Drawings 187279_REPL-CRACKED-VALVE-YSN-2307_DWGS.pdf

PDF 926 KB Posted

Attached to
REPAIR VALVES, S-2307, S-5277 AND S-5270, YONGASAN
Solicitation number
w90vn8
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

STATUS

REVISION

DESCRIPTION OF DRAWINGSSHT.NO.DWG.NO.REF.NO.RING NO.

S C H E D U L E O F D R A W I N G S

GENERAL

MECHANICAL

G-1

M-2

KIM, SM

MECHANICAL

1 G-1

NTS

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A

B C D

E F G H

30000

SCALE: 1:5000

0 10000 20000

GRAPHIC SCALE

M-1

THIS PROJECT

GFEBS. NO. 187279, YONGSAN

187279

G U

A R

D

T O

W E

R

81338

1488 1490

STREET

BATES

BOWMAN STREET

2079 2

E L

L S

O N

S

T R

R E

T

S T

R E

E T

EILER ST.

1531 1530

EILER STREET

E L

L S

O N

S

T R

E E

T1529

245 244 246

T

2604 2

F L O R E S

STREET

G A

IN

E S

S T

R E E T

P A

N P

O R

O

S T

R R

E T

T106

Baseba ll

Field

BEARD STREET

21113

ALLEN STREET

S

C L

A G

G A

V E

N U

E

CAMP STREET

15 1350

1407 1408

1370 14

ARMOR LOOP

150215

11 1519

1522180 157

F A R R E L L

A V

E N

U E

E

IL

E R

S176

S175

1619 1621

STREET

DUNN

16021627

1656 1655

160016001599

27632710

ELLSON STRRET

1ST CORPS BLVD.

15501495

R O

A D

A R

M Y

T

H

149414

5 ELLSON STREET

1ST CORPS BLVD.

01382

123112

2215 2322

T

H A

R M

Y R

O A

D

G U

L L

U P

A V

E N

U E

PARADE GROUND

4 2

2475 2661

62474

24802480

UN BOULEVARD

23652361

23642364

HAWKA STREET

2386239

CAVALRY DIVISION ROAD

1ST

S200

S

S273 Basketball

Court

S

ROK WAR MEMORIAL

T-109

T-108

T-1197

S

S

233823362335 2337

23312330 23342333

C

B

GATE #19(was #20)

GATE #18(was #8B)

GATE #17(was #23)

GATE #15(was #43) GATE #2(was #5) GATE #3(was #7)

GATE #16(was #1)

GATE #20(was #2)

TOWER

ANTENNA

SIGNAL

GATE #21(was #3)

SOUTH POST

YONGSAN GARRISON

MAIN POST

CAMP

COINER

VICINITY MAP

NOT TO SCALE

N

1 PROJECT LOCATION PLAN

SCALE = 1:5000G1

TITLE SHEET & PROJECT LOCATION PLAN

TITLE SHEET & PROJECT LOCATION PLAN

GENERAL NOTES, SCOPE OF WORK & EQUIPMENT SCHEDULE

EXISTING/REMOVAL/NEW PLAN & SECTION, SITE PICTURES

& AIR COMPRESSOR, S-2307

REPLACE CRACKED OS-Y VALVE

YONGSAN, KOREA

& AIR COMPRESSOR, S-2307

REPLACE CRACKED OS-Y VALVE

PWO#187279

YONGSAN

& AIR COMPRESSOR, S-2307

REPLACE CRACKED OS-Y VALVE

GENERAL NOTE SCOPE OF WORK (MECHANICAL)

A. REPAIR/MAINTENANCE (K-WORK)

KIM, SM

MECHANICAL

NTS

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A

B C D

E F G H

NOTE :

3 M-1

11. SALVAGEABLE MATERIALS SHALL BE RETURNED TO DPW.

PROTECTION TO KEEP THE ROOMS CLEAN DURING CONSTRUCTION.

10. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND REMOVE CONSTRUCTION BARRICADES AND/OR

U.S. GOVERNMENT.

