DRAWINGS - CP1024656_ Add Child Dev Center West B90306.pdf
PDF 23 MB Posted
- Attached to
- Construct Addition to CDC West Bldg. 90306
- Solicitation number
- CP1018887
- Issued by
-
Department of the Air Force
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications Addition to CDC West Bldg 90306.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P O
O L
P O
O L
P O
O L
P O
O L
P O
O L
M A R Y E S T H E R , F L O R I D A
91065
90527
9915799156
31022
31022
90639
91006
91158
9113191129
99901 99902
90395 90080
90050
91362
99147
9053590535
90535
90523
90209
90108
90580
90581
91404
99326
90727
90800
90536
90534
91157
91107
91168
90306
90905
90917
99958
91059
91058
90086
90311
90508
90500
90611
90730
30041
90083
90356
90364
99103
90524
99121
90626
90749
90757
90813
91041
91263
91264
92478 92479
90351
90363
90360
90512 90513
90513
90512
29077
29077
91043
91038
90005
90734
90581
90534
29073
29073
90396 90396
29075
29075
29075
29075
91124
91149
93605
90379
90380
90507
91101
90506
92547
90628
99154
99077
90021
90503
91537
92557
90414
90209
92540
90038
90427
90412
90502
99009
93576
90710
91141
93318
99005
92418
91625
90221
90433
90228
99049
90612
90065
90365
90349
92536
93357
90425
92485
90059
90067
91262
91259
92500
93405
90408
92031
92078
92075
90020
90028
90206
90630
91113
91258
93701
90332
91042
91136
90060
92077
90010
91126
90708
90812
91302
92564
93621
90113
93333
93332
92439
90700
90758
92531
93346
90428
92276
92108
90002
92552
91153
92542
91041
90353
90640
90501
93530
92049
93565
90718
92066
92507
90322
91250
90603
90231
92408
92465
90829
91049
90135
92096
92442
91013
93454
90712
92463
92101
90420
99065
93626
90519
92073
92003 92002
92020
90029
91257
92018
90055
92467
93464
92402
90323
90407
90367
90050
90551
92086
90220
90310
90755
90034
91144
92468
90816
99141
92440
92525
91021
90423 91028
90057
90061
90066
90638
90553
91260
93437
90625
92517
90624
91036
92508
92459
93413
91268
92074
92106
92104 92041
92053
92056
92070
92524
92535
92543
92097
92067
90404
90720
90632
92045
90203
91114
91119
91538
93640
90431
90838
99098
91033
92401
91000
90079
92444
90331
92511
90517
90705
92092
90117
92530
92445
91147
90343
90373
93549
93301
92545
93461
92523
91515
91024
91027
92433
92518
91361
92473
99031
92521
90140
90402
93476
92544
93429
92063
92088
91370
90518
90036
90417
91020
92062
99126
91351
90535
99019
92562
99158
91365
91603
91025
90926
93432
91601
91120
92466
90505
91035
93421
90074
90073
90039
93637
93389
92539
92036
92012
90213
92044
91500
99117
91266
92428
92460
93566
91310
91135
91106
90329
92503
90109
90763
90418
90714
93541
99010
90361
92047
90810
90627
90823
92514
93325
92555
92083
90742
93349
91164
91052
90368
92095
99137
92533
92038
93398
90833
90081
91325
91360
91007
90743
90811
91156
90916
92079
92425
92400
92015
92407
91099
92527
90601
93510
93309
90355
92054
90070
90111
90357
90023
92471
92441
90102
93304
93317
93354
90911
91145
90076
92556
91152
91030
91132
91034
92033
92450
92502
99146
99018
99094
90729
91057
99053
92103
90387
90381
91161
92515
92446
92025
92464
90951
91162
90052
92529
93501
92014
90134
90613
92537
93493
93629
90362
99004
90141
93517
90037
92064
90392
90629
93397
90069
90068
99041
91510
99057
90388
92424
91112
90523
91133
92094
90430
90711
92048
93368
93485
90577
90075
90340
99016
99014
99020
99048
99090
99104
90607
92541
92516
99150
99535
92501
92463
92419 92426
90330
91154
92089
90747
90509
90522
93538
92505
99058
92023
91032
92034
99067
91546
90210
92005
99024
99025
99051
99127
99719 99718 99717
99716
99023
90609
90085
92461
92009
90511
92434
93445
93608
91122
90724
92051
92008
92001
92549
90626
92435
93453
90327
93645
92548
90701
92553
93365
91330
90809
90432
92437
91105
93596
90580
93650
93444
91103
93586
91104
90413
92087
92522
90207
99115
92100
92004
90827
93500
90320
93556
90333
91053
90058
92058
92068
92071
92076
92072
92010
92055 90056
93486
93373
90817
90230
91146
93522
92026 92027
92040
90436
90377
90054
90642
90223
90001
93581
91012
92022
90378
92451
93573
92452
90606
91155
92436
91054
90145
90717
92030 92032
90372
90731
90328
92069
92024
90084
90005
93509
92455
92528
90703
92000
92013
91252
91055
99043
90802
91037
92011
91140
91023
91151
92430
90759
92420
92275
90610
90801
91031
90121
92039
92432
90015
91009
91039
90635
99068
90928
90616
90105
92406
93477
90615
92035
92052
90707
90229
93613
90375
90760
90049
92082 92061
92538
90337
91130
91363
90410
91350
91050
90334
92050
92090
93381 93341
90950
99162
99001
90131
99060
90552
91016
99105
99007
99083
99055
99056
90390
99044
99126
99145
99022
90825
90358
92098
90347
91163
92102
90008
91300
90339
92105
90621
99059
92099
99116
90048
92084
92546
90374
90300
91142
92107
92016 92017
90419
92551
92037
9204392042
92057
92513
91137
92059
90617
93653
92080
90215
90382
92404
90232
93386
90302
93414
99142
90510
92091
90521
93557
91520
91255
90702
90033
92438
93597
90935
92065
93422
90369
90532
90619
90035
90208
90618
90128
90822
90748
92472
90137
93469
90371
93618
9102990352
92060
90138
90063
90806
90525
91047
92021 92019
92028
90326
90438
93589
90713
92403
90064
90370
90115
92519
92449
90426
90062
90636
91045
99030
90531
90051
91254
90304
99500
91056
90366
91364
92429
99042
91303
91148
92093
90880
91301
90815
99118
99029
99061
90225
90416
92046
90439
90053
91265
92085
90030
91400
90716
92427
93542
91159
90359
92469
90032
90106
90637
90325
91307
99045
91048
90761
90101
92081
92431
90600
93660
90434
9200792006
90308
90043
92470
90918
Tully Street
Kissam Street
M A
Y S
T R
E E
T
Downs Road
W alkup W ay
M artin
L uther K ing
Downs Road
Kanuha Driv e
Blessi nger D r iv e
Bartley Street
Mitchell Road
Independence Road
T er ry A v en u e
McC lea n Street
Harts on Stre et
US98
Tully Street
M a in te na nc e H a u l R o a
US98
Howie Walters W ay
Lielmanis Avenue
US98
K e rw o o d
R oa d
C od y Ave nu e
Lukasik Avenue
Tully Street
R ed
H or se R oa d
H am by Place
Westfal l C ircl e
Bedel Street
T u lly S tr e e t
T ully Street
Benn ett A ve nue
C ru z A ve n u e
Red Horse Road
C ru z A ve n u e
Frazier Street
B e n n e tt
A v e n u e
Bedel Street
Independence Road
W alkup W ay
Corlew Road
McMillan Street
US98
W e av er
A v e nu e
Schmauss Lane
Hume Drive
Clark Road
Gelshlager Street
Whitbeck Street
C a m p ai gn e S tr e e t Purcell Drive
C o d y A v enu e
US98
Independence Road
O 'N e il
A ve n u e
US98
McIntosh Court
Hume Drive
Harrison Drive
Acha Drive
H u m e
D ri v e
Walters Drive
Hodges Street
Lewis Drive
Hume Drive
Galvan Street
Bland Street
Hume Drive
Grimm Lane unk unk
Tully Street
Red H orse
Road
Bakke Street
M a yo S tre et
Bakke Street
Tupelo Circle
Red Horse Road
S im p son A venu e
Tully Street
F ox x A ve n ue
Le to ur n e a u
C irc le
L e to u rn e a u
C irc le
NORTH
BASE MAP
MARTIN LUTHER KING JR. BLVD
INTERSECTION ENTRANCE
COMMERCIAL VEHICLE INSPECTION
ENTRANCE PASS & ID OFFICE
HURLBURT EAST GATE, NO
COMMERCIAL ENTRANCE
FIRE DEPARTMENT BLDG 90734
CONTRACTOR HAUL ROUTE
HURLBURT FIELD, FLORIDA
CP1024656
90306
PROJECT SITE
NORTH
PLAN
NORTH
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
AT
IO
M M
S
CO
D
SHEET REFERENCE:
D A
T E
SHEET NUMBER:
OF
D E
S C
R
IP
T
IO
N R
E V
A
IR
F O
R C
E
SP
EC
IA
L O
PE
R
A
TI
O N
S C
O M
M A
N D
S
P
EC
IA
L
O
PE
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
ER
S
Q U
A D
R O
N
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
90306
G-001
9/04/2020
T
IT
L E
S H
E E
T
MSH
RCR
CP1024656
A D
D
IT
IO
N
C D
C W
E S
T B
L D
G
CONSTRUCT ADDITION CDC WEST
BLDG 90306
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R
ID
A
R IC
E
AC
REBO
R
RLT
09/04/20
ABBREVIATIONS
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHLORIDE
R RADIUS, RANGE, RISER
RCP REFLECTED CEILING PLAN
RD REINFORCING STEEL BARS REBAR
REF REFERENCE, REFRIGERATOR
REG REGISTER
REINF REINFORCE
RET RETURN
REV REVISION
RH RIGHT HAND
RM ROOM
ROW RIGHT OF WAY
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FOOT(FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TE TOP ELEVATION
TEL TELEPHONE
TOC TOP OF CONCRETE
TOS TOP OF SLAB, TOP OF STEEL
TV TELEVISION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WASHER, WEST, WIDE
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WP WATERPROOFING
WSCT WAINSCOT
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
BD BOARD
BLDG BUILDING
BOT BOTTOM
BRG BEARING
BRG PL BEARING PLATE
BUR BUILT-UP ROOFING
CF/CI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CF/GI CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CID COMPREHENSIVE INTERIOR
DESIGN PACKAGE
CIP CAST-IN-PLACE, CAST IRON PIPE
CJ CONSTRUCTION JOINT/CONTROL
JOINT
CL CENTER LINE, CLASS, CLOSE
CLG CEILING
CLR CLEAR, COLOR, COOLER
CMU CONCRETE MASONRY UNIT
CPT CARPET
COL COLUMN
CONC CONCRETE
CONT CONTINUE, CONTINUOUS
CONTR CONTRACT, CONTRACTOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
COTR CONTRACTING OFFICER
TECHNICAL REPRESENTATIVE
CU FT CUBIC FEET
CU YD CUBIC YARD
D DRYER
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWS EYE WASH STATION
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FIN GR FINISH GRADE
FLR FLOOR
FP FIREPROOF
FT FEET, FOOT
FTG FOOTING
GA GAGE
GALV GALVANIZED IRON
GB GRAB BAR
GC GENERAL CONTRACTOR
GF/GI GOVERNMENT FURNISHED/
GOVERNMENT INSTALLED
GF/CI GOVERNMENT FURNISHED/
CONTRACTOR INSTALLED
GL GLASS
GLZ GLAZING
GMS GALVANIZED METAL STUD
GYP BD GYPSUM BOARD
HB HOSE BIBB
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATING/AIR COND
IBC INTERNATIONAL BUILDING CODE
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MS MOP SINK
MT MOUNT
MTD MOUNTED
MTG MEETING
MTL METAL
MW MICROWAVE
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OF/OI OWNER FURNISH/
OWNER INSTALLED
OF/CI OWNER FURNISH/
CONTRACTOR INSTALLED
OH OVERHANG, OVERHEAD
OH DR OVERHEAD (COILING) DOOR
OPNG OPENING
OPP OPPOSITE
PCF POUNDS PER CUBIC FOOT
SYMBOLS LEGEND
ROOM NAME / NUMBER
DESIGNATION
DOOR NUMBER
WINDOW / LOUVER
TYPE
WALL TYPE
ELEVATION
TARGET
ELEVATION NUMBER
INTERIOR ELEVATION
SYMBOL
SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION NUMBER
EXTERIOR ELEVATION
SYMBOL
SHEET ON WHICH
ELEVATION IS DRAWN
NORTH ARROW
SECTION NUMBER
SECTION SYMBOL
SHEET ON WHICH
SECTION IS DRAWN
DETAIL NUMBER
DETAIL SYMBOL
SHEET ON WHICH
DETAIL IS DRAWN
PLAN
NORTH
A101
SIM
A
A
4 A-200
ROOM NAME
A-201
PLAN NORTH
TRUE NORTH A-201
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
AT
IO
M M
S
CO
D
SHEET REFERENCE:
D A
T E
SHEET NUMBER:
OF
D E
S C
R
IP
T
IO
N R
E V
A
IR
F O
R C
E
SP
EC
IA
L O
PE
R
A
TI
O N
S C
O M
M A
N D
S
P
EC
IA
L
O
PE
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
ER
S
Q U
A D
R O
N
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
90306
G-002
9/04/2020
S H
E E
T
IN
D E
X
MSH
RCR
CP1024656
A D
D
IT
IO
N
C D
C W
E S
T B
L D
G
INDEX OF DRAWINGS
CH SHEET NAME
A-603 OPENING DETAILS
INTERIOR
I-101 FINISH PLAN
I-102 SIGNAGE PLAN
I-103 FINISH PLAN CEILING
I-601 FINISH SCHEDULE AND DETAILS
FIRE PROTECTION
F-001 GENERAL FIRE PROTECTION INFORMATION
F-101 FIRST FLOOR PLAN - DEMO - FIRE PROT.
F-201 FIRST FLOOR PLAN - FIRE PROTECTION
F-501 FIRE PROTECTION DETAILS
FIRE ALARM
FA-001 FIRE ALARM LEGEND, GENERAL NOTES
FA-002 FIRE ALARM DETAILS & DIAGRAM
FA-100 NEW WORK FA/MNS PLAN
PLUMBING
P-100 PLUMBING PLAN - DEMOLITION
P-101 FIRST FLOOR PLAN - PLUMBING
P-102 FIRST FLOOR PLAN - NEW WORK - WATER
P-501 DETAILS
P-601 WASTE RISER
MECHANICAL
M-001 GENERAL MECHANICAL INFORMATION
M-101 FIRST FLOOR PLAN - DEMOLITION - HVAC
M-201A FIRST FLOOR PLAN AREA A - DUCTWORK
M-301A FIRST FLOOR PLAN AREA A - PIPING
M-301B FIRST FLOOR PLAN AREA B - PIPING
M-501 MECHANICAL DETAILS
M-601 MCHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS
ELECTRICAL
E-001 ELECTRICAL LEGEND, GENERAL NOTES
E-002 LIGHTING DETAILS
E-003 NEW WORK POWER RISER DIAGRAM
E-004 PANEL SCHEDULES
E-101 ELECTRICAL DEMOLITION PLAN
E-102 SITE ELECTRICAL DEMOLITION PLAN
E-103 NEW WORK ELECTRICAL SITE PLAN
E-200 NEW WORK POWER PLAN
E-201 NEW WORK MECHANICAL POWER PLAN
E-300 NEW WORK LIGHTING PLAN
E-400 NEW WORK LIGHTNING PROTECTION PLAN
TELECOMMUNICATIONS
T-001 TELECOM LEGEND
T-002 TELECOM NOTES
T-100 TELECOM DEMOLITION PLAN
T-111 TELECOM FLOOR PLAN
T-201 TELECOM DETAILS
T-202 TELECOM DETAILS
T-301 SYSTEMS SINGLE LINE DIAGRAMS
INDEX OF DRAWINGS
CH SHEET NAME
GENERAL
G-001 TITLE SHEET
G-002 SHEET INDEX
G-003 SITE LOCATION & HAUL ROUTE
G-004 CONTRACTOR STAGING & LAYDOWN AREA
G-110 AIR BARRIER PLAN DIAGRAM
CIVIL
C-001 CIVIL NOTES
C-002 GENERAL NOTES AND LEGEND
C-100 EXISTING CONDITIONS PLAN
C-101 DEMOITION AND EROSION CONTROL PLAN
C-102 SITE PLAN AND HORIZONTAL CONTROL
C-103 UTILITY PLAN
C-104 GRADING PLAN
C-105 GRADING PLAN - CONCRETE SIDEWALKS
C-106 CONCRETE JOINT LAYOUT PLAN
C-501 CIVIL DETAILS
C-502 FENCE DETAILS
C-503 FENCE DETAILS
C-504 FENCE DETAILS
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES & WIND LOADS DIAGRAM
S-101 FOUNDATION & SLAB-ON-GRADE PLAN
S-102 ROOF FRAMING PLAN
S-201 EXTERIOR WALL ELEVATIONS
S-401 FOUNDATION SECTIONS & DETAILS
S-410 ROOF SECTIONS & DETAILS
S-411 ROOF SECTIONS & DETAILS
S-501 TYPICAL FOUNDATION DETAILS
S-502 TYPICAL FOUNDATION DETAILS
S-503 TYPICAL STEEL DETAILS
S-601 TYPICAL MASONRY DETAILS
ARCHITECTURAL
A-001 LIFE SAFETY PLAN
A-002 WALL TYPES
A-101 DEMOLITION PLANS AND ELEVATION
A-102 DEMOLITION RCP AND DETAILS
A-111 COMPOSITE PLAN
A-112 FLOOR PLAN
A-113 PLAYGROUND DETAILS
A-140 ROOF PLAN
A-141 ROOF DETAILS
A-150 CEILING PLAN
A-201 EXTERIOR ELEVATIONS
A-202 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-310 WALL SECTIONS
A-401 INTERIOR ELEVATIONS
A-402 CASEWORK SECTIONS
A-450 ENLARGED FLOOR PLAN
A-501 COLUMN DETAILS AND PLAN DETAILS
A-601 OPENING SCHEDULE AND DETAILS
A-602 OPENING DETAILS
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
PROJECT LOCATION
LAT: N30°24'47.92"
LON: W86°42'14.33"
N:
E
528200
N:
E
525900
N:
E
521700
N:
E
518800
N:
E
518800
N:
E
520800
N:
E
523000
N:
E
525900
N:
E
528200
N:
E
529800
N:
E
529800
N:
E
518800
N:
E
523000
CONTRACTOR'S HAUL ROUTE
1" = 500'
BASE VICINITY MAP
NTS
N
GENERAL NOTES:
1. CONSTRUCTION ACCESS TO THE PROJECT SITE
SHALL BE THROUGH THE DOWNS ROAD ENTRANCE
OFF OF MARTIN LUTHER KING JR. BOULEVARD. ALL
CONSTRUCTION MATERIAL DELIVERIES INCLUDING
CONCRETE, ASPHALT AND MISCELLANEOUS
CONSTRUCTION MATERIALS NECESSARY TO THE
PROJECT WILL BE SUBJECT TO INSPECTION.
2. CONSTRUCTION TRAFFIC IS PROHIBITED TO
ACCESS THE PROJECT SITE USING THE FLIGHT
LINE PERIMETER ROAD.
3. CONTRACTOR SHALL MAINTAIN THE ACCESS
ROUTE TO BE FREE FROM DEBRIS CAUSED FROM
CONSTRUCTION ACTIVITY ON A DAILY BASIS.
CONTRACTORS SHALL KEEP ALL PUBLIC ROADS
AND STREETS CLEAN OF CONSTRUCTION DEBRIS,
MUD, ETC. AT ALL TIMES. CONTRACTOR TO
PROVIDE EQUIPMENT AND PERSONNEL TO CLEAN
ANY STREETS AS REQUESTED BY THE
CONTRACTING OFFICER. CONTRACTOR IS
RESPONSIBLE FOR ALL REPAIRS TO STREETS,
PARKING AREAS, AND BASE OR GOVERNMENT
PROPERTY, DUE TO DAMAGE BY THEIR
CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL
REFER TO SECTION 01 00 00 FOR ADDITIONAL
CRITERIA PROCEDURES.
ACCESS AND SAFETY PLAN NOTES:
1. ACCESS AND VEHICLE PARKING
A. ACCESS TO THE PROJECT FOR ALL CONTRACTOR
PERSONNEL, VEHICLES, AND EQUIPMENT IS
ILLUSTRATED ON THIS SHEET. ACCESS ROUTES
MAY BE SUBJECT TO CHANGE BASED ON
OPERATIONAL REQUIREMENTS ON BASE OR ON
THE AIRFIELD. POTENTIAL SCHEDULE IMPACTS
SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER.
B. CONTRACTOR SHALL PROVIDE AND INSTALL A
PROFESSIONALLY PAINTED SIGN, MEETING
CONTRACTING OFFICER APPROVAL, AT THE
CONSTRUCTION ENTRANCE TO DIRECT MATERIAL
SUPPLIERS AND EMPLOYEES TO THE
CONSTRUCTION SITE.
C. CONTRACTOR MAY SUBMIT ALTERNATIVES TO
STAGING AREA LOCATIONS AS SHOWN.
CONTRACTOR'S STAGING AREA SHALL BE SUBJECT
TO APPROVAL OF CONTRACTING OFFICER'S
REPRESENTATIVE. LOCATION OF CONTRACTOR'S
STAGING AREA SHALL BE WITHIN THE PROJECT
WORK AREA.
D. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITY,
THE CONTRACTOR'S CONSTRUCTION EQUIPMENT
AND VEHICLES SHALL BE PARKED IN THE
CONTRACTOR'S STAGING AREA.
E. LOCATION OF ACCESS/HAUL ROADS ARE AS
INDICATED ON THIS SHEET.
F. ALL HAUL ROADS SHALL BE MAINTAINED SUCH
THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED
AT ALL TIMES FROM THE ROAD TO THE STAGING
AREA AND FROM THE STAGING AREA TO THE
WORK SITE AND FACILITATE GOVERNMENT
ACCESS TO THE BASE AT ALL TIMES. THE
MAINTENANCE OF HAUL ROADS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AT NO
ADDITIONAL COST TO THE GOVERNMENT. THE
HAUL ROAD LOCATIONS SHALL BE AS INDICATED
ON THIS SHEET OR BY THE CONTRACTING
OFFICER.
G. CONTRACTOR SHALL COORDINATE ACTIVITIES
THROUGHOUT THE PROJECT IN A MANNER THAT
ALLOWS EMERGENCY ACCESS TO ALL EXISTING
ROADWAYS AT ALL TIMES WITHOUT DELAYS TO
EMERGENCY VEHICLES RESPONSE TIME.
H. CONTRACTOR'S STAGING AREA AND ANY OTHER
AREA DISTURBED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE RETURNED TO ORIGINAL
CONDITIONS AS APPROVED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) AT THE
COMPLETION OF CONSTRUCTION.
I. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY
BE SEARCHED BY SECURITY POLICE WHEN
ENTERING THE BASE AND MAY EXPERIENCE
DELAYS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
J. CONTRACTOR SHALL COORDINATE WITH
CONTRACTING OFFICER'S REPRESENTATIVE ANY
GOVERNMENT-OWNED EQUIPMENT REQUIRING
RELOCATION TO COMPLETE WORK.
2. COORDINATION AND COMMUNICATION DURING
CONSTRUCTION
A. CONTRACTOR SHALL APPOINT A CONSTRUCTION
SUPERINTENDENT, SUBJECT TO THE APPROVAL OF
THE CONTRACTING OFFICER, WHO SHALL BE
PRESENT ON THE CONSTRUCTION SITE AT ALL
TIMES DURING WORKING HOURS WHILE JOB IS IN
PROGRESS. THE SUPERINTENDENT SHALL BE
DESIGNATED THE RESPONSIBLE CONTRACTOR'S
REPRESENTATIVE WHO SHALL BE AVAILABLE ON A
24-HOUR BASIS. WHEN THE CONTRACTOR
REPRESENTATIVE IS NOT AVAILABLE ON THE
CONSTRUCTION SITE, AN ALTERNATE
REPRESENTATIVE SHALL BE PROVIDED.
B. PRIOR TO CONSTRUCTION, THE CONTRACTOR
SHALL CORDON OFF THE WORK AREAS AND
STREET CROSSINGS BY USING BARRICADES
APPROVED BY THE CONTRACTING OFFICER.
C. THIS PROJECT SHALL BE CONSTRUCTED IN
COMPLIANCE WITH PART 91 OF ACT 451 OF 1994, AS
AMENDED. THE SOIL EROSION AND SEDIMENT
CONTROL ACT. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING ALL REQUIREMENTS WITH STATE
AND LOCAL AUTHORITIES AND DOCUMENTS TO BE
SUBMITTED FOR PERMITTING.
D. EROSION CONTROL DEVICES SHALL BE USED FOR
THE STAGING AREA AND ANY MATERIAL
STOCKPILES WHEN NECESSARY TO CONTROL
EROSION AND STORM WATER RUNOFF IN
ACCORDANCE WITH FEDERAL, STATE AND LOCAL
REGULATIONS.
3. TRAFFIC CONTROL
A. ALL CONSTRUCTION EQUIPMENT AND VEHICLES
SHALL BE MARKED WITH COMPANY PAINTED
DESIGNS, INSIGNIAS OR OTHER COMPANY
MARKINGS, WHICH ARE CLEARLY VISIBLE.
B. CONSTRUCTION EQUIPMENT SHALL HAVE
AUTOMATIC SIGNALING DEVICES TO SOUND AN
ALARM WHEN MOVING IN REVERSE.
C. ONLY RUBBER-TIRED VEHICLES SHALL BE
ALLOWED ON EXISTING PAVEMENT THAT IS TO
REMAIN.
D. NON-CONSTRUCTION PEDESTRIAN TRAFFIC WILL
NOT BE ALLOWED INSIDE THE CONSTRUCTION
LIMITS OR CONSTRUCTION FENCE.
E. ANY DAMAGE TO ROADS AND PAVEMENT DUE TO
CONSTRUCTION EQUIPMENT OR CONSTRUCTION
TRAFFIC SHALL BE REPAIRED TO THEIR ORIGINAL
CONDITION BY THE CONTRACTOR AT HIS/HER OWN
EXPENSE TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
F. CONTRACTOR SHALL PROVIDE A NOTICE FOR
ROAD CLOSURE TO THE CONTRACTING OFFICER A
MINIMUM OF 10 WORKING DAYS PRIOR TO ROAD
REQUIRING CLOSURE.
G. CONTRACTOR SHALL PROVIDE A TEMPORARY
TRAFFIC CONTROL PLAN TO AND ON FILE WITH
THE CONTRACTING OFFICER AND BASE ENGINEER
PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
H. TEMPORARY TRAFFIC CONTROL PLAN SHALL
COMPLY WITH MUTCD CRITERIA.
4. EQUIPMENT AND STOCKPILE HEIGHT
A. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN
A MANNER TO PREVENT ITS MOVEMENT BY RAIN
AND WIND FORCES.
5. EXCAVATION, TRENCHES AND BORROW SITES
A. OPEN TRENCHES AND EXCAVATIONS AT THE
CONSTRUCTION SITE SHALL BE PROMINENTLY
MARKED WITH ORANGE AND WHITE BARRICADES
AND WITH FLASHING RED LIGHTS ACCEPTABLE TO
THE CONTRACTING OFFICER AND USACE SAFETY
MANUAL EM385-1-1.
B. BORROW SITES ARE NOT AVAILABLE FOR USE BY
THE CONTRACTOR ON THE BASE. ALL BORROW
MATERIALS, TOPSOIL, OR OTHER SOIL MATERIAL
SHALL BE OBTAINED BY THE CONTRACTOR FROM
COMMERCIAL SOURCES FROM OFF-SITE
LOCATIONS.
6. DISPOSAL AREAS
A. DISPOSAL AREAS FOR RUBBLE, UNSUITABLE
EXCESS SOIL MATERIALS, OR OTHER
CONSTRUCTION DEBRIS ARE NOT AVAILABLE ON
THE BASE FOR THE CONTRACTOR'S USE. DISPOSAL
IS THE RESPONSIBILITY OF THE CONTRACTOR AT
SITES OFF GOVERNMENT CONTROLLED LANDS.
7. OTHER SAFETY REQUIREMENTS
A. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES
THAT CONFORM TO OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) REGULATIONS
AND USACE SAFETY MANUAL EM385-1-1.
B. CONTRACTOR SHALL MAINTAIN AT ALL TIMES ONE
FIRE LANE FREE FROM OBSTRUCTION AND
MAINTAIN 20' WIDTH ACCESS TO THE SITE AND ALL
SURROUNDING ROADS AND STREETS.
8. CONTRACTOR SAFETY PLAN SUBMITTALS
A. CONTRACTOR SHALL FURNISH A CONSTRUCTION
SAFETY PLAN IN ACCORDANCE WITH THE
SPECIFICATIONS AND USACE SAFETY MANUAL EM
385-1-1 WITH HIS/HER PROJECT SCHEDULE. THE
SAFETY PLAN SHALL IDENTIFY THE FOLLOWING
ITEMS:
· PROPOSED ACCESS POINTS, STAGING AREA AND
HAUL ROUTES.
· TEMPORARY MARKINGS TO BE USED, IF
ANY.LOCATION AND TYPE OF BARRICADES OR
OTHER TRAFFIC CONTROL DEVICES.
· METHODS BY WHICH THE CONTRACTOR WILL
COMMUNICATE WITH THE CONTRACTING OFFICER.
0 600' 1200'
CORP OF ENGINEERS
RESIDENT OFFICE
BUILDING 90052
SHEET REFERENCE:
DA
TE
SHEET NUMBER:
OF
DE
SC
RI
PT
IO
N
RE
V
AI
R
FO
RC
E
SP
EC
IA
L
OP
ER
AT
IO
NS
C
OM
M
AN
D
1 S
PE
CIA
L O
PE
RA
TIO
NS
CI
VIL
EN
GIN
EE
R S
QU
AD
RO
N
HU
RL
BU
RT
F
IE
LD
, F
LO
RI
DA
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
90306
IA
R
E
OF R
C
SPE
C
IA
AN
N
PE
R L O
ATI
O
MM
SC
O
D
A D
D I T
I O
N
C
D C
W
E S
T
B
L D
G
CP1024656
OVERALL VICINITY MAP
NTS
PROJECT LOCATION
HURLBURT FIELD
LATITUDE: N 30° 24' 47.92"
LONGITUDE: W 86° 42' 14.33"
HAMBY PLACE
RED HORSE ROAD
DOWNS
ROAD
TULLY STREET
INDEPENDENCE
ROAD
US HIGHWAY 98
T
T
/W
F
CONTRACTOR'S
HAUL ROUTE
(INGRESS/EGRESS)
COMMERCIAL
VEHICLE
INSPECTION
ENTRANCE
TULLY STREET
US HIGHWAY 98
INDEPENDENCE
ROAD
FREEDOM WAY
(WALKUP WAY)
BEDEL STREET
BENNETT AVENUE
CODY
AVENUE
CRUZ
AVENUE
MARTIN LUTHER KING JR
BOULEVARD
CONTRACTOR'S HAUL ROUTE
LEGEND
BUILDING 90210
LUKASIK
AVENUE
BASE SECURITY
FRAZIER
STREET
FIRE DEPARTMENT
BUILDING 90734
T/W C
T
G
R
T
AIR TRAFFIC CONTROL
BUILDING 90729
BASE CIVIL ENGINEERING
BUILDING 90053
VISITOR CENTER
PASS/ID
MAIN GATE
(NO COMMERCIAL ENTRY)
BACK GATE
CRUZ
AVENUE
RED HORSE
ROAD
CODY
AVENUE
WEAVER
AVENUE
CLARK
ROAD
G-003
S I T
E
L
O C
A T
I O
N
H
A U
L
R
O U
T E
CEB
JG
9/4/20 jgerth aim
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
0 30' 60'
N
48 HOURS BEFORE DIGGING
1-800-432-4770
SUNSHINE STATE ONE CALL CENTER
CALL 811
TOLL FREE
OR
Know what's below.
Call before you dig.
SHEET REFERENCE:
DA
TE
SHEET NUMBER:
OF
DE
SC
RI
PT
IO
N
RE
V
AI
R
FO
RC
E
SP
EC
IA
L
OP
ER
AT
IO
NS
C
OM
M
AN
D
1 S
PE
CIA
L O
PE
RA
TIO
NS
CI
VIL
EN
GIN
EE
R S
QU
AD
RO
N
HU
RL
BU
RT
F
IE
LD
, F
LO
RI
DA
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
90306
IA
R
E
OF R
C
SPE
C
IA
AN
N
PE
R L O
ATI
O
MM
SC
O
D
A D
D I T
I O
N
C
S
T
B
L D
G
CP1024656
NOTES:
1. INSTALL TEMPORARY CONSTRUCTION FENCE AROUND THE LIMITS OF
WORK NOT INCLUDING THE CONSTRUCTION ACCESS ROAD.
COORDINATE CHAIN AND PADLOCKS ON GATES WITH BASE FIRE
DEPARTMENT. EACH GATE TO BE NUMBERED FOR EMERGENCY
ACCESS. CONTRACTORS TO MAINTAIN FIRE ACCESS THROUGH
CONSTRUCTION SITE AT ALL TIMES.
2. SEE CIVIL LEGEND ON SHEET C-002.
3. CONTRACTOR SHALL ENSURE ALL CONSTRUCTION EQUIPMENT
MOBILIZED AND USED FOR THE PROJECT IS CLEAN AND FREE OF
PLANT PARTS BEFORE SOIL DISTURBANCE COMMENCE AT HURLBURT
FIELD BASE. IN ADDITION, IF THE CONSTRUCTION EQUIPMENT IS
UTILIZED AT ANOTHER LOCATION ON BASE, IT SHALL BE CLEANED
BEFORE IS MOBILIZED ON BASE TO PREVENT SPREADING INVASIVE
PLANTS.
4. TRUCK WASHOUT AREA TO BE CONSTRUCTED, MAINTAINED, AND
CLEANED IN ACCORDANCE WITH FLORIDA DEPT OF ENVIRONMENTAL
PROTECTION REGULATIONS. PROVIDE DETAILS AND MAINTENANCE
PLAN AS PART OF THE STORMWATER POLLUTION PREVENTION PLAN.
5. ALL TEMPORARY TRAFFIC BARRIERS TO BE INSTALLED AND
MAINTAINED TO CLOSE ROADS TO ALL NON-CONSTRUCTION TRAFFIC
AND SHALL BE INSTALLED BY THE CONTRACTOR. COORDINATE WITH
EGLIN SECURITY AND POLICE.
6. ALL CONTRACTORS TO STOCKPILE REQUIRED MATERIALS AND
EQUIPMENT WITHIN LIMITS OF PROJECT AREA OR STAGING AREA AS
INDICATED ON THE DRAWINGS, AND RESTORE THE AREA TO
PRE-CONSTRUCTION CONDITIONS.
7. ALL CONTRACTORS TO COORDINATE UTILITY WORK WITH
CONTRACTING OFFICER AND ADJACENT CONTRACTORS.
COORDINATE TO ALLOW ACCESS AROUND OR WITHIN WORK LIMITS
FOR OTHER CONTRACTORS TO INSTALL NEW UTILITY MAINS,
CAP/PLUG EXISTING LINES, AND EXTEND/RELOCATE EXISTING UTILITY
SERVICES.
8. CONTRACTOR SHALL CONNECT TO EXISTING OR NEW FIRE HYDRANTS
FOR TEMPORARY CONSTRUCTION WATER. INSTALL QUICK
DISCONNECT, BACK FLOW PREVENTER AND SHUT-OFF VALVE ON 2
HOSE CONNECTION ONLY. PRIOR TO MAKING ANY CONNECTIONS TO
BASE WATER SYSTEMS THE CONTRACTOR MUST NOTIFY AND
COORDINATE WITH THE CONTRACTING OFFICER.
9. STOCKPILE ALL EXCESS SATISFACTORY MATERIAL WITHIN CLEAR
AREA BETWEEN THE TREES AND DITCH. MAXIMUM HEIGHT 15.00' WITH
5:1 SIDE SLOPES. PROVIDE EROSION CONTROL PROTECTION AROUND
THE STOCKPILE LIMITS. MATERIAL TO BE USED FOR OTHER PROJECTS
ON BASE, COORDINATE WITH CONTRACTING OFFICER. ALL
UNSATISFACTORY MATERIAL SHALL BE HAULED OFF GOVERNMENT
PROPERTY.
10. PROTECT ALL EXISTING TREES. ANY TREES DAMAGED DURING
CONSTRUCTION SHALL BE REPLACED WITH SIMILAR MATERIAL AND
CALIPER.
V:
\2
6\ ac tiv e\
7\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
G -0
.d w g
/0 9/
:3
PM B
y:
G er th , J am es
BLDG 90306
BLDG 90357
BLDG 90390
BLDG 90353
BLDG 92013
BLDG 92021
BLDG 92022
W
E
A
V
V
E
N
U
E
BLDG 90381
BLDG 90296
G-004
C O
N T
R A
C T
S
A
G I N
G
L
Y
D O
E
A
CEB
JG
9/4/20
D
I
T
C
H
STAGING \
LAYDOWN
AREA
PLAYGROUND
SPORTS
FIELD
P
I C
K
U
P
M
P
33' UNOBSTRUCTED SPACE
F
I
N
E
F
I
N
E
STAGING \ LAYDOWN AREA
STAGING \ LAYDOWN AREA
LEGEND
D
I T
C
H
P
A
R
K
I
N
G
X X X X
TEMPORARY CONSTRUCTION FENCE
jgerth aim
U.C.
Refr.
U.C.
Refr.
U.C.
Refr.
TIE IN NEW AIR BARRIER
WITH EXISTING
TIE IN NEW AIR BARRIER
WITH EXISTING
EXISTING AIR BARRIER EXISTING AIR BARRIER
NEW AIR BARRIER
312309
310 313
307302
BOUNDARY OF
EXISTING AREA
LINE OF ROOF TIE-IN ABOVE
G-110
EXISTING AREA
B
G-110
B B
B B
OVERLAP NEW AIR
BARRIER AT ROOF
WITH EXISTING
NEW
ROOF
EXISTING
ROOF
NEW
FLOOR AREA
EXISTING
FLOOR AREA
ZONE 1
G-110
B
D
C
D
GENERAL NOTES
1. DRAWINGS ON THIS SHEET ARE PROVIDED
TO SHOW DIAGRAMMATIC LOCATION OF AIR
BARRIER.
2. SEE SHEET A-002 FOR SPECIFIC WALL
CONSTRUCTION INFORMATION.
3. SEE WALL SECTIONS AND DETAILS FOR
ADDITIONAL AIR BARRIER INFORMATION.
KEYNOTES
PAINTED GYPSUM WALLBOARD
PERFORMS AS AIR BARRIER.
FLUID APPLIED AIR/MOISTURE
BARRIER PERFORMS AS AIR BARRIER.
CONCRETE SLAB PERFORMS AS AIR
BARRIER.
ROOFING UNDERLAYMENT PERFORMS
AS AIR BARRIER
A
B
C
D
GRAPHIC LEGEND
AIR BARRIER LOCATION
SURFACE AREA
TEST ZONE 1: 12,056 SF
G-110
ZONE 1 B
D
C B
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
AT
IO
M M
S
CO
D
SHEET REFERENCE:
D A
T E
SHEET NUMBER:
OF
D E
S C
R
IP
T
IO
N R
E V
A
IR
F O
R C
E
SP
EC
IA
L O
PE
R
A
TI
O N
S C
O M
M A
N D
S
P
EC
IA
L
O
PE
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
ER
S
Q U
A D
R O
N
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
90306
G-110
9/04/2020
A
IR
B A
R R
IE
R
P L A
N D
IA
G
R A
M
GJD
LCS
CP1024656
A D
D
IT
IO
N
C D
C W
E S
T B
L D
G
1/8" = 1'-0"G-110
1 AIR BARRIER PLAN
PLAN
NORTH
1/8" = 1'-0"G-110
2 AIR BARRIER SECTION
1/8" = 1'-0"G-110
3 AIR BARRIER SECTION TRANSVERSE
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R
ID
A
R IC
E
AC
REBO
R
1.00 GENERAL NOTES
1.01 DRAWINGS SHOW TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. FOR DETAILS NOT
SPECIFICALLY SHOWN, PROVIDE DETAILS SIMILAR TO THOSE SHOWN.
1.02 VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS BEFORE STARTING WORK. NOTIFY
STRUCTURAL ENGINEER OF ANY DISCREPANCY.
1.03 THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC., ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. TAKE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING STRUCTURE AND ITS FOUNDATION AND TO LIMIT, TO THE EXTENT POSSIBLE, THE EFFECTS OF CONSTRUCTION THAT THE NEW STRUCTURE HAS ON THE EXISTING STRUCTURE.
1.04 COORDINATE STRUCTURAL CONTRACT DOCUMENTS WITH ARCHITECTURAL, MECHANICAL,
ELECTRICAL, PLUMBING AND CIVIL. NOTIFY STRUCTURAL ENGINEER OF ANY CONFLICT AND/OR OMISSION. CONTRACTOR SHALL MAKE NO DEVIATION FROM DESIGN DRAWINGS WITHOUT WRITTEN
APPROVAL OF THE ARCHITECT. FOR ADDITIONAL OPENINGS NOT SHOWN ON THE STRUCTURAL
DRAWINGS, SEE ARCHITECTURAL, MECHANICAL, AND PLUMBING DRAWINGS.
1.05 DESIGN CRITERIA:
THE STRUCTURE HAS BEEN DESIGNED UTILIZING THE FOLLOWING REFERENCES:
A. UFC 1%200%01, GENERAL BUILDING REQUIREMENTS
B. UFC 3%301%01, STRUCTURAL ENGINEERING, WITH CHANGE 1
C. INTERNATIONAL BUILDING CODE, 2015
D. ASCE 7%10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
E. ACI 302.1 R%5, CONCRETE FLOOR AND SLAB CONSTRUCTION
F. ACI 318%11, BUILDING CODE REQUIREMENTS FOR CONCRETE STRUCTURES
G. ACI 360 R%06, DESIGN OF SLAB ON GRADES
H. AISC STEEL CONSTRUCTION MANUAL 14TH EDITION
I. ACI 530%05, BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES
1.06 DESIGN LOADS
A. DEAD LOADS:
1. MECHANICAL, ELECTRICAL, PLUMBING: 10 PSF
2. CEILINGS AND INSULATION: 5 PSF
B. LIVE LOADS: (MAY BE REDUCED PER CODE)
1. ROOFS: 20 PSF
2. SLAB%ON%GRADE: 100 PSF
3. STORAGE: 125 PSF
4. MECHANICAL/ ELECTRICAL ROOMS: 150 PSF
C. WIND LOADS % STRUCTURE HAS BEEN DESIGNED TO CONFORM TO THE WIND PROVISIONS OF
ASCE 7%10. SEE WIND PRESSURE DIAGRAM & CHART FOR THE FOLLOWING:
1. BASIC WIND SPEED (3%SEC GUST)
2. BUILDING RISK CATEGORY
3. WIND EXPOSURE CATEGORY
4. INTERNAL PRESSURE COEFFICIENT
5. COMPONENT & CLADDING WIND PRESSURES
1.07 SUBMITTALS:
A. REVIEW OF SUBMITTALS AND/OR SHOP DRAWINGS BY THE CONTRACTING OFFICER DOES NOT
RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP DRAWINGS
BEFORE SUBMITTAL TO THE CONTRACTING OFFICER. THE CONTRACTOR REMAINS SOLELY
RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP
DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, AND DIMENSIONS SPECIFIED IN THE
CONTRACT DOCUMENTS. CONTRACTOR IS ALSO RESPONSIBLE FOR MEANS, METHODS,
TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION.
1.08 SHOP DRAWING SUBMITTALS:
A. THE REVIEW OF SUBMITTALS AND/OR SHOP DRAWINGS DONE BY THE CONTRACTING OFFICER
DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP
DRAWINGS BEFORE SUBMITTAL TO THE CONTRACTING OFFICER. THE REVIEW BY THE
CONTRACTING OFFICER IS FOR GENERAL CONFORMANCE ONLY. IF SHOP DRAWINGS HAVE NOT
BEEN REVIEWED AND APPROVED BEFORE SUBMITTAL TO THE CONTRACTING OFFICER, THEY
SHALL BE RETURNED WITHOUT APPROVAL.
B. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY AND ALL ERRORS AND OMISSIONS
ASSOCIATED WITH THE PREPARATION OF ALL SHOP DRAWINGS IN RELATIONSHIP TO THE
CONSTRUCTION DOCUMENTS.
C. ALL MODIFICATIONS MADE FOR SUBMITTALS THAT ARE RE%SUBMITTED SHALL CLEARLY NOTE
ALL CHANGES.
D. REPRODUCING THE CONTRACT DOCUMENTS FOR USE AS SHOP DRAWINGS IS NOT ALLOWED,
AND SHOP DRAWINGS WILL BE RETURNED WITHOUT APPROVAL.
E. GENERAL SHOP DRAWING REQUIREMENTS:
1. SUBMIT SHOP DRAWINGS AND ANY OTHER SPECIAL INFORMATION NECCESSARY FOR
PROPER FABRICATION, ERECTION, AND PLACEMENT OF STRUCTURAL FABRICATIONS.
INCLUDE PLANS, ELEVATIONS, AND SECTIONS. CLEARLY SHOW ANCHORAGES,
CONNECTIONS, AND ACCESSORY ITEMS. THE DETAILER MUST INTERPRET THE
CONTRACT DOCUMENTS AND CLEARLY CONVEY THIS INTERPRETATION TO THE FIELD IN
THE FORM OF PLACING OR ERECTION DRAWINGS.
2. CONCRETE REINFORCING DETAILER % PROVIDE PLACING DRAWINGS FOR FABRICATION
AND PLACING OF REINFORCING STEEL. THESE DRAWINGS SHALL INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING: BAR LISTS, SCHEDULES, BENDING DETAILS, PLACING
DETAILS, PLACING PLANS, AND PLACING ELEVATIONS. CLEARLY SHOW FOUNDATION
REINFORCING. INDICATE BAR LENGTHS, LOCATION AND SPLICES OF CONTINUOUS BARS,
AND BAR SUPPORTS. CLEARLY SHOW LOCATIONS OF ALL DOWELS ON PLAN.
1.09 SHOP DRAWINGS BY SPECIALTY ENGINEER:
A. THE FOLLOWING SYSTEMS AND COMPONENTS AS A MINIMUM REQUIRE SPECIALTY
ENGINEERED ERECTION AND FABRICATION DRAWINGS WITH INPUT BY A SPECIALTY ENGINEER,
BUT ARE NOT LIMITED TO: WINDOW SYSTEMS, STOREFRONT SYSTEM, ROOF SYSTEMS,
AWNINGS, LOUVERS, LADDERS, AND ALL EXTERIOR SOFFIT FRAMING.
B. THE SPECIALTY ENGINEER OR SUPPLIER SHALL DESIGN AND INSTALL THEIR COMPLETED
SYSTEM IN ITS ENTIRETY TO THE PRIMARY STRUCTURE PER THE CRITERIA NOTED ON THESE
CONSTRUCTION DOCUMENTS. THE SPECIALTY ENGINEER SHALL ADHERE TO ALL
REQUIREMENTS OF THE APPLICABLE BUILDING CODE OR THESE NOTES, WHICHEVER IS MORE
STRINGENT.
C. SHOP DRAWINGS SHALL BE PROVIDED TO THE CONTRACTING OFFICER AND CALCULATIONS
SHALL REQUIRE THE SEAL, DATE, AND SIGNATURE OF THE SPECIALTY ENGINEER.
2.00 FOUNDATIONS AND SLAB%ON%GRADE
2.01 THE DESIGN OF FOUNDATIONS, RETAINING WALLS AND SLAB ON GRADE IS BASED ON THE CRITERIA ESTABLISHED IN THE GEOTECHNICAL REPORT BY UNIVERSAL ENGINEERING SCIENCES, PENSACOLA, FLORIDA; FILE #1730.180057.0000, DATED JUNE 29, 2018. THE RECOMMENDATIONS OF THAT REPORT
SHALL BE CONSIDERED AN INTEGRAL PART OF THE CONTRACT DOCUMENTS.
2.02 SHALLOW FOUNDATIONS HAVE BEEN DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF
2500 PSF.
2.03 A QUALIFIED GEOTECHNICAL ENGINEER SHALL VERIFY CONDITION AND/OR ADEQUACY OF ALL
SUBGRADES, FILLS AND BACKFILLS BEFORE PLACEMENT OF FOUNDATIONS, FOOTINGS, SLABS,
WALLS, FILLS, BACKFILLS, ETC. SHOULD THE CONTRACTOR FIND UNDESIRABLE SOILS, HE SHALL STOP WORK AND IMMEDIATELY CONTACT THE CONTRACTING OFFICER. ALL FOOTINGS SHALL REST EITHER ON UNDISTURBED SOIL OR A MANUALLY OPERATED VIBRATORY SLED OR TAMPER SHOULD BE USED
TO DENSIFY ANY SOILS IN THE BOTTOM OF THE FOOTING TRENCHES LOOSENED DURING THE
EXCAVATION OPERATION.
2.04 SIDES OF FOUNDATIONS SHALL BE FORMED UNLESS CONDITIONS PERMIT EARTH FORMING.
FOUNDATIONS POURED AGAINST THE EARTH REQUIRE THE FOLLOWING PRECAUTIONS: SLOPE SIDES OF EXCAVATIONS AS APPROVED BY GEOTECHNICAL ENGINEER AND CLEAN UP SLOUGHING BEFORE
AND DURING CONCRETE PLACEMENT.
2.05 CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY PROTECTING ALL EXCAVATION SLOPES.
2.06 WHERE FOOTING STEPS ARE NECESSARY, THEY SHALL BE NO STEEPER THAN ONE VERTICAL TO TWO
HORIZONTAL.
2.07 DEWATER TO AT LEAST TWO FEET BELOW BOTTOM OF LOWEST FOUNDATION IF GROUNDWATER IS
ENCOUNTERED.
2.08 SLAB%ON%GRADE REQUIREMENTS:
A. UNLESS NOTED OTHERWISE, THE SLAB%ON%GRADE SHALL BE A MINIMUM OF 4 INCHES THICK, PLACED ON COMPACTED SUBGRADE, AND REINFORCED WITH 6 x 6 % W2.0 x W2.0 WWF IN FLAT
SHEETS (ROLLS ARE NOT PERMITTED). PROVIDE POSITIVE SUPPORT 2½” CLEAR FROM BOTTOM
OF SLAB. LAP MESH 12”.
B. PLACE SAWN CONTROL JOINTS IN THE SLAB%ON%GRADE AT LOCATIONS INDICATED BY “S.C.J.”.
SEE SPECS FOR SAW CUTTING CONTROL JOINTS UNDER THE HEADING “INTERIOR
LONGITUDINAL CONTRACTION JOINT”.
C. SUBGRADE SHALL BE PREPARED AS RECOMMENDED IN THE GEOTECHNICAL REPORT.
D. PROVIDE A CAPILLARY BREAK CONSISTING OF A COMPACTED 4” LAYER OF CLEAN #57 STONE
OVER THE COMPACTED SUBGRADE.
E. SEE SPECIFICATIONS FOR VAPOR RETARDER MATERIAL. VAPOR RETARDER SHALL CONFORM
TO ASTM E1745, CLASS A, B, OR C. THE VAPOR RETARDER SHOULD BE PLACED OVER THE
PREPARED SUBGRADE. TO REDUCE THE POSSIBILITY OF PUNCTURE WHEN THE VAPOR
RETARDER IS TO BE PLACED OVER A ROUGH GRANULAR FILL LAYER, PROVIDE A THIN LAYER
OF APPROXIMATELY 1/2 INCH OF FINE%GRADED MATERIAL ROLLED OR COMPACTED OVER THE
GRANULAR FILL LAYER PRIOR TO INSTALLATION OF THE VAPOR RETARDER. VAPOR RETARDER
SHOULD BE OVERLAPPED 8 IN. AND TAPED AT THE JOINTS AND CAREFULLY FITTED AROUND
SERVICE OPENINGS.
3.00 REINFORCED CONCRETE
3.01 ALL CONCRETE WORK SHALL CONFORM TO ACI 301%05, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS. DESIGN IS BASED ON ACI 318%05, BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE. DETAIL CONCRETE REINFORCEMENT AND ACCESSORIES IN ACCORDANCE WITH ACI 315, DETAILING MANUAL. DETAIL ALL CONCRETE WALLS AND BEAMS ON THE SHOP DRAWINGS IN
ELEVATION UNLESS SPECIFICALLY APPROVED OTHERWISE. SUBMIT SHOP DRAWINGS FOR APPROVAL, SHOWING ALL FABRICATION DIMENSIONS AND LOCATIONS FOR PLACING REINFORCING STEEL AND
ACCESSORIES. DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE COMPLETED AND
REVIEWED.
3.02 UNLESS NOTED OTHERWISE, ALL CONCRETE SHALL BE NORMAL WEIGHT AND HAVE THE FOLLOWING
MINIMUM 28 DAY COMPRESSIVE STRENGTHS:
A. FOUNDATIONS 3500 PSI
B. SLAB%ON%GRADE 3500 PSI
ALL CONCRETE SHALL HAVE ENTRAINED AIR, U.N.O. CONCRETE MAY CONTAIN A PROPERLY DESIGNED
SUPERPLASTICIZER FOR WORKABILITY.
3.03 REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 UNLESS NOTED OTHERWISE.
3.04 THE PROPOSED MATERIALS AND MIX DESIGN SHALL BE FULLY DOCUMENTED AND REVIEWED BY THE OWNER'S TESTING LABORATORY. RESPONSIBILITY FOR OBTAINING THE REQUIRED DESIGN STRENGTH
IS THE CONTRACTOR'S.
3.05 USE OF CALCIUM CHLORIDE, CHLORIDE IONS, OR OTHER SALTS IN CONCRETE IS NOT PERMITTED.
3.06 HORIZONTAL CONSTRUCTION JOINTS ARE PERMITTED ONLY WHERE INDICATED. THE STRUCTURAL ENGINEER SHALL APPROVE THE LOCATION OF VERTICAL CONSTRUCTION JOINTS. CONSTRUCTION JOINTS SHALL BE THOROUGHLY ROUGHENED BY MECHANICAL MEANS, AND CLEANED. CONTRACTOR SHALL SUBMIT DRAWINGS SHOWING INTENDED POURING SEQUENCE AND LOCATION OF CONSTRUCTION JOINT TO THE ENGINEER FOR REVIEW. PROPOSED METHODS MUST BE ACCEPTABLE TO THE ARCHITECT BEFORE USE.
3.07 CHAMFER OR ROUND ALL EXPOSED CORNERS A MINIMUM OF 3/4".
3.08 TIE ALL REINFORCING STEEL AND EMBEDMENTS SECURELY IN PLACE PRIOR TO PLACING CONCRETE.
PROVIDE SUFFICIENT SUPPORTS TO MAINTAIN THE POSITION OF REINFORCEMENT WITHIN SPECIFIED TOLERANCE DURING ALL CONSTRUCTION ACTIVITIES. "STICKING” DOWELS INTO WET CONCRETE IS NOT
PERMITTED.
3.09 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE; SPLICE ONLY AS SHOWN OR APPROVED;
STAGGER SPLICE WHERE POSSIBLE; USE FULL TENSION SPLICE (CLASS "B") UNLESS NOTED OTHERWISE.
DOWELS SHALL MATCH THE SIZE AND SPACING OF THE SPECIFIED REINFORCEMENT AND SHALL BE LAPPED WITH FULL TENSION SPLICES (CLASS "B") UNLESS NOTED OTHERWISE. TERMINATE BARS WITH STANDARD
HOOKS.
3.10 REINFORCING STEEL SHALL HAVE THE FOLLOWING CONCRETE COVER UNLESS NOTED OTHERWISE (PER ACI
318%05 PAR.7.7.1):
A. CONCRETE AGAINST EARTH (NOT FORMED): 3"
B. FORMED CONCRETE EXPOSED TO THE EARTH OR WEATHER:
1. #6 THROUGH #18 BARS: 2"
2. #5 BARS AND SMALLER: 1%1/2"
C. CONCRETE NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS AND WALLS: 1"
2. BEAMS (STIRRUPS) AND COLUMNS (TIES): 1%1/2"
3.11 DO NOT PLACE DUCTS EXCEEDING ONE%THIRD THE SLAB OR WALL THICKNESS WITHIN THE SLAB OR WALL
UNLESS SPECIFICALLY SHOWN AND DETAILED ON STRUCTURAL DRAWINGS.
3.12 DO NOT WELD OR TACK WELD REINFORCING STEEL UNLESS APPROVED OR DIRECTED BY THE STRUCTURAL
ENGINEER.
3.13 ALL REINFORCING STEEL PLACEMENTS SHALL BE REVIEWED BY THE CONTRACTING OFFICER, OR BY A
REPRESENTATIVE RESPONSIBLE TO HIM. (RE: ACI 318 PAR. 1.3.1)
4.00 STRUCTURAL STEEL, STEEL DECK
4.01 STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED ACCORDING TO AISC
"SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, ASD, LATEST EDITION.
4.02 SUBMIT SHOP DRAWINGS PREPARED IN ACCORDANCE WITH AISC MANUAL "DETAILING FOR STEEL CONSTRUCTION", LATEST EDITION. STEEL FABRICATOR SHALL SUPPLY ANCHOR BOLT LOCATION DRAWINGS.
DO NOT BEGIN FABRICATION UNTIL SHOP DRAWINGS ARE COMPLETED AND REVIEWED.
4.03 HEADED ANCHOR RODS: ASTM F 1554, GRADE 36 ASTM F 1554, GRADE 55, WELDABLE, STRAIGHT.NUTS:
ASTM A 563 (ASTM A 563M) HEAVY%HEX CARBON STEEL, PLATE WASHERS: ASTM A 36/A 36M CARBON STEEL, WASHERS: ASTM F 436 (ASTM F 436M), TYPE 1, HARDENED CARBON STEEL. FINISH: HOT%DIP ZINC COATING, ASTM A 153/A 153M, CLASS C MECHANICALLY DEPOSITED ZINC COATING, ASTM B 695, CLASS 50.
4.04 STRUCTURAL STEEL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992. STRUCTURAL STEEL SHAPES, PLATES, ANGLES, AND CHANNELS SHALL CONFORM TO ASTM A36 UNLESS NOTED OTHERWISE.
STRUCTURAL TUBING SHALL CONFORM TO ASTM A500, GRADE B, FY = 46 KSI, UNLESS NOTED OTHERWISE.
STEEL PIPE SHALL CONFORM TO ASTM A501 OR ASTM A53, TYPE E OR S, GRADE B.
4.05 BOLTS SHALL CONFORM TO ASTM A325, 3/4%INCH DIAMETER MINIMUM, UNLESS NOTED OTHERWISE. BOLTS IN BEARING CONNECTIONS SHALL BE DESIGNATED TYPE N, TENSIONED, SNUG%TIGHT AS DEFINED BY AISC. BOLTS IN MOMENT CONNECTIONS AND IN TRUSSES SHALL BE DESIGNATED SLIP%CRITICAL (SC). FULLY TENSION SLIP% CRITICAL CONNECTIONS WITH DIRECT TENSION INDICATOR WASHERS INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTION.
4.06 USE PRE%QUALIFIED WELDED JOINTS AS PER AISC, AND AWS D1.1 "STRUCTURAL WELDING CODE." USE ONLY CERTIFIED WELDERS; ALL ELECTRODES SHALL CONFORM TO AWS A5 GRADE E70XX. BARE ELECTRODE AND GRANULAR FLUX SHALL CONFORM TO AWS A5, F70 AWS FLUX CLASSIFICATION. MINIMUM WELD SIZE TO BE
3/16" FILLET WELD, U.N.O.
4.07 CUTS, BOLTS, COPING, ETC. REQUIRED FOR WORK OR OTHER TRADES SHALL BE SHOWN ON THE SHOP DRAWINGS AND MADE IN THE SHOP. CUTS OR BURNING HOLES IN STRUCTURAL STEEL MEMBERS IN THE FIELD
WILL NOT BE PERMITTED.
4.08 SHOP CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS MAY BE WELDED OR BOLTED. FIELD CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS SHALL BE BOLTED, WHERE POSSIBLE.
4.09 WHEN SPECIFICALLY NOT DETAILED ON THE DESIGN DRAWINGS PROVIDE THE FOLLOWING BEAM
CONNECTIONS:
A. USE TWO%SIDE ANGLE CONNECTIONS PER AISC SPECIFICATIONS, LATEST EDITION.
B. WHERE BEAM REACTIONS ARE SHOWN, CONNECTIONS SHALL DEVELOP THE REACTION GIVEN.
C. WHEN BEAM REACTIONS ARE NOT SHOWN, CONNECTIONS SHALL BE DESIGNED TO SUPPORT ONE HALF
THE TOTAL UNIFORM LOAD CAPACITIES SHOWN IN THE ALLOWABLE UNIFORM LOAD TABLES, PARTS 2
OF THE AISC MANUAL, FOR THE GIVEN BEAM, SPAN, AND GRADE OF STEEL SPECIFIED.
D. WHERE REACTIONS ARE SUBJECT TO ECCENTRICITY, SUCH ECCENTRICITY SHALL BE TAKEN INTO
ACCOUNT.
4.10 STEEL TRUSS CONNECTIONS SHALL DEVELOP FULL TENSILE CAPACITY OF MEMBER CONNECTED, UNLESS NOTED OTHERWISE. DOUBLE ANGLE TRUSS MEMBERS SHALL HAVE SPACERS EQUAL TO GUSSET THICKNESS AT 3RD POINTS. THIS NOTE APPLIES TO BOTH VERTICAL AND HORIZONTAL TRUSSES. IF NECCESARY AT TRUSS CONNECTIONS, EXTEND THE WEB OF TEE SHAPED CHORDS USING PLATE EQUAL IN THICKNESS TO TEE WEB
USING FULL PENETRATION WELDS.
4.11 FIELD SPLICES SHALL BE DESIGNED TO DEVELOP THE FULL CAPACITY OF MEMBER AT THE POINT OF SPLICE IN
BENDING, SHEAR AND AXIAL LOAD (COMPRESSION AND TENSION).
IA
R
E
OF
RC
SP
EC
IA
AN
N
P
ER
L O
AT
IO
M M
S
CO
D
SHEET REFERENCE:
D A
T E
SHEET NUMBER:
OF
D E
S C
R
IP
T
IO
N R
E V
A
IR
F O
R C
E
SP
EC
IA
L O
PE
R
A
TI
O N
S C
O M
M A
N D
S
P
EC
IA
L
O
PE
R A
TI
O
N S
C
IV
IL
E
N G
IN
E
ER
S
Q U
A D
R O
N
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
PROJECT NUMBER:
BUILDING NUMBER:
DRAWN BY:
DESIGNED BY:
DATE:
90306
D
EU
SOJ
R E
G
ISTERE
R E
E
NIGNED
EPH
ER
IL
SI
U
OL
ADIOL
F
R
STATE OF
No. 54319
E T
ACFIT
C R
E
I
S-001
9/4/2020
G E
N E
R A
L N
O T
E S
JTG
JTG
CP1024656
A D
D
IT
IO
N
C D
C W
E S
T B
L D
G
9/4/20209/4/20209/4/20209/4/2020
4.12 ALTERNATE CONNECTION DETAILS MAY BE USED IF SUCH DETAILS ARE SUBMITTED TO THE ENGINEER FOR REVIEW AND ACCEPTANCE IS GRANTED. HOWEVER, THE ENGINEER SHALL BE THE SOLE JUDGE OF ACCEPTABILITY AND THE CONTRACTOR'S BID SHALL ANTICIPATE THE USE OF THE SPECIFIC DETAILS SHOWN ON THE DRAWINGS. IN ANY EVENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE DESIGN OF SUCH ALTERNATE DETAILS, WHICH HE PROPOSES.
4.13 PROVIDE STIFFENER PLATES ON EACH SIDE OF WEB OF BEAM OR GIRDER AT POINTS OF
CONCENTRATED LOADS. MINIMUM STIFFENER PLATE THICKNESS SHALL BE 1/2" OR FLANGE
THICKNESS OF COLUMNS ABOVE OR BELOW, WHICHEVER IS THICKER.
4.14 FILLER BEAMS OR JOISTS SHOULD BE SPACED EQUALLY BETWEEN THE COLUMNS IF NOT SHOWN
OTHERWISE ON THE DRAWINGS.
4.15 PROVIDE TEMPORARY BRACING OF STRUCTURAL FRAMING TO PROVIDE LATERAL SUPPORT UNTIL ALL
PERMANENT BRACING MOMENT CONNECTIONS AND FLOOR AND ROOF DECKS (DIAPHRAGMS) ARE
COMPLETELY INSTALLED.
4.16 STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL AND MECHANICAL DRAWINGS AND DRAWINGS RELATED TO OTHER TRADES. CONTRACTOR SHALL BE RESPONSIBLE TO CHECK AND COORDINATE DIMENSIONS, CLEARANCES, ETC. WITH THE WORK OF OTHER TRADES. THE
STRUCTURAL STEEL CONTRACTOR SHALL PROVIDE FRAMING AROUND OPENINGS IN FLOOR AND
ROOF SLAB AS INDICATED IN THE MECHANICAL AND ARCHITECTURAL DRAWINGS.
4.17 THE STRUCTURAL STEEL CONTRACTOR SHALL PROVIDE WEB REINFORCEMENT AT OPENINGS IN
STEEL BEAMS AND GIRDERS FOR MECHANICAL AND ELECTRICAL PENETRATIONS. WEB OPENINGS
SHALL BE LOCATED IN THE MIDDLE 1/3 OF BEAM DEPTH. WEB REINFORCEMENT IS NOT REQUIRED FOR WEB OPENINGS LESS THAN 4" DIAMETER OR 3" X 3". A MAXIMUM OF ONE WEB OPENING IS PERMITTED
FOR EACH BEAM NOT HAVING WEB REINFORCEMENT.
4.18 STRUCTURAL STEEL CONTRACTOR SHALL COORDINATE THE BOTTOM OF BASE PLATE ELEVATION WITH THE TOP OF CONCRETE ELEVATION. IN CASE OF CONFLICT, THE CONTRACTOR SHALL MAKE
ALLOWANCE IN HIS BID FOR MORE STRINGENT REQUIREMENTS.
4.19 PAINT STRUCTURAL STEEL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. DO NOT PAINT
STEEL SURFACES TO BE ENCASED IN CONCRETE OR RECEIVE SPRAYED ON FIREPROOFING,
CONNECTIONS DESIGNATED AS SLIP CRITICAL, OR TO BE WELDED.
4.20 PRIMER: SSPC-PAINT 25, TYPE I, ZINC OXIDE, ALKYD, LINSEED OIL PRIMER.
STEEL DECKING:
4.21 MATERIAL FOR STEEL DECKING SHALL CONFORM TO ASTM A1008 GRADES 33 AND 40, OR FROM A653.
SEE DRAWINGS FOR STEEL DECK TYPE, GAUGE, YIELD STRENGTH AND SECTION PROPERTIES.
4.22 ROOF DECK SHALL BE TYPE B, WIDE RIB.
4.23 UNLESS NOTED OTHERWISE ALL STEEL DECKING SHALL HAVE A GALVANIZED COATING CONFORMING
TO ASTM A653, G90
4.24 STEEL ROOF DECK ANCHORAGE (UNLESS NOTED OTHERWISE ON PLANS OR DETAILS):
A. ANCHOR DECK TO SUPPORTING STRUCTURE AT ALL EDGE RIBS PLUS INTERIOR RIBS AT A
MAXIMUM SPACING OF 6 INCHES USING THE FOLLOWING:
1. WHEN BASE STEEL THICKNESS IS 3/8” OR LESS, USE #12 SELF-TAPPING HEX WASHER
HEAD SCREWS BY HILTI (OR APPROVED EQUAL) OR X-EDN19 THQ12 POWDER ACTUATED
FASTENERS BY HILTI (OR APPROVED EQUAL).
2. WHEN BASE STEEL THICKNESS EXCEEDS 3/8”, IT IS THE CONTRACTOR’S OPTION TO PRE-
DRILL AND USE #12 HEX WASHER HEAD SCREWS BY HILTI (OR APPROVED EQUAL) OR TO
USE HILTI X-ENP-19 L15 POWDER ACTUATED FASTENERS (OR APPROVED EQUAL).
B. FASTEN SIDE LAPS OF ADJACENT UNITS AT A MAXIMUM SPACING OF 12 INCHES WITH #10 SELF-
TAPPING SCREWS BY HILTI (OR APPROVED EQUAL).
4.25 PROVIDE DECKING CONTINUOUS OVER 3 SPANS MINIMUM WHERE SUPPORTING STRUCTURE PERMITS.
4.26 STEEL DECKING SHALL BE ERECTED IN STRICT COMPLIANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS
5.00 MASONRY
5.01 CONCRETE MASONRY DESIGN, CONSTRUCTION AND TESTING SHALL CONFORM TO TMS 602/ACI
530.1/ASCE 6-13, SPECIFICATION FOR MASONRY STRUCTURES AND OTHER STANDARDS.
5.02 PROVIDE LIGHTWEIGHT, HOLLOW, LOAD-BEARING CONCRETE MASONRY UNITS (CMU) CONFORMING
TO ASTM C90, UNLESS NOTED OTHERWISE.
5.03 PROVIDE MASONRY CONSTRUCTION WITH MINIMUM COMPRESSIVE STRENGTH, f'm = 1700 PSI.
5.04 PROVIDE TYPE "N" MORTAR IN ACCORDANCE WITH ASTM C270 BY PROPORTION REQUIREMENTS, UNLESS NOTED OTHERWISE.
5.05 VERTICAL CELLS SHALL BE REINFORCED WITH #5 @24" O.C. MINIMUM, UNLESS NOTED OTHERWISE (U.N.O.) IN THE CONTRACT DRAWINGS. VERTICAL REINFORCING SHALL BE CONTINUOUS (LAPPED 48 BAR DIAMETERS MINIMUM AT SPLICES, U.N.O.) AND HELD IN POSITION AT THE TOP AND BOTTOM OF
THE GROUT POUR. U.N.O., POSITION VERTICAL REINFORCING IN THE CENTER OF THE CELL.
5.06 PROVIDE GROUT FOR REINFORCED MASONRY IN ACCORDANCE WITH ASTM C476. GROUT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3,000 PSI UNLESS NOTED OTHERWISE. GROUT SHALL
BE FLUID CONSISTENCY. FLUID CONSISTENCY SHALL MEAN THAT CONSISTENCY AS FLUID AS
POSSIBLE FOR POURING WITHOUT SEGREGATION OF THE CONSTITUENT PARTS. FILL ALL CELLS BELOW GRADE WITH GROUT. ALL GROUT SHALL BE CONSOLIDATED AT THE TIME OF POURING BY VIBRATING AND THEN RECONSOLIDATED BY AGAIN PUDDLING LATER, BEFORE PLASTICITY IS LOST.
WHEN GROUTING IS STOPPED FOR ONE HOUR OR LONGER, CONSTRUCTION JOINTS SHALL BE
FORMED BY STOPPING THE POUR OF THE GROUT 1-1/2 INCHES BELOW THE TOP OF THE UPPERMOST
UNIT.
5.07 PROVIDE HORIZONTAL JOINT REINFORCEMENT COMPLYING WITH ASTM A82, NO. 9 GAUGE OR
HEAVIER, ZINC COATED, PLACED 16 INCHES ON CENTER UNLESS NOTED OTHERWISE.
5.08 PROVIDE RUNNING BONDS WITH VERTICAL JOINTS LOCATED AT CENTER OF MASONRY UNITS IN THE
ALTERNATE COURSE BELOW, UNLESS NOTED OTHERWISE.
5.09 ALL MASONRY UNITS SHALL BE FREE OF EXCESSIVE DUST AND DIRT AT THE TIME THEY ARE LAYED BY
THE MASON.
5.10 ALL REINFORCED HOLLOW UNIT MASONRY SHALL BE BUILT TO PRESERVE THE UNOBSTRUCTED VERTICAL CONTINUITY OF THE CELLS TO BE FILLED. WALLS AND CROSS WEBS IN ALL REINFORCED MASONRY WALLS SHALL BE FULLY BEDDED IN MORTAR. ALL HEAD (OR END) JOINTS SHALL BE SOLIDLY FILLED WITH MORTAR FOR A DISTANCE IN FROM EACH FACE OF THE UNIT NOT LESS THAN THE THICKNESS OF THE LONGITUDINAL FACE SHELLS, BOND SHALL BE PROVIDED BY LAPPING UNITS IN
SUCCESSIVE VERTICAL COURSES.
5.11 PROVIDE VERTICAL CONTROL JOINTS BETWEEN REINFORCED MASONRY WALLS AND MASONRY
PARTITION WALLS, AND AT A MINIMUM OF 20’-0” O.C.
5.12 SAMPLE AND TEST MASONRY MATERIAL IN ACCORDANCE WITH TMS 602-16, TABLE 3, QUALITY
ASSURANCE LEVEL 2.
5.13 INSPECT MASONRY CONSTRUCTION IN ACCORDANCE WITH TMS 602-16, TABLE 4, QUALITY ASSURANCE
LEVEL 2 .
6.00 POST-INSTALLED ANCHORS
6.01 EXCEPT WHERE INDICATED ON THE DRAWINGS, POST-INSTALLED ANCHORS SHALL CONSIST OF THE FOLLOWING ANCHOR TYPES AS PROVIDED BY HILTI, INC. CONTACT HILTI AT (800) 879-8000 FOR
PRODUCT RELATED QUESTIONS.
a) ANCHORAGE TO CONCRETE
i) ADHESIVE ANCHORS FOR CRACKED AND UNCRACKED CONCRETE USE:
(1) HILTI HIT-HY 200 SAFE SET SYSTEM WITH HILTI HIT-Z ROD PER ICC ESR-3187.
(2) HILTI HIT-HY 200 SAFE SET SYSTEM WITH HILTI HOLLOW DRILL BIT SYSTEM WITH
HAS-E THREADED ROD PER ICC ESR-3187.
(3) HILTI HIT-RE 500-V3 EPOXY ADHESIVE ANCHORING SYSTEM WITH HAS-E
THREADED ROD PER ICC ESR-2322 FOR SLOW CURE APPLICATIONS
ii) MEDIUM DUTY MECHANICAL ANCHORS FOR CRACKED AND UNCRACKED CONCRETE USE:
(1) HILTI KWIK HUS-EZ AND KWIK HUS EZ-I SCREW ANCHORS PER ICC ESR-3027
(2) HILTI KWIK BOLT-TZ EXPANSION ANCHORS PER ICC ESR-1917
(3) HILTI KWIK BOLT 3 EXPANSION ANCHORS (UNCRACKED CONCRETE ONLY) PER
ICC ESR-2302
iii) HEAVY DUTY MECHANICAL ANCHORS FOR CRACKED AND UNCRACKED CONCRETE USE:
(1) HILTI HDA UNDERCUT ANCHORS PER ICC ESR 1546
(2) HILTI HSL-3 EXPANSION ANCHORS PER ICC ESR 1545
b) REBAR DOWELING INTO CONCRETE
i) ADHESIVE ANCHORS FOR CRACKED AND UNCRACKED CONCRETE USE:
(1) HILTI HIT-HY 200 SAFE SET SYSTEM WITH HILTI HOLLOW DRILL BIT SYSTEM WITH
CONTINUOUSLY DEFORMED REBAR PER ICC ESR-3187.
(2) HILTI HIT-RE 500-V3 EPOXY ADHESIVE ANCHORING SYSTEM WITH CONTINUOUSLY
DEFORMED REBAR PER ICC ESR-2322.
c) ANCHORAGE TO SOLID GROUTED MASONRY
i) ADHESIVE ANCHORS USE:
(1) HILTI HIT-HY 70 MASONRY ADHESIVE ANCHORING SYSTEM (ICC PENDING).
(2) STEEL ANCHOR ELEMENT SHALL BE HILTI HAS-E CONTINUOUSLY THREADED ROD
OR CONTINUOUSLY DEFORMED STEEL REBAR
ii) MECHANICAL ANCHORS USE:
(1) HILTI KWIK HUS-EZ SCREW ANCHOR PER ICC ESR-3056
(2) HILTI KWIK BOLT-3 EXPANSION ANCHORS PER ICC ESR-1385
d) ANCHORAGE TO HOLLOW / MULTI-WYTHE MASONRY
i) ADHESIVE ANCHORS USE:
(1) HILTI HIT-HY 70 MASONRY ADHESIVE ANCHORING SYSTEM PER ICC ESR-3342.
(2) STEEL ANCHOR ELEMENT SHALL BE HILTI HAS-E CONTINUOUSLY THREADED ROD
OR CONTINUOUSLY DEFORMED STEEL REBAR
(3) THE APPROPRIATE SIZE SCREEN TUBE SHALL BE USED PER ADHESIVE
MANUFACTURER’S RECOMMENDATION
6.02 ANCHOR CAPACITY USED IN DESIGN SHALL BE BASED ON THE TECHNICAL DATA PUBLISHED BY HILTI OR SUCH OTHER METHOD AS APPROVED BY THE STRUCTURAL ENGINEER OF RECORD. SUBSTITUTION
REQUESTS FOR ALTERNATE PRODUCTS MUST BE APPROVED IN WRITING BY THE STRUCTURAL
ENGINEER OF RECORD PRIOR TO USE. CONTRACTOR SHALL PROVIDE CALCULATIONS
DEMONSTRATING THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING THE PERFORMANCE VALUES OF THE SPECIFIED PRODUCT. SUBSTITUTIONS WILL BE EVALUATED BY THEIR HAVING AN ICC
ESR SHOWING COMPLIANCE WITH THE RELEVANT BUILDING CODE FOR SEISMIC USES, LOAD
RESISTANCE, INSTALLATION CATEGORY, AND AVAILABILITY OF COMPREHENSIVE INSTALLATION
INSTRUCTIONS. ADHESIVE ANCHOR EVALUATION WILL ALSO CONSIDER CREEP, IN-SERVICE
TEMPERATURE AND INSTALLATION TEMPERATURE.
6.03 INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INCLUDED IN THE ANCHOR
PACKAGING AND IN STRICT ACCORDANCE WITH THE CURRENT ICC ESR.
6.04 THE CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER’S REPRESENTATIVE TO PROVIDE
ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. THE
STRUCTURAL ENGINEER OF RECORD MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF THE
CONTRACTOR’S PERSONNEL WHO INSTALL ANCHORS ARE TRAINED PRIOR TO THE COMMENCEMENT
OF INSTALLING ANCHORS.
6.05 ANCHOR CAPACITY IS DEPENDANT UPON SPACING BETWEEN ADJACENT ANCHORS AND PROXIMITY OF
ANCHORS TO EDGE OF CONCRETE. INSTALL ANCHORS IN ACCORDANCE WITH…