Drawing.pdf
PDF 5 MB Posted
- Solicitation number
- w90vn9
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Orientation Place.pdf | ||
| RFP W90VN922R0024 (MATOCONTRACTOR ONLY).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 22 - 01
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
J1-10043-1J
UNIT #15746, APO AP 96218-5746
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
YI, TONG KI
AS SHOWN
1 1 OF 1R - 1
T I T L E S H E E T
TITLE SHEET
DATE: 18 NOV 21
C - 12
C - 23
C - 34
M - 18
M - 29
CIVIL
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
CAMP WALKER & HENRY
PROJECT NO. J1-10043-1J, CAMP WALKER & HENRY
C - 45
C - 56
C - 67
M - 310 9 OF 16
M - 411 10 OF 16
M - 512 11 OF 16
M - 613 12 OF 16
M - 714 13 OF 16
M - 815 14 OF 16
E - 116 15 OF 16
E - 217 16 OF 16
MECHANICAL
ELECTRICAL
LOCATION PLAN (CAMP WALKER)
LOCATION PLAN (CAMP HENRY)
NOTES AND SCOPE OF WORKS
SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #304)
SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #452)
DETAILS
LEGEND AND ABBREVIATIONS
DETAIL DRAWING
ELECTRICAL SITE PLAN
GENERAL NOTES, SCOPE OF WORK AND EQUIPMENT SCHEDULE
EXISTING & REMOVAL FUEL OIL PIPING PLAN AND NEW FUEL OIL PIPING PLAN AT BLDG. #1211, CAMP HENRY
LEGEND, NOTES, SCOPE OF WORK AND ELECTRICAL SITE PLAN
EXISTING & REMOVAL FUEL OIL PIPING PLAN AT BLDG. #304, CAMP WALKER
NEW FUEL OIL PIPING PLAN AT BLDG. #304, CAMP WALKER
EXISTING & REMOVAL FUEL OIL PIPING PLAN AT BLDG. #452, CAMP WALKER
NEW FUEL OIL PIPING PLAN AT BLDG. #452, CAMP WALKER
CIVIL
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
GRAPHIC SCALE
(IN METERS)
0 60 120
N
SCALE: 1 : 3000
15 SCALE : 1 / 3000
THIS PROJECT
STOP
E
E
S
S
S
S-398
S-363
S-373
S-372 S-367
S-409
T-392 T-391T-390
T-235 Golf Course
S-468
T-445
S
T
S
S
T 9 S-470
S-457 T-465
T-466
S-450T-706
S-324
S-422
S-335
S-320
S-338
S-200
S-216T-213
S-452
T-720T-721
T-235 Golf Course
T-235 Golf Course
GATE 6
S-403
TMP Washrack
188TH MP S-431
S-430
T-433
S-441
GOLAN 10
T-442
S-414
S-411
S -416S
-410
T
S-440
S-711
T-712
S-358
S-349
S-408 T-421
S -420
T-342
T-387
S-701
S-348
T-235 Golf Course
KELLY FIELD
S-252
S-283
S
S-205
S-208
S-261
S-202
S-217
S-212
S
S-222
S-382
S-362
T
T
S-360
S-368
S-386
S-38
T-235 Golf Course
S-2
S-
S-148
S-149 S-163
T-164
S-165
S-166
S-565
S
S
S-161
T-158
S-617
S-57
S-57
S-574
S-556
S
S 1S-566
T-569
S-57
S-57
S-584
T-614
S
S -602
S-601
S
S
S
S
S-
S-
S
S-221
T-573
S
S-267
S
S-314
S-303
S-304
S-305
S-309
S-327
S-328
S-334
S-312
S-318
S
S-592
T-594
S
S
S-379
S-374
T
S-310
T-340
S-330
T-341
SUBSTATION
MIDDLE / HIGH SCHOOL
S-321
S-359
S-36
S-38 S-8
S-1
S-32
S-21 S-22
T-20
GATE 4
F A
M
IL
Y
H O
U S
IN
G
T
W E
R
P A
R K
S
R U
C T
U R
E
P A
R K
R U
C T
U R
E
TOWER 2
FAMILY HOUSING
P A
R K
R U
C T
U R
E
P A
R K
R U
C T
U R
E
TOWER 3
FAMILY HOUSING
T O
W E
R
F A
M
IL
Y
H
U S
IN
G
S-393
APSAN OVERPASS BRIDGE
APSAN OVERPASS BRIDGE
S-357
T-364
S-356
T-355
S-353 S-399
S-350
S-352
S-344 tank-1 water tank-2 water
ETC
STREET
WASHINGTON
S-556
S-
S-5
S-585
S
S
S
S
S-315
S
S-226
S-316
S
S
S
S-237
CDC
S-
S-
S-
S
S-182 S-555
S-557
S-228
S-230
S-227
S-261
S-260
S
S-265
C-1
1 5
LOCATION PLAN (CAMP WALKER)
PARK, WON CHAE
KU, HUN MO
18 NOV 21
J1-10043-1J
AS SHOWN
D - 22 - 01
LOCATION PLAN (CAMP WALKER)
SEE SITE PLAN
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
CAMP WALKER & HENRY
1 16
TVPC
-1
T-
T-1007
T-1319
T-1607
T-1407
S-1423
GATE 1
Memorial
3.1 Movement
Dol-Harubang
S
T S
T R
E E
T
T
H S
T R
E E
T
T
H S
T R
E E
T
S-1427
S-1504
S-1856
S-1305
T-1569
S-1703
S-1705
S-1712
T-1671
S-1684
S-111
S-1600
S-1624
T-1531
T-1325
S-1651
S-1106
S-1124
S-1307
S-1107
S-1121
S-1254
S-1505
S-1815
S-1639
S-1662
S -1
S-1501
S-1516
S-1521
S-1664
S -1
S-1425
S-1420
S-1522
S-1530
S-1814
S-1810
S -1
S-1805
S-1685
S-1669
S-1600
S-1109
S-1110
S-1220
S-1217
S -1
S-1410
S-1535
S-1131
S-1115
S-1154
S-1241
S-1208
S-1303
S-1650
S-1652
S-1540
S-1801
S-1715
T-1001
S-1653S-1654
S-1845
S-1844
S-1835
S-1680
S-1304
S-1701
S-1707
V P
C
S-2546
T-1706
S-2543
S-1622 S-1103
S-1153
S-1211
S-1222
S-1225
T-1229
S-1311
DFAC
BARRACK
C-2
S-1621
GATE
S -1
T -1
S-1543
LOCATION PLAN (CAMP HENRY)
THIS PROJECT
LOCATION PLAN (CAMP HENRY)
PARK, WON CHAE
KU, HUN MO
D - 22 - 01
CIVIL
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
SCALE : 1 / 1000-
GRAPHIC SCALE
(IN METERS)
0 20 40
SCALE: 1 :1000
N
S-1413S-1328
S-1329
J1-10043-1J
18 NOV 21
SEE THE MECH. DRAWING(S)
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
2 16
SOD WITH TOP SOIL AND SOLID SODDING.
