Drawing_R.pdf

PDF 40 MB Posted

Attached to
Renovate 1st and 3rd floor of P-6145, USAG Humphreys
Solicitation number
W91QVN24R0051
Issued by

About this file

The file provided appears to be a solicitation for the renovation of the 1st and 3rd floors of building P-6145 at USAG Humphreys, with the solicitation number W91QVN24R0051. The solicitation is open only to "KOREA MATOC VENDORS". The key details include:

The solicitation requires renovating the 1st and 3rd floors of building P-6145 at USAG Humphreys. The contracting agency is the Department of the Army Materiel Command Army Contracting Command. The solicitation number is W91QVN24R0051, and the opportunity type is a Solicitation. The attached "Drawing_R.pdf" document provides further details on the required renovations.

View the file

Other files

File Type Posted
W91QVN24R0051.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HGFEDCBA

SUBMITTED BY

PROJECT NO.

SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

AS SHOWN

USAG HUMPHREYS

IMCOM

REVIEWED BY

RING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REMARKS

SHEET OF

RING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REMARKS

T-2

SCHEDULE OF DRAWINGS

USAG HUMPHREYS

TITLE SHEET - 2

WQ-300000290285

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV. USING AGENCY

CI BR.

ELECTRICAL

ARCHITECTURAL

C - 1

C - 2

C - 3

C - 46

7 C - 5

A - 18

PM BR.

CHIEF DESIGN BR.

TS BR.

WQ-300000290285

FOR GARRISON HQ MOVE

RENOVATE 1st & 3rd FL.OF P-6145

A - 2

A - 3

A - 4

A - 5

A - 6

A - 7

A - 8

A - 9

A - 10

A - 11

A - 12

A - 13

A - 14

A - 15

A - 16

24 A - 17

A - 18

A - 19

A - 20

A - 21

A - 22

MECHANICAL

CIVIL

LOCATION PLAN

SITE REMOVAL PLAN

SITE LAYOUT PLAN

SITE DRAINAGE PLAN

ASPHALT CONCRETE PAVEMENT PLAN, GEOGRID DETAIL

LEGEND AND KEY PLAN

EXIST/REMOVAL 1st FLOOR PLAN, PROPOSED 1st FLOOR PLAN, SCOPE OF WORK, SCOPE OF WORK AND LEGEND

EXIST/REMOVAL 1st FLOOR CEILING PLAN, PROPOSED 1st FLOOR CEILING PLAN, EXIST/REMOVAL 3rd FLOOR PLAN, PROPOSED 3rd FLOOR PLAN, LEGEND AND KEY PLAN

AND LEGEND

EXIST/REMOVAL 3rd FLOOR CEILING PLAN, PROPOSED 3rd FLOOR CEILING PLAN, LEGEND AND KEY PLAN

EXIST/REMOVAL 1st COMMON AREA FLOOR PLAN, PROPOSED 1st COMMON AREA FLOOR PLAN, AND LEGEND

EXIST/REMOVAL 1st COMMON AREA CEILING PLAN, PROPOSED 1st COMMON AREA CEILING PLAN, LEGEND AND KEY PLAN

EXIST/REMOVAL 3rd COMMON AREA FLOOR PLAN, PROPOSED 3rd COMMON AREA FLOOR PLAN, AND LEGEND

EXIST/REMOVAL 3rd COMMON AREA CEILING PLAN, PROPOSED 1st COMMON AREA CEILING PLAN, ENLARGED "SECTOR A" PLAN AND RM B-116 ELEVATION

ENLARGED "SECTOR B" PLAN AND RM B-120 ELEVATION

ENLARGED "SECTOR C" PLAN AND RM B-134 ELEVATION

RM E-322 ELEVATION-1, RM E-322 ELEVATION-2 AND RM E-322 ELEVATION-3

RM E-320 ELEVATION, RM E-328 ELEVATION AND RM E-316 ELEVATION

P-103 ELEVATION

P-301 ELEVATION

INTERIOR WALL DETAIL-1

INTERIOR WALL DETAIL-2

INTERIOR WALL DETAIL-3

P-101-1 OPEN SPACE ENLARGED PLAN, WALL SECTION AND P-101-1 OPEN SPACE ELEVATION

A - 23

AND COVE CEILING DETAIL

P-103 COVE CEILING ENLARGED PLAN, P-301 COVE CEILING ENLARGED PLAN

A - 24

AND NOTE

MONITOR's PARTITION PLAN, MONITOR's PARTITION SECTION, COLUMN BASE PLAN

SECURITY METAL GRILLES DETAIL, RECEPTION DESK DETAIL AND NOTE

DISPLAY WOODEN CABINET AND NOTE

DOOR SCHEDULE, HARDWARE SCHEDULE AND NOTE

A - 25 INTERIOR FINISH SCHEDULE-1 AND NOTE

A - 26 INTERIOR FINISH SCHEDULE-2

A - 27 1st FLOOR SIGNAGE PLAN, 3rd FLOOR SIGNAGE PLAN AND SIGNAGE SCHEDULE

A - 28 SIGNAGE SCHEDULE AND SIGN TYPE

1st FLOOR COMMON AREA SIGNAGE PLAN, 3rd FLOOR COMMON AREA SIGNAGE PLAN, A - 29

M - 1

M - 2

M - 3

EQUIPMENT SCHEDULE AND SCOPE OF WORK

1st FLOOR NEW DUCT AND DIFFUSERS PLAN

1st FLOOR NEW DUCT AND DIFFUSERS PLAN

1st FLOOR NEW DUCT AND DIFFUSERS PLANM - 4

M - 5 CONTROL DIAGRAM AND SEQUENCE OF OPERATION

M - 6

M - 7

M - 8

E - 2

E - 1

E - 3

E - 4

E - 5

E - 7

E - 6

E - 8

E - 9

E - 10

E - 12

E - 11

E - 13

E - 14

E - 15

E - 17

E - 16

E - 18

E - 19

E - 20

E - 22

E - 21

E - 23

E - 24

E - 25

E - 27

E - 26

ABBREVIATION AND LEGEND

1ST FL. LIGHTING ENLARGED PARTIAL REMOVAL PLAN(1)

GENERAL NOTES AND SCOPE OF WORK

1ST FL. LIGHTING ENLARGED PARTIAL REMOVAL PLAN(2)

3RD FL. LIGHTING ENLARGED PARTIAL REMOVAL PLAN

1ST FL. POWER ENLARGED PARTIAL REMOVAL PLAN

3RD FL. POWER ENLARGED PARTIAL REMOVAL PLAN

1ST FL. FIRE ALARM ENLARGED PARTIAL REMOVAL PLAN

3RD FL. FIRE ALARM ENLARGED PARTIAL REMOVAL PLAN

1ST FL. MASS NOTIFICATION ENLARGED PARTIAL PLAN

3RD FL. MASS NOTIFICATION ENLARGED PARTIAL REMOVAL PLAN

3RD FL. COMMUNICATION SYSTEM ENLARGED PARTIAL REMOVAL PLAN

1ST FL. LIGHTING ENLARGED PARTIAL PLAN(1)

3RD FL. LIGHTING ENLARGED PARTIAL PLAN

LIGHTING FIXTURE DETAIL

OCCUPANCY SENSOR WIRING DIAGRAM AND COVERAGE DETAIL (CEILING MTD)

1ST FL. POWER ENLARGED PARTIAL PLAN(1)

1ST FL. POWER ENLARGED PARTIAL PLAN(2)

3RD FL. POWER ENLARGED PARTIAL PLAN

SCHEDULE

1ST FL. MECH. POWER ENLARGED PARTIAL PLAN(2), SAFETY SWITCH AND EQUIPMENT

3RD FL. MECH. POWER ENLARGED PARTIAL PLAN

1ST FL. MECH. POWER ENLARGED PARTIAL PLAN(1)

1ST FL. FIRE ALARM ENLARGED PARTIAL PLAN

3RD FL. FIRE ALARM ENLARGED PARTIAL PLAN

E - 28

E - 29

E - 31

E - 30

1ST FL. MASS NOTIFICATION ENLARGED PARTIAL PLAN

3RD FL. MASS NOTIFICATION ENLARGED PARTIAL PLAN

3RD FL. COMMUNICATION SYSTEM ENLARGED PARTIAL PLAN

FOR GARRISON MOVE

RENOVATE 1st & 3rd FL.OF P-6145

1ST FL. LIGHTING ENLARGED PARTIAL PLAN(2) AND ELEC/COMM ROOM EQUIPMENT LAYOUT

FIRE PROTECTION PLAN

FIRE PROTECTION PLAN & WORK PLAN REQUIREMENT NOTES

FIRE PROTECTION PLAN

1ST FL. COMMUNICATION SYSTEM ENLARGED PARTIAL REMOVAL PLAN(1),(2)

LIGHTING FIXTURE SCHEDULE AND COVE LIGHT INSTALLATION DETAIL

1ST FL. COMMUNICATION SYSTEM ENLARGED PARTIAL PLAN(1),(2)

E - 32

TYPICAL OUTLETS, UNDERFLOOR TRAY SYSTEM, WALL DUCT DETAIL AND RAISED FLOOR GROUNDING DETAILS

A - 30 PROJECT IMAGE PLAN

RAISED FLOOR DETAIL

77 75 OF 75

1289988820.LN

Typewritten Text 24-033

1289988820.LN

Typewritten Text 2 2

1289988820.LN

Rectangle

1289988820.LN

1289988820.LN

1289988820.LN

1289988820.LN

1289988820.LN

24-033

1289988820.LN

6 75

24-033

1289988820.LN

7 75

24-033

1289988820.LN

8 75

24-033

1289988820.LN

9 75

24-033

1289988820.LN

10 75

24-033

1289988820.LN

11 75

24-033

1289988820.LN

12 75

24-033

1289988820.LN

13 75

24-033

1289988820.LN

14 75

24-033

1289988820.LN

15 75

24-033

1289988820.LN

16 75

24-033

1289988820.LN

17 75

24-033

1289988820.LN

18 75

24-033

1289988820.LN

19 75

24-033

1289988820.LN

20 75

24-033

1289988820.LN

21 75

24-033

1289988820.LN

22 75

24-033

1289988820.LN

23 75

24-033

1289988820.LN

24 75

24-033

1289988820.LN

25 75

24-033

1289988820.LN

26 75

24-033

1289988820.LN

27 75

24-033

1289988820.LN

28 75

24-033

1289988820.LN

29 75

24-033

1289988820.LN

30 75

24-033

1289988820.LN

31 75

24-033

1289988820.LN

32 75

24-033

1289988820.LN

33 75

HGFEDCBA

AS SHOWN

A-29

SIM, C H

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

REF NO.

