Drawings.pdf

PDF 16 MB Posted

Attached to
Z1DA--Reface Limestone, Various Buildings 610-23-516
Solicitation number
36C25023Q0404
Issued by

View the file

Other files

File Type Posted
SPECIFICATIONS.pdf PDF
36C25023Q0404.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved: Medical Center Director

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department Zachary I. McDaniel

Drawing Title

F

610-23-516

Various

23-101M 12/25/2022

Marion, IN

Z.McDaniel C.Hatfield

Cover Sheet Anthony Colon

NORTHERN INDIANA HEALTH CARE SYSTEMS,

VETERANS ADMINISTRATION

1700 E. 38TH. STREET MARION, INDIANA 46953

PROJECT # 610-23-516

REFACE LIMESTONE, VARIOUS

BUILDINGS

Reface Limestone, Various Buildings

Michael E. Hershman

M

IS

SI

SS

IN

EW

A

RI

VE

R

NATIO

NAL CEM

ETARY

NATIONAL CEMETARY

N

ATIO

N

AL C

EM

ETAR

Y

65 114

N

ATIO

N

AL C

EM

ETAR

Y

COMPOUND

MATERIAL

COMPOUND

51 52

(2) 30,000

GAL. U.S.T.

T516

9 8

1301 / 733002 / 72

3001 / 69

ES / 3004

MB / 3

G01

3003 / 83

T504

E 38TH ST.

E 38TH ST. E 38TH ST. E 38TH ST.

S LIN

C

O

LN

BLVD

41 97

177 49

HA7

HA8

R.T.

HA9

HA1

DIESEL

HA6

HA3

HA4

WATER ST.

WATER ST.

M

CM

AH

O

N

AV

E.

CO

TT

AG

E

RD

CO

TT

AG

E

RD

BLACK RD.

WATER ST.

RAILROAD AVE.

BL

AC

K

RD

BL

AC

K

RD

EA

RTH

FI

LL

HA2 HA5

HA10

HA11

GRAY

R

D.

G R

AY

R

D

. STEELE CIRCLE

MCMAHON AVE.

MAIN ENTRANCE

MCMAHON AVE.

IN

DIA

NA

AV

E.

INDIANA AVE.

INDIANA AVE.

STEELE CIRCLE

BLACK RD.

BLACK RD. BLACK RD.

BLACK RD.

BL

AC

K R

D

BLACK RD.

G R

AY

R

D

ORCHARD AVE.

ORCHARD AVE.

ORCHARD AVE.

RIVER RD.

O

RCHARD AVE.

NELSON ST.

NELSON ST.

S LIN

C

O

LN

BLVD

S LIN

C

O

LN

BLVD

CHAPMAN AVE.

CHAPMAN AVE.

CHAPMAN AVE.

M

ISSISSIN

EW

A R

D

KUDER PL. KUDER PL.

NATIONAL CEMETERY

MAIN ENTRANCE

HYDE RD.

H

YD

E R D

H

YD

E R D

M

AR

IO

N

R D

M

AR

IO

N

R D

HYD

E

RD.

IR

W

IN

D

R

IR

W

IN

D

R

CHAPMAN AVE.

CHAPMAN AVE.

CHAPM

AN AVE.

STEELE C

IR

C

LE

NELSON ST.

SHORT ST.

M

EC

H

AN

IC

S AVE.

WATER ST.

SH

O

RT

S

T.

FLO

W

ER ST.

FLO

W

ER

ST.

RIVER RD.

RAILROAD AVE.

M

EC

H

AN

IC

S AVE.

VINE RD.

VINE RD.

DOCTOR'S RD.

D O

C

TO

R 'S R

D

D

IX R

D

D

IX R

D

Architectural Sheet Building 8 - South Elevation Architectural Sheet Building 8 - West Elevation

Architectural Sheet Building 8 - North Elevation Architectural Sheet Building 8 - East Elevation

Architectural Sheet Building 55 - North Elevation Architectural Sheet Building 55 - North Elevation Architectural Sheet Building 55 - East Elevation

Architectural Sheet Building 55 - Floor Plan

Architectural Sheet Building 8 - Floor Plan

Architectural Sheet Building 55 - Floor Plan

Cover Sheet, Index of Drawings, Location Maps

Architectural Sheet Building 51 & 52 - South Elevation Architectural Sheet Building 51 & 52 - South Elevation

