SHALL ENSURE THAT
CONSTRUCTION ENVIRONMENT IS MAINTAINED IN SUCH
A WAY TO INHIBIT MOLD AND MILDEW GROWTH.
7. THE GENERAL CONTRACTOR SHALL REMOVE PROMPTLY
AND LEGALLY ALL ACCUMULATED DEBRIS, PROTECT ALL
EXPOSED PORTIONS OF WORK FROM ELEMENTS, AVOID
OVER- LOADING STRUCTURE, AND SECURELY STORE
ALL ITEMS TO BE USED FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR SHALL VERIFY LOCATION
OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO
EXCAVATION.
9. THE GENERAL CONTRACTOR SHALL TAKE ALL
NECESSARY PRECAUTIONARY MEASURES TO PROTECT
THE PUBLIC AND ADJACENT PROPERTIES FROM
DAMAGE THROUGHOUT CONSTRUCTION.
10. ANY EXISTING UTILITIES TO BE ABANDONED SHALL BE
PROPERLY DISCONNECTED, PLUGGED OR CAPPED, AS
REQUIRED BY CODE OR SOUND CONSTRUCTION
PRACTICE.
11. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL
BE MADE FROM THE DRAWINGS OR SPECIFICATIONS
WITHOUT FIRST SECURING WRITTEN PERMISSION FROM
THE CONTRACTING OFFICER.
12. WHERE LACK OF INFORMATION, OR ANY DISCREPANCY
SHOULD APPEAR IN THE DRAWINGS OR
SPECIFICATIONS, REQUEST WRITTEN INTERPRETATION
FROM THE CONTRACTING OFFICER BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
13. WHEN A SYSTEM OR ASSEMBLY IS SPECIFIED, ALL
NECESSARY PARTS AND MATERIALS REQUIRED FOR A
COMPLETE INSTALLATION/SYSTEM SHALL BE INSTALLED
ACCORDING TO THE MANUFACTURERS INSTRUCTIONS.
14. COORDINATE WITH ALL TRADES THE LOCATIONS OF
SLEEVES OR OTHER PRESET ACCESSORIES INVOLVING
OTHER TRADES.
15. THE GENERAL CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR THE COMPLETION OF ALL WORK
SHOWN OR REASONABLY IMPLIED BY THESE DRAWINGS
AND/OR SPECIFICATIONS. THE GENERAL CONTRACTOR
SHALL CONFIRM ALL DIMENSIONS AND CONDITIONS AT
THE SITE AND SHALL IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER IN WRITING OF ANY
DISCREPANCIES.
16. DETAILS TAKE PRECEDENCE OVER PLANS AND
ELEVATIONS - LARGER SCALE DRAWINGS TAKE
PRECEDENCE OVER SMALLER SCALE DRAWINGS.
17. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR OBTAINING ALL REQUIRED BUILDING PERMIT
APPROVALS PRIOR TO THE COMMENCEMENT OF ANY
WORK.
18. THE GENERAL CONTRACTOR SHALL FURNISH COPIES OF
PERMITS, INSPECTIONS, AND CERTIFICATES TO THE
CONTRACTING OFFICER AS REQUESTED ALONG WITH
FIRST APPLICATION FOR PAYMENT.
19. THE GENERAL CONTRACTOR SHALL PROVIDE ALL
CERTIFICATES OF OCCUPANCY, PERMITS AND CLOSE
OUT DOCUMENTS TO CONTRACTING OFFICER UPON
COMPLETION OF PROJECT.
20. THE DESIGN OF THIS PROJECT IS BASED UPON
INFORMATION PROVIDED BY NATIONAL PARK SERVICE
THROUGH EXISTING DRAWINGS AND ON-SITE
OBSERVATION. VERIFY ALL EXISTING DIMENSIONS AND
CONDITIONS PRIOR TO COMMENCING WORK. IF
EXISTING CONDITIONS ARE NOT AS DEPICTED OR
ANTICIPATED, NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY UPON DISCOVERY AND DO NOT PROCEED
WITHOUT APPROVAL. IF CONTRACTOR PROCEEDS
WITHOUT APPROVAL, THE CONTRACTOR ACCEPTS FULL
LIABILITY FOR THAT PORTION OF CONSTRUCTION.
A
A/E ARCHITECT/ENGINEER
ABV ABOVE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECT (URAL)
AUTO AUTOMATIC
AVG AVERAGE
& AND
@ AT
B
BLDG BUILDING
BD BOARD
B.O. BOTTOM OF
C
CJ CONTROL JOINT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS(ATION)
D
DBL DOUBLE
DEPT DEPARTMENT
Ø, DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIV DIVISION
DN DOWN
DSC DENVER SERVICE CENTER
DTL DETAIL
DWG DRAWING
E
EA EACH
ELEC ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP JT EXPANSION JOINT
EXPS EXPOSE(D)
EXT EXTERIOR
F
FAB FABRICATION
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR
ELEVATION
FFL FINISHED FLOOR LINE
FIN FINISH
FLR FLOOR(ING)
FRP FIBER REINFORCED PANEL
FRT FIRE RETARDANT TREATED
FT FOOT/FEET
G
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GPM GALLONS PER MINUTE
H
H HIGH
HDPE HIGH DENSITY
POLYETHLYENE
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSEPOWER
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
I
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J
JT JOINT
L
L LONG
M
MAINT MAINTENANCE
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MISC MISCELLANEOUS
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MTD MOUNTED
MTL METAL
N
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
O
OC ON CENTER
OPNG OPENING(S)
OPP OPPOSITE
OVHD OVERHEAD
P
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PMIS PROJECT MANAGEMENT
INFORMATION SYSTEM
PMIS NO PROJECT PMIS NUMBER
PNL PANEL
PREFAB PREFABRICATED
PREFIN PREFINISHED
PT PRESSURE TREATED
Q
QTY QUANTITY
R
R, RAD RADIUS
REINF REINFORCE (D) (ING)
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
S
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURAL
STL STEEL
STO STORAGE
SUSP SUSPENDED
T
TBD TO BE DETERMINED
TEMP TEMPERED
TDH TOTAL DYNAMIC HEAD
THK THICK
T.O. TOP OF
TYP TYPICAL
U
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
V
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
W
W/ WITH
W WIDTH
WC WATER CLOSET
WD WOOD
W/O WITHOUT
WTRPRF WATERPROOFING
ABBREVIATIONS:
DEFINITIONS:
A. "ALIGN" MEANS (I.E.) TO ACCURATELY LOCATE FINISH
FACES IN LINE OR SO AS TO BE PARALLEL.
B. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM
FINISHED FACE TO FINISHED FACE.
C. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR
CONDITIONS, UNO.
D. WHEREVER THE TERM "OR EQUAL" IS USED, IT SHALL
MEAN EQUAL OR BETTER PRODUCT AS APPROVED BY
THE CONTRACTING OFFICER.
