N
STATUS
REVISION
DESCRIPTION OF DRAWINGSSHT.NO.DWG.NO.REF.NO.RING NO.
S C H E D U L E O F D R A W I N G S
GENERAL
MECHANICAL
G-1
M-2
KIM, SM
MECHANICAL
1 G-1
NTS
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
30000
SCALE: 1:5000
0 10000 20000
GRAPHIC SCALE
M-1
THIS PROJECT
GFEBS. NO. 187279, YONGSAN
187279
G U
A R
D
T O
W E
R
81338
1488 1490
STREET
BATES
BOWMAN STREET
2079 2
E L
L S
O N
S
T R
R E
T
S T
R E
E T
EILER ST.
1531 1530
EILER STREET
E L
L S
O N
S
T R
E E
T1529
245 244 246
T
2604 2
F L O R E S
STREET
G A
IN
E S
S T
R E E T
P A
N P
O R
O
S T
R R
E T
T106
Baseba ll
Field
BEARD STREET
21113
ALLEN STREET
S
C L
A G
G A
V E
N U
E
CAMP STREET
15 1350
1407 1408
1370 14
ARMOR LOOP
150215
11 1519
1522180 157
F A R R E L L
A V
E N
U E
E
IL
E R
S176
S175
1619 1621
STREET
DUNN
16021627
1656 1655
160016001599
27632710
ELLSON STRRET
1ST CORPS BLVD.
15501495
R O
A D
A R
M Y
T
H
149414
5 ELLSON STREET
1ST CORPS BLVD.
01382
123112
2215 2322
T
H A
R M
Y R
O A
D
G U
L L
U P
A V
E N
U E
PARADE GROUND
4 2
2475 2661
62474
24802480
UN BOULEVARD
23652361
23642364
HAWKA STREET
2386239
CAVALRY DIVISION ROAD
1ST
S200
S
S273 Basketball
Court
S
ROK WAR MEMORIAL
T-109
T-108
T-1197
S
S
233823362335 2337
23312330 23342333
C
B
GATE #19(was #20)
GATE #18(was #8B)
GATE #17(was #23)
GATE #15(was #43) GATE #2(was #5) GATE #3(was #7)
GATE #16(was #1)
GATE #20(was #2)
TOWER
ANTENNA
SIGNAL
GATE #21(was #3)
SOUTH POST
YONGSAN GARRISON
MAIN POST
CAMP
COINER
VICINITY MAP
NOT TO SCALE
N
1 PROJECT LOCATION PLAN
SCALE = 1:5000G1
TITLE SHEET & PROJECT LOCATION PLAN
TITLE SHEET & PROJECT LOCATION PLAN
GENERAL NOTES, SCOPE OF WORK & EQUIPMENT SCHEDULE
EXISTING/REMOVAL/NEW PLAN & SECTION, SITE PICTURES
& AIR COMPRESSOR, S-2307
REPLACE CRACKED OS-Y VALVE
YONGSAN, KOREA
& AIR COMPRESSOR, S-2307
REPLACE CRACKED OS-Y VALVE
PWO#187279
YONGSAN
& AIR COMPRESSOR, S-2307
REPLACE CRACKED OS-Y VALVE
GENERAL NOTE SCOPE OF WORK (MECHANICAL)
A. REPAIR/MAINTENANCE (K-WORK)
KIM, SM
MECHANICAL
NTS
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
NOTE :
3 M-1
11. SALVAGEABLE MATERIALS SHALL BE RETURNED TO DPW.
PROTECTION TO KEEP THE ROOMS CLEAN DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND REMOVE CONSTRUCTION BARRICADES AND/OR
U.S. GOVERNMENT.
ACTIVITIES, AND THE LIKE SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
9. DISPOSAL OF CONSTRUCTION DEBRIS, WASTE MATERIALS, MATERIALS RESULTING FROM DEMOLITION
TO ITEMS SUCH AS WALLS, CEILING, ROOF, PIPE, DUCT, EQUIPMENT AND ELECTRICAL ITEMS.