USING AGENCY SCALE :

DRAWING NO.

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

DESCRIPTION

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DATE

R E V I S I O N S

IMCOM

BY CHK. APVD.

USAG HUMPHREYS

REVIEWED BY

SHEET OF

PROJECT NO.

DESIGNED BY REVIEWED BY

CHIEF DESIGN BR.

DEPUTY DESIGN BR.

CI BR.

YI, Y S

WQ-300000290285

FOR GARRISON HQ MOVE

RENOVATE 1st & 3rd FL. OF P-6145

100X100X2.0T

HEAD

PEDESTAL

23X27X550X1.0T

STRINER

600 600 600 600

CUT PANEL

±0FFL

+230

+460

+690

A29

A9

RAISED FLOOR DETAIL

NTS

A

GROUND DETAIL

B

SECTION

ON STL.CEMENT PANEL

600X600 CARPET TILE

WALL

EXST.FLOOR

600600

100X100X2.0T

STL.BASE PLATE

PEDESTAL PIPE

3/4" STL NUT

ELEVATING NUT

CEMENT + ADMIXTURE

PORTLAND BLAST FURNACE

670X670X1.0T

BOTTOM PLATE

46X46X3.0T

CUSHION PAD

3/4" STL BOLT

ELEVATING ROD

100X100X2.0T

PEDESTAL HEAD

600X600X1.0T

TOP PLATE

SCREW

CARPET TILE

C

ASSEMBLY DETAIL

2,4002,4002,400

RAISED FLOOR

CARPET TILE

SIDE HEAD

FINISH TILE

BUBBER NONSLIP 50X15

FLOOR PANEL

1F

A29 - 1G

A29

D

FIELD PEDESTAL

E

CORNER/SIDE PEDESTAL

F

WALL/COLUMN DETAIL

G

STEP DETAIL

H

STEEL CEMENT PANEL

PEDESTAL SET

RAISED FLOOR DETAIL

RECOMMENDED BY MANUFACTURE COMPANY)

USE Ø32 SIZED PEDESTAL PIPE OR SIZE THAT

(THE FLOOR HEIGHT IS 600mm or HIGHER, ON THE EDGE OF THE FLOOR FOR AIRFLOW

PROVIDE 2EA OF GRATING PANEL

1289988820.LN

Typewritten Text 24-033

1289988820.LN

34 75

24-033

1289988820.LN

35 75

1289988820.LN

36 75

24-033

1289988820.LN

37 75

1289988820.LN

38 75

1289988820.LN

1289988820.LN

24-033

1289988820.LN

41 75

1289988820.LN

1289988820.LN

24-033

1289988820.LN

44 75

24-033

1289988820.LN

45 75

24-033

1289988820.LN

46 75

24-033

1289988820.LN

47 75

24-033

1289988820.LN

48 75

24-033

1289988820.LN

49 75

24-033

1289988820.LN

50 75

24-033

1289988820.LN

51 75

24-033

1289988820.LN

52 75

24-033

1289988820.LN

53 75

24-033

1289988820.LN

54 75

24-033

1289988820.LN

55 75

24-033

1289988820.LN

56 75

24-033

1289988820.LN

57 75

24-033

1289988820.LN

58 75

24-033

1289988820.LN

59 75

24-033

1289988820.LN

60 75

24-033

1289988820.LN

61 75

24-033

1289988820.LN

62 75

24-033

1289988820.LN

63 75

24-033

1289988820.LN

64 75

24-033

1289988820.LN

65 75

24-033

1289988820.LN

66 75

24-033

1289988820.LN

67 75

24-033

1289988820.LN

68 75

24-033

1289988820.LN

69 75

24-033

1289988820.LN

70 75

24-033

1289988820.LN

71 75

24-033

1289988820.LN

72 75

24-033

1289988820.LN

73 75

24-033

1289988820.LN

74 75

24-033

1289988820.LN

75 75

WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec.pdf
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec1
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec2
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec3
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec4
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec5
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec6
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec7
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec8
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec9
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec10
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec11
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec12
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec13
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec14
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec15
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec16
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec17
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec18
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec19
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec20
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec21
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec22
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec23
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec24
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec25
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec26
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec27
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec28
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec29
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec30
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec31
WQ-300000290285 RENOVATE 1F&3F OF BUILDING FOR GARRISON MOVE_elec32

File details come from the government source that posted it. Updated .