Architectural Sheet Building 51 & 52 - North Elevation

Architectural Sheet Building 51 & 52 - East Elevation

Architectural Sheet Building 53 - West Elevation Architectural Sheet Building 53 - South Elevation

Architectural Sheet Building 53 - West Elevation

Architectural Sheet Building 53 - North Elevation

Architectural Sheet Building 53 - East Elevation Architectural Sheet Building 53 - East Elevation

Architectural Sheet Building 53 - Floor Plan

Architectural Sheet Building 51 & 52 - Floor Plan

Architectural Sheet Building 51 & 52 - West Elevation

Architectural Sheet Building 51 & 52 - North Elevation

General Notes

Architectural Sheet Building 76 - South Elevation

PROJECT AREAS

Architectural Sheet Building 9 - North Elevation

Architectural Sheet Building 9 - West Elevation

Architectural Sheet Building 9 - South Elevation

Architectural Sheet Building 9 - East Elevation

Architectural Sheet Building 9 - Floor Plan

SHEET

NUMBER

INDEX OF DRAWINGS

SHEET NAME

Architectural Sheet Building 97 - Floor Plan

Architectural Sheet Building 97 - East Elevation Architectural Sheet Building 97 - North Elevation

Architectural Sheet Building 97 - South Elevation Architectural Sheet Building 97 - West Elevation

Architectural Sheet Building 55 - East Elevation Architectural Sheet Building 55 - South Elevation Architectural Sheet Building 55 - South Elevation Architectural Sheet Building 55 - West Elevation Architectural Sheet Building 55 - West Elevation

Architectural Sheet Building 9 - West Elevation

Architectural Sheet Building 9 - East Elevation

AutoCAD SHX Text N

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Various Marion, IN

Zachary I. McDaniel 23-101M

2-25-2022 Z.McDaniel C.Hatfield

General Notes Anthony Colon

Reface Limestone, Various Buildings

Michael E. Hershman 610-23-516

GENERAL NOTES:

Dwg. of2 44

1. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY FOR PREFACING LIMESTONE FOR VARIOUS BUILDINGS (BUILDINGS 8, 51, 52, 53, 55, AND SOUTH-SIDE OF BUILDING 76) IN CONFORMANCE WITH THE DETAILS AS SHOWN.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND TAKING EXACT MEASUREMENTS USED IN PREPARATION OF BIDDING DOCUMENTS, FOR ALL MEASUREMENTS

ARE APPROXIMATE.

3. TOOLS AND EQUIPMENT SHALL BE SECURED AT ALL TIMES. THE WORK SITE SHALL BE CLEANED UP AT THE CONCLUSION OF EACH DAYS WORK. UPON FINAL CLEAN-UP, THE CONTRACTOR SHALL REMOVE ALL DEBRIS, RUBBISH AND EXCESS MATERIAL FROM THE STATION.

4. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VAMC REGULATIONS, OSHA STANDARDS AND INTERIM LIFE SAFETY MEASURES.

5. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGING ADJACENT UTILITIES, WALLS, CEILING, ETC... IF DAMAGE OCCURS IT MUST BE REPAIRED AT CONTRACTORS OWN EXPENSE PER THE APPROVAL OF THE CONTRACTING OFFICER REPRESENTATIVE (COR).

6. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH THE PROJECT ENGINEER (COR)AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A SCHEDULE ALLOWING A MINIMUM OF SEVEN (7)DAYS ADVANCE NOTICE OF THE PLANNED START OF WORK/CONSTRUCTION ACTIVITIES. ALL UTILITY OUTAGES SHALL BE SCHEDULED WITH THE COR IN WRITING WITH A (7) DAY ADVANCE NOTICE.

7. THE CONTRACTOR WILL BE ALLOWED TO WORK AFTER THE CLOSE OF REGULAR BUSINESS HOURS IF HE CHOOSES. THIS SHALL BE SCHEDULED WITH THE PROJECT ENGINEER (COR) AND THE CONTRACTOR SHALL REPORT IN AND OUT WITH THE VA POLICE WHEN WORKING AFTER HOURS.

8. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE CONSTRUCTION PROGRESS A FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS NAME IS TO BE CERTIFIED TO THE VA AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A RESPONSIBLE PERSON CAN BE REACHED AFTER HOURS IN CASE OF PROBLEMS ETC... SHALL BE

PROVIDED ALSO.

9. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE FOLLOWED: THE DOCUMENTS (DRAWINGS, SPECIFICATIONS, ECT.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSION OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, THE MAJOR STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK REQUIRED.

10. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION WITH THE COR.

11. ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF MASONRY, FACE OF LIMESTONE, OR COLUMN CENTERLINE, UNLESS OTHERWISE NOTED.

12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH BUILDING COMPONENT LOCATION. BRING ANY DISCREPANCIES TO THE CONTRACTING OFFICER REPRESENTATIVE'S

(COR) ATTENTION IN WRITING IMMEDIATELY.

13. REPLACE LIMESTONE VENEER TRIM: THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIEL AND EXPERT SUPERVISION TO REPLACE LIMESTONE EXTERIOR VENEER TRIM USING NEW FASTENERS/HANGERS MATCHING THE EXISTING EXACT. ALL JOINTS AROUND THE NEW LIMESTONE SHALL BE REMOVED AND FREE FROM DEBRIS. NEW MORTAR

USED TO INSTALL NEW LIMESTONE SHALL MATCH EXISTING EXACT.

14. REPOINT (TUCKPOINT): REMOVE LOOSE AND OR DETERIORATED MORTAR AND CLEAN AREA OF ALL LOOSE MORTAR, DIRT AND DEBRIS. PREPARE MORTAL ONSITE WITH A RECORDED "RECIPE" TO ENSURE CONSISTENT MORTAR MIX THAT MATCHES EXACT: COLOR, TEXTURE, AND STYLE.. ADD THE COST TO REPLACE SEVERELY CRACKED, SPALLED, AND/OR DETERIORATED LIMESTONE PER PROJECT DOCUMENTS AND REPLACE WITH LIMESTONE THAT MATCHES EXACT COLOR, TEXTURE, AND STYLE INCLUDING THE MORTAR JOINT.

15. CLEANING: THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND EXPERT SUPERVISION TO WASH CLEAN AND FREE OF DIRT, MORTAR AND OTHER OBJECTIONABLE ACCUMULATIONS. REMOVE MORTAR DROPPINGS AND SMEARS AS WORK PROGRESSES. FINAL CLEAN DOWN SHALL INCLUDE BRUSHING WITH STIFF FIBER BRUSHES AND MILD SOAP OR DETERGENT AND RINSING WITH CLEAR WATER. DO NOT USE WIRE BRUSHES, ACID TYPE CLEANING AGENTS (ANYTHING WITH CITRUS AGENTS) OR OTHER MATERIEL OR METHODS WHICH COULD DAMAGE TO LIMESTONE. CONTRACTOR SHALL NOTIFY THE VA OF ANY DAMAGE CAUSED BY THE CONTRACTOR IMMEDIATELY.

16. A DESCRIPTION OF THE GROUPINGSOF BUILDING AS OUTLINED IN CONTRACT DOCUMENTS (SEE TABLE BELOW).

CONTRACT BUILDING GROUPINGS

Group 1 Buildings: 51, 52, 53 Group 2 Buildings: 55 Group 3 Buildings: 76 Group 4 Buildings: 97 Group 5 Buildings: 8 Group 6 Buildings: 9

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

B - 51 & 52 Marion, IN

Zachary I. McDaniel Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516Architectural Sheet Building 51 & 52 - Floor Plan

UP

UP TO ATTIC

DOWN

BUILDING 52BUILDING 51

103104

106107

107A

104A

112114

107 108 109 110A1 110

110A

112B

112A

112C112D114A114B

DO

W

N

BUILDING 52

BUILDING 53

9'10"

62'6"12'9"

8'4.5"

46'6" 83'7"

3'-6"

14' 12'11"

4'10.5"8'

7'11.5"

12'10"

43' 143' 11'9"

6'9"

16'8"

50'

6'4"

6'9.5"