SYSTEM AT NO ADDITIONAL COST TO THE GOVERNMENT, INCLUDING, BUT NOT NECESSARILY LIMITED
AS NECESSARY TO ALLOW FOR INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE ALARM
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REINSTALLATION OF ALL OBSTRUCTIONS
SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT SPECIFICATIONS.
PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON CONTRACT DRAWINGS SHALL BE
SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS OF THE ACTUAL
7. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL SYSTEM TO
STANDARD TECHNICAL SPECIFICATIONS FOR MISCELLANEOUS PROJECTS, KOREA.
STRICT ACCORDANCE WITH APPLICABLE SECTIONS OF DIVISION 22 & 23 - MECHANICAL. O & MA
6. ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED AND BALANCED BY THE CONTRACTOR IN
WORK AT NO ADDITIONAL COST TO THE U.S. GOVERNMENT.
THIS PROJECT. THE DETAILS WILL BE UTILIZED WHILE PERFORMING THE MECHANICAL SCOPE OF
5. FOR O & MA PROJECTS, KOREA, OCTOBER 1, 2003 DEPARTMENT OF THE ARMY FORM AS A PART OF
GOVERNMENT.
4. CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP DRAWINGS FOR APPROVAL BY
FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROAL.
SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL
3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACT FIELD CONDITIONS.
THE CONTRACTING OFFICER.
AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS AS DIRECTED BY
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING
AND ADDITIONAL ITEMS.
WORK SUCH AS EQUIPMENT & SERVICE CLEARANCE, EQUIPMENT PAD SIZE, INSTALLATION LOCATIONS,
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS FOR NEW
QTYITEM D E S C R I P T I O N ITEM QTY D E S C R I P T I O N
E Q U I P M E N T S C H E D U L E S
OV
SCOPE OF WORK (ELECTRICAL)
NOTE :
A. REPAIR/MAINTENANCE (K-WORK)
3. THE CONTRACTOR MUST SUBMIT SHOP DRAWINGS FOR GOVERNMENT APPROVAL.
ACCORDANCE WITH MECHANICAL EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.
2. EXACT RATINGS AND SETTINGS OF ELECTRICAL EQUIPMENT AND DEVICES SHALL BE IN
UNIFIED FACILITIES CRITERIA AND CONTRACT SPECIFICATIONS.
NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, LIFE SAFETY CODE,
1. ALL ELECTRICAL WORK SHOULD BE DONE IN ACCORDANCE WITH THE CURRENT EDITIONS OF
AIR COMPRESSOR
AC
187279
OS-Y VALVE W/ TAMPER SWITCH
UL-LISTED.
TAMPER SWITCH - NEMA 3R RATED ENCLOSURE, TWO SETS OF SPDT (FORM C).
CONFORMS TO MSS-SP-70. UL OR FM APP GUIDE-LISTED.
175 PSI, SOLID WEDGE DISC, BOLTED BONNET, FLANGED ENDS.
OS-Y VALVE - SIZE 100mm, IRON BODY OUTSIDE SCREW AND YOKE, WORKING PRESSURE
SAFETIES & OPERATING ACCESSORIES.
PRESSURE SWITCH, ASME CODED TANK, AUTO DRAIN VALVE, AND ALL NECESSARY
REQUIRED, CORROSION RESISTANT INTERNAL PARTS, UL-LISTED HIGH CYCLE RATING
AND PRESSURE SWITCH FOR AUTOMATIC STARTING AND STOPPING, NO LUBRICATION
WITH A GAUGE, DRAIN VALVE, CHECK VALVE, SHUT-OFF VALVE, SAFETY RELIEF VALVE
UL-LISTED OILLESS PISTON AIR COMPRESSOR, AUTOMATIC, DIRECT DRIVE, COMPLETE
MOTOR
RECEIVER TANK CAP.
