Drawings 626-19-205 Morgue Exhaust and Elevator .pdf

PDF 20 MB Posted

Attached to
Z1DA--626-19-205 - Upgrade Morgue Exhaust and Elevator
Solicitation number
36C24922B0032
Issued by

About this file

This document provides details on a federal contract opportunity to upgrade a morgue exhaust and elevator system. The solicitation number is 36C24922B0032 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 to obtain contractor services to upgrade the exhaust and elevator located at its morgue facility. The contractor will be required to provide all labor, materials, equipment and supervision necessary to remove the existing exhaust system and install a new one, as well as replace an aging elevator located within the morgue. The contractor must have experience performing similar exhaust and elevator upgrade projects at medical facilities. The response due date for proposals is July 15, 2022.

View the file

Other files

File Type Posted
36C24922B0032 0001.docx DOCX document
36C24922B0032.pdf PDF
Specs 626-19-205 Morgue Exhaust and Elevator.pdf PDF
WD TN20220178 09022022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT #: 626-19-205 APOGEE PROJECT #: 19-149

NASHVILLE VA MEDICAL CENTER

1310 24th. AVENUE SOUTH, NASHVILLE, TN 37212

NASHVILLE VA

MEDICAL CENTER

UPGRADE MORGUE EXHAUST AND ELEVATOR

NASHVILLE VA

MEDICAL CENTER

PROJECT SITE MAP PROJECT LOCATION MAP

CAMPUS MAP

BUILDING 1 LOCATION

DRAWING LIST

GENERAL

ARCHITECTURAL

COVER SHEET 1

A-001

GI002

GI003

DRAWING LIST

GENERAL

COVER SHEET 1

A-001

DRAWING LIST

GENERAL

GI001

AD001

AE101

AE102

COVER SHEET

BASEMENT FLOOR AND REFLECTED CEILING DEMOLITION PLANS

BASEMENT AND FIRST FLOOR PLANS

A-001 GENERAL INFORMATION

BASEMENT AND FIRST FLOOR PROPOSED ENLARGED PLANS AND ELEVATIONS

ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES

OVERALL BASEMENT AND FIRST FLOOR PLANS

GI004 4

PROPOSED FLOOR PLANS

AE301 5 5

SECTIONS

GI005

GI006

GENERAL NOTES

GENERAL NOTES

PLUMBING

PP101 BASEMENT FLOOR PLUMBING PLANS 1 1

MECHANICAL

M-001 MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES

MH101 BASEMENT AND FIFTH FLOOR ROOF PLANS

11 2

2 2

ELECTRICALELECTRICALELECTRICAL

E-101

E-501

E-001

ED101

ELECTRICAL NOTES, LEGEND, AND ABBREVIATIONS

BASEMENT ELECTRICAL DEMOLITION PLANS

BASEMENT AND FIRST FLOOR ENLARGED PLANS AND ELEVATIONS

ELECTRICAL DETAILS

E-601 ELECTRICAL SCHEDULES 5 5

3/

/2

2:

:2

PM

GI001

EG, DGCLW

COVER SHEET

FULLY SPRINKLERED

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# MARCH 25, 2021

UPGRADE MORGUE

EXHAUST AND ELEVATOR

626-19-205

NASHVILLE VA MEDICAL CENTER

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212

19-149

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

Engineers Architects

DocuSign Envelope ID: A26E07ED-DBD1-46BF-96FB-90D34014AC6B

3/25/2021

A. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED

INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS

USED ARE USED ONLY FOR THE PURPOSES OF

CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY

DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF

THE DRAWINGS, OR OF THE DRAWINGS AND

SPECIFICATIONS AS A WHOLE. THE FACT THAT THE

DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT

THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE,

INTEGRATED AND UNIFIED WHOLE.

B. THE DRAWINGS AND SPECIFICATIONS, INCLUDING

DRAWINGS PREPARED BY SPECIFIC ARCHITECT AND/OR

ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS

SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE

CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT

FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY

BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR

WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL

SEEK CLARIFICATION OR INTERPRETATION FROM THE COR

PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT

CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL

SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED,

THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY

OR GREATER QUANTITY OF WORK.

C. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION

WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH

THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING

MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY

DISCOVERED. THE CONTRACTOR IS RESPONSIBLE FOR

CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS

THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES

EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD

CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING

WITH THE WORK.

D. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

E. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING

CONSTRUCTION.

F. AT FIRE RATED WALLS WHERE OPENINGS ARE GREATER

THAN 16 SQUARE INCHES OR WHERE TOTAL AREA OF

OPENINGS EXCEEDS 100 SQUARE INCHES IN 100 SQUARE

FEET, WRAP 5/8" TYPE 'X' GYPSUM BOARD BEHIND

OPENINGS PER U.L. DESIGN #U510.

G. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN

THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING

AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS

TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL

CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE

LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL

NECESSARY PERMITS.

H. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND

UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE

FOLLOWING: THESE CONSTRUCTION DOCUMENTS

(DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE

THE GENERAL SCOPE OF THE PROJECT IN TERMS OF

ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF

THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS,

AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL,

AND DATA SYSTEMS. ON THE BASIS OF THE GENERAL

SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE

CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR

THE PROPER EXECUTION AND COMPLETION OF THEIR

WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL

AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR

WARRANTY FOR THEIR WORK UNLESS A LONGER

WARRANTY IS INDICATED IN THE SPECIFICATIONS.

I. THERE IS NO GUARANTEE THAT THERE WILL BE SPACE ON

SITE OR IN THE HOSPITAL FOR ANY MATERIAL STORAGE.

THE CONTRACTOR IS RESPONSIBLE FOR ACCUMULATING

MATERIAL AS RECOMMENDED BY THE MANUFACTURER.

J. THE VA WILL DESIGNATE WHAT ITEMS ON THE WALL (HAND

SANITIZER DESPENSERS, LITERATURE SLOTS, BULLETIN

BOARD, DISPLAY CASES, EQUIPMENT, ETC.) IS TO BE

STORED BY THE CONTRACTOR AND REINSTALLED AT THE

END OF EACH PHASE. UNMARKED ITEMS ARE TO BE

DISPOSED OF.

K. WHEN REPAIRING WALLS OR CEILINGS, MATCH EXISTING

CONDITION THAT EXISTS THROUGHTOUT THAT AREA, UNO.

GENERAL NOTES:SYMBOL LEGEND

ELEVATION

INDICATION

FIRE EXTINGUISHER

CABINET

SITE PLAN NORTH

ARROW

REVISION

INDICATION

BUILDING WALL SECTION

INDICATION

DETAIL

INDICATION

GENERAL

DIMENSIONING

ROOM NAME

ROOM NUMBER

AREA DETAILED

STARTING POINT

NOTE: THE ± INDICATES A DIMENSION THAT CAN VARY.

(NOTIFY THE ARCHITECT OF ANY CHANGE IN THAT DIMENSION IF

IT IS GREATER THAN 1")

NOTE: DIMENSIONS ARE TAKEN FROM/TO

FINISH SURFACE, UNLESS OTHERWISE

NOTES.