Dwg. of3

SCALE: NTS

PROJECT

EXCLUSION AREA

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

4. NO MAINTENANCE REQUIRED - LIMESTONE IS PAINTED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-51 North

Architectural Sheet Building 51 & 52 - North Elevation

P2 - Photo 2

P1 - Photo 1

Elevation: B-52 North

P1 - Photo 1

P4 - Photo4

P5 - Photo 5

P1 3 1

P4 & 5

P1

P2

P3 - Photo 3

BUILDING 51

PHOTOS

BUILDING 52

PHOTOS

P3

1 1

NOT TO SCALE

M

AT

C H

L

IN

E

- S

EE

P

AG

E

NOT TO SCALE

14"

4' 3'10"

14.5"

4'

15"

32"x28.5"

(TYP) 1

Dwg. of4

4'10" 5'1.5"

3'5"

7"

8"

(TYP)

NOTE: 27 L.F. OF DAMAGED

LIMESTONE TO BE REPLACED IN

VARIOUS LENGTHS.

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

4. NO MAINTENANCE REQUIRED - LIMESTONE IS PAINTED.

B - 51 & 52

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-51 North

Architectural Sheet Building 51 & 52 - North Elevation

P2 - Photo 2

P1 - Photo 1

P1

P3 (TYP)

P2

(TYP)

P2

P3 - Photo 3

NOT TO SCALE

M

AT

C H

L

IN

E -S

EE

P

AG

E

42"

8" (TYP)

20"X20"X16"

(TYP)

42"

Dwg. of5

3'9" 3'9"

9.5"

9.5" 6" 8"

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-52 East

Architectural Sheet Building 51 & 52 - East Elevation

P1 - Photo 1

P2 - Photo 2

P1

P2

NOT TO SCALE

14"12"11"10"10"10" 9.5"

9" 6'6.5"8'9.5"8'9"6'7.5"

Dwg. of6 44

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-51 South

Architectural Sheet Building 51 & 52 - South Elevation

P2 - Photo 2

P1 - Photo 1

P4 - Photo4

P5 - Photo 5 P3 - Photo 3

P4 P1

6"

NOT TO SCALE

M

AT

C H

L

IN

E

- S

EE

P

AG

E

36.5"41"

Dwg. of7

34"

DOCK IS A PROJECT

EXCLUSION AREA

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-51 South

Architectural Sheet Building 51 & 52 - South Elevation

Elevation: B-52 South

P1

P1 - Photo 1

NOT TO SCALE

M

AT

C H

L

IN

E -S

EE

P

AG

E

NOT TO SCALE

2'4.5"

4'2"

3'1.5"

Dwg. of8 44

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-51 West

Architectural Sheet Building 51 & 52 - West Elevation

NOT TO SCALE

10"

2'10.5"

10"

2'10.5"

5.5"

9"

8" 1

1 1

8" 4'11"

Dwg. of9

3'

BRICK

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Building 53 Marion, IN

Zachary I. McDaniel Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516Architectural Sheet Building 53 - Floor Plan

DOWN

UP

100101

102105

102B

102A

BUILDING 52BUILDING 53

109'

12'6"

11'5"

8'6" 8'8"

11'5"

10'6"

11'7"

17'

8'1" 8' 14'

12'6" 10'6"

QUESTIONS:

Should I draw in the ramp and head walls?

Should I show a cross-sectional view of the headwalls for quantitative take-offs?

43'7"

4'3"

Dwg. of10

7'3"

6'

SCALE: NTS

PROJECT

EXCLUSION AREA

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

4. NO MAINTENANCE REQUIRED - LIMESTONE IS PAINTED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-53 West

Architectural Sheet Building 53 - West Elevation

P2 - Photo 2

P1 - Photo 1

P2

NOT TO SCALE

M

AT

C H

L

IN

E

- S

EE

P

AG

E

P4 - Photo 4

P4 & P5

P3 - Photo 3P5 - Photo 5

P4 & P5

4.5" 6.5" 7.5"

15"

Dwg. of11

DOCK IS A PROJECT

EXCLUSION AREA

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Building 53

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-53 West

Architectural Sheet Building 53 - West Elevation

P1 - Photo 1

P2 - Photo 2

P1

P2

NOT TO SCALE

M

AT

C H

L

IN

E -S

EE

P

AG

E

14.5"

Dwg. of12 44

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-53 South

Architectural Sheet Building 53 - South Elevation

P1 - Photo 1

P1P1

3 NOT TO SCALE

12" 10" 11" 12" 3 3

Dwg. of13

3'11"