CAPACITY
: 3/4 HP, 3 PH, 115/230 V, 60 HZ
: 20 GALS
: FREE AIR 2.9 CFM AT 50 PSI
MFR. GASTE OR APPROVED EQUAL.
CONTROLLERS, CONDUITS AND ALL NECESSARY ACCESSORIES FOR H.V.A.C CONTROLS.
2. THE MECHANICAL/CONTROLS CONTRACTOR SHALL PROVIDE ALL THE WIRINGS, RELAYS,
LOCATIONS, AND ADDITIONAL ITEMS.
& SERVICE CLEARANCE, DUCT & PIPE LAYOUT, EQUIPMENT PAD SIZE, INSTALLATION
1. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS FOR NEW WORK SUCH AS EQUIPMENT
REPLACED AIR COMPRESSOR.
1. DISCONNECT AND RECONNECT POWER SUPPLY AND CONTROL LINES W/ ACCESSORIES FOR
& EQUIPMENT SCHEDULE
GENERAL NOTES, SCOPE OF WORK
PERFORMANCE TESTING.) TEST REPORT SHALL BE SIGNED BY THE TECHNICIAN.
2. CONTRACTOR SHALL TEST FOR THIS PROJECT. (AIR PRESSURE TESTING & SYSTEM
PROTECTION SYSTEM AS SHOWN ON DRAWINGS.
VALVE WITH TAMPER SWITCH, FLANGES, AND ALL ASSOCIATED ACCESSORIES, FOR FIRE
1. REPLACE DETERIORATED EXISTING AIR COMPRESSOR, EQUIPMENT SUPPORT, 100mm OS & Y
YONGSAN
& AIR COMPRESSOR, S-2307
M-2
N
N
M2 M2
M2
187279
P.O.C
W/ TAMPER SWITCH
100mm OS & Y VALVE
REPLACE EXISTING
P.O.C
WITH TANK
AIR COMPRESSOR
REPLACE EXISTING
EXIST/NEW PLAN
MECH. ROOM
SYSTEM TO REMAIN
FIRE PROTECTION
EXISTING ALL
TO REMAIN (TYP.)
EXISTING AIR LINE
P.O.C
P.O.C
SYSTEM TO REMAIN
FIRE PROTECTION
EXISTING ALL
TO REMAIN (TYP.)
EXISTING AIR LINE
TAMPER SWITCH
OS & Y VALVE W/
NEW 100mm
TO REMAIN
CONC. PAD
EXISTING
TO REMAIN
CONC. PAD
EXISTING
CONTROL SWITCH
NEW PRESSURE
EQUIPMENT
MECHANICAL
EXISTING
EQUIPMENT
MECHANICAL
EXISTING
EQUIPMENT
MECHANICAL
EXISTING
EQUIPMENT
MECHANICAL
EXISTING
EQUIPMENT
MECHANICAL
EXISTING
EQUIPMENT
MECHANICAL
EXISTING
EXIST/REMOVAL PLAN
MECH. ROOM
PS PS
SPRINKLER PIPING SECTION
EXIST/NEW
TAMPER SWITCH
OS & Y VALVE W/
NEW 100mm
P.O.C
SYSTEM TO REMAIN
FIRE PROTECTION
EXISTING ALL
M2
NOT TO SCALE
S I T E P I C T U R E S
P.O.C
W/ TAMPER SWITCH
100mm OS & Y VALVE
REPLACE EXISTING
AND EQUIPMENT SUPPORT
AIR COMPRESSOR W/ TANK
REPLACE EXISTING
CONTROL SWITCH
NEW PRESSURE
P.O.C
AS SHOWN
SECTION, SITE PICTURES
EXISTING/REMOVAL/NEW PLAN &
KIM, SM
MECHANICAL
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
SACLE = 1:50 - SACLE = 1:50
- SACLE = 1:50
KEY PLAN
SCALE: 1:50
0 1000 2000
GRAPHIC SCALE
AIR COMPRESSOR
NEW AC
YONGSAN
& AIR COMPRESSOR, S-2307