APPLICABLE CODES:APPLICABLE CODES:
• INTERNATIONAL BUILDING CODE (IBC) 2021, WITH APPENDICES
• INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021
• NFPA 70 NATIONAL ELECTRIC CODE (NEC) 2020
• NATIONAL HISTORIC PRESERVATION ACT, 1966 AS AMENDED
• SECRETARY OF INTERIOR STANDARDS FOR REHABILITATION,
CODIFIED 36 CFR 67
• SECRETARY OF THE INTERIOR STANDARDS FOR THE
TREATMENT OF HISTORIC PROPERTIES
• RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES -
BOARD OF STATE AND PROVINCIAL PUBLIC HEALTH AND
ENVIRONMENTAL MANAGERS (2014 EDITION - "10 STATE
STANDARDS")
• NFPA 820: STANDARD FOR FIRE PROTECTION IN WASTEWATER
TREATMENT AND COLLECTION FACILITIES (2020 EDITION)
• EPA ONSITE WASTEWATER TREATMENT SYSTEMS MANUAL
(2002 EDITION)
• FLORIDA BUILDING CODE, 2020 7TH EDITION
• FLORIDA DEPARTMENT OF HEALTH
• FLORIDA ADMINISTRATIVE CODE & REGISTER, RULE CHAPTER
64E-6: STANDARDS FOR ONSITE SEWAGE TREATMENT AND
DISPOSAL SYSTEMS
• FLORIDA ADMINISTRATIVE CODE & REGISTER, RULE CHAPTER
62-600: DOMESTIC WASTEWATER FACILITIES
• FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
• NSF CERTIFICATION
• NSF/ANSI 40 FOR RESIDENTIAL WASTEWATER TREATMENT
SYSTEMS
• NSF/ANSI 245 FOR NITROGEN REDUCTION
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:4
A
M
GENERAL INFORMATION AND
INDEX OF DRAWINGSG101
C.BAXTER
J.RYAN
J.MORGAN
2 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
INDEX OF DRAWINGS
SHEET
SUB
SHEET TITLE OF SHEET
GENERAL
1 CS COVER SHEET
2 G101 GENERAL INFORMATION AND INDEX OF DRAWINGS
ARCHITECTURAL SITE
3 AS101 ARCHITECTURAL SITE PLAN
CIVIL
4 C1 WASTEWATER COLLECTION SYSTEM PLAN
5 C2 WASTEWATER COLLECTION DEMOLITION PLAN
6 C3 COLLECTION SYSTEM PLAN AND PROFILE
7 C4 WASTEWATER TREATMENT PLANT LAYOUT
8 C5 DETAILS
9 C6 TREATMENT PLANT FLOW DIAGRAM
ARCHITECTURAL DEMOLITION
10 AD101 DEMOLITION FLOOR PLAN
ARCHITECTURAL
11 A101 FLOOR PLAN
12 A201 ELEVATIONS
13 A351 SECTION DETAILS
14 A352 LIFT STATION 2 DETAILS
ELECTRICAL
15 E101 ELECTRICAL PLAN AND RISER
16 E201 SCHEDULES AND DETAILS
Grand total: 16
A. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING
CONDITIONS TO REMAIN. DAMAGE SHALL BE RESTORED TO MATCH
EXISTING OR BETTER.
B. CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO
EXISTING LANDSCAPING ONCE PROJECT IS COMPLETE.
COORDINATE WITH PARK TO IDENTIFY LANDSCAPE CONDITIONS TO
BE RESTORED.
C. ANY POTENTIAL MATERIAL LAYDOWN AREAS TO BE COORDINATED
WITH THE CONTRACTING OFFICER AND THE PARK.
D. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
E. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL SITE NOTES:
WASTE WATER
TREATMENT PLANT,
SEE A101
EXISTING RESIDENCE QUARTERS
EXISTING CISTERN
EXISTING SMALL DETACHED MAGAZINE
MAGAZINE
MOAT
MOAT
EXISTING ENGINEERING OFFICERS
QUARTER'S RESIDENCE
EXISTING TREE LINE (TYP)
MAIN DOCK
COUNTERSCARP (MOAT WALL)
CAMPING AREA AND MAIN BEACH
ENTRANCE BRIDGE
BRICK DEBRIS
MOAT MOAT
DOCK HOUSE
SEAPLANE BEACH
OFFICERS QUARTERS
FOUNDATION RUINS
LIGHTHOUSE
TOWER ABOVE
PROTECT
EXISTING BRICK
WALKWAY
SHOT
FURNACE
LARGE
MAGAZINE
ENGINEERING OFFICERS
QUARTER'S RUINS
B A
R R
A C
K S
F O
U N
D A
T
IO
N R
U
IN
S
LIFT STATION 1 (EXISTING)
LIFT STATION 2 (EXISTING)
NEW E/ONE SENTRY ALARM PANEL FOR LIFT
STATION 1. MOUNT ON STAINLESS STEEL
UNISTRUT 12" ABOVE FINISHED GRADE.
ROUT CONDUIT A MINIMUM
OF 18" BELOW GRADE
NEW E/ONE SENTRY ALARM PANEL FOR LIFT STATION 2.
MOUNT OUTSIDE OF LIFT STATION COVER ON STAINLESS
STEEL UNISTRUT 12" ABOVE FINISHED GRADE.
DOSING TANK (EXISTING)
EXISTING LAUNDRY
ROOM. VERIFY IN FIELD
FOR EXACT LOCATION.
EXISTING WATER LAB.
VERIFY IN FIELD FOR
EXACT LOCATION.
A352
EFFLUENT DRAIN FIELD
(EXISTING) SEE CIVIL DRAWINGS.
MOAT
MOAT
MOAT
LIMITS OF CONSTRUCTION WORK
PROPOSED MAIN CONSTRUCTION
STAGING AREA. CONFIRM SIZE /
LOCATION WITH THE PARK PRIOR TO
BEGINNING CONSTRUCTION.
COAL SHED RUINS
NORTH SWIM BEACH
PROPOSED SECONDARY
CONSTRUCTION STAGING AREA FOR
DOCK HOUSE SEPTIC TANK REMOVAL
ONLY. CONFIRM SIZE / LOCATION WITH
THE PARK PRIOR TO BEGINNING
CONSTRUCTION.
PROPOSED SAND BORROW AREA FOR
DOCK HOUSE SEPTIC TANK REMOVAL ONLY.
CONFIRM SIZE / LOCATION WITH THE PARK
PRIOR TO BEGINNING CONSTRUCTION.
PROPOSED SAND BORROW AREA FOR
DOCK HOUSE SEPTIC TANK REMOVAL ONLY.
CONFIRM SIZE / LOCATION WITH THE PARK
PRIOR TO BEGINNING CONSTRUCTION.
SITE PLAN LEGEND:
LIMITS OF
CONSTRUCTION
WORK
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/1
/2
:3 :4
P
M
ARCHITECTURAL SITE PLAN
AS101
11/03/2023
C.BAXTER
J.RYAN
J.MORGAN
3 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK
SCALE OF FEET
50050
AS101
1 ARCHITECTURAL SITE PLAN
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
09/01/2023
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
SYSTEM PLAN
WASTEWATER COLLECTION
REPLACE WASTEWATER TREATMENT PLANT
C1
SITE PLAN - GARDEN KEY (FORT JEFFERSON)1
C1
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
11/13/2023
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
DEMOLITION PLAN
WASTEWATER COLLECTION
REPLACE WASTEWATER TREATMENT PLANT
C2
SITE PLAN - GARDEN KEY (FORT JEFFERSON)1
C2
AutoCAD SHX Text Xref .\Dry Tortugas Wastewater Treatment Plant Draft.dwg
AutoCAD SHX Text
CISTERN
AutoCAD SHX Text
EXISTING FORCE MAIN TO BE REMOVED
AutoCAD SHX Text GENERAL NOTES 1. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY. 2. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING TEMPORARY PROTECTION THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN. 3. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED BY DEMOLITION SHALL BE ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST TO THE GOVERNMENT. 4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS AND NOTIFY THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF DISCREPANCIES BEFORE PROCEEDING WITH THE WORK. 5. NO CHANGES, MODIFICATIONS, OR DEVIATIONS SHALL BE MADE FROM THE DRAWINGS NO CHANGES, MODIFICATIONS, OR DEVIATIONS SHALL BE MADE FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN PERMISSION FROM THE CONTRACTING OFFICER. 6. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING OFFICER FOR ANY LACK OF OR REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE WORK. 7. CONTRACTOR TO MINIMIZE IMPACT TO THE LANDSCAPING WITHIN THE CONSTRUCTION LIMITS CONTRACTOR TO MINIMIZE IMPACT TO THE LANDSCAPING WITHIN THE CONSTRUCTION LIMITS OF THE PROJECT. 8. LIFT STATIONS, TREATMENT PLANT, AND FORCE MAIN PIPING TO BE REPLACED IN EXISTING LIFT STATIONS, TREATMENT PLANT, AND FORCE MAIN PIPING TO BE REPLACED IN EXISTING TRENCHES AND LOCATIONS TO NOT ALTER ANY ABOVE GROUND EXISTING CONDITIONS. 9. ANY REMOVAL OR MODIFICATION TO THE BRICK WALKWAY (NOT SHOWN) WILL BE REPLACED ANY REMOVAL OR MODIFICATION TO THE BRICK WALKWAY (NOT SHOWN) WILL BE REPLACED WITH THE SAME BRICKS REMOVED IN THE SAME LAYOUT AS EXISTING. ALL BRICK AND PORTIONS OF THE FORT TO BE CONSIDERED HISTORICALLY IMPORTANT AND SHALL BE CAREFULLY MAINTAINED DURING CONSTRUCTION. 10. LIFT STATION 2 TO HAVE DECORATIVE COVER REMOVED AND DISPOSED OF ABOVE THE LIFT STATION 2 TO HAVE DECORATIVE COVER REMOVED AND DISPOSED OF ABOVE THE WETWELL LID. 11. EXISTING GRAVITY PIPING TO REMAIN IN PLACE AND BE RECONNECTED TO NEW WETWELLS. EXISTING GRAVITY PIPING TO REMAIN IN PLACE AND BE RECONNECTED TO NEW WETWELLS. 12. CONTRACTOR TO REPLACE ALL ELECTRICAL SUPPLY FROM WASTEWATER PLANT TO NEW LIFT CONTRACTOR TO REPLACE ALL ELECTRICAL SUPPLY FROM WASTEWATER PLANT TO NEW LIFT STATIONS AND TO NEW DOSING TANK COMPONENTS. THIS INCLUDES REMOVAL OF EXISTING ELECTRICAL WIRING THROUGHOUT THE COLLECTION SYSTEM. 13. CONTROLS FOR DOSING TANK AND PLANT COMPONENTS TO BE INSTALLED IN TREATMENT CONTROLS FOR DOSING TANK AND PLANT COMPONENTS TO BE INSTALLED IN TREATMENT PLANT CASEMATE. LIFT STATION CONTROL PANELS TO BE INSTALLED AT LIFT STATION. EXISTING CONTROL PANEL TO BE MAINTAINED AND REUSED FOR NEW ELECTRICAL SYSTEM COMPONENTS. 14. CONTRACTOR TO REMOVE LIFT STATIONS INDIVIDUALLY. WHILE EACH LIFT STATION IS OUT OF CONTRACTOR TO REMOVE LIFT STATIONS INDIVIDUALLY. WHILE EACH LIFT STATION IS OUT OF OPERATION, CONTRACTOR TO SUPPLY BYPASS PUMPING OPERATIONS TO MAINTAIN COLLECTION SYSTEM OPERATION. BYPASS PUMPING TO SUPPLY APPROXIMATELY 13 GPM DURING CONSTRUCTION. 15. CONTRACTOR TO MAINTAIN DOSING TANK PUMP OPERATION DURING REPLACEMENT IN SIMILAR CONTRACTOR TO MAINTAIN DOSING TANK PUMP OPERATION DURING REPLACEMENT IN SIMILAR MANNER AS LIFT STATIONS. 16. CONTRACTOR TO DISPOSE OF ANY MATERIALS REMOVED DURING CONSTRUCTION, UNLESS CONTRACTOR TO DISPOSE OF ANY MATERIALS REMOVED DURING CONSTRUCTION, UNLESS OTHERWISE INSTRUCTED BY THE CONTRACTING OFFICER. 17. SEE SHEET 1 OF 15 FOR SECONDARY STAGING AREA FOR DOCK HOUSE/HOLDING TANK SEE SHEET 1 OF 15 FOR SECONDARY STAGING AREA FOR DOCK HOUSE/HOLDING TANK REMOVAL TEMPORARY WASTEWATER TREATMENT NOTES: 18. WASTEWATER TREATMENT SHALL BE PROVIDED DURING CONSTRUCTION. WASTEWATER TREATMENT SHALL BE PROVIDED DURING CONSTRUCTION. 18.1. WESTECH SEQUENCING BATCH REACTOR CF1500, OR APPROVED EQUAL, SHALL BE WESTECH SEQUENCING BATCH REACTOR CF1500, OR APPROVED EQUAL, SHALL BE UTILIZED FOR TEMPORARY WASTEWATER TREATMENT. CONTRACTOR TO VERIFY TANK WILL FIT THROUGH FORT ENTRY BEFORE ORDERING TEMPORARY TREATMENT. 18.2. TEMPORARY WASTEWATER PLANT MUST MEET THE FOLLOWING TREATMENT CRITERIA: TEMPORARY WASTEWATER PLANT MUST MEET THE FOLLOWING TREATMENT CRITERIA: 18.2.1. MAX EFFLUENT CBOD: 25 MG/L MAX EFFLUENT CBOD: 25 MG/L 18.2.2. MAX EFFLUENT TSS: 25 MG/L MAX EFFLUENT TSS: 25 MG/L 18.2.3. MAX EFFLUENT TN: 10 MG/L MAX EFFLUENT TN: 10 MG/L 18.2.4. MAX EFFLUENT TKN: 20 MG/L MAX EFFLUENT TKN: 20 MG/L 18.2.5. MUST PROVIDE MINIMUM 1,500 GPD TREATMENT CAPACITY MUST PROVIDE MINIMUM 1,500 GPD TREATMENT CAPACITY 18.2.6. CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER TO ENSURE 1,500 GPD CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER TO ENSURE 1,500 GPD LIMIT IS UTILIZED. 18.2.7. CONTRACTOR TO ENSURE FLOW FROM PLANT IS NOT NEGATIVELY IMPACTING DRAIN CONTRACTOR TO ENSURE FLOW FROM PLANT IS NOT NEGATIVELY IMPACTING DRAIN FIELD DURING CONSTRUCTION. INSPECTIONS TO BE PERFORMED DAILY DURING TEMPORARY PLANT USE. CONSTRUCTION PHASING THE FOLLOWING PHASING PLAN IS INTENDED TO MINIMIZE CONSTRUCTION TIME WHERE SEWER COLLECTION AND TREATMENT IS UNAVAILABLE. CONTRACTOR IS ENCOURAGED TO BE INNOVATIVE IN DECREASING DOWN TIME AS MUCH AS POSSIBLE AND MAY VARY FROM THIS PLAN. WASTEWATER PLANT REPLACEMENT 1. INSTALL TEMPORARY TREATMENT FACILITY SO THAT CONNECTION TO DISTRIBUTION SYSTEM INSTALL TEMPORARY TREATMENT FACILITY SO THAT CONNECTION TO DISTRIBUTION SYSTEM AND COLLECTION SYSTEM ARE FINAL STEPS. 2. DISCONNECT LIFT STATION AND EFFLUENT DISCHARGE PIPING FROM EXISTING PLANT. DISCONNECT LIFT STATION AND EFFLUENT DISCHARGE PIPING FROM EXISTING PLANT. 3. CONNECT LIFT STATION TO TEMPORARY LIFT STATION AND DISCHARGE PIPING, ALLOWING CONNECT LIFT STATION TO TEMPORARY LIFT STATION AND DISCHARGE PIPING, ALLOWING FLOW TO BE ROUTED TO THE DOSING TANK. 4. REMOVE EXISTING WASTEWATER PLANT, PLATFORMS, AND OTHER VARIOUS ITEMS TO ALLOW REMOVE EXISTING WASTEWATER PLANT, PLATFORMS, AND OTHER VARIOUS ITEMS TO ALLOW FOR INSTALL OF NEW WASTEWATER PLANT AND APPURTENANCES. 5. INSTALL WASTEWATER PLANT AND APPURTENANCES. INSTALL WASTEWATER PLANT AND APPURTENANCES. 6. DISCONNECT COLLECTION AND EFFLUENT DISCHARGE PIPING FROM TEMPORARY PLANT. DISCONNECT COLLECTION AND EFFLUENT DISCHARGE PIPING FROM TEMPORARY PLANT. 7. CONNECT AND COMMISSION NEW WASTEWATER TREATMENT PLANT. CONNECT AND COMMISSION NEW WASTEWATER TREATMENT PLANT. COLLECTION SYSTEM REPLACEMENT 1. STAGE WASTEWATER BYPASS AROUND LIFT STATION 1 WITH TEMPORARY PIPING TO STAGE WASTEWATER BYPASS AROUND LIFT STATION 1 WITH TEMPORARY PIPING TO TEMPORARY TREATMENT PLANT. 2. SWITCH FLOW FROM EXISTING LIFT STATION 1 TO TEMPORARY JUMPER. SWITCH FLOW FROM EXISTING LIFT STATION 1 TO TEMPORARY JUMPER. 3. REMOVE PIPING FROM LIFT STATION 1 TO TREATMENT PLANT. REMOVE PIPING FROM LIFT STATION 1 TO TREATMENT PLANT. 4. INSTALL NEW LIFT STATION 1 AND PIPING TO WASTEWATER TREATMENT PLANT. INSTALL NEW LIFT STATION 1 AND PIPING TO WASTEWATER TREATMENT PLANT. 5. MOVE TEMPORARY BYPASS TO LIFT STATION 2 AFTER LIFT STATION 1 IS OPERATIONAL. MOVE TEMPORARY BYPASS TO LIFT STATION 2 AFTER LIFT STATION 1 IS OPERATIONAL. 6. WHILE OPERATING TEMPORARY BYPASS, REMOVE LIFT STATION 2 AND FORCE MAIN BETWEEN WHILE OPERATING TEMPORARY BYPASS, REMOVE LIFT STATION 2 AND FORCE MAIN BETWEEN LIFT STATIONS 1 AND 2. 7. REPLACE COMPONENTS IN STEP 6 WITH NEW COMPONENTS. REPLACE COMPONENTS IN STEP 6 WITH NEW COMPONENTS. 8. SWITCH FLOW TO NEW COMPONENTS. SWITCH FLOW TO NEW COMPONENTS. 9. MOVE TEMPORARY BYPASS TO CREW QUARTERS TO ALLOW FLOW TO LIFT STATION 2. MOVE TEMPORARY BYPASS TO CREW QUARTERS TO ALLOW FLOW TO LIFT STATION 2. 10. REMOVE GRAVITY LINES FROM CREW QUARTERS TO LIFT STATION 2. REMOVE GRAVITY LINES FROM CREW QUARTERS TO LIFT STATION 2. 11. CONSTRUCTION NEW GRAVITY LINE FROM CREW QUARTERS TO LIFT STATION 2. CONSTRUCTION NEW GRAVITY LINE FROM CREW QUARTERS TO LIFT STATION 2. 12. REMOVE ALL TEMPORARY BYPASS AND OPERATE FULL SYSTEM BEFORE CLEANING UP AND REMOVE ALL TEMPORARY BYPASS AND OPERATE FULL SYSTEM BEFORE CLEANING UP AND RESTORING THE SITE TO ORIGINAL CONDITION. 13. AS A SEPARATE ITEM, DOSING TANK SHALL BE PROVIDED TEMPORARY BYPASS DURING AS A SEPARATE ITEM, DOSING TANK SHALL BE PROVIDED TEMPORARY BYPASS DURING INSTALLATION OF NEW DOSING TANK COMPONENTS.
AutoCAD SHX Text
EXISTING LIFT STATION AND DECORATIVE COVER TO BE REMOVED
AutoCAD SHX Text
ENGINEERS OFFICERS QUARTERS
AutoCAD SHX Text
OFFICERS QUARTERS FOUNDATION RUINS
AutoCAD SHX Text
HOTSHOT OVEN
AutoCAD SHX Text
LARGE MAGAZINE
AutoCAD SHX Text
BARRACKS FOUNDATION RUINS
AutoCAD SHX Text
BRICK WALKWAY
AutoCAD SHX Text
EXISTING LIFT STATION TO BE REMOVED
AutoCAD SHX Text EXISTING WASTEWATER TREATMENT PLANT AND WOODEN PLATFORM TO REMOVED IN ENTIRETY. WASTEWATER TREATMENT PLANT CONTROL PANEL CABINET TO REMAIN FOR REPLACEMENT OF INTERIOR COMPONENTS
AutoCAD SHX Text
EXISTING CREW QUARTERS GRAVITY SEWER LINE - TO REMAIN
AutoCAD SHX Text
EXISTING 6" PVC GRAVITY SEWER PIPE
AutoCAD SHX Text
EXISTING 6" PVC GRAVITY SEWER PIPE
AutoCAD SHX Text
EFFLUENT DRAIN FIELD (APPROXIMATE LOCATION)
AutoCAD SHX Text
EXISTING WASTEWATER TREATMENT TO EFFLUENT DISPOSAL DRAIN FIELD PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text POTENTIAL TEMPORARY TREATMENT PLANT AREA TO BE USED DURING CONSTRUCTION (SEE NOTE 17, THIS SHEET, FOR ADDITIONAL REQUIREMENTS)
AutoCAD SHX Text
SMALL MAGAZINE
AutoCAD SHX Text
STAFF HOUSING
AutoCAD SHX Text
WATER LAB
AutoCAD SHX Text
CREW QUARTERS
AutoCAD SHX Text
EXISTING DOSING TANK INTERNAL COMPONENTS TO BE REPLACED
AutoCAD SHX Text
EXISTING 2" PVC DOSING TANK SUPPLY LINE TO BE REMOVED
AutoCAD SHX Text
CONTRACTOR TO REMOVE AND DISPOSE OF SEPTIC TANK.
AutoCAD SHX Text
CONTRACTOR TO REMOVE AND DISPOSE OF APPROX. 319' OF 1.5" PVC LINE.
AutoCAD SHX Text
SEPTIC TANK AND PIPELINE REMOVAL CONSTRUCTION LIMITS.
AutoCAD SHX Text CONTRACTOR TO LOCATE ALL UTILITIES ALONG REMOVAL ROUTE AND IS NOT TO DAMAGE EXISTING PIPING.
AutoCAD SHX Text
APPROXIMATE LOCATION OF ACTIVE DIESEL PIPING SHOWN FOR REFERENCE.
AutoCAD SHX Text
PIPELINE REMOVAL CONSTRUCTION LIMITS
JRyan Snapshot
SANITARY SEWER ALIGNMENT PLAN
SCALE 1"=50'
C3
SANITARY SEWER PROFILE
HORIZONTAL SCALE: 1"=50'
VERTICAL SCALE: 1"=4'
C3
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
09/01/2023
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
PLAN & PROFILE
COLLECTION SYSTEM
REPLACE WASTEWATER TREATMENT PLANT
C3
TREATMENT PLANT LAYOUT1
C4
TREATMENT PLANT SECTION2
C4
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
09/01/2023
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
PLANT LAYOUT
WASTEWATER TREATMENT
REPLACE WASTEWATER TREATMENT PLANT
C4
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
09/01/2023
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
DETAILS
REPLACE WASTEWATER TREATMENT PLANT
C5
LIFT STATION 1 PLAN AND SECTION1
C5
LIFT STATION 2 PLAN AND SECTION2
C5
PIPE TRENCH REQUIREMENTS3
C5
NOT TO SCALE NOT TO SCALE
NOT TO SCALE
SECTION VIEW
PLAN
ID TAG
S.C.E.S.D.
WATER
PVC
LOCATOR WIRE ACCESS4
C5 NOT TO SCALE
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
09/01/2023
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
FLOW DIAGRAM
TREATMENT PLANT
REPLACE WASTEWATER TREATMENT PLANT
C6
LIFT STATION 2 LIFT STATION 1
FORCEMAIN
FORCEMAIN
PRIMARY TREATMENT TANK
2,000 GALLON SETTLING
BASIN COMPARTMENT
1,000 GALLON
RECIRCULATION TANK
COMPARTMENT
E-ONE PUMP
E-ONE PUMP
ORENCO
RECIRCULATION
PUMP
ORENCO AX-20 UNIT
ORENCO AX-20 UNIT
FLOW SPLIT ALTERNATES
PER ORENCO CONTROLS
ORENCO SUPPLIED
TREATMENT
PIPING
ORENCO SUPPLIED
TREATMENT
PIPING
FLOW SPLITS PER ORENCO
CONTROLS
DOSING TANK
(EXISTING) TO DRAIN FIELD
WASTEWATER TREATMENT PLANT FLOW DIAGRAM 1
C6
NOTES:
1. ORENCO SUPPLIED SYSTEM BEGINS AT INFLUENT DUMPING INTO SETTLING BASIN COMPARTMENT AND ENDS AFTER THE FLOW SPLIT IMMEDIATELY
BEFORE THE DOSING TANK.
2. ARROWS ALONG SINGLE LINES DENOTE FLOW DIRECTION.
3. SYSTEM NOT SHOWN TO SCALE AND ONLY SHOWN FOR PROCESS CLARITY.
4. SYSTEM PERFORMANCE DEPENDS ON INFLUENT CONCENTRATION. HISTORICAL DATA DEMONSTRATES THE FOLLOWING DISCHARGE PERFORMANCE:
4.1. cBOD5 < 5 MG/L
4.2. TOTAL SUSPENDED SOLIDS , 5 MG/L
4.3. NITROGEN REDUCTION = 64%
4.4. PHOSPHORUS REDUCTION = 33%
4.5. DATA TAKEN FROM TESTING CONDUCTED IN ACCORDANCE WITH NSF/ANSI 40 TESTING REQUIREMENTS PERFORMED BY A THIRD PARTY.
REMOVE EXISTING WASTEWATER
TREATMENT PLANT AND WOODEN
PLATFORM IN ITS ENTIRETY. WASTEWATER
TREATMENT CONTROL PANEL CABINET TO
REMAIN FOR REPLACEMENT OF INTERIOR
COMPONENTS. SEE CIVIL DRAWINGS FOR
ADDITIONAL NOTES AND INFORMATION.
REMOVE EXISTING WOOD
STEPS AND GUARDRAIL
REMOVE EXISTING BUILT-IN
COUNTERTOP AND
DECORATIVE OPENING
PANELING
REMOVE BASE CABINETS,
COUNTERTOP, AND SINK. CAP
EXISTING PLUMBING UNTIL
NEW SINK INSTALLATION.
DISCONNECT EXISTING POWER TO WATER
TREATMENT EQUIPMENT AND LEAVE IN
PLACE FOR RE-USE TO NEW EQUIPMENT.
SEE ELECTRICAL DRAWINGS.
EXISTING DRAIN FIELD DOSING
TANK PUMPS PANEL TO REMAIN.
EXISTING PANEL BOX TO REMAIN. ITEMS
INSIDE FOR WASTEWATER TREATMENT
PLANT TO BE REMOVED. PREP FOR NEW
SYSTEM. SEE ELECTRICAL DRAWINGS.
LIFTSTATION PUMP CONTROL PANELS TO
BE REMOVED. EXISTING STAINLESS STEEL
UNISTRUT TO REMAIN AND BE REUSED.
REMOVE BUILT-IN
SHELVING UNIT AND PREP
FOR NEW
EXISTING STORAGE CABINETS.
COORDINATE WITH PARK FOR
STORAGE AND FOR
REINSTALLATION OR REMOVAL.
EXISTING STORAGE CABINETS.
COORDINATE WITH PARK FOR STORAGE
AND FOR REINSTALLATION OR REMOVAL.
REMOVE LOWER WOODEN PLATFORM.
REMOVE LOWER WOODEN
PLATFORM.
LINE FOR ROOF ELEVATION
CHANGE ABOVE
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. FURNISH, INSTALL, AND MAINTAIN DUST COVERINGS TO PREVENT
THE SPREAD OF DUST BEYOND THE IMMEDIATE AREA WHERE
DEMOLITION IS BEING PERFORMED.
F. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE
PARK AND OCCUPANTS OF THIS BUILDING SO AS TO PROVIDE THE
LEAST AMOUNT OF DISRUPTION OF THE BUILDING ACTIVITIES AS
POSSIBLE.
G. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
H. SEE CIVIL FOR ADDITIONAL DEMOLITION.
I. SEE SPECIFICATIONS FOR ADDITIONAL DEMOLITION.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:4
A
M
DEMOLITION FLOOR PLANAD101
C.BAXTER
J.RYAN
J.MORGAN
10 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
AD101
1 DEMOLITION FLOOR PLAN
SCALE OF FEET
2 0 2 4
B L D
G
UP
EXISTING PANEL. SEE
ELECTRICAL DRAWINGS.
E X
IS
T
IN
G
R O
V
IF
EXISTING RO (VIF)
3' - 3"
E X
IS
T
IN
G
R O
V
IF
EXISTING RO (VIF)
3' - 3"
A201
A101
NEW BUILT-IN SHELVING UNIT
INSIDE EXISTING OPENING.
SEE DETAIL 3/A351.
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
INSTALL CABINET
PROVIDED BY THE PARK.
COORDINATE WITH PARK.
EXISTING DRAIN FIELD DOSING
TANK PUMPS PANEL TO
REMAIN. SEE ELECTRICAL
DRAWINGS.
EQ
PER MANUF REQUIREMENTS
10' - 0" EQ
T O
P L A
T F
O R
M
O R
E Q
O R
E Q
V
IF
E Q
E Q
E Q
A351
2' - 1"
A351
LINE FOR ROOF ELEVATION
CHANGE ABOVE
NEW BUILT-IN COUNTERTOP
INSIDE EXISTING OPENING.
SEE DETAIL 4/A351.
T
R E
A D
S
E A
C H
V
IF
V E
R
IF
Y W
IT
H
G R
A D
E
3' - 0"
CLEAR
1' - 11 1/2"
PANEL FOR WASTEWATER
TREATMENT PLANT. SEE
ELECTRICAL DRAWINGS.
NEW PANELS. SEE ELECTRICAL
DRAWINGS.
A351
A351
LINE FOR PLATFORM
(V
IF
A351
A351
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
1X COMPOSITE DECKING
ON PLATFORM
6X6 PRESSURE TREATED
TIMBER POST (TYP)
PRESSURE TREATED
(2)-2X10 WOOD BEAM WITH
(2)-5/8" DIA. THRU-BOLTS AT
EACH END OF BEAM (TYP)
PRESSURE TREATED 2X8 WOOD
JOIST @ 24" O.C.. CONNECT TO
WOOD BEAM WITH SIMPSON LUS28
STAINLESS STEEL HANGER (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF POST BASE (IN BOTH
DIRECTIONS). CONNECT TO POST
(2)-5/8" DIA. THRU BOLTS
NOTE: PLATFORM DESIGNED FOR MAINTENANCE
WORK LOADING (25 PSF LIVE LOAD)
P E
R M
A N
U F
R E
Q U
IR
E
M E
N T
S
PER MANUF REQUIREMENTS
10' - 0"
A201
A201
A201
A201
PRESSURE TREATED
(2)-2X10 WOOD BEAM WITH
(2)-5/8" DIA. THRU-BOLTS AT
EACH END OF BEAM (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF POST BASE (IN BOTH
DIRECTIONS). CONNECT TO POST
(2)-5/8" DIA. THRU BOLTS
PRESSURE TREATED 2X6 WOOD
JOIST @ 16" O.C.. CONNECT TO
WOOD BEAM WITH SIMPSON LUS28
STAINLESS STEEL HANGER (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF STAIR. CONNECT TO
POST (2)-5/8" DIA. THRU BOLTS
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:4
A
M
FLOOR PLANA101
C.BAXTER
J.RYAN
J.MORGAN
11 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
A101
1 FLOOR PLAN
SCALE OF FEET
2 0 2 4
B L D
G
A101
2 PLATFORM FRAMING PLAN
NEW FREE STANDING STORAGE
SHELVING UNIT INSIDE EXISTING
MASONRY OPENING. PROTECT EXISTING
MASORY WALLS. SEE DETAILS ON A351.
EXISTING MASONRY WALLS
NEW SINK TO BE
CONNECTED TO
EXISTING PLUMBING.
LINE FOR CASEWORK
BEHIND COLUMN
E X
IS
T
IN
G
T O
P R
O
V
IF
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
A351
A351
E Q
E Q
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
(V
IF
OR EQ
2' - 6" 3' - 0"
OR EQ
2' - 6"
EQ EQ EQ
VIF
8' - 0"
LINE FOR CASEWORK
BEHIND COLUMN
INSTALL CABINET
PROVIDED BY THE PARK
NEW BUILT-IN COUNTERTOP
INSIDE EXISTING OPENING.
SEE DETAIL 4/A351.
EXISTING RO (VIF)
12' - 3"
EXISTING RO (VIF)
4' - 0"
(V
IF
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
E X
IS
T
IN
G
T O
P R
O
V
IF
E X
IS
T
IN
G
T O
P R
O
V
IF
"1
A351
A351
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
NOTE: PLATFORM DESIGNED FOR MAINTENANCE
WORK LOADING (25 PSF LIVE LOAD)
6X6 PRESSURE TREATED
TIMBER POST (TYP)
PRESSURE TREATED (2)-2X10 WOOD
BEAM WITH (2)-5/8" DIA. THRU-BOLTS
AT EACH END OF BEAM (TYP)
PRESSURE TREATED WOOD JOIST.
SEE 2/A101 FRAMING PLAN (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF POST BASE (IN BOTH
DIRECTIONS). CONNECT TO POST
(2)-5/8" DIA. THRU BOLTS
1X COMPOSITE DECKING
ON PLATFORM
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
8 TREADS @ 11" EACH
7' - 4" 13' - 2" 10' - 0" 4' - 2"
A351
A351
E
Q U
A L R
IS
E
R S
M
IN
/7 "M
A X
V E
R
IF
Y W
G
R A
D E
T Y
P
A201
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
E X
IS
T
IN
G
T O
P R
O
V
IF
A351
NOTE: PLATFORM DESIGNED FOR MAINTENANCE
WORK LOADING (25 PSF LIVE LOAD)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:4
A
M
ELEVATIONSA201
C.BAXTER
J.RYAN
J.MORGAN
12 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
SCALE OF FEET
2 0 2 4
A201
1 ELEVATION OF CASEWORK
A201
2 SECTION DETAIL - PLATFORM AND STAIRS
A201
3 PLATFORM SECTION
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
1"
1' - 9" 3"
2' - 0"
SPLASH
CAULK
QUARTZ COUNTERTOP
OVER 3/4" MARINE GRADE
PLYWOOD TOP, WRAP
ALONG FRONT EDGE
HARDWARE
EXISTING SLAB
WOOD VENEER BASE
CONCEALED HINGE,TYP.
PVC CABINET BOX
3/4" COMPOSITE DOOR
PRESSURE TREATED 2x4
SINK AND FAUCET. CONNECT
TO EXISTING PLUMBING
HARDWARE
DRAWER
EXISTING SLAB
WOOD VENEER BASE
ADJUSTABLE SHELF
1"
1' - 8"
1' - 9" 3"
2' - 0"
CONCEALED HINGE,TYP.
PVC CABINET BOX
3/4" COMPOSITE DOOR
SPLASH
CAULK
QUARTZ COUNTERTOP
OVER 3/4" MARINE GRADE
PLYWOOD TOP, WRAP
ALONG FRONT EDGE
PRESSURE TREATED 2x4
E X
IS
T
IN
G
R O
V
IF
E Q
E Q
3/4" OSB (FULL SHEET)
EXISTING BRICK MASONRY
PRESSURE TREATED 2X4
FRAMING (TYP)
3/4" OSB (FULL SHEET)
PRESSURE TREATED 2X4
WOOD POST WITH 2X4
SISTERED IN FRAMING
USING 2-1/2" WOOD
SCREWS (TYP)
EXISTING BRICK MASONRY
PRESSURE TREATED 2X4
FRAMING (TYP)
3/4" OSB (FULL SHEET)
PRESSURE TREATED 2X4
WOOD POST WITH 2X4
SISTERED IN FRAMING
USING 2-1/2" WOOD
SCREWS (TYP)
3/4" PRESSURE TREATED
WOOD PANELING TO BE CUT
TO FIT EXISTING OPENEING.
TO MATCH EXISTING.
7'-9"
T/O OPENING
/2
2 1/4"
ONLY AT
STAIRS
/2
1.5" O.D. HANDRAIL,
STAINLESS STEEL
2X6 COMPOSITE CAP
2X4 PT RAIL
2X4 PT RAIL
2X2 PT PICKET @ 5
1/2" O.C. MAX.
(MAX. 4" GAP)
4X4 PT POST @ 48"
O.C. MAX.
2-8D NAILS
2-8D NAILS
5/8" DIA.
THRU-BOLTS
1X COMPOSITE DECKING
2X PT DECK
FRAMING
1"
PT TIMBER POST
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:4
A
M
SECTION DETAILSA351
C.BAXTER
J.RYAN
J.MORGAN
13 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
SCALE
1 0 1 2
SCALE OF FEET
A
SCALE AA351
1 SINK MILLWORK SECTION
SCALE AA351
2 TYPICAL MILLWORK SECTION
SCALE BA351
3 BUILT-IN SHELVING DETAIL
SCALE BA351
4 BUILT-IN COUNTER DETAIL SCALE
SCALE OF FEET
2 0 2 4 B
NOT TO SCALEA351
5 RAILING DETAIL
A352
VERIFY WITH LIFT MANUF.
4' - 0" EACH SIDE OR EQ
19/32" PRESSURE
TREATED T1-11
PLYWOOD SIDING,
PAINTED.
NEW LIFT STATION.
SEE CIVIL DRAWINGS
PRESSURE TREATED
2X6
(2) 4X4 PRESSURE TREATED
TIMBER POST FIT
TOGETHER IN PAIRS AT
EACH CORNER.
LINE OF PRESSURE TREATED
2X6 RAFTERS ABOVE
LINE OF ROOF ABOVE
A352
LINE OF WALL BELOW
ASHALT SHINGLES ON SELF-
ADHERING, HIGH
TEMPERATURE
UNDERLAYMENT ON MIN. 5/8"
PLYWOOD ON 2X6 FRAMING
3/4" X 4 1/2" HOT DIPPED
GALVANIZED SCREW EYE
BOLT TO ALLOW COVER TO BE
LIFTED OFF WITH A FRONT
END LOADER OR OTHER
PIECE OF EQUIPMENT.
NEW LIFT STATION. SEE CIVIL
DRAWINGS
3" / 1'-0"3" / 1'-0"
ASHALT SHINGLES ON SELF-
ADHERING, HIGH
TEMPERATURE
UNDERLAYMENT ON MIN. 5/8"
PLYWOOD ON 2X6 FRAMING
A352
3/4" X 4 1/2" HOT DIPPED
GALVANIZED SCREW EYE BOLT
TO ALLOW COVER TO BE LIFTED
OFF WITH A FRONT END LOADER
OR OTHER PIECE OF EQUIPMENT.
HORIZONTAL PRESSURE
TREATED 2X6 ON EITHER SIDE
OF THE ROOF MEMBERS
19/32" PRESSURE TREATED T1-11
PLYWOOD SIDING, PAINTED.
PRESSURE TREATED
2X4 BETWEEN POST
(2) 4X4 PRESSURE TREATED
TIMBER POST BEYOND
PRESSURE
TREATED 2X6
ASHALT SHINGLES ON SELF-
ADHERING, HIGH
TEMPERATURE
UNDERLAYMENT ON MIN. 5/8"
PLYWOOD ON 2X6 FRAMING
PRESSURE
TREATED 2X6
V E
R
IF
Y W
IT
H
L
IF
T
HORIZONTAL PRESSURE
TREATED 2X6 ON EITHER SIDE
OF THE ROOF MEMBERS
GALVALUME DRIP EDGE
PRESSURE TREATED 2X6
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:4
A
M
LIFT STATION 2 DETAILSA352
C.BAXTER
J.RYAN
J.MORGAN
14 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
SCALE
SCALE OF FEET
2 0 2 4 A
SCALE AA352
1 FLOOR PLAN - LIFT STATION 2
SCALE AA352
2 ROOF PLAN - LIFT STATION 2
SCALE AA352
3 SECTION DETAIL - LIFT STATION 2
SCALE B
SCALE OF INCHES
12 6 12
SCALE BA352
4 DETAIL - LIFT STATION 2
EXISTING 120/208 PANEL "W"
NEW WASTE WATER TREATMENT
CONTROL PANEL.
NEW 15 KVA TRANSFORMER "TW-1"
NEW 100A LOAD CENTER "W-1"
SEE E201 FOR MORE DETAILS.
EXISTING DOSING CONTROL
PANEL. REPLACE ONE FOR ONE
WITH NEW CONTROL PANEL.ORENCO TANK PUMPS.
SEE CIVIL DRAWINGS.
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
NEW PLATFORM. SEE
ARCH DRAWINGS.
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
WASTE WATER
TREATMENT
CONTROL
PANEL
NEW
DOSING
TANK
PUMPS
CONTROL
FROM EXISTING ELECTRICAL INFRASTRUCTURE.
WASTE WATER TREATMENT AREA
LIFT STATION 1 E/ONE SENTRY ALARM PANEL MOUNTED ON
STAINLESS STEEL UNISTRUT 12" ABOVE FINISHED GRADE.
LIFT STATION 2 E/ONE SENTRY
ALARM PANEL. MOUNTED ON
STAINLESS STEEL UNISTRUT
12" ABOVE FINISHED GRADE.
PROVIDE AND INSTALL NEW NEMA 3R JUNCTION
BOX MOUNTED ON STAINLESS STEEL UNISTRUT 12"
ABOVE FINISHED GRADE FOR DOSING TANK PUMPS.
20-3
20-2
20-2
EXIST
1. REFER TO ACHITECTURAL SITE PLAN ON AS101 FOR EXACT
LOCATIONS OF LIFT STATIONS 1, 2, AND DOSING TANK.
2. REFER TO ELECTRICAL SCHEDULES AND DETAILS ON E201
FOR LIFT STATION ALARM PANEL WIRING DIAGRAM.
3. DASHED LINES INDICATE CONDUIT TO BE ROUTED
UNDERGROUND. UNDERGROUND CONDUIT TO BE ROUTED A
MINIMUM OF 18" BELOW GRADE.
TRANSFORMER
"TW-1"
208V - 240/120V 1Ø, 3W 15 kVA
EXISTING
PANEL
"W"
200A MCB
208/120V 1Ø, 3W
NEW
PANEL
"W-1"
80A MCB
208/120V 1Ø, 3W
TO WASTE WATER
TREATMENT PUMPS.
GENERAL RISER NOTES:
CONNECT TO EXISTING
GROUNDING SYSTEM.20-3
PROVIDE EXTRA 3/4" CONDUIT WITH PULL STRING
FOR DOSING TANK PUMPS CONTROL WIRE.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:1
P M
ELECTRICAL PLAN AND
RISERE101
J.SERRADAS
T.PAYNE
R.RAHN
15 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/2023
SCALE OF FEET
2 0 2 4
B L D
G
E101
1 ELECTRICAL PLAN
ELECTRICAL PLAN SHEET NOTES
TAG # TAG DESCRIPTION
1 MOUNT TRANSFORMER "TW-1" ONTO EXISTING STAINLESS STEEL
UNISTRUT.
2 MOUNT LOADCENTER "W-1" ONTO EXISTING STAINLESS STEEL
UNISTRUT.
3 NEW WASTE WATER TREATMENT CONTROL PANEL TO BE
INSTALLED INSIDE EXISTING STAINLESS STEEL NEMA 3R
ENCLOSURE.
4 REPLACE EXISTING DOSING CONTROL PANEL 1 FOR 1 WITH NEW
DOSING CONTROL PANEL.
CONDUCTOR SCHEDULE
MARK CAPACITY SETS PHASE/WIRE WIRE EQUIP GND CONDUIT
20-2 20 AMP 2 1 PHASE/2 WIRE (2)#12 (1)#12 3/4"
20-3 20 AMP 2 1 PHASE/3 WIRE (3)#12 (1)#12 3/4"
30 30 AMP 1 1 PHASE/3 WIRE (3)#10 (1)#10 3/4"
80 80 AMP 1 1 PHASE/3 WIRE (3)#3 (1)#8 1-1/4"
100 100 AMP 1 1 PHASE/3 WIRE (3)#1 (1)#8 1-1/4"
EXIST EXISTING - 1 PHASE/3 WIRE EXISTING EXISTING EXISTING
NOT TO SCALEE101
2 ELECTRICAL RISER
09/01/23
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:1
P M
SCHEDULES AND DETAILS
E201
J.SERRADAS
T.PAYNE
R.RAHN
16 16
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK09/01/202309/01/23
| DTRO 196743B WWTP FINAL CD |
| G101 - GENERAL INFORMATION AND INDEX OF DRAWINGS |
| AS101 - ARCHITECTURAL SITE PLAN |
| C1 - SYSTEM PLAN WASTEWATER COLLECTION |
| C2 - DEMOLITION PLAN WASTEWATER COLLECTION |
| C3 - PLAN & PROFILE COLLECTION SYSTEM |
| C4 - PLANT LAYOUT WASTEWATER TREATMENT |
| C5 - DETAILS |
| C6 - FLOW DIAGRAM TREATMENT PLANT |
| AD101 - DEMOLITION FLOOR PLAN |
| A101 - FLOOR PLAN |
| A201 - ELEVATIONS |
| A351 - SECTION DETAILS |
| A352 - LIFT STATION 2 DETAILS |
| E101 - ELECTRICAL PLAN AND RISER |
| E201 - SCHEDULES AND DETAILS |
File details come from the government source that posted it. Updated .