This document appears to be a set of drawings related to the federal contract opportunity for Repair of the Aboveground Storage Tank (AST) Leak Detection Monitoring System at DLA Gimcheon.
The scope of work includes replacing the AST leak detection monitoring system, fuel pipeline, valve and flange system, sensors, containment pipes, and flexible double wall fuel pipelines underground. It also requires providing detectable aluminum foil plastic-backed tape or detectable magnetic plastic tape for warning and identification of buried piping. The drawings provide details on the fuel tank/boiler room work plan and fuel line replacement plan. The related federal contract opportunity is solicitation #W90VN924R0120, with a closing date of June 17, 2024 at 1:00 PM Korea local time. The contracting agency is the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP W90VN924R0120.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
BUSINESS AND OPERATIONS INTERGRATION DIVISION, ESTIMATION Br.
PROJECT NO.
D D D D
D
D D
D D D D
D
D D D D
D
D
OWS
OWS
DD D
Sep Tank p
2308 Scale
Open Storage
Sep Tank p
Dock
D
"P
"P 2321 2314
"PFT
2305 2309
D
D
D
D
D
D
D
FT
D
D
D D
2303 2323
D Flagpole
2315j fi fi
Open Storage
Bridge
THIS LOCATION
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
UNIT #15746, APO AP 96218-5746
DATE:
ESTIMATION Br.
PROJECT LOCATION PLAN
HU-00023-3J
PROJECT LOCATION PLAN
B2323, DLA GIMCHEON
REPAIR AST LEAK DETECTION MONITORING SYSTEM
B2323, DLA GIMCHEON
REPAIR AST LEAK DETECTION MONITORING SYSTEM
FEWR # HU-00023-3J
1#305, Aposunhwan-ro, Gimcheon-si, Gyeongsangbuk-do, South Korea
PROJECT NO.
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
UNIT #15746, APO AP 96218-5746
DATE:
ESTIMATION Br.
HU-00023-3J
B2323, DLA GIMCHEON
REPAIR AST LEAK DETECTION MONITORING SYSTEM
BOILER ROOMREAR SIDE VIEW
LEFT SIDE VIEW RIGHT SIDE VIEWFRONT VIEW
FUEL TANK/ BOILER ROOM WORK PLAN
FUEL TANK/ BOILER ROOM WORK PLAN
AND ALL ENTRY BOOT FITTINGS.
4. REPLACE SUMP, CONCRETE CONTAINMENT DIKE
DOUBLE WALL PIPE FROM SUMP TO BOILER ROOM
3. REPLACE CONTAINMENT PIPE AND FLEXIBLE
FROM UPPER SIDE FLANGE TO SUMP.
2. REPLACE FUEL PIPELINE, VALVE, AND FLANGE
SYSTEM AND SENSORS.
1. REPLACE THE AST LEAK DETECTION MONITORING
SCOPE OF WORK
PROJECT NO.
D D D D
D
D D
D D D D
D
D D D D
D
D
OWS
OWS
DD D
Sep Tank p
2308 Scale
Open Storage2318
Sep Tank p
Dock
D
FT
"P
"P 2321 2314
"PFT
2305 2309
D
D
D
D
D
D
D
FT
D
D
D D
2303 2323
D Flagpole
2315j fi fi fi
Open Storage
Bridge
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
UNIT #15746, APO AP 96218-5746
DATE:
ESTIMATION Br.
HU-00023-3J
KEY PLAN
B2323, DLA GIMCHEON
REPAIR AST LEAK DETECTION MONITORING SYSTEM
FUEL LINE REPLACEMENT PLAN
FUEL LINE REPLACEMENT PLAN
W
H
LEGEND
HOT WATER BOILER
HEATING BOILER
S SUMP
ROOM
BOILER
FUEL TANK2303
W
H
S
AST AST MONITOR
AST
(HOT WATER BOILER)
4" CONTAINMENT PIPE
(HEATING BOILER)
4" CONTAINMENT PIPE
FROM SUMP TO BOILER ROOM.
1. REPLACE TWO(2) CONTAINMENT PIPES AND FOUR(4) FLEXIBLE DOUBLE WALL FUEL PIPELINES UNDERGROUND
SCOPE OF WORK
FOR WARNING AND IDENTIFICATION OF BURIED PIPING.
5. DETECTABLE ALUMINUM FOIL PLASTIC-BAKCED TAPE OR DETECTABLE MAGNETIC PLASTIC TAPE SHALL BE PROVIDED
TRAINED BY THE MANUFACTURER.
AND LISTED IN COMPLIANCE WITH UL 971 AND NFPA 30. INSTALLATION SHALL BE PERFORMED BY INDIVIDUALS
4. UNDERGROUND PIPING SHALL BE OF FLEXIBLE, SECONDARILY CONTAINED THAT IS DESIGNED
TO AVOIDE OBSTRUCTIONS CAUSED BY PIPELINE(S) FOR SAFETY PURPOSES.
3. UNLESS OTHERWISE INDICATED, ROUTE FUEL OIL LINE(S) INSIDE THE MECHANICAL ROOM ALONG THE INTERIOR WALLS
2. SUMPS SHALL BE PROVIDED AT ALL LOW POINTS, ALL JOINTS ANO CONNECTIONS OF UNDERGROUND PIPING.
1. ALL UNDERGROUND PIPING SHALL BE CONTINUOUSLY SLOPED TO SUMPS.
NOTES :
| Encl #5_HU-00023-3J_Applicable Contract Drawings |
| HU-23-3J FUEL SENSOR-Model-0001 |
| HU-23-3J FUEL SENSOR-Model-0002 |
| HU-23-3J FUEL SENSOR-Model-0003 |
HU-23-3J FUEL SENSOR-Model-000