ACTIVITIES, AND THE LIKE SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE

9. DISPOSAL OF CONSTRUCTION DEBRIS, WASTE MATERIALS, MATERIALS RESULTING FROM DEMOLITION

TO ITEMS SUCH AS WALLS, CEILING, ROOF, PIPE, DUCT, EQUIPMENT AND ELECTRICAL ITEMS.

SYSTEM AT NO ADDITIONAL COST TO THE GOVERNMENT, INCLUDING, BUT NOT NECESSARILY LIMITED

AS NECESSARY TO ALLOW FOR INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE ALARM

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REINSTALLATION OF ALL OBSTRUCTIONS

SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT SPECIFICATIONS.

PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON CONTRACT DRAWINGS SHALL BE

SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS OF THE ACTUAL

7. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL SYSTEM TO

STANDARD TECHNICAL SPECIFICATIONS FOR MISCELLANEOUS PROJECTS, KOREA.

STRICT ACCORDANCE WITH APPLICABLE SECTIONS OF DIVISION 22 & 23 - MECHANICAL. O & MA

6. ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED AND BALANCED BY THE CONTRACTOR IN

WORK AT NO ADDITIONAL COST TO THE U.S. GOVERNMENT.

THIS PROJECT. THE DETAILS WILL BE UTILIZED WHILE PERFORMING THE MECHANICAL SCOPE OF

5. FOR O & MA PROJECTS, KOREA, OCTOBER 1, 2003 DEPARTMENT OF THE ARMY FORM AS A PART OF

GOVERNMENT.

4. CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP DRAWINGS FOR APPROVAL BY

FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROAL.

SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL

3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACT FIELD CONDITIONS.

THE CONTRACTING OFFICER.

AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS AS DIRECTED BY

2. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING

AND ADDITIONAL ITEMS.

WORK SUCH AS EQUIPMENT & SERVICE CLEARANCE, EQUIPMENT PAD SIZE, INSTALLATION LOCATIONS,

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS FOR NEW

QTYITEM D E S C R I P T I O N ITEM QTY D E S C R I P T I O N

E Q U I P M E N T S C H E D U L E S

OV

SCOPE OF WORK (ELECTRICAL)

NOTE :

A. REPAIR/MAINTENANCE (K-WORK)

3. THE CONTRACTOR MUST SUBMIT SHOP DRAWINGS FOR GOVERNMENT APPROVAL.

ACCORDANCE WITH MECHANICAL EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.

2. EXACT RATINGS AND SETTINGS OF ELECTRICAL EQUIPMENT AND DEVICES SHALL BE IN

UNIFIED FACILITIES CRITERIA AND CONTRACT SPECIFICATIONS.

NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, LIFE SAFETY CODE,

1. ALL ELECTRICAL WORK SHOULD BE DONE IN ACCORDANCE WITH THE CURRENT EDITIONS OF

AIR COMPRESSOR

AC

187279

OS-Y VALVE W/ TAMPER SWITCH

UL-LISTED.

TAMPER SWITCH - NEMA 3R RATED ENCLOSURE, TWO SETS OF SPDT (FORM C).

CONFORMS TO MSS-SP-70. UL OR FM APP GUIDE-LISTED.

175 PSI, SOLID WEDGE DISC, BOLTED BONNET, FLANGED ENDS.

OS-Y VALVE - SIZE 100mm, IRON BODY OUTSIDE SCREW AND YOKE, WORKING PRESSURE

SAFETIES & OPERATING ACCESSORIES.

PRESSURE SWITCH, ASME CODED TANK, AUTO DRAIN VALVE, AND ALL NECESSARY

REQUIRED, CORROSION RESISTANT INTERNAL PARTS, UL-LISTED HIGH CYCLE RATING

AND PRESSURE SWITCH FOR AUTOMATIC STARTING AND STOPPING, NO LUBRICATION

WITH A GAUGE, DRAIN VALVE, CHECK VALVE, SHUT-OFF VALVE, SAFETY RELIEF VALVE

UL-LISTED OILLESS PISTON AIR COMPRESSOR, AUTOMATIC, DIRECT DRIVE, COMPLETE

MOTOR

RECEIVER TANK CAP.

CAPACITY

: 3/4 HP, 3 PH, 115/230 V, 60 HZ

: 20 GALS

: FREE AIR 2.9 CFM AT 50 PSI

MFR. GASTE OR APPROVED EQUAL.

CONTROLLERS, CONDUITS AND ALL NECESSARY ACCESSORIES FOR H.V.A.C CONTROLS.

2. THE MECHANICAL/CONTROLS CONTRACTOR SHALL PROVIDE ALL THE WIRINGS, RELAYS,

LOCATIONS, AND ADDITIONAL ITEMS.

& SERVICE CLEARANCE, DUCT & PIPE LAYOUT, EQUIPMENT PAD SIZE, INSTALLATION

1. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS FOR NEW WORK SUCH AS EQUIPMENT

REPLACED AIR COMPRESSOR.

1. DISCONNECT AND RECONNECT POWER SUPPLY AND CONTROL LINES W/ ACCESSORIES FOR

& EQUIPMENT SCHEDULE

GENERAL NOTES, SCOPE OF WORK

PERFORMANCE TESTING.) TEST REPORT SHALL BE SIGNED BY THE TECHNICIAN.

2. CONTRACTOR SHALL TEST FOR THIS PROJECT. (AIR PRESSURE TESTING & SYSTEM

PROTECTION SYSTEM AS SHOWN ON DRAWINGS.

VALVE WITH TAMPER SWITCH, FLANGES, AND ALL ASSOCIATED ACCESSORIES, FOR FIRE

1. REPLACE DETERIORATED EXISTING AIR COMPRESSOR, EQUIPMENT SUPPORT, 100mm OS & Y

YONGSAN

& AIR COMPRESSOR, S-2307

M-2

N

N

M2 M2

M2

187279

P.O.C

W/ TAMPER SWITCH

100mm OS & Y VALVE

REPLACE EXISTING

P.O.C

WITH TANK

AIR COMPRESSOR

REPLACE EXISTING

EXIST/NEW PLAN

MECH. ROOM

SYSTEM TO REMAIN

FIRE PROTECTION

EXISTING ALL

TO REMAIN (TYP.)

EXISTING AIR LINE

P.O.C

P.O.C

SYSTEM TO REMAIN

FIRE PROTECTION

EXISTING ALL

TO REMAIN (TYP.)

EXISTING AIR LINE

TAMPER SWITCH

OS & Y VALVE W/

NEW 100mm

TO REMAIN

CONC. PAD

EXISTING

TO REMAIN

CONC. PAD

EXISTING

CONTROL SWITCH

NEW PRESSURE

EQUIPMENT

MECHANICAL

EXISTING

EQUIPMENT

MECHANICAL

EXISTING

EQUIPMENT

MECHANICAL

EXISTING

EQUIPMENT

MECHANICAL

EXISTING

EQUIPMENT

MECHANICAL

EXISTING

EQUIPMENT

MECHANICAL

EXISTING

EXIST/REMOVAL PLAN

MECH. ROOM

PS PS

SPRINKLER PIPING SECTION

EXIST/NEW

TAMPER SWITCH

OS & Y VALVE W/

NEW 100mm

P.O.C

SYSTEM TO REMAIN

FIRE PROTECTION

EXISTING ALL

M2

NOT TO SCALE

S I T E P I C T U R E S

P.O.C

W/ TAMPER SWITCH

100mm OS & Y VALVE

REPLACE EXISTING

AND EQUIPMENT SUPPORT

AIR COMPRESSOR W/ TANK

REPLACE EXISTING

CONTROL SWITCH

NEW PRESSURE

P.O.C

AS SHOWN

SECTION, SITE PICTURES

EXISTING/REMOVAL/NEW PLAN &

KIM, SM

MECHANICAL

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A

B C D

E F G H

SACLE = 1:50 - SACLE = 1:50

- SACLE = 1:50

KEY PLAN

SCALE: 1:50

0 1000 2000

GRAPHIC SCALE

AIR COMPRESSOR

NEW AC

YONGSAN

& AIR COMPRESSOR, S-2307

File details come from the government source that posted it. Updated .