This document is a set of drawings and notes related to a federal contract opportunity to Install Boiler Safety Devices at the Altoona VA Medical Center.

The key details are:

  • The contract opportunity has a Solicitation Number of 36C24425Q0097, and a NAICS code of 236220 for Commercial and Institutional Building Construction.
  • The work involves replacing 8 existing safety/pressure relief valves in the Building 3 Boiler Room, including modifying connections, vents, and drain lines.
  • Technical specifications are provided, including the manufacturer, model, size, set pressure, and capacity of the required replacement valves.
  • This is currently a Sources Sought notice only, with responses due by 11:00 AM EST on November 26, 2024. If approved, a full solicitation may be issued later.
  • The procurement is set aside for small businesses, including SDVOSB and VOSB firms. Companies must be registered in SAM to be eligible.
  • Responses should provide company information, qualifications, and socioeconomic status.

View the file

Other files

File Type Posted
36C24425Q0097_1.docx DOCX document
Combined Specifications 503-25-104.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boiler Safety Project

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

100% BID DOCUMENTS

N O

R T H

1 2 08/08/2024

Job Numbers and Descriptions

MP-100

Drawing Notes

1) Refer to highlighted areas to see description of work.

2) Job numbers listed are referenced in other sheets throughout the drawing package.

3) Do not use this document as assurance that what is installed throughout the Boiler Plant match's what it shown on the drawings.

Contractor must field verify conditions.

503-25-104 Revision 0: 8/08/2024 KJC

JOB 1: There is an existing, brass threaded safety valve here also that will need replaced.

Connections will need modified to retrofit the new device, and vent stack will need modified due to the size difference of the SV.

JOB 2:Replace safety valve. Field verify measurements as the clearance from the piping to the roof insulation is minimal.

Evaluate if it would be more beneficial to install the new Safety Valve on the main line, rather than on the bypass line. Review method and location of installation with the VA before performing work. If alternate location of installation is deemed the best option, proper blanking/isolation of the original location is required.

Any insulation that is removed to perform work will need replaced.

JOB 3: remove existing safety valves (qty=2), modify connection points (flanged instead of threaded) ,cut back vent stack, install new SV, modify drain lines

JOB 4: remove existing safety valves (qty=2), modify connection points (flanged instead of threaded) ,cut back vent stack, install new SV's, modify drain lines.

JOB 5: remove existing safety valves (qty=2), modify connection points (flanged instead of threaded) ,cut back vent stack, install new SV's, modify drain lines

Revision 1: 9/20/2024 KJC

VHAALTChronK Rectangle JOB 3: remove existing safety valves (qty=2), modify connection points (flanged instead of threaded) ,cut back vent stack, install new SV, modify drain lines

VHAALTChronK Rectangle JOB 4: remove existing safety valves (qty=2), modify connection points (flanged instead of threaded) ,cut back vent stack, install new SV's, modify drain lines

VHAALTChronK Rectangle JOB 5: remove existing safety valves (qty=2), modify connection points (flanged instead of threaded) ,cut back vent stack, install new SV's, modify drain lines

VHAALTChronK Rectangle JOB 2: Replace safety valve. Field verify measurements as the clearance from the piping to the roof insulation is minimal. Evaluate if it would be more beneficial to install the new Safety Valve on the main line, rather than on the bypass line. Review method and location of installation with the VA before performing work. If alternate location of installation is deemed the best option, proper blanking/isolation of the original location is required.

Any insulation that is removed to perform work will need replaced.

VHAALTChronK Rectangle JOB 1: There is an existing, brass threaded safety valve here also that will need replaced. Connections will need modified to retrofit the new device, and vent stack will need modified due to the size difference of the SV.

VHAALTChronK Line

VHAALTChronK Line

VHAALTChronK Line

VHAALTChronK Line

VHAALTChronK Line

Boiler Safety Project

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

100% BID DOCUMENTS

2 2

MP-101

08/08/2024

Drawing Notes

1)Do not use this document as assurance that what is installed throughout the Boiler Plant match's what it shown on the drawings. Contractor must field verify conditions.

2)SV's, drain line modifications, and vent stack modifications. See information in notes 4 & 5 on SV's. Pictures of serial tags are also provided within this package.

3)6 of 8 safety valves to be replaced are shown on this sheet. The other two safety's and their locations (labeled as JOB 1 and JOB 2) can be found on marked up drawing MP-100.

4)Primary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 110psig, Capacity= 7749 PPH 5)Secondary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 115psig, Capacity= 7749 PPH

Mechanical - Boiler Safety Valves and Drain Lines

503-25-104

Revision 0: 8/08/2024 KJC

Revision 1: 9/20/2024 KJC

VHAALTChronK Rectangle SV's, drain line modifications, and vent stack modifications. See information below on SV's. Pictures of serial tags are also provided within this package.

Primary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 110psig, Capacity= 7749 PPH

Secondary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 115psig, Capacity= 7749 PPH

VHAALTChronK Rectangle SV's, drain line modifications, and vent stack modifications. See information below on SV's. Pictures of serial tags are also provided within this package.

Primary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 110psig, Capacity= 7749 PPH

Secondary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 115psig, Capacity= 7749 PPH

VHAALTChronK Rectangle SV's, drain line modifications, and vent stack modifications. See information below on SV's. Pictures of serial tags are also provided within this package.

Primary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 110psig, Capacity= 7749 PPH

Secondary SV: Manufacturer= Kunkle, Model= 300LJG01-AS, Size=1.5", Set= 115psig, Capacity= 7749 PPH

VHAALTChronK Sticky Note 6 of 8 safety valves to be replaced are shown on this sheet. The other two safety's and their locations (labeled as JOB 1 and JOB 2) can be found on marked up drawing MP-101.

VHAALTChronK Line