STARTING

POINT

ON ELEVATION

NORTH

ARROW

DOOR

SYMBOL

WINDOW

SYMBOL

ELEVATION

TAG

F.E.C

NORTH

ALIGN WITH EXISTING

CONSTRUCTION

COLUMN GRID

LIMIT OF WORK

EXISTING COLUMN GRID

DENOTED WITH AN E/

PREFIX

FINISH

SYMBOLS

CEILING

HEIGHT

MATCHLINE

LINETYPE

SYMBOLS

IN PLAN

NEW DOOR

DESIGNATION

PARTITION TYPE

SYMBOL

EQUIPMENT

DESIGNATION

BREAK LINE

SECTION NUMBER

SHEET WHERE SHOWN

SHEET WHERE SHOWN

REVISION NUMBER

DETAIL NUMBER

DENOTES CORNER GUARD

LOCATION

PARTITION TYPE

EQUIPMENT TYPE

(SEE EQUIPMENT MANUAL)

COLUMN GRID CENTERLINE INDICATOR

KEYNOTE INDICATOR

WINDOW TYPE

OR VISION PANEL

CG

INTERIOR

AND/OR

EXTERIOR

MULTIPLE INTERIOR

NEW DOOR

EMERGENCY DOOR

DESIGNATION

EMERGENCY SWING

DOUBLE EGRESS DOOR

DESIGNATION

ROOM

NAME101

1t 1t

A.F.F.10' 6"

A101

SIM

RM

CEILING:

WALL:

FLOOR:

BASE:

NAME

CEILING

FINISHWALL

FINISHFLOOR

FINISHBASE

FINISH

ROOM FINISH TAG

NAME

ELEVATION

N

NEW DOOR

NOTE: EXISTING DIMENSIONS INDICATED AS [0'-0"] OR WITH (VIF)

ARE SUPPLIED TO THE ARCHITECT BY OTHERS AND SHALL BE

FIELD VERIFIED BY THE CONTRACTOR. (SEE "GENERAL

CONTRACTOR RESPONSIBILITIES WITH RESPECT TO EXISTING

CONDITION NOTES")

ROOM

INDICATION

KEYNOTE

SYMBOL

O'-O"

FACE OF SURFACE INDICATOR

O'-O"

O'-O" ±

O'-O"

VIF

NEW DOOR

A101

F2

A201

A1

A3

A4 A2A201

EXISTING DOOR

DESIGNATION

EXISTING DOOR

A

1 1

A

A102

AREA A

INDICATOR OF AREA SHOWN ON DRAWING

SHEET NUMBER OF ADJACENT DRAWING

A

X

EXISTING WALL

TEMPORARY BARRIER

CONSTRUCTION ROUTE

GENERAL DEMOLITION NOTES:

A. REMOVE EXISTING CONSTRUCTION AS

DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS

PRIOR TO PROCEEDING WITH NEW

CONSTRUCTION.

B. EXISTING EQUIPMENT REMOVED SHALL BE

PROPERLY DISPOSED OFF MEDICAL CENTER

GROUNDS. COORDINATE WITH VA COR.

C. EXTENSIONS OF EXISTING WALLS AND PATCHED

WALL OPENING SHALL AS A MINIMUM, MATCH THE

INTEGRITY OF ADJACENT CONSTRUCTION UNLESS

INDICATED OTHERWISE.

D. NOTIFY CONTRACTING OFFICER'S

REPRESENTATIVE OF ANY AREA REQUIRING

DEMOLITION FOR INSTALLATION OF MECHANICAL,

PLUMBING, STRUCTURAL, ELECTRICAL, OR DATA

ITEMS (INCLUDING ROOF PENETRATIONS) NOT

SHOWN IN THESE DRAWINGS. AFTER SUCH

DEMOLITION AND INSTALLATION, PATCH OR

REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

E. THE INFORMATION CONTAINED IN THESE

DEMOLITION DOCUMENTS DEFINES GENERAL

SCOPE ONLY AND DOES NOT RELIEVE THE

CONTRACTOR OF THE RESPONSIBILITY OF

PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

F. REFER TO THE ELECTRICAL DRAWINGS FOR

FURTHER INFORMATION REGARDING DEMOLITION

OF ELECTRICAL SYSTEMS.

G. ALL DEMOLITION WORK SHALL BE PERFORMED

WITH "CARE AND DILIGENCE" IN ORDER TO

PREVENT ARBITRARY DAMAGE OR INTERRUPTION

OF SERVICE OR CONCEALED UTILITIES INTENDED

TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES

OR CONDITIONS LOCATED DIFFERENTLY FROM

THAT INDICATED OR THAT ARE NOT IDENTIFIED.

SHALL BE REPORTED TO THE CONTRACTING

OFFICER.

H. SALVAGE ALL EXISTING SIGNAGE, GRILLE, COVER

PLATES AND ELEVATOR DOOR ACCESS CONTROL

KEY PAD AND CEILING MOUNT SENSORS (ON

SOME LEVELS) WITHIN THE LIMIT OF WORK OF

THE ELEVATOR AREA ON EACH FLOOR.

I. CONTRACTOR IS RESPONSIBLE TO ENSURE

LIGHTING, SMOKE DETECTOR AND EXIT SIGNS

WILL BE AVAILABLE AND OPERABLE DURING

CONSTRUCTION FOR EACH PHASE. COORDINATE

WITH VA COR AND SAFETY ABOUT RELOCATION

OF THESE ELEMENTS PRIOR TO ERECTING

TEMPORARY CONSTRUCTION BARRIER, IF

NECESSARY.

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE TRANSPORTATION

ALUM ALMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOD BASIS OF DESIGN

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH

CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT COTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CR CRASH RAIL

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETR EXISTING TO REMAIN

ETS EXPOSED TO STRUCTURE

ARCHITECTURAL ABBREVIATIONS

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GYP BD GYPSUM BOARD

GYP GYPSUM

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEPF MECHANICAL, ELECTRICAL,

PLUMBING,

FIRE PROTECTION (CONDUIT)

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N

NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PAINT

PARTN PARTITION

PBD PARTICLE BOARD

PBSW PATIENT BED SERVICE WALL

PCC PRECAST CONCRETE

PI PSYCHIATRIC INPATIENT

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PMU PSYCHIATRIC MEDICAL UNIT

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT CONC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RFT RESILIENT FLOOR TILE

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

INV INVERT

ITG INSULATED TEMPERED GLASS

TT TERRAZZO TILE

GENERAL NOTES (CONTINUED):

AA. PROVIDE TRANSITION STRIPS TO MATCH EXISTING

BETWEEN VARIED TYPES OF FLOORS AT TRANSITIONS AT

DOORS. COORDINATE SCHEDULE FOR ACCESSING THESE

DOORS FOR EACH PHASE WITH VA COR.

BB. NOTE DELETED

CC. ALTHOUGH EGRESS IN THE CONSTRUCTION PHASES IS

RESTRICTED DURING CONSTRUCTION HOURS,

EMERGENCY EGRESS IN CORRIDORS MUST BE

MAINTAINED.

DD. NOTE DELETED

EE. THE VA WILL IDENTIFY WHAT ARTWORK IS TO BE RETAINED

AND TURNED OVER TO THE VA. ALL REMAINING ARTWORK

IS TO BE DISPOSED OF. THE G.C. WILL REINSTALL

ARTWORK.

FF. AT THE BEGINNING OF EACH PHASE, THE CONTRACTOR

WILL REMOVE ALL SIGNAGE, EXCLUDING EMERGENCY

EGRESS SIGNAGE, UNO. SIGNAGE SHALL BE TURNED OVER

TO THE VA. CONTRACTOR WILL INSTALL TEMPORARY

PRINTED SIGNAGE THAT CONTAINS THE SAME

INFORMATION AS THE REMOVED SIGNS. THE VA WILL

EITHER RETURN THE SIGNAGE OR PROVIDE NEW SIGNAGE

FOR CONTRACTOR INSTALL.

GG. CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE

FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

HH. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN

EACH BUILDING COMPONENT LOCATION. BRING

DISCREPANCIES TO THE COR'S ATTENTION IN WRITING

IMMEDIATELY.

II. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING OR

FINISHED FACE OF EXISTING WALL SURFACE.

JJ. ALL WORK SHALL BE PERFORMED IN A SKILLED

WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO THE

COR'S.

KK. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR

MOUNTING OFWALL-MOUNTED ITEMS: CONTRACTOR TO

PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS

INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE

STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.

LL. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN

DIFFERENT MATERIALS.

MM. EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO

BEGINNING OF WORK. ANY ERRORS OR OMISSIONS SHALL

BE BROUGHT TO THE ARCHITECT'S ATTENTION IN WRITING

IMMEDIATELY.

NN. ALL CARS TO BE CONSTRUCTED ON THE GROUND FLOOR,

INSIDE THE SHAFT.

OO. CONTRACTOR IS RESPONSIBLE FOR ALL SERVICE CALLS

AND SERVICES FOR ALL ELEVATOR AFTER THE EXECUTION

AND DURING THE DURATION OF THEIR CONTRACT.

PP. FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE

THE ARE OF WORK FOR THIS PROJECT, COORDINATE WITH

VA COR ABOUT OFF-HOUR SCHEDULE AND ICRA

PROTECTION REQUIREMENTS.

QQ. FLOOR NUMBERS ON THE WALL AND SIGNAGE ARE TO BE

DONE IN ANOTHER PROJECT.

RR. ALL WORK SHALL BE PERFORMED DURING AFTER HOURS

(5:00PM TO 5:00 AM.) WITHIN THE MORGUE AREA AND AS

DIRECTED BY THE COR.

3/

/2

2:

:2

PM

GI002

EG, DGCLW

ARCHITECTURAL SYMBOL,

ABBREVIATIONS AND NOTES

FULLY SPRINKLERED

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# MARCH 25, 2021

UPGRADE MORGUE

EXHAUST AND ELEVATOR

626-19-205

NASHVILLE VA MEDICAL CENTER

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212

19-149

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R

TH

TRUE

Engineers Architects

WALL RATING LEGEND

1 HR - FIRE

SEPARATION

2 HR - FIRE

SEPARATION

SMOKE RESISTIVE HAZARDOUS

AREA

S S S S

ALTERNATE NOTES:

ALTERNATE DEDUCT #1: DEDUCT WORK AT ROOF EXHAUST.

ALTERNATE DEDUCT #2: DEDUCT WORK INCLUDES DUCTWORK INSTALLATION

AND CEILING REMOVAL/REPLACEMENT AT AUTOPSY ROOM.

3/

/2

2:

:2

PM

GI003

EG, DGCLW

GENERAL NOTES

FULLY SPRINKLERED

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# MARCH 25, 2021

UPGRADE MORGUE

EXHAUST AND ELEVATOR

626-19-205

NASHVILLE VA MEDICAL CENTER

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212

19-149

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

Engineers Architects

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED APPLICABLE LOCAL / STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND REGULATIONS ALONG WITH ALL RELATED VA DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND STANDARDS PLUS ALL VA REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT SPECIFIC TO THE DOCUMENTED SCOPE OF WORK ON

THIS SITE.

EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND WORKMAN ’S COMPENSATION INSURANCE AS REQUIRED BY THE VA IN THE BIDDING DOCUMENTATION. CONTACT THE VA/CO DURING THE BIDDING PHASE WITH ANY QUESTIONS, VERIFICATIONS, AND DOCUMENTATION NECESSARY CONCERNING ALL REQUIREMENTS FOR PROJECT INSURANCE COVERAGE.

EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL FULLY COORDINATE AND VERIFY WITH ALL OTHER CONTRACTORS, OTHER TRADES AND THE VA/COR CONCERNING ALL SPACE REQUIREMENTS FOR THIS PROJECT. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COMMUNICATING, DOCUMENTING AND COORDINATING ALL SPACE REQUIREMENTS WITH THE VA/COR TO AVOID

CONFLICTS AND MISCOMMUNICATION.

BEFORE SUBMITTING A BID, ALL CONTRACTORS WILL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE CONTRACT REQUIREMENTS. EACH BIDDER SHOULD THEN VISIT THE SITE OF THE WORK TO BECOME ACQUAINTED WITH ALL VISIBLE FIELD CONDITIONS AFFECTING THE CONTRACT, SUCH AS OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER CONDITIONS RELATIVE TO WHAT COULD AFFECT/IMPACT THE WORK OR BE AFFECTED BY THE PERFORMANCE OF THE WORK.

IF AWARDED THE CONTRACT, THE CONTRACTORS SHALL NOT BE ALLOWED ANY EXTRA COMPENSATION BY REASON OF ANY UNFORESEEN DIFFICULTIES OR OBSTACLES WHICH THE BIDDER COULD HAVE REASONABLY ANTICIPATED PRIOR TO BIDDING. SHOULD ANY DISCREPANCIES, ERRORS, CONOFLICT OR ITEMS NEEDING CLARIFICATION BE DISCOVERED IN THE PLANS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE VA/CO PRIOR TO SUBMITTING A BID AND THE VA/COR BEFORE STARTING ANY OF THE WORK.

CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK FOR FULLY DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND COORDINATE SAME WITH THE GENERAL/PRIME CONTRACTOR. SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN OTHER SECTIONS OF THE DRAWINGS AND THE

COMPLETE SET OF CONTRACT DOCUMENTS.

DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS. COORDINATE SHOP DRAWIN REQUIREMENTS WITH ALL TRADES.

ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS SHALL BE TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS INTENDED PLACEMENT AND DISTRIBUTION WITHIN THE GENERAL PROXIMITY WHERE SHOWN. THE SIZE AND MEANS OF RUNNING DISTRIBUTION SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY CONNECTION, FITTING, OFFSET, SUPPORT ELEMENT, NOR EVERY STRUCTURAL DIFFICULTY THAT CAN BE ENCOUNTERED DURING THE INSTALLATION OF THE WORK.

OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING ANY DEMOLITION WORK OR NEW CONSTRUCTION, INCLUDING

TEMPORARY BARRICAEDES AND PROTECTION WORK.

PROJECT LIMIT LINES ARE SHOWN ON THE DRAWINGS FOR ORIENTATION PURPOSES ONLY AND SHOULD NOT BE CONSTRUED TO INDICATE

THE FULL EXTENT OR LIMITS OF THE AREA(S) OF WORK.

ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS THAT FEED OTHER SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT ARE LOCATED WITHIN THE AREA OF WORK, THEREBY INTERFERING WITH THE NEW CONSTRUCTION, SHALL BE REROUTED

AND RELOCATED AS REQUIRED TO MAINTAIN FULL SERVICE TO THE AFFECTED AREAS.

ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION IN THE“GENERAL” DRAWINGS SECTION AND COORDINATE ALL SITE-SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.

EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30 FOREMAN OR DIRECT REPRESENTATIVE ON THE JOB AT ALL TIMES. THE CONTRACTOR SHALL COOPERATE WITH AND COORDINATE WITH THE SUPERINTENDENT AND FOREMAN OF OTHER TRADES IN ORDER THAT

THERE BE NO DELAYS IN THE EXECUTION AND COMPLETION OF THE WORK.

DURING CONSTRUCTION, EACH CONTRACTOR SHALL KEEP ON SITE ACCURATE FIELD RECORDS OF ALL CONCEALED WORK THAT DIFFERS FROM THE CONTRACT DRAWINGS. THESE AS-BUILT, MARKED-UP, RECORD DRAWINGS WILL BE KEPT UP TO DATE BY THE GENERAL/PRIME CONTRACTOR AND PROVIDED TO THE VA/COR FOR DISTRIBUTION AT THE COMPLETION OF THE PROJECT.

IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH DEMOLITION A ND CONSTRUCTION SEQUENCES OF THE WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND REFINISHED TO A“LIKE-NEW” CONDITION PRIOR TO THE VA/COR’S ACCEPTANCE OF THAT WORK. THIS INCLUDES PROTECTION OF EXISTING

FLOORING AND OTHER FINISHES.

THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED

AREAS OF WORK.

PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE

PROJECT LIMIT LINES REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.

ALL CUTTING, CORING, AND DRILLING OF EXISTING CONCRETE AND MASONRY CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPNG, CONDUITS, OR OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEEDING WITH ANY SUCH REQUIRED

PENETRATIONS WORK.

RELOCATIONS OF ANY INFRASTRUCTURE DISTRIBUTION SYSTEMS OR EQUIPMENT, WHICH MAY ALTER THE ARCHITECTURAL OR STRUCTURAL CONSTRUCTION, MUST BE APPROVED FIRST BY THE VA/COR PRIOR TO STARTING ITS RELOCATION.

THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC

LOGISTICAL SEQUENCING REQUIREMENTS.

CONTRACTORS TO ENSURE ALL FIRE RESISTIVE RATINGS ARE MAINTAINED PER LOCATIONS SHOWN ON THE DRAWINGS. ALL PENETRATIONS ARE TO BE SEALED BY AN APPROVED UL FIRESTOPPING SYSTEM. SEAL ALL EXISTING PENETRATIONS EXPOSED DURING CONSTRUCTION AS PER THE APPROVED UL FIRESTOPPING SYSTEM INSTALLATION REQUIREMENTS. FOLLOW THE MANUFACTURER’S DESIGN RECOMMENDATIONS FOR THE PROPER FIRE STOPPING MATERIAL TO BE USED IN EACH SPECIFIC APPLICATION. THIS INCLUDES ALL EXISTING PENETRATIONS THAT

VIOLATE THE FIRE RATING INTEGRITY.

ALL FIRESTOPS SHALL MATCH THE FIRE RATING OF THE CONSTRUCTION BEING PENETRATED, SUCH AS WALLS, FLOORS, CEILINGS, PARTITIONS, ETC. AND SHALL COMPLY WITH ALL CODE REQUIREMENTS. USE ONLY A SINGLE (FMRC) APPROVED MANUFACTURE’S LINE OF PRODUCTS FOR ALL PROJECT FIRESTOPPING. THE BOD FOR ALL FIRESTOPPING WILL BE ALL PRODUCTS AS MANUFACTURED BY EITHER THE

3M COMPANY OR HILTI.

PROVIDE AN HOURLY-RATED FIRESTOP AT ALL PENETRATIONS OF RATED CONSTRUCTION AND/OR ASSEMBLIES, WHETHER NEW OR EXISTING, AND/OR AS A DIRECT RESULT OF THE PROJECT DEMOLITION WORK OR NEW CONSTRUCTION. WHERE COMBUSTIBLE PENETRATIONS OCCUR, USE A FIRE-RATED INTUMESCENT MATERIAL AND WHERE NONCOMBUSTIBLE PENTRATIONS OCCUR, USE A FIRE-RATED ENDOTHERMIC MATERIAL. ALL FIRESTOPPING WORK MUST BE APPROVED BY THE VA/COR BEFORE CONCEALED BY CONSTRUCTION IN WRITING.

1.

2.

3.

4.

ALL CONTRACTORS, SUBCONTRACTORS, AND THEIR REPRESENTATIVES WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING THE

COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF THEIR EMPLOYEES.

EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HAZARD ACT, ALONG

WITH ALL OTHER APPLICABLE GOVERNING REGULATIONS AND VA REQUIREMNTS.

THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE HIS/HER SATISFACTION AND FULL ACCEPTANCE OF THE CURRENT SITE CONDITIONS REGARDING SAFEY AND THE NECESSARY COMPLIANCE WITH ALL CONTRACT REQUIREMENTS REGARDING SAME. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR ANY ACCIDENTS, INJURIES, AND/OR DAMAGES INCURRED AS A RESULT OF ANY VISIBLE OR KNOWN

UNSAFE CONDITIONS THAT EXIST.

IF UNSATISFIED WITH THE CURRENT SITE SAFETY CONDITIONS AND/OR THE NECESSARY COMPLIANCE, THE CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE THE ACTIONS AND/OR DEVICES NECESSARY TO RENDER THE JOBSITE SAFE. IF THE WORK OF OTHER PARTIES, UPON INSPECTION, IS FOUND AT ANY TIME TO BE UNSAFE, THE CONTRACTOR OR SUBCONTRACTOR SHALL IMMEDIATELY STOP ALL WORK AND NOTIFY THE GENERAL/PRIME CONTRACTOR AND THE VA/COR. THE SUBMISSION OF A BID FOR ANY PORTION OF WORK INCLUDED IN THIS CONTRACT SHALL ALSO INDICATE ACKNOWLEDGMENT AND ACCEPTANCE

OF THESE REQUIREMENTS.

1.

2.

3.

4.

5.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

SUMMARY DESCRIPTION:

THE BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS ARE TO BE FOLLOWED FOR ALL CONTRACTOR PROPOSED EQUIVALENT SUBSTITUTIONS OR

DEVIATIONS FROM THE BASE BID/CONSTRUCTION DOCUMENTS.

AN EQUIVALENT SUBSTITUTION REPRESENTS ANY DEVIATION FROM THE CONTRACT DOCUMENTS ORIGINAL DESIGN INTENT, SCOPE OF WORK

REQUIREMENTS, THE DETAILING OR SPECIFICATIONS.

NO SUCH EQUIVALENT SUBSTITUTION OR DEVIATION WILL BE ALLOWED WITHOUT FIRST GOING THROUGH THE BOD COMPLIANCE PROTOCOLS PROCESS

AND OBTAINNG VA APPROVAL.

ONCE VA APPROVAL OF THE EQUIVALENT SUBSTITUTION OR DEVIATION REQUEST HAS BEEN OBTAINED, THE FORMAL SHOP DRAWING PREPARATION AND

SUBMITTAL PROCESS MAY BEGIN FOR THAT WORK.

THE FOLLOWING BOD COMPLIANCE PROTOCOLS DEFINE IN DETAIL THE RESPONSIBLITIES AND THE EVALUATION PROCESS ALONG WITH THE REQUIREMENTS AND PROCEDURES TO BE FOLLOWED WHEN REQUESTING VA CONSIDERATION OF ANY PROPOSED EQUIVALENT SUBTITUTION OR

DEVIATION.

BOD COMPLIANCE PROTOCOLS:

THE BOD COMPLIANCE PROTOCOLS APPLY TO ALL MATERIALS, EQUIPMENT, HARDWARE, FINISHES, CONTROLS, ENGINEERING SYSTEMS AND THEIR INCLUSIVE PARTS, DETAILED ASSEMBLIES PLUS ALL RELATED DESIGN ELEMENTS AND SPECIFIED PARAMETERS THAT ARE CONTAINED WITHIN THE BID/ISSUED FOR CONSTRUCTION DRAWINGS AND SPECIFICATIONS DOCUMENTATION, OR AS SPECIFCIALLY REFERENCED BY SAME.

SPECIFIC CHARACTERISTICS REQUIRING BOD COMPLIANCE ANALYSIS WILL VARY WITH EACH SPECIFIC ITEM BEING PROPOSED AS AN EQUIVALENT

SUBSTITUITON AND WILL NEED TO BE FULLY COMPARED TO ESTABLISH BOD COMPLIANCE.

CRITICAL DESIGN CHARACTERISTICS AND ELEMENTS ARE SPECIFIC TO EACH ITEM NEEDING CONSIDERATION AND COULD CONSIST OF, BUT NOT LIMITED TO, CRITERIA SUCH AS DIMENSIONAL, LOGISTICS, PERFORMANCE CHARACTERISTICS, CAPACITY, DUTY REQUIREMENTS, UTILITIES IMPACTS, CONNECTION VARIANCES, DETAILING DEVIATIONS, FRAMING MODIFICATIONS, ROUGH-IN REQUIREMENTS, WEIGHT INCREASES AND/OR DISTRIBUTIONS, STRUCTURAL IMPACTS, ATTACHMENTS, SUPPORTS, FINISHES, AVAILABILITY, COMPATIBILITY, CONSTRUCTABILITY, WARRANTIES, SERVICE LIFE, MAINTENANCE REQUIREMENTS, ENVIRONMETNAL CONSIDRATIONS, LEED RELATED DESIGN CONSIDERATIONS, ETC.

A VERY CRITICAL IMPORTANT DESIGN CHARACTERISTIC OF ALL BOD ITEMS NEEDING TO BE FULLY EVALUATED AND PROPERLY COORDINATED WOULD BE THE DESIGN AND LAYOUT OF DIMENSIONAL AND LOGISTICS REQUIREMENTS. THOSE CRITICAL PARAMETERS COULD CONSIST OF, BUT NOT LIMITED TO, ALL DIMENSIONAL ELEMENTS THAT AFFECT SIZE, HEIGHT, WIDTH, DEPTH, THICKNESS, PLACEMENT, SPACING, CLEARANCES, ACCESS, MOUNTING, CONNECTION/LOCATION REQUIREMENTS, INSTALLATION TOLERANCES, OPERABLE ELEMENT CLEARANCES, SCHEDULES, ETC., ALL OF WHICH COULD

IMPACT OTHER AREAS OR COMPONENTS OF WORK, INCLUDING TIMING OF DELIVERY.

CONTRACTORS WILL BE RESPONSIBLE TO FULLY IDENTIFY ALL PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS, IMPACTS AND MODIFICATIONS FROM THE “BASIS OF DESIGN” INTENT WITH THE GENERAL/PRIME CONTRACTOR DURING THE BIDDING PROCESS AND OBTAIN THEIR APPROVAL BEFORE

COMPLETING THEIR PRICING AND SUBMITTING A BID.

IF A PROPOSED EQUIVALENT SUBSTITUTION ITEM WILL REQUIRE THAT MODIFICATIONS NEED TO BE MADE, TO THE WORK OF THE PROVIDING CONTRACTOR, THE WORK OF OTHER CONTRACTORS OR THE WORK OF THE VA, THE SUBMITTING CONTRACTOR SHALL BE FULLY RESPONSIBLE TO INFORM AND ADVISE THE GENERAL/PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY IMPACTS AND POSSIBLE MODIFICATIONS REQUIRED AS A PART OF

THEIR BIDDING AND BASE CONTRACTUAL SCOPE OF WORK RESPONSIBILITIES.

THE CONTRACTOR PROPOSING THE EQUIVALENT SUBSTITUTION SHALL BE RESPONSIBLE FOR ALL RELATED WORK AND SHALL IDENTIFY, VERIFY, COORDINATE AND PROVIDE ENGINEERED SOLUTIONS FOR ALL IMPACT ISSUES AFFECTING INFRASTRUCTURE SYSTEMS, UTILITIES SERVICES, BUILDING STRUCTURE, SURROUNDING ELEMENTS, AND SYSTEMS AFFECTED FROM WEIGHT DIFFERENTIALS, REVISED LOADING CHARACTERISTICS, CONNECTION/MOUNTING VARIANCES, INSTALLATION CONFLICTS AND DETAILING MODIFICATIONS, ETC. CAUSED BY THE EQUIVALENT SUBSTITUTION

REQUIREMENTS.

SPECIAL ATTENTION NEEDS TO BE PAID TO ANY SYSTEMS EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS INCLUDING ALL ASPECTS OF THEIR DIMENSIONAL LOGISTIC FEATURES AND REQUIREMENTS ALONG WITH ANY STRUCTURAL AND UTILITIES IMPACTS.

EACH EQUIVALENT SUBSTITUTION REQUEST ALONG WITH ANY/ALL IMPACTS, DEVIATIONS/VARIANCES AND MODIFICATIONS WILL REQUIRE VA/COR APPROVAL(S) BEFORE ANY SUCH REQUEST IS DEEMED APPROPRIATE BY THE VA AND ALLOWED TO PROCEED INTO THE NORMAL SHOP DRAWING

PREPARATION, SUBMITTAL AND REVIEW PROCESS.

NO REQUEST FOR AN EQUIVALENT SUBSTITUTION REVIEW CAN BE MADE VIA SHOP DRAWING SUBMISSION. ANY SUCH SUBMISSION WILL NOT BE REVIEWED AND WILL BE REJECTED AS NON-CONFORMING WITH THE DESIGN INTENT AND NOTED THAT THE CONTRACTOR IS TO FOLLOW THE STANDARD

BOD COMPLIANCE PROTOCOLS.

ANY DEVIATIONS FROM THE BOD REQUIREMENTS THAT SURFACE DURING THE CONSTRUCTION PHASE SHALL IMMEDIATELY BE MADE KNOWN TO THE GENERAL/PRIME CONTRACTOR WHO WILL IN TURN NOTIFY THE VA/COR. ALL SUCH DEVIATIONS, VARIANCES, AND IMPACTS WILL BE FULLY IDENTIFIED, DOCUMENTED AND SUBMITTED TO THE VA/COR FOR REVIEW, EVALUATION AND DIRECTION(S) ON HOW TO PROCEED.

ANY NON-COMPLIANT EQUIVALENT SUBSTITUTIONS WORK FOUND TO BE IN PLACE DURING THE CONSTRUCTION PHASE THAT HAD NOT GONE THROUGH THE BOD COMPLIANCE PROTOCOLS APPROVAL PROCESS AND THAT DOESN’T HAVE THE VA/COR’S APPROVAL WILL BE SUBJECT TO POSSIBLE REJECTION

AND REMOVAL.

THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND ITS IMPACTS SHALL NOT COMPROMISE ANY OF THE BOD PERFORMANCE CHARACTERISTICS NOT SHALL IT ENCUMBER ANY OF THE ASSOCIATED DESIGN LAYOUT AND DIMENSIONAL LOGISTIC REQUIREMENTS.

THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND ITS IMPACTS SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES, REGULATIONS, AND VA REQUIREMENTS, PLUS ALLOW ANY SYSTEMS, EQUIPMENT, AND/OR MATERIALS, TO FUNCTION PROPERLY AND SAFELY.

1.

A.

A.

B.

C.

D.

A.

A.

B.

C.

D.

E.

F.

G.

H.

A.

B.

C.

A.

B.

A.

B.

C.

D.

A.

A.

B.

BIDDING PHASE

ALL BOD PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS AND ASSOCIATED IMPACTS SHALL BE FULLY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR(S) DURING THE BIDDING PROCESS SUCH THAT THE COST OF ALL ASSOCIATED BOD SUBSTITUTION MODIFICATIONS, REQUIRED DEVIATIONS AND SCOPE OF WORK IMPACTS DIRECTLY AFFECTING OTHER TRADES SHALL BE INCLUDED IN THE BASE BIDS OF ALL AFFECTED CONTRACTORS.

2. GENERAL/PRIME CONTRACTOR RESPONSIBLE FOR COORDINATION

THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY, DOCUMENT, MAKE SUBMISSIONS, TRACK, COORDINATE, OBTAIN APPROVALS AND INCLUDE THE COST OF ALL SUCH EQUIVALENT SUBSTITUTIONS, VARIANCE MODIFICATIONS AND ALL IMPACT SCOPE OF WORK IN THEIR BASE BID COST OF

CONSTRUCTION AS WELL AS ALLOWED FOR WITHIN THEIR PROJECT SCHEDULE.

THE GENERAL/PRIME CONTRACTOR SHORTLY AFTER CONTRACT AWARD/EXECUTION SHALL NOTIFY AND COORDINATE WITH THE VA/COR, ALL SUCH KNOWN EQUIVALENT SUBSTITUTION DEVIATION REQUESTS AND POSSIBLE IMPACTS FROM THE SPECIFIC BOD REQUIREMENTS PROVIDED IN THE DRAWINGS AND

SPECIFICATIONS.

ALL SUCH DEVIATIONS, VARIANCES, AND IMPACTS WILL BE FULLY IDENTIFIED, DOCUMENTED AND SUBMITTED TO THE VA/COR FOR REVIEW, EVALUATION AND

DIRECTION(S) ON HOW TO PROCEED.

DOCUMENTATION BEFORE STARTING THE WORK: THEY WILL ALSO BE RESPONSIBLE TO FULLY IDENTIFY AND COORDINATE SAME WITH ALL AFFECTED SUBCONTRACTORS TO BE SURE THAT ALL SUCH WORK IS INCLUDED IN THEIR BASE BID SCOPE OF WORK.

3. CONTRACTORS IDENTIFY PROPOSED EQUIVALENT SUBSTITUTION(S)

ALL CONTRACTORS, BEFORE SUBMITTING THEIR REQUEST FOR EQUIVALENT SUBSTITUTION SHALL BE RESPONSIBLE TO HAVE FULLY VERIFIED AND CERTIFIED IN WRITING THAT THE DESIGN CHARACTERISTICS OF THE ITEMS THEY WILL BE SUBMITTING FOR BOD COMPLIANCE REVIEW MEETS OR EXCEEDS THE DESIGN

INTENT AND PERFORMANCE REQUIREMENTS AS DESIGNED, DETAILED AND SPECIFIED.

4. CONTRACTORS PREPARE DETAILED COMPARISONS

A. THE REQUESTING CONTRACTOR SHALL PREPARE AND PROVIDE TO THE GENERAL/PRIME CONTRACTOR A FULL LINE ITEM, SIDE-BY-SIDE COMPARISON LISTING OF ALL BOD DESIGN AND MANUFACTURED CHARACTERISTICS VERSUS THE SAME FOR THE EQUIVALENT SUBSTITUTION BEING PROPOSED.

ALL EQUIPMENT, MATERIALS OR ASSEMBLY EQUIVALENT SUBSTITUTIONS SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER EACH REQUESTED SUBSTITUTION WITH A FULL AND DETAILED COMPARATIVE DESCRIPTION OF ALL SPECIFICATIONS, PERFORMANCE CHARACTERISTICS, CAPACITIES, WEIGHT, DIMENSIONAL LOGISTICS AND KNOWN DEVIATIONS FROM THE ORIGINAL BOD.

CONTRACTORS IDENTIFY RELATED IMPACTS AND DEVIATIONS.

THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY AND DOCUMENT ALL PROPOSED EQUIVALENT SUBSTITUTION CAUSED IMPACTS, DEVIATIONS AND MODIFICATIONS FROM THE ORIGINAL BOD REQUIREMENTS WITH THE GENERAL/PRIME CONTRACTOR AS WELL AS ALL AFFECTED

CONTRACTORS.

SEE THE DETAILED PROTOCOL REQUIREMENTS FOR THE EXTENT OF RESPONSIBLITIES AND DOCUMENTATION REQUIRED FOR THIS CRITICAL ITEM.

CONTRACTOR’S DOCUMENTATION TO GENERAL/PRIME CONTRACTOR.

CONTRACTORS SHALL COORDINATE WITH THE GENERAL/PRIME CONTACTOR AS TO THE SPECIFIC DATE THAT EACH IS REQUIRED FOR THE COMPLETION OF THEIR EQUIVALENT SUBSTITUTION SUBMISSION REQUEST DOCUMENTATION AND DELIVERY OF THE COMPLETED PACKAGE(S) TO THEM.

THE GENERAL/PRIME CONTRACTOR HAVING BEEN MADE FULLY AWARE OF THESE POTENTIAL EQUIVALENCY SUBSTITUTIONS AND IMPACTS DURING THE BIDDING PROCESS SHALL INCLUDE AND DOCUMENT THIS BOD PROCESS IN THEIR DETAILED PROJECT SCHEDULE ALLOWING A SEPARATE TASK ITEM TIMELINE WITH

CRITICAL DATES AND PERFORMANCE TARGETS IDENTIFIED AND TRACKED.

5. TRACKING LIST OF PROPOSED EQUIVALENT SUBSTITUTIONS AND IMPACTS

THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL PREPARE A COMPLETE MASTER LISTING, BY SPECIFICATION AND/OR DRAWING SECTIONS, OF ALL

PROPOSED EQUIVALENT SUBSTITUTION REQUESTS.

THIS MASTER LISTING WILL CONSIST OF A SUMMARY DESCRIPTION OF EACH REQUEST ALONG WITH A BULLET POINT LISTING OF THE MAJOR IMPACTS AND

DEVIATIONS RESULTING FROM IT.

THIS DOCUMENT WILL BE PREPARED AS A SPREAD SHEET AND UTILIZED AS A TRACKING TOOL FOR DOCUMENTING ALL SIGNIFICANT ASSOCIATED DATES, ACTION ITEMS, CURRENT STATUS, REJECTIONS/APPROVALS AND ADDITIONAL PERTINENT ISSUES AND ITEMS TO BE RECORDED AND TRACKED AS REQUIRED BY THE

VA/COR.

6. EQUIVALENCY REQUEST(S) SUBMITTED TO VA

THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL SUBMIT TO THE VA/COR FOR PRELIMINARY REVIEW A MASTER SUMMARY LISTING OF ALL EQUIVALENT

SUBSTITUTION REQUESTS WITHT ANY/ALL IMPACTS IDENTIFIED.

A SEPARATE FULLY DETAILED SUBMMISSION DOCUMENTATION PACKAGE SHALL BE PREPARED FOR EACH SUBSTITUTION REQUEST AND WILL CONSIST OF SEQUENCE ITEMS NUMBER 3, 4, 5, & 6 ALONG WITH ANY ADDITIONAL PERTINENT INFORMATION DEEMED NECESSARY SUCH AS SKETCHES, DETAILED DRAWINGS, ENGINEERING DESIGN AND CALCULATIONS, MORE DETAILED DESCRIPTIONS, ETC.

7. VA REVIEW AND ACTION NOTIFICATION

THE VA/COR SHALL REVIEW EACH SUBSTITUTION REQUEST PACKAGE AND TAKE SUCH ACTION AS DEEMED NECESSARY ON EACH. SUCH ACTION COULD CONSIST OF REJECTION, APPROVAL OR DIRECTION ON PROVIDING MORE DETAILED INFORMATION AND/OR CLARIFICATION(S) ON EACH SUBMISSION AND/OR

EACH IMPACT.

AS PART OF THE VA’S REVIEW PROCESS THE AE WILL ALSO BE INCLUDED IN A SIMILAR FASHION TO THE SHOP DRAWING REVIEW PROCESS AND SHALL CONSULT

WITH THE VA/COR AND PROVIDE A RECOMMENDATION FOR THE VA’S CONSIDERATION.

THE AE WILL REJECT IMMEDIATELY WITHOUT REVIEWING ANY SUBMITTAL THAT IS DEEMED INCOMPLETE AND NOT IN COMPLIANCE WITH THE BOD PROTOCOLS

COMPLIANCE REQUIREMENTS.

IT SHOULD BE NOTED THAT IT IS NOT THE AE’S RESPONSIBILITY TO RESEARCH, DOCUMENT AND PROVE EQUIVALENCE, THAT IS THE REQUESTING/SUBMITTING CONTRACTOR’S RESPONSIBILITY AS PER THESE PROTOCOLS. THE AE’S RESPONSIBILITY IS TO REVIEW AND ANALYZE THE DETAILED COMPARATIVE

DOCUMENTATION PROVIDED AND ADVISE THE VA/COR ON WHAT WAS SUBMITTED.

8. VA APPROVAL ALLOWS SHOP DRAWING PROCESS TO BEGIN

PRIOR TO THE CONTRACTOR(S) BEING ALLOWED TO PROCEED WITH SHOP DRAWING PREPARATION AND THE OFFICIAL SHOP DRAWING SUBMISSION(S) PROCESS, THEY WILL FIRST NEED TO OBTAIN THE VA/COR APPROVAL(S) ON EACH EQUIVALENT SUBSTITUTION REQUEST THAT WILL AFFECT THE SHOP DRAWING

PROCESS FOR THAT ITEM.

9. IMPLEMENTATION OF SUBSTITUION(S) AND IMPACT(S)

ONCE APPROVED BY THE VA/COR THE CONTRACTORS SHALL PERFORM THEIR FINAL COORDINATION EFFORTS AND BEGIN THE NORMAL SHOP DRAWING PREPARATION AND SUBMITTAL PROCESS INCLUDING PROVIDING ANY ADDITIONAL ENGINEERING WORK NECESSITATED BY THE EQUIVALENT SUBSTITUTION.

THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK ASSOCIATED WITH AND IMPACTED BY ANY EQUIVALENT SUBSTITUTION

ALONG WITH THE COMPLETE COORDINATION AND MANAGEMENT OF THE WORK.

BASIS OF DESIGN (BOD) COMPLIANCE PROTOCALS

SPECIAL SAFETY NOTESGENERAL NOTES FOR CONTRACTORS BOD EQUIVALENT SUBSTITUTIONS PROCESS SEQUENCE

EXISTING

PARTITION

DEMOLISHED

PARTITION

NEW PARTITION

EXISTING DOOR

DEMOLISHED

DOOR

NEW DOOR

3/

/2

2:

:3

PM

GI004

EG, DGCLW

GENERAL NOTES

FULLY SPRINKLERED

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# MARCH 25, 2021

UPGRADE MORGUE

EXHAUST AND ELEVATOR

626-19-205

NASHVILLE VA MEDICAL CENTER

1310 24TH AVENUE SOUTH

NASHVILLE, TN 37212

19-149

FINAL BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

Engineers Architects

GENERAL SCOPE OF WORK (SOW) DESCRIPTION

MISCELLANEOUS

FLOOR PLAN LEGEND

1.

2.

3.

4.

CONTRACTOR SHALL VERIFY All DIMENSIONS AND ELEVATIONS IN THEFIELD PRIOR TO COMMENCING WORK.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DIMENSIONS SHOWN ON THE DRAWINGS. NOTIFY THE VA/COR OF ANY DISCREPANCYBEFORE

STARTING WORK.

A SUCCESSFUL REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THEARCHITECT/ENGINEER DOES NOT RELIEVE CONTRACTOR OF THERESPONSIBILITY TO REVIEW AND CHECK SHOP DRAWINGS BEFORESUBMITTAL TO VA/COR. THE CONTRACTOR REMAINS SOLELYRESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO DETAILS ANDGIVEN DIMENSIONS IN THE CONTRACT

DOCUMENTS.

CONTRACTOR SHALL OBTAIN VA/COR WRITTEN APPROVAL PRIOR TOPROCEEDING WITH ANY CHANGES FROM THE INFORMATION PROVIDEDHEREIN.

5. THE CONTRACTOR SHALL IDENTIFY ALL EMPLOYEES THAT WILL BE WORKING UNDER THE AWARDED CONTRACT. CONTRACTOR PERSONNEL SHALL BEEMPLOYEES SUB CONTRACTOR 1 SUPPLIERS AND DELIVERY PERSONNEL ENTERING THE MEDICAL CENTER. THOSE EMPLOYEES SHALL BRING 2 FORMS OFGOVERNMENT ISSUED ID TO OBTAIN A VA CONTRACTOR FLASH IDENTIFICATION BADGE THAT SHALL BE WORN ABOVE THE BELT AT ALLTIMES WHILE ONMEDICAL CENTERPROPERTY. IF ISSUED A TEMPORARY BADGECONTRACTOR EMPLOYEES SHALL RETURN ALL TEMPORARY I.D. BADGES TO DESIGNATEDPERSONNEL AT THE END OF THE PERIOD

OF PERFORMANCE OF THE CONTRACT. LOSTBADGES WILL RESULT IN A SURCHARGE.

6. IT IS THE INTENT OF THE DEPARTMENT OF VETERANS AFFAIRS TO HAVE THE CONTRACTORFULLY MEASURE SURVEY INVESTIGATE AND DOCUMENT THE EXISTING WINDOWSCONNECTIONS AND INTERIOR / EXTERIOR' INTERFACES IN ORDER TO GAIN THE KNOWLEDGE AND INSIGHT NECESSARY TO PERFORM THE CONSTRUCTION IN A PROFESSIONAL AND COMPETENT MANNER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND COR OF ANYDISCREPANCY BEFORE PERFORMING ANY WORK. THE CONTRACTOR SHALL BE SPECIFICALLY RESPONSIBLE FOR THE COORDINATION AND PROPER RELATION OF HISWORK TO

THE BUILDING, STRUCTURE, PHASING AND ENSURE THE SAFETY OF EMPLOYEES ANDWORKMEN.

OCCUPIED AREA PROTECTION PROTOCOLS

1.

WHEN PERFORMING WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWINGPROTECTION PROTOCOLS Will BE FOLLOWED ON A

DAILY BASIS UNLESS MODIFIED INWRITING BY THE COR ON A CASE BY CASE BASIS:

CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS, BLINDS, CURTAINS,ETC. THAT ARE IN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE.NOTE:THIS ALSO APPLIES TO THE DIRECT ACCESS ROUTE

THRU THE OCCUPIED AREA TO

AND FROM THE ACTUAL WORK AREA/ZONE. NOTE: THE VA Will BE RESPONSIBLETO MOVE/RELOCATE ANY FURNITURE, EQUIPMENT, BOXES, FILES, USER BELONGINGS,ETC. THAT WOULD BE IN THE AREA OF WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF THE CONTRACTOR'S WORK. COORDINATE All REQUIRED VARELOCATIONS WITH VA/COR.

2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTIONBARRIERS/COVERS FOR All SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDmONAL PROTECTION OF All WALL SURFACES/FINISHES, WINDOWS/GLAZING,DOORS, FRAMES, HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, CEILING CONSTRUCTION, TILE, GRID, WALL ANGLES, LIGHT FIXTURES, DIFFUSERS, GRILLES, ETC.

3. FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) TEMPORARY TARPAULIN(S)/DROPCLOTH(S) AS A MINIMUM FOR DUST, MOISTURE AND VERY LIGHT FOOT TRAFFICPROTECTION

4. All MAIN TRAFFIC AREAS TO AND FROM , ALONG WITH INSIDE THE WORKZONE/AREAS, SHALL HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/ 8' DRYWALL 4'XB' PANELS.All PANELS SHALL BE FIRMLY HELDTOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED2' HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLICATION NOTE:All BOARD TO BOARD JOINTSWILL BE FULLY TAPED THE LENGTH OF THE JOINT AND All BOARD TO VISQUEEN JOINTSWILL BE TAPED AT4' ON CENTER WITH AMINIMUM 8' LENGTH OF TAPE. PAINTERS TAPE AND/OR MASKING TAPE ARE NOTCONSIDERED EQUIVALENTS TO THE HD CONSTRUCTION

ADHESIVE TAPE BEINGSPECIFIED.

5. CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, CONTAINMENT ENCLOSURE AROUND All CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUSTAND DEBRIS AS POSSIBLE DURING THE PERFORMANCE OF ANY DEMOLITION, CONSTRUCTION AND CLEAN-

UP WORK.

6. THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE CONSTRUCTEDOF A MINIMUM 6 MIL HEAVY DUTY REINFORCED, FIRE- RETARDANT POLY SHEETING (VISQUEEN) WITH THE USE OF THE APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL VERTICAL SPRING LOADED SUPPORT STUDS/POLES.FULL HEIGHT FOAM PADDED RAILS, PRESSURE FIT AT All PERIMETER WALL/PARTITIONCONNECTION COMMONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE USE OF TAPE SEALS ON All

FINISHED WALL SURFACES.

7. WHEN All WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S), SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BEFULLY CLEANED-UP, All TEMPORARY CONTAINMENT ENCLOSURES AND PROTECTIONREMOVED WITH All FURNITURE AND EQUIPMENT RETURNED TO THEIR PRIORFUNCTIONING POSITIONSNOTE: FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALLSURFACES BEING FULLY WIPED DOWN AND DUST FREE AS ACCEPTED PRIOR TO THE CONTRACTORS WORK.

8. All SPACES Will BE RETURNED TO THE USER, BY THE CONTRACTOR, AS ACOMMERCIALLY CLEAN ENVIRONMENT WITH All OPEN CONSTRUCTION SURFACES SEALED WITH TEMPORARY CONSTRUCTION MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY REINFORCED, FIRE-RETARDANT POLY SHEETING (VISQUEEN), IN ORDER TO AVOID DUST PARTICLES FROM THE CONSTRUCTION AREA MIGRATING INTO THE

OCCUPIED USERS AREA/SPACE/ROOM(S).

9. UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE VA/COR, ALL TEMPORARYPROTECTION AND ENCLOSURES ARE TO BE SET-UP AND KNOCKED-DOWN ON A DAILYBASIS SUCH THAT THE USERS OF THE OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND PREVENTED FROM FUNCTIONING WITHIN THEIR SPACE/AREA/ROOM(S) DURING THEIR NORMAL BUSINESS HOURS OF OPERATION.

WHEREVER THE WORK BEING PERFORMED BY THIS PROJECT REQUIRESTHE REMOVAL/DEMOLITION FROM, OR THE INSTALLATION OF NEWCONDUIT, JUNCTION BOXES, CABINETS, PANELS, DEVICES, EQUIPMENT, ETC., TO FINISH PAINTED SURFACES, THE CONTRACTOR SHALL PROVIDEALL PAINTING TO THE EXISTING WALL/CEILING SURFACES AND NEWMATERIALS BEING INSTALLED TO MATCH ALL OF THE EXISTING FINISHED CONDITIONS SO THAT WHEN THE WORK PERFORMED IS COMPLETED IT BLENDS WITH THE EXISTING FINISHING DtCOR AND DOESN'T STAND OUTAS BEING A REPAIR, UNFINISHED OR NEW WORK THAT DOESN'T BLENDWITH THE EXISTING CONDITIONS. PAINTING/REPAINTING SHALL OCCUR INALL INSTANCES FROM FLOOR TO CEILING AND FROM A WALL CORNER TO A WALL CORNER CHANGE IN PLANE WITH ALL EXISTING PAINTED SURFACES RECEIVING A NEW FINISH COAT AS A MINIMUM, SEE BELOW:

P1. PROVIDE ALL PAINTING AND RELATED WORK AS SHOWN ON THE DRAWING AND/OR AS REASONABLY IMPLIED BY THE SPECIFICATIONS

AND THE PROJECT REQUIREMENTS TO PROVIDE A COMPLETELY FINISHED PROJECT.

P2. ALL SCRATCHES, DENTS, CRACKS AND/OR OPENINGS ON EXISTING AND NEW WALL SURFACES ARE TO BE FILLED WITH PLASTER PATCH, SPACKLING COMPOUND OR OTHER PRESCRIBED MATEIRAL IN AN INDUSTRY APPROVED MANNER AND SANDED SMOOTH TO

PROVIDE A“LIKE NEW” SURFACE CONDITION BEFORE PAINTING AND FINISHING.

P3. ALL SURFACES ARE TO BE CLEANED FREE OF LOOSE DIRT, DUST, OIL, GREASE AND ALL FOREIGN MATTER JUST PRIOR TO FINISHING.

P4. PROVIDE ALL LABOR, MATERIALS, BRUSHES, TOOLS, LADDERS AND ALL EQUIPMENT OF ANY KIND NECESSARY FOR PROPER

EXECUTION OF THE WORK.

P5. WORKMANSHIP SHALL BE FIRST CLASS IN EVERY RESPECT WITH ALL MATERIALS EVENLY SPREAD AND SMOOTH WITHOUT RUNS, SAGS, OR DEBRIS IN THE FINISHED SURFACE.

P6. THE PRIME COAT SHALL BE TINTED TO APPROXIMATE SHADE OF FINAL COAT. ALL SECTIONS, SPOTS OR HOT SPOTS AFTER PRIMARY APPLICATION SHALL BE TOUCHED UP BEFORE APPLYING SECOND COAT TO PRODUCE A SMOOTH AND LEVEL SURFACE. THE FINAL COAT SHALL NOT BE APPLIED UNTIL AFTER ALL OTHER TRADES, WHOSE OPERATIONS WOULD BE DETRIMENTAL TO FINISH PAINTING, HAVE FINISHED THEIR WORK IN THE ARES TO BE PAINTED.

P7. WORK NOT INCLUDED: UNLESS OTHERWISE INDICATED, SHOP PRIMING OF FERROUS METAL ITEMS AND FABRICATED COMPONENTS ARE INCLUDED UNDER THEIR RESPECTIVE TRADES. PRE-FINIHSED ITEMS ARE NOT INCLUDED. FINISHED METALS SUCH AS ANODIZED ALUMINUM, STAINLESS STEEL, BRONZE, AND SIMILAR METALS WILL NOT BE PAINTED, UNLESS OTHERWISE SPECIFIED. DO NOT PAINT ANY MOVING PARTS OF OPERATING UNTIS, OR OVER ANY EQUIPMENT IDENTIFICATION, PERFORMANCE RATINGS, NAMES

OR NOMENCLATURE PLATES OR CODE-REQUIRED LABELS.

P8. PROTECT WORK OF OTHER TRADES. CORRECT ANY PAINTING RELATED DAMAGES BY CLEANING, REPAIRING OR REPLACING, AND

REFINISHING,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .