S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

O T

S

C A

L E

P

L O

T

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

M F

K

P

R O

J E

C T

N

U M

B E

R

IDENTIFICATION

D A

T E

A P

P R

SHEET

D

C

A

B

MANHOLE SECTION

PROVIDE 4-D16 DIAGONAL

BARS FOR D>600mm

CLR

D

SCALE 1:20

1200200 200

3600 MAX

VARIES

D13 BARS @ 300 OC

EACH WAY TYP EACH SIDE

19mm DIA RUNGS

@ 300mm OC TYP

LADDER TO BE PROVIDED

FOR ALL INLETS EXCEED

1200mm IN DEPTH

AND BOTTOM

75mm THK CONCRETE

W/ W6xW6 WELDED WIRE

FABRIC 0.5m SURROUNDING

MANHOLE

13mm EXPANSION

JOINT TYP

S L O

P E

D

FINISHED

GRADE

SEE GRATING SHELF

DETAIL THIS SHEET

S L O

P E

D

Ø6mm STUD WELDED

TO L75x75 AT 12" OC

L75x75x6mm

CONTINUOUS

TRAFFIC RATED

GRATING

GRATING SHELF DETAIL

SCALE 1:10

75 x 6mm THICK PLATE TYP.

PIPE FLOW

LINE

300 MINIMUM

BEDDING MAT'L

INITIAL

BACKFILL

EMBEDMENT

MATERIAL

COMPACTED

BACKFILL

MATERIAL

PIPE BEDDING DETAIL

NTS

DROP INLET AND

GENERAL NOTES

GRADE BOTTOMS OF TRENCH TO PROVIDE UNIFORM BEARING AND SUPPORT FOR THE BOTTOM

QUADRANT OF EACH SECTION OF THE PIPE. EXCAVATE BELL HOLES TO THE NECESSARY SIZE AT

EACH JOINT TO ELIMINATE POINT BEARING. REMOVE ALL STONES 75mm (3 INCHES) IN DIAMETER

OR GREATER.

WHERE UNSTABLE MATERIAL IS ENCOUNTERED IN THE BOTTOM OF THE TRENCH, REMOVE THE

UNSATISFACTORY MATERIAL A MINIMUM OF 150m (6 INCHES) OR UNTIL SATISFACTORY BEARING

MATERIAL IS ENCOUNTERED AND BRING THE EXCAVATION TO GRADE USING GRANULAR BACKFILL.

PROVIDE BEDDING MATERIAL MEETING THE REQUIREMENTS OF OMA SPECIFICATIONS . PLACE

INITIAL BACKFILL MATERIAL AND COMPACT IT WITH APPROVED TAMPER TO A HEIGHT OF AT LEAST

300mm (12 INCHES) ABOVE THE UTILITY PIPE. BRING UP THE BACKFILL EVENLY ON BOTH SIDES OF

THE PIPE FOR THE FULL LENGTH OF THE PIPE. TAKE CARE TO INSURE THOROUGH COMPACTION

OF THE FILL UNDER THE HAUNCHES OF THE PIPE.

FILL THE REMAINDER OF THE TRENCH WITH OFFSITE SATISFACTORY MATERIAL AND COMPACT TO

95% STANDARD PROCTOR DENSITY.

AFTER THE DROP INLET MANHOLE HAS BEEN CONSTRUCTED AND THE CONCRETE HAS BEEN

ALLOWED TO CURE FOR A MINIMUM OF SEVEN DAYS PLACE BACKFILL SUCH THAT DAMAGE DOES

NOT OCCUR DUE TO THE SHOCK OF THE FALLING SOIL. DEPOSIT BACKFILL MATERIAL EVENLY ON

ALL SIDES AND COMPACT TO 95% STANDARD PROCTOR DENSITY IN 300mm LIFTS.

1.

2.

3.

4.

5.

D A

V I D

R

H

U T

C H

I N

S O

N

D R

H D

R H

D A

V

D

H

U T

C H

I N

S O

N

S E

P T

E M

B E

R

M F

K

X

R E

P A

B

A R

R I C

A D

E

P

O H

A N

G

M

S A

21 3 4 5

1 1

RIDGE EXISTING BERM

NEW 900mm DIA

REINFORCED

EXISTING CONCRETE

HEADWALL (TYP)

CONCRETE PIPE

NEW 600mm DIA

REINFORCED

CONCRETE PIPE

NEW REINFORCED

CONCRETE DROP

INLET. SEE DETAILS

NEW 600mm DIA

REINFORCED

CONCRETE PIPE

NEW REINFORCED

CONCRETE DROP

INLET. SEE DETAILS

NEW 600mm DIA

REINFORCED

CONCRETE PIPE

EXISTING CONCRETE

HEADWALL (TYP)

APPROXIMATE EDGE

OF FILL AREA

APPROXIMATE EDGE

OF FILL AREA

CONTRACTOR TO BASE HIS ESTIMATE

ON A MAXIMUM FILL DEPTH OF 4.0m.

NOTE:

SCALE 1:100

SITE PLAN

ROK MAGAZINE AREA

EDGE OF ASPHALT

ASPHALT PAVEMENT

EXISTING BERM RIDGE

EXISTING EARTHEN

BERM TO REMAIN

PAVEMENT

ASPHALT

DRIVE

APPROXIMATE EDGE

OF FUTURE EARTHEN BERM

U.S. MAGAZINE

TYPICAL

OF FILL AREA

EXISTING EARTHEN

BERM TO REMAIN

APPROXIMATE EDGE

ASPHALT

DRIVE

APPROXIMATE EDGE

OF FUTURE EARTHEN BERM

12 m

TYPICAL

APPROXIMATE EDGE

OF FILL AREA

ASPHALT PAVEMENT

±95.0 m

±95.0 m

±95.0 m

45°

15.0m±

30.0m±

SCALE: 1:10

SECTION THROUGH FILL AREA

U.S. MAGAZINE

TYPICAL

EL 73.97

EL 67.09

EL 61.59

EL 68.47

PEAK EXST BERM EL 69.60

EXST

BERM

ROK MAGAZINE

US MAGAZINE

30.0m ±

4.0m±

APPROXIMATE FINISH

GRADE EL. = 63.68

LONGITUDINAL

DRAINAGE PIPE

ENGINEERED

SELECT BACKFILL

C1

A

C1

C1

A

C1

C1

A

C1

AutoCAD SHX Text Sheet of

AutoCAD SHX Text C1

AutoCAD SHX Text

SECTION AND PLAN VIEW

AutoCAD SHX Text

MARINE BASE POHANG

AutoCAD SHX Text

REPAIR BARRICADE

AutoCAD SHX Text

MUNITIONS SUPPLY AREA

AutoCAD SHX Text

1XCX09

AutoCAD SHX Text

1XCX08

AutoCAD SHX Text

1XCX07

AutoCAD SHX Text

1XCX11

AutoCAD SHX Text

1XCX12

Sheets and Views
Model