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-53 East

Architectural Sheet Building 53 - East Elevation

P2 - Photo 2

P1 - Photo 1

3 31 1

NOT TO SCALE

M

AT

C H

L

IN

E

- S

EE

P

AG

E

21' 37'6"

12" 10.5" 10.5"

7" 5.5"

6"

2'3"

P1

Dwg. of14 44

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-53 East

Architectural Sheet Building 53 - East Elevation

P1 - Photo 1

3 11

NOT TO SCALE

M

AT

C H

L

IN

E

- S

EE

P

AG

E

P3 - Photo 3

P2 - Photo 2

4.5" 5"

7.5"

1'7"

6"

P1

P1

Dwg. of15 44

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516

Elevation: B-53 North

Architectural Sheet Building 53 - North Elevation

P1 - Photo 1

NOT TO SCALE

6" 6"

Dwg. of16 44

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Building 55 Marion, IN

Zachary I. McDaniel Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516Architectural Sheet Building 55 - Floor Plan

100 101

101A

1B

102A

103A

B-055 B-055A

B-055 B-055A

B-055C B-055

0A

B-055 B-055A

33' 82' 14'5" 14'4" 14'3"

8'11"

7'7"

41'

19'

MATCH LINE - SEE PAGE 18

Dwg. of17

SCALE: NTS

PROJECT

EXCLUSION AREA

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN FOR REPAIR/REPLACE. NOTIFY THE COR

OF ANY MAJOR DISCREPANCIES IMMEDIATELY.

2. CONTRACTOR SHALL COORDINATE ALL WORK WITH PROJECT ENGINEER/

COR.

3. INSTALL ALL PRODUCTS PER MANUFACTURERS WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE AT THE END

OF EACH WORK DAY.

5. PROTECT ALL AREAS BELOW AND SURROUNDING THE AREA UNDER

CONSTRUCTION. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY

DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN

THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL CONTACT THE

PROJECT ENGINEER/COR IMMEDIATELY.

6. CONTRACTOR TO PROTECT EXTERIOR BUILDING AND SIGNAGE BELOW,

ABOVE, OR ADJACENT TO THE AREA OF WORK, WHEREVER THE SIGNAGE

COULD BE AFFECTED BY THE CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PROTECT/REMOVE SIGNAGE AND RE-INSTALL UPON

COMPLETION OF THE WORK AT CONTRACTORS EXSPENCE.

PLAN CONSTRUCTION NOTES:

1. CLEAN, PREP AREA AND REFACE LIMESTONE SURFACES. MATCH EXISTING

STYLE AND COLOR EXACT.

2. REMOVE, CLEAN AREA, AND REPLACE DAMAGED LIMESTONE WITH NEW

LIMESTONE USING NEW HANGERS. FIELD VERIFY EXACT SIZE, COLOR,

TEXTURE AND HANGERS AFTER REMOVAL. NEW LIMESTONE, MORTAR

AND HANGERS TO MATCH EXISTING EXACTLY.

3. REMOVE ALL LOSE CONCRETE/MORTAR MATERIEL AROUND DAMAGED

AREAS. REPAIR CONCRETE ENSURING ALL EXPOSED REBAR IS COVERED.

4. NO MAINTENANCE REQUIRED - LIMESTONE IS PAINTED.

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department

Drawing Title

F

Marion, IN Zachary I. McDaniel

Z.McDaniel

Anthony Colon

Michael E. Hershman

23-101M 2-25-2022 C.Hatfield

Reface Limestone, Various Buildings

610-23-516Architectural Sheet Building 55 - Floor Plan

101 100 102

ELEVATOR

MATCH LINE - SEE PAGE 17

Dwg. of18

SCALE: NTS

GENERAL CONSTRUCTRION NOTES:

1. AREAS SHOWN FOR REPAIRED/REPLACED HAVE BEEN PRIORITIZED. NOT

ALL DAMAGED AREAS ARE SHOW TO BE REPAIRED/REPLACED. THE

INTENT OF THESE DOCUMENTS ARE TO CLEAN, PREP, AND REFACE ALL

THE EXTERIOR LIMESTONE FOUNDATIONS AND TRIM BANDS AND

REPAIR/REPLACE THE MOST DAMAGED AREAS AS NOTED ON THESE

DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND

DIMENSIONS OF AREAS SHOWN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .