This document appears to be a set of drawings related to the federal contract opportunity for Repair of the Aboveground Storage Tank (AST) Leak Detection Monitoring System at DLA Gimcheon.

The scope of work includes replacing the AST leak detection monitoring system, fuel pipeline, valve and flange system, sensors, containment pipes, and flexible double wall fuel pipelines underground. It also requires providing detectable aluminum foil plastic-backed tape or detectable magnetic plastic tape for warning and identification of buried piping. The drawings provide details on the fuel tank/boiler room work plan and fuel line replacement plan. The related federal contract opportunity is solicitation #W90VN924R0120, with a closing date of June 17, 2024 at 1:00 PM Korea local time. The contracting agency is the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
RFP W90VN924R0120.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT TO SCALE

BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION Br.

PROJECT NO.

D D D D

D

D D

D D D D

D

D D D D

D

D

OWS

OWS

DD D

Sep Tank p

2308 Scale

Open Storage

Sep Tank p

Dock

D

"P

"P 2321 2314

"PFT

2305 2309

D

D

D

D

D

D

D

FT

D

D

D D

2303 2323

D Flagpole

2315j fi fi

Open Storage

Bridge

THIS LOCATION

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

UNIT #15746, APO AP 96218-5746

DATE:

ESTIMATION Br.

PROJECT LOCATION PLAN

HU-00023-3J

PROJECT LOCATION PLAN

B2323, DLA GIMCHEON

REPAIR AST LEAK DETECTION MONITORING SYSTEM

B2323, DLA GIMCHEON

REPAIR AST LEAK DETECTION MONITORING SYSTEM

FEWR # HU-00023-3J

1#305, Aposunhwan-ro, Gimcheon-si, Gyeongsangbuk-do, South Korea

PROJECT NO.

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

UNIT #15746, APO AP 96218-5746

DATE:

ESTIMATION Br.

HU-00023-3J

B2323, DLA GIMCHEON

REPAIR AST LEAK DETECTION MONITORING SYSTEM

BOILER ROOMREAR SIDE VIEW

LEFT SIDE VIEW RIGHT SIDE VIEWFRONT VIEW

FUEL TANK/ BOILER ROOM WORK PLAN

FUEL TANK/ BOILER ROOM WORK PLAN

AND ALL ENTRY BOOT FITTINGS.

4. REPLACE SUMP, CONCRETE CONTAINMENT DIKE

DOUBLE WALL PIPE FROM SUMP TO BOILER ROOM

3. REPLACE CONTAINMENT PIPE AND FLEXIBLE

FROM UPPER SIDE FLANGE TO SUMP.

2. REPLACE FUEL PIPELINE, VALVE, AND FLANGE

SYSTEM AND SENSORS.

1. REPLACE THE AST LEAK DETECTION MONITORING

SCOPE OF WORK

PROJECT NO.

D D D D

D

D D

D D D D

D

D D D D

D

D

OWS

OWS

DD D

Sep Tank p

2308 Scale

Open Storage2318

Sep Tank p

Dock

D

FT

"P

"P 2321 2314

"PFT

2305 2309

D

D

D

D

D

D

D

FT

D

D

D D

2303 2323

D Flagpole

2315j fi fi fi

Open Storage

Bridge

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

UNIT #15746, APO AP 96218-5746

DATE:

ESTIMATION Br.

HU-00023-3J

KEY PLAN

B2323, DLA GIMCHEON

REPAIR AST LEAK DETECTION MONITORING SYSTEM

FUEL LINE REPLACEMENT PLAN

FUEL LINE REPLACEMENT PLAN

W

H

LEGEND

HOT WATER BOILER

HEATING BOILER

S SUMP

ROOM

BOILER

FUEL TANK2303

W

H

S

AST AST MONITOR

AST

(HOT WATER BOILER)

4" CONTAINMENT PIPE

(HEATING BOILER)

4" CONTAINMENT PIPE

FROM SUMP TO BOILER ROOM.

1. REPLACE TWO(2) CONTAINMENT PIPES AND FOUR(4) FLEXIBLE DOUBLE WALL FUEL PIPELINES UNDERGROUND

SCOPE OF WORK

FOR WARNING AND IDENTIFICATION OF BURIED PIPING.

5. DETECTABLE ALUMINUM FOIL PLASTIC-BAKCED TAPE OR DETECTABLE MAGNETIC PLASTIC TAPE SHALL BE PROVIDED

TRAINED BY THE MANUFACTURER.

AND LISTED IN COMPLIANCE WITH UL 971 AND NFPA 30. INSTALLATION SHALL BE PERFORMED BY INDIVIDUALS

4. UNDERGROUND PIPING SHALL BE OF FLEXIBLE, SECONDARILY CONTAINED THAT IS DESIGNED

TO AVOIDE OBSTRUCTIONS CAUSED BY PIPELINE(S) FOR SAFETY PURPOSES.

3. UNLESS OTHERWISE INDICATED, ROUTE FUEL OIL LINE(S) INSIDE THE MECHANICAL ROOM ALONG THE INTERIOR WALLS

2. SUMPS SHALL BE PROVIDED AT ALL LOW POINTS, ALL JOINTS ANO CONNECTIONS OF UNDERGROUND PIPING.

1. ALL UNDERGROUND PIPING SHALL BE CONTINUOUSLY SLOPED TO SUMPS.

NOTES :

Encl #5_HU-00023-3J_Applicable Contract Drawings
HU-23-3J FUEL SENSOR-Model-0001
HU-23-3J FUEL SENSOR-Model-0002
HU-23-3J FUEL SENSOR-Model-0003

HU-23-3J FUEL SENSOR-Model-000