REMOVE EXISTING WOOD STUMPS.
RESTORE EXISTING WOODEN FENCE SAME AS EXIST.
REROUTE UNDERGROUND UTILITY LINES.
3.
PARK, WON CHAE
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
14.
13.
10.
11.
12.
15.
16.
PRIOR TO COMMENCING WORK ON THE PROJECT.
JOB BY THE COR AND SHOULD BE APPROVED BY THE CONTRACTING OFFICER
2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY PORTION OF THE
CONTRACTING OFFICER.
REMOVING AT THE CONTRACTORS EXPENSE TO THE SATISFACTION OF THE
ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY DISMANTLING, DEMOLISHING, OR
3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/ RESTORATION TO THEIR
CONSTRUCTION OPERATIONS.
EXISTING UTILITY LINES, AND OTHER ITEMS WHICH WILL INTERFERE WITH THE
REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS UNDERGROUND ROCK BASE,
4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND CLEARED/
FOR VEHICLES DURING CONSTRUCTION PERIOD IF REQUIRED.
5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND DETOUR ROAD
MARKERS IN THE PROJECT LIMIT.
6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS AND OTHER UTILITY
THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE CIVIL SCOPE OF WORK.
ARMY INSTALLATION MANAGEMENT COMMAND" FORM AS A PART OF THIS PROJECT.
FOR O & MA PROJECT, KOREA, REVISION1, 30 OCTOBER 2015, DEPARTMENT OF THE
INSTALLATION MANAGEMENT COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS
FOR O & MA PROJECT, KOREA, 30 NOVEMBER 2015, DEPARTMENT OF THE ARMY
7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS,
UNLESS OTHERWISE NOTED.
8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF FROST DEPTH
SUCH AS FORMWORKS AND SHORING WITHOUT ANY ADDITIONAL COST.
9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES INCLUDING FALSEWORK
PROPERTY IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.
DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S. GOVERNMENT LEASED
THE CONTRACTOR BY THE GOVERNMENT.
THE CONSTRUCTION AREA AND NO LAY DOWN AREA SHALL BE PROVIDED FOR
BY C.O.R. ADMINISTRATIVE FIELD OFFICES AND STORAGE AREAS SHALL BE WITHIN
FACILITIES ACCORDING TO O&MA SPEC. AT THE LOCATION APPROVED/INDICATED
CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S TEMPORARY
THE WORK.
DESIGN AND TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO COMMENCING
THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL SUBMITTAL TO THE
THE PUBLIC AND/OR MILITARY TRAFFIC AND OPERATIONS.
SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF
FLARES, BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND
CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS,
STATIONS AND ELEVATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS AND
WITHIN THE WORK BOUNDARY.
CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND SOLID SODDING
UNLESS OTHERWISE NOTED.
1. ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT LIMITS INDICATED,
AND REQUIRED.
2. THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED AS INDICATED
FENCE, ETC.
PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF ROADWAY, EXISTING CHAIN-LINK
3. EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION FOR THE
ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK PAM 200-1.
4. ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE KOREAN
ORIGINAL OR BETTER CONDITIONS.
THE CONSTRUCTION WORK, CONTRACTOR SHALL RESTORE IMMEDIATELY TO ITS
6. EXISTING UNDERGROUND UTILITY LINES HAVE BEEN DAMAGED AS A RESULT OF
HANDLING METHODS.
WITHIN PROJECT LIMIT WITH COR CAREFULLY TO DETERMINE PROPER MATERIAL
CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE MATERIALS
1.
2.
4.
KU, HUN MO
18 NOV 21
THE DRAWING OR NOT, CONTRACTOR SHALL VERIFY THE LOCATION OF UTILITY LINES.
5. EXISTING UTILITY LINES (WATER, SEWER, STORM DRAIN, AND ELEC.) SHOWN ON
1.
5.
6.
7.
#1 (REPAIR/MAINTENANCE)
C-3
J1-10043-1J
3 16
D - 22 - 01
#1 (CONSTRUCTION/ALTERATION)
1.
#2 (REPAIR/MAINTENANCE)
2.
3.SOD WITH TOP SOIL AND SOLID SODDING.
REROUTE UNDERGROUND UTILITY LINES.4.
REMOVAL NOTES:
GENERAL NOTES: NOTES:
NOTES AND SCOPE OF WORKS
THE PROJECT SITE ORIENTATION PRIOR TO SUBMISSION OF CONTRACT PROPOSAL.
1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT
EXCAVATIONS OF FUEL LINE TO THE COR AND ENVIRONMENTAL DIVISION.
1. THE CONTRACTOR SHALL REPORT ANY CONTAMINATED SOIL DISCOVERED DURING
4. ALL UNDERGROUND FUEL OIL LINE(S) SHALL BE CONTINUOUSLY SLOPED TO SUMP(S).
SCOPE OF WORK (BLDG.# S-304, CAMP WALKER)
SCOPE OF WORK (BLDG.# S-452, CAMP WALKER)
REPLACE EXISTING CONCRETE SIDEWALK INCLUDING BASE COURSE.
REPLACE EXISITING STEEL GRATING COVERED CONCRETE DITCH.
CONSTRUCT CONCRETE SLAB AND WALLS.
REPLACE UNDERGROUND FUEL OIL LINE(S) INCLUDING NECESSARY ACCESSORIES.
SCOPE OF WORK (BLDG.# S-1211, CAMP HENRY)
REPLACE EXISTING CONCRETE SIDEWALK INCLUDING BASE COURSE.
ABOVEGROUND FUEL OIL LINE INCLUDING ACCESSORIES AND ETC.
3. SEE MECH. DRAWINGS FOR REMOVAL/INSTALLATION WORKS SUCH AS SUMP(S),
CLEANING THE EXTERIOR UNDER THE SUPERVISION OF COR.
2. FUEL OIL LINE PIPING INCLUDING ACCESSORIES SHALL BE REMOVED AFTER
WHICH HAVE POSSIBILITY OF OIL LEAKAGE, SHALL BE SEALED, BLOCKED OR CAPPED.
5. ALL LEAKED OIL SHALL BE COLLECTED TO THE SUMP AND ANY GAPS & JOINTS,
REPLACE EXISTING UNDERGROUND FUEL OIL LINE(S) INCLUDING NECESSARY ACCESSORIES.
*SEE THE MECH. DRAWING(S)
GRATING COVERED CONCRETE DITCH WHEN THE PENETRATION IS NEEDED.
6. FUEL OIL LINE SHALL HAVE 300MM CLEARANCE FROM THE INVERT OF THE STEEL
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
SCALE : 1 / 100
BLDG. #S-304
BLDG. #S-303
S
~SIDEWALK~
~SIDEWALK~
ELEC.
E/P
ELEC.
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
GRAPHIC SCALE
SCALE: 1 : 100
2000 4000
N
90.6
90.4
90.2
90.0
90.8
90.8
89.8
(ASSUMED) REMOVE EXISTING WOOD STUMPS
PROJECT WORK LIMIT
F
D - 22 - 01
4 16
KU, HUN MO
PARK, WON CHAE
C-4
18 NOV 21
J1-10043-1J
TO BE REPLACED
INCLUDING BASE COURSE
EXISTING CONCRETE SIDEWALK
CONCRETE DITCH TO BE REPLACED
EXISITING STEEL GRATING COVERED
TO BE RESTORED
EXISTING WOODEN FENCE
SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #304)
LEGEND:
TBM : TEMPORARY BENCH MARK
SCALE : 1 / 100
TO BE REPLACED
EXISTING UNDERGROUND FUEL OIL LINE
COVERED CONCRETE DITCH WITH NEW
REPLACE EXISITING STEEL GRATING
SAME AS EXIST.
RESTORE EXISTING WOODEN FENCE
(PROJECT WORK LIMIT)
SOD WITH TOP SOIL AND SOLID SODDING
(PROJECT WORK LIMIT)
REROUTE UNDERGROUND UTILITY LINES
EL=90.238
SEWER MANHOLE
TOP OF EXIST.
TBM
F
BLDG. #S-304
BLDG. #S-303
S
~SIDEWALK~
~SIDEWALK~
ELEC.
E/P
ELEC.
90.6
90.4
90.2
90.0
90.8
90.8
89.8 F
PROJECT WORK LIMIT
(1,000 GAL)
FUEL OIL TANK
(1,000 GAL)
FUEL OIL TANK
FUEL OIL LINE
REMOVAL OF ABOVEGROUND
SEE THE MECH. DRAWINGS FOR
S
REMOVAL PLAN
SITE LAYOUT PLAN
INCLUDING NECESSARY ACCESSORIES
REPLACE EXISTING UNDERGROUND FUEL OIL LINE
SAME AS EXIST.
INCLUDING BASE COURSE
REPLACE EXISTING CONCRETE SIDEWALK
SEE THE MECH. DRAWING(S)
CONNETED TO BLDG.#304
FUEL OIL LINE TO BE
ABOVEGROUND FUEL OIL LINE AND ETC.
SUCH AS SUMP, CONCRETE PIT AND
SEE THE MECH. DRAWING(S) FOR WORKS
LEGEND:
ITEMS TO BE REMOVED
F
NEW FUEL OIL LINE
EXST. FUEL OIL LINE
FOR FUEL TANKS, S-304, S-452 & S-1211
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
N
GRAPHIC SCALE
SCALE: 1 : 50
1000 2000
SCALE : 1 / 50
78.024
BLDG
78.156
BLDG
78.577
BLDG
79.326
CLF
79.352
WFEN
78.765
WFEN
78.591
WFEN
78.3
PAD
78.294
PAD
78.213
PAD
78.515
PAD
78.852
PANEL
78.079
SWALK
77.927
GAS
77.981
GAS
E/P
S-452
BLDG. #
FUEL OIL TANK
(1,000 GAL)
78.024
BLDG
78.156
BLDG
78.577
BLDG
79.326
CLF
79.352
WFEN
78.765
WFEN
78.591
WFEN
78.3
PAD
78.294
PAD
78.213
PAD
78.515
PAD
.22
PAD
78.852
PANEL
77.927
GAS
77.981
GAS
E/P
S-452
BLDG. #
FUEL OIL TANK
(1,000 GAL)
SCALE : 1 / 50
F F
J1-10043-1J
KU, HUN MO
PARK, WON CHAE
C-5
SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #452)
TO BE REPLACED
FUEL OIL LINE
EXISTING UNDERGROUND
BOX
JUNCTION
FORMER
TRANS-
FORMER
TRANS-
BOX
JUNCTION
(PROJECT WORK LIMIT)
SOD WITH TOP SOIL AND SOLID SODDING
(PROJECT WORK LIMIT)
REROUTE UNDERGROUND UTILITY LINES
PROJECT WORK LIMIT
(ASSUMED)
UNIT
A.C.
UNIT
A.C.
LEGEND:
ITEMS TO BE REMOVED
F EXST. FUEL OIL LINE
51 5
ABOVEGROUND FUEL OIL LINE AND ETC.
SUCH AS SUMP, CONCRETE PIT AND
SEE THE MECH. DRAWINGS FOR WORKS
ACCESSORIES.
OIL LINE(S) INCLUDING NECESSARY
REPLACE EXISTING UNDERGROUND FUEL
SEE THE SECTION AND DETAIL
CONSTRUCT CONCRETE SLAB AND WALLS
REMOVAL PLAN SITE LAYOUT PLAN
INCLUDING BASE COURSE
REPLACE EXISTING CONCRETE SIDEWALKTO BE REPLACED
INCLUDING BASE COURSE
EXISTING CONCRETE SIDEWALK
SEE THE MECH. DRAWINGS
CONNETED TO BLDG.#452
FUEL OIL LINE(S) TO BE
FUEL OIL LINE
REMOVAL OF ABOVEGROUND
SEE THE MECH. DRAWING(S) FOR
LEGEND:
F NEW FUEL OIL LINE
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
CAMP WALKER & HENRY
18 NOV 21
D - 22 - 01
5 16
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
FINISH GRADE
1, (M
IN
NEW CONCRETE WALL
1,100
1,100
~ EXISTING FUEL OIL STORAGE TANK ~
(1,000 GAL)
#8- (150 X 150)
WIRE MESH
TO REMAIN
EXISTING CONCRETE SADDLES
(TYP.)
EXPANSION JOINT
D13 @ 300 O.C.E.W
4,200
(TYP.)
EXISTING FUEL OIL
STORAGE TANK~
(1,000 GAL)
TO REMAIN
EXISTING CONCRETE SADDLES
NEW CONCRETE WALL D13 @ 300 O.C.E.W
FINISH GRADE
1, (M
IN
#8- (150 X 150)
WIRE MESH
200 200
SLOPE
150 150
150150 1,900
(TYP.)
C-6
J1-10043-1J
KU, HUN MO
PARK, WON CHAE
A
SECTION
B
SECTION
WARNING TAPE
SLOPE 1%
ACCESS 4’’ PIPE
- 6 NOT TO SCALE
NOT TO SCALE
2 FUEL OIL LINE CONNECTION
fy = 440 Mpa fy = 392 Mpa (GRADE 60)
Fnt = 310 Mpa fu = 482 Mpa
1. CONCRETE : (MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS)
ALL CONCRETE UNLESS NOTED OTHERWISE
HOT-ROLLED DEFORMED BAR
2. STEEL
WELDED WIRE FABRIC
4. BOLTS :
ASTM A307,
3. WELDING ELECTRODE:
CONCRETE
CONFORM TO ACI STANDARDS (ACI 318, ACI 301 ETC.)
1. ALL WORK FOR CONCRETE AND REINFORCING STEEL SHALL
CONCRETE FINISH
f’c = 21 MPa
SIDEWALK PATH.
1. APPLY BROOM FINISH PERPENDICULAR TO RAMP AND
MATERIAL STRENGTHS
INCLUDING ACCESSORIES
THE ABOVEGROUND FUEL OIL LINE
SEE MECH. DRAWINGS FOR
BLDG.
WITH THE MANUFACTURER’S GUIDANCE
OIL RETURN LINE IN ACCORDANCE
CAP THE UNUSED HOLE FOR THE FUEL
DETAILS
CONCRETE SLAB AND WALLS
(T=100)
NEW CONCRETE SLAB
(T=100)
NEW CONCRETE SLAB
TEST BOOT ASSEMBLY
TRANSITION ASSEMBLY
FUEL OIL LINE 3/4’’ PIPE
DOUBLE WALL FLEXIBLE
(PROVIDE DRAIN HOLE)
WITH LOCK DEVICE
OUTLET PIPE AND GATE VALVE, (D=50)
NOTE:
WITH THE MANUFACTURER’S TECHNICAL GUIDANCE.
FUEL OIL LINE SHALL BE DOUBLE WALL FLEXIBLE PIPES AND ACCESSORIES FOR THE FUEL OIL LINE SHALL BE IN ACCORDANCE
FOR FUEL TANKS, S-304, S-452 & S-1211
REPLACE UNDERGROUND SINGLE WALL PIPES
CAMP WALKER & HENRY
18 NOV 21
D - 22 - 01
6 16
SCH
SA
SAN
QTY
R12, R22
RA
RDTR
RPM
RT
PG
PH
POC
POL
PPM
PRV
QT
OA
OAIL
OD
OS&Y
Pa
NTS
BUTTERFLY
CUBIC METER PER HOUR
AIR CONDITION (-ING,-ED)
AIR CONDITION UNIT (S)
AIR COOLED CONDENSING UNIT
CHILLED/HOT WATER RETURN
CHILLED/HOT WATER SUPPLY
REFRIGERANT LIQUID
CAP CAPACITY
CUBIC METER
COMPRESSOR
CONTINUE
CONNECTION
CPRSR
CU M
CONT
CONN
COUNTER CLOCKWISE
COEFFICIENT
CIRCUIT
CAST IRON PIPE
CHILLED WATER
CKT
CMH
COEF
CHW
CCW
CIP
ALARM CHECK VALVEACV
AVG AVERAGE
BAROMETER(-TRIC)
CENTIGRADEC
BARO
AMPERE(AMP, AMPS)
ALUMINUM
APPROX
AMP
AIR COND
AHU
AL
AIR COOLED
ACU
ACLD
ACCU
CHWS
CHWR
CHR
CHS
D
RL
DRAIN
KILOCALORIE PER HOUR
KILOGRAM PER SQ. CENTIMETER
KILOGRAM
THERMAL CONDUCTIVITY
IRON PIPE SIZE
ISOMETRIC
DIAMETER, INSIDE
FACE AREA OR FRESH AIR
EXTERNAL STATIC PRESSURE
EVAPORAT (-E,-ING,-ED,-OR)
ENTERING WATER TEMP
FIRE HOSE CABINET
EXPLOSION PROOF
FHC
FA
ESP
EVAP
EWT
EFF
ENT
EQPT
EP
EFFICIENCY
ENTERING
EQUIPMENT
KG
K
IPS
ISO
ID
NIC
N.O.
NO
MPS
N.C.
N/A
MM
MPH
MIN
MAX
NOT IN CONTRACT
NORMALLY OPEN
NUMBER
NORMALLY CLOSED
METERS PER SECOND
METERS PER HOUR
MINIMUM OR MINUTE
NOT APPLICABLE
MILLIMETER
MAXIMUM
HERTZ
HOSE BIBB
HEAD
HORSEPOWER
HOUR(S)
HOT WATER
HOT WATER HEATER
HORIZONTAL
FIBERGLASS REINFORCED PLASTIC
FREQUENCY
FLUSH VALVE
FEED WATER PUMP
FIXTURE
GAGE OR GAUGE
GALVANIZED STEEL
FUEL OIL
FEMALE PIPE THREAD
CIRCULATING WATER PUMPCWP
FRP
DECIBEL OR DRY BULB
DRY BULB TEMPERATURE
ENTERING AIR TEMPERATURE
DRY PIPE VALVE
DIRECT EXPANSION
DO DIESEL OIL
EAT
DPV
DX
DIV
DIAG
DIFF
DB
DBT
DIVISION
DIAMETER
DIAGRAM
DIFFERENCE
DEGREE
HR
HZ
HW
HWH
HORIZ
HB
HD
HP
GA
GALVS
FV
FWP
FXTR
CLOCKWISE OR COLD WATERCW
PLUG VALVE
THREE WAY
FREQ
FO
FPT
GATE, GLOBE
GATE, ANGLE
GLOBE
CONTROL
GATE
M
LPS
LWT
LT
LPH
LPD
LL
LG
LBS
LAT
LAV
L
KWH
KW
LITERS PER SECOND
LITERS PER HOUR
LEAVING WATER TEMPERATURE
METERS
LAUNDRY TRAY
LITERS PER DAY
LIQUID LINE
LEAVING AIR TEMPERATURE
POUNDS
LAVATORY
LENGTH
KILOWATT HOUR
KILOWATT
LITERS
P
STRAINER, BLOW OFF
STRAINER
PUMP (INDICATE USE)
KG/ SM KILOGRAM PER SQ. METER
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
PIPE TO BE REMOVED
MEDIUM TEMPERATURE HOT WATER RETURN
MEDIUM TEMPERATURE HOT WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
RS
RD
(NAME)
(NAME)E EXISTING PIPE
HWR
HWS
MTWR
MTWS
CR
CS
PIPING
SANITARY DRAIN
CHECK, SWING
PIPE SLEEVE WITH FIRE STOPPING
VENT THRU ROOF
BFP
PLAN
HOSE BIBB
BALL
ELEV.
PIPE SLEEVE
BACKFLOW PREVENTER
FLOOR DRAIN
FLOOR CLEANOUT
FD
FCO
FLEXIBLE CONNECTOR
ANCHOR, INTERMEDIATE
ANCHOR, MAIN
EXPANSION JOINT
EXPANSION LOOP
EJ
RELIEF
SAFETY
HOSE END DRAIN
LOCK SHIELD
NEEDLE
PRESSURE REDUCING
CONTROL, PNEUMATIC-ELECTRIC
CONTROL, ELECTRIC-PNEUMATIC
CHECK, NON-SLAM
S
R
EP
PE
COLD WATER
VENT
AD FD
QUANTITY
TEMPERATURE DIFFERENCE
TONS OF REFRIGERATION
SCHEDULE
SUPPLY AIR
SANITARY
REFRIGERANT (12, 22, ETC)
RETURN AIR
REVOLUTIONS PER MINUTE
REFRIGERATION TON
RADIATOR
TYP TYPICAL
UNIT HEATER
URINAL
UH
UR
SYMBOL
TEMPERATURE
THICKNESS
TONS
THK
TEMP
SYM
TD
OUTSIDE AIR INTAKE LOUVER
PRESSURE REDUCING VALVE
PHASE (ELECTRIC)
PETROLEUM, OIL AND LUBRICANTS
POINT OF CONNECTION
PARTS PER MILLION
PERCENT/
QUART
PRESSURE GAGE
DIAMETER, OUTSIDE
OUTSIDE SCREW & YOKE
PASCAL
POLE
SPR SPRINKLER
STAINLESS STEEL
SQUARE
STEAM
STANDARD
STEEL
ST
STD
STL
SQ
SST
SPECIFICATION
SQUARE METER
STATIC PRESSURE
SPEC
SP
SM
OUTSIDE AIR
NOT TO SCALE
SECONDSEC
VAV VARIABLE AIR VOLUME
WATER CLOSET
VENTILATION
W/
WT
WC
WD
WITH
WEIGHT
WIDTH
W
WB
VOL
VEL
VENT
VERT
WATT
WET BULB
VOLUME
VELOCITY
VERTICAL
SMOKE DAMPER (PROVIDE ACCESS DOOR)
MANUAL VOLUME DAMPER
VAC
V
VACUUM
VOLT
SPLITTER DAMPER
AD
SD
VD
TEE, SINGLE SWEEP
TEE, OUTLET DOWN
REDUCER, ECCENTRIC (STRAIGHT, DOWN)
REDUCER, ECCENTRIC (STRAIGHT, INVERT)
ELBOW, TURNED DOWN
UNION, FLANGED
UNION, SCREWED
TEE, OUTLET UP
TEE
LATERAL
ELBOW, TURNED UP
CONNECTION, TOP
CONNECTION, BOTTOM
BUSHING
CAP
FIRE DAMPER (PROVIDE ACCESS DOOR)
BDD
TURNING VANES
TRANSITION
FLEXIBLE CONNECTION
FLEXIBLE DUCT
FC
DUCT WORK
A B B R E V I A T I O N S
L E G E N D
PG
TM
AAV
FOS
3-WAY VALVE (MOTORIZED)
PRESSURE GAUGE
THERMOMETER
AUTOMATIC AIR VENT
GATE VALVE
CHECK VALVE
FUEL OIL SUPPLY
FLEXIBLE JOINTFJ
& STRAINER
M
CS
SD
SHOWER DRAIN
DEG
DIA or o
CEAT CONDENSER ENTERING AIR TEMP
LCWT LEAVING CHILLED WATER TEMP
FAIL FRESH AIR INTAKE LOUVER
EXPANSION JOINTEXPJT
EXST EXISTING
A / C AIR CONDITIONING
APPROXIMATELY
ARCH ARCHITECTURAL
BLDG BUILDING
CONC CONCRETE
DWG DRAWING
EA EACH
F.C.U. FAN COIL UNIT
MECH MECHANICAL
KCAL/ HR
KG/ SQ CM
HOT WATER SUPPLY
HOT WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
V
DOMESTIC HOT WATER SUPPLY
DOMESTIC HOT WATER RETURN
AAV
ED EXHAUST DUCT
AUTOMATIC AIR VENT
AIR HANDLING UNIT
GROUND LEVELGL
REGISTER, SIDEWALL
SUPPLY AIR GRILLE OR
REGISTER, CEILING
SUPPLY AIR GRILLE OR
(200mm NECK DIAMETER)
CEILING DIFFUSER, ROUND TYPE
REGISTER, CEILING
EXHAUST AIR GRILLE OR
GRILLES, REGISTERS AND DIFFUSERS
SQUARE TYPE
CEILING DIFFUSER,
EG
ER
SG
SR
SG
SR
RG
RR
CD
200mm NCD
COWL, (GOOSENECK) AND FLASHING
(810mm WIDTH x 400mm DEPTH)
DUCT SIZES SHOWN810mm x 400mm
M
ELECTRIC MOTOR OPERATED DAMPER
S
MOTORIZED DAMPER
MD
SUPPLY AIR DUCT RISER
RETURN OR EXHAUST AIR DUCT RISER
SUPPLY AIR DUCT SECTION
RETURN AIR DUCT SECTION
GATE, GLOBE OR BALL VALVE
CHECK VALVE (FLOW)
ANGLE VALVE
STRAINER
DRIP CHECK VALVE
RESTRICTED ORIFICE
FILL CUP
PRESSURE GAUGE
SOLENOID VALVE
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLEXIBLE PIPE CONNECTION
RELAY
HOSE VALVE
TEST HEADER
SMOKE DAMPER
R
SD
S
: WATER MOTER ALARM GONG
SPRINKLER SYSTEM
: UP-RIGHT TYPE SPRINKLER
: PENDENT TYPE SPRINKLER
: SIDE WALL TYPE SPRINKLER
REMOVAL WORK
RELOCATED WORK
SUPPLY AIR DUCT
RETURN AIR DUCT
EXHAUST AIR DUCT
SA
RA
EA
DEMPERS
VALVES, SPECIAL DUTY
HEATING
AIR CONDITIONING & REFRIGERATION
PLUMBING
VALVES : (for selective actuators)
BACK DRAFT DAMPER
CIRCUIT SETTER
POINT OF CONNECTIONPOC
POR POINT OF REMOVAL
TcH THERMOSTAT HEATING/COOLING
THERMOSTAT OF HEATING
REGISTER, CEILING
RETURN AIR GRILLE OR
Th
REDUCER, CONCENTRIC
LEGEND AND ABBREVIATIONS
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
7 16
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-1
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
FOR FUEL TANKS, S-304, S-452 & S-1211
WORK CLASS: "K" (REPAIR/ MAINTENANCE WORK)
GENERAL NOTES
SCOPE OF WORK
THROUGH COR.
SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE
ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE NEW
TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA
BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED PRIOR TO ANY WORK
AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK AREA WILL NEED TO
CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CASE WORK IN THE
NOT PRESENT IN THE AREA AFFECTED BY THIS WORK. HOWEVER, IF SUSPECTED ASBESTOS
VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS
PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER
PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL
17. THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1
CONSTRUCTION.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING
START OF CONSTRUCTION.
PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW AND THE USER, PRIOR TO THE
USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING
SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE
FACILITY BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR
15. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, IF IT IS REQUIRED THAT THE
SPECIFICATIONS.
CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT
OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON
SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS
14. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL
VERIFIED AT THE JOB SITE.
13. LOCATION AND SIZES OF EXISTING EQUIPMENT, PIPING, ETC, ARE APPROXIMATE AND SHALL BE
ADDITIONAL COST TO THE PROJECT CONTRACT.
THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO
O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.
12. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR
SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".
11. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL
TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.
EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED
10. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW
REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.
9. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL
FOR APPROVAL.
DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION
8. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE
PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS CONTRACTOR.
THE EXISTING EQUIPMENT, NEW EQUIPMENT, PIPING AND ETC. DAMAGES DUE TO THE WORK
7. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
6. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.
AS DIRECTED BY THE CONTRACTING OFFICER.
EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.
4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND
PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR
3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE
TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE DESIGN &
2.THIS DRAWING IS ONLY FOR GOVERNMENT COSTING PURPOSE ONLY AT CONCEPTUAL LEVEL. THE
CONTRACTING OFFICER’S APPROVAL.
REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S
PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.
EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,
COMMENCING CONSTRUCTION.
SHALL PROVIDE SHOP DRAWINGS OF THE FUEL OIL SYSTEM FOR APPROVAL BEFORE
SPECIFICATIONS AND MANUFACTURER’S WRITTEN INSTRUCTIONS. THE CONTRACTOR
ACCORDANCE WITH THE REQUIREMENTS OF THE NFPA 30 & 31, O&MA STANDARD
18. THE FUEL OIL SYSTEM SHALL BE DESIGNED, INSTALLED, TESTED AND CLEANED IN
TAPE SHALL BE PROVIDED FOR WARNING AND IDENTIFICATION OF BURIED PIPING.
20. DETECTABLE ALUMINUM FOIL PLASTIC-BACKED TAPE OR DETECTABLE MAGNETIC PLASTIC
D E S C R I P T I O NQ’ TY
NO.
ITEM
CONTAINMENT SUMP SYSTEM2
EQUIPMENT SCHEDULE
"OPW" MODEL NO. PST-4630 TRANSITION SUMP OR APPROVED EQUAL
- ADJUSTABLE TO A MINIMUM OF 26"
STRUCTURAL RIGIDITY
- LARGE, HEAVILY RIBBED POLYETHYLENE CONTAINMENT CHAMBER PROVIDES
POLYETHYLENE SUMP / FIBERGLASS TOP
BLDG. #304, #452, CP WALKER
BLDG. #1211, CP HENRY
US ORIGIN MATERIALS:
AS INDICATED ON THE DRAWINGS.
INTERNET SITE HTTP:// WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE
DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT
REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS",
ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL
MANUFACTURER.
AND NFPA 30. INSTALLATION SHALL BE PERFORMED BY INDIVIDUALS TRAINED BY THE
SECONDARILY CONTAINED THAT IS DESIGNED AND LISTED IN COMPLIANCE WITH UL 971
19. ABOVEGROUND PIPING SHALL BE STEEL. UNDERGROUND PIPING SHALL BE OF FLEXIBLE,
SAMPLE FROM CREDIBLE LABORATORY.
THE CONTRACTOR SHALL BE SUBMITTED CERTIFIED REPORT OF CONTAMINATED SOIL
METERS MUST BE TRANSPORTED TO THE LAND FARM FACILITY AT CAMP CARROLL.
METERS FOR THE TOTAL PROJECT SITES. ANY CONTAMINATED SOIL ABOVE 50 CUBIC
CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF CONTAMINATED SOIL UP TO 50 CUBIC
MUST HANDLE BY GUIDANCE UNDER SUPERVISION OF ENVIRONMENTAL DIVISION. THE
CONTAMINATED SOIL HAS BEEN DETECTED ON REMOVAL SITE. THE CONTAMINATED SOIL
21. THE CONTRACTOR SHALL REPORT TO C.O.R. AND ENVIRONMENTAL DIVISION, WHEN
AND PARTS.
CABINET, SUMP LEAK SENSOR, EMERGENCY ALARM, CONDUIT AND ALL NECESSARY ACCESSORIES
2. INSTALL NEW OIL LEAK DETECTION CONTROL SYSTEM INCLUDING CONTROL PANEL, CONTROL
PAINTING AND ALL NECESSARY ACCESSORIES AND PARTS.
OIL STEEL PIPE INCLUDING FITTINGS, PIPE SUPPORTS, PIPE STRAINER, FUEL OIL FILTER, VALVES
1. REPLACE EXISTING UNDERGROUND FUEL OIL STEEL PIPE WITH NEW ABOVE GROUND FUEL
NECESSARY ACCESSORIES AND PARTS.
SUPPORTS, VALVES, TEST BOOT ASSEMBLYS, ENTRY BOOT CONDUITS, PAINTING AND ALL
SUMP CONCRETE BOXS, ENTRY FITTINGS, FUEL OIL FILTERS, PIPE STRAINERS, STEEL PIPES, PIPE
1. REPLACE EXISTING FUEL OIL SYSTEMS WITH NEW ONES INCLUDING CONTAINMENT SUMPS,
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
G
CHANG, TAE HO
NAM, TAE CHIN
M-2
AND EQUIPMENT SCHEDULE
GENERAL NOTES, SCOPE OF WORK
18 NOV 21
J1-10043-1J D - 22 - 01
8 16
CAMP WALKER & HENRY
POR
POR
ABANDON EXISTING OIL PIPE
CUT & CAP EXISTING OIL PIPE
SEE CIVIL DRAWING
FUEL OIL PIPE
REMOVE UNDERGROUND
SEE CIVIL DRAWING
FUEL OIL PIPE
REMOVE UNDERGROUND
(1000 GAL)
EXISTING FUEL OIL TANK TO REMAIN
GROUND LEVEL GROUND LEVEL
MECH. ROOM FLOOR
GROUND LEVEL
OIL SUPPLY LINE
REMOVE 20mm FUEL
POR
EXISTING / REMOVAL FUEL OIL SYSTEM SECTION (BLDG. #304)
DIKE TO REMAIN
EXISTING CONCRETE
BLDG. #S-303
BLDG. #S-304
S-1 M-3
P-1 M-3
EXISTING / REMOVAL FUEL OIL SYSTEM PLAN (BLDG. #304)
NOT TO SCALE
POR
SCALE : 1 / 100
(1000 GAL)
EXISTING FUEL OIL TANK TO REMAIN
S
SEE CIVIL DRAWING
REMOVE ASSUMED EXISTING OIL PIPE
DOMESTIC HOT WATER HEATER
EXISTING OIL PIPE CONTINUE TO
POR
FUEL OIL PIPE
ABANDON EXISTING
FUEL OIL PIPE
CUT & CAP EXISTING
E-1
M-3 SCALE : 1 / 20
ENLARGED PLAN
E-1
M-3
SEE
DOMESTIC HOT WATER HEATER
EXISTING OIL PIPE CONTINUE TO
GRAPHIC SCALE
SCALE: 1 : 100
2000 4000
N
LEGEND
TO BE REMOVED
SPECIFIC NOTES
TO DPW.
6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED
RECOMMENDATION AND SITE CONDITIONS.
2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S
PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.
1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL
TO ADJACENT CONSTRUCTION.
DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING
4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO
FILLED OR RESTORED.
5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND
7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.
EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.
3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,
HOT WATER HEATER
CONTINUE TO DOMESTIC
MECH. ROOM
BLDG. #S-304
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
9 16
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-3
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
AT BLDG. #304, CAMP WALKER
EXISTING & REMOVAL FUEL OIL PIPING PLAN
NOT TO SCALE
S-1 NEW FUEL OIL SYSTEM SECTION (BLDG. #304)
COUPLINGS / ADAPTORS
OR FOUNDATION)
TEST BOOT ASSEMBLY
TRANSITION ASSEMBLY
WARNING TAPE
SLOPE 1%
ACCESS PIPE
FUEL OIL PIPE
SLOPE 1%
SLOPE 1%
ENTRY BOOT
CONDUIT
SUMP LEAK SENSOR
TEST BOOT ASSEMBLY
COUPLING
SHUT OFF BALL V/V
TEST BOOT ASSEMBLY
PIPE
FUEL OIL
CONTAINMENT SUMP
TAPE
WARNING
D-1
M-8
SEE
POC
POC
SLOPE 1%
(1000 GAL)
EXISTING FUEL OIL TANK
MECH. ROOM FLOOR
GROUND LEVEL
OIL SUPPLY LINE
NEW 20mm FUEL
FUEL OIL PIPE, SEE CIVIL DRAWING
NEW UNDERGROUND DOUBLE WALL
GROUND LEVEL
M
IN
M
IN
FUEL OIL FILTER
PIPE STRAINER
20mm GATE VALVE
EXISTING CONCRETE DIKE
TMS 2000
TANK SELECTMODE TEST
SUMP CONCRETE BOX
D-4
M-8
SEE
M-4
BLDG. #S-303
BLDG. #S-304
SUMP CONCRTET BOX
P-1
M-4
NEW FUEL OIL SYSTEM PLAN (BLDG. #304)
D-4
M-8
SEE
POC
SCALE : 1 / 100
(1000 GAL)
EXISTING FUEL OIL TANK
SEE CIVIL DRAWING
FUEL OIL PIPE
DOUBLE WALL
NEW UNDERGROUND
S
FUEL OIL PIPE
SINGLE WALL
NEW UNDERGROUND
DRAIN HOLE
CONTAINMENT SUMP
(FASTENED TO WALL
DOMESTIC HOT WATER HEATER
EXISTING OIL PIPE CONTINUE TO
SINGLE WALL FUEL OIL PIPE
HOT WATER HEATER
CONTINUE TO DOMESTIC
LEGEND
FUEL OIL PIPE
SINGLE WALL
FUEL OIL PIPE
DOUBLE WALL
E-1
M-4 SCALE : 1 / 20
ENLARGED PLAN
POC
FUEL OIL FILTER
PIPE STRAINER
E-1
M-4
SEE
SPECIFIC NOTES
TO DPW.
6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED
RECOMMENDATION AND SITE CONDITIONS.
2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S
PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.
1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL
TO ADJACENT CONSTRUCTION.
DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING
4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO
FILLED OR RESTORED.
5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND
7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.
D-1
M-8
SEE
N D-3
M-8-
D-3
M-8-
EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.
3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,
(WEATHERPROOF)
CONTROL PANEL
LEAK DETECTION
WALL MOUNTED
(WEATHERPROOF)
CONTROL PANEL
LEAK DETECTION
WALL MOUNTED
MECH. ROOM
BLDG. #S-304
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
10 16
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-4
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
AT BLDG. #304, CAMP WALKER
NEW FUEL OIL PIPING PLAN
NOT TO SCALEM-5
(1000 GAL)
EXISTING FUEL OIL TANK
GROUND LEVEL
MECH. ROOM FLOOROIL SUPPLY LINE
REMOVE 20MM FUEL
DIKE TO REMAIN
EXISTING CONCRETE
EXISTING / REMOVAL FUEL OIL SYSTEM SECTION (BLDG. #452)
- M-5
P-1
SCALE : 1 / 50
FUEL OIL FILTER
PIPE STRAINER
POR
EXISTING / REMOVAL FUEL OIL SYSTEM PLAN (BLDG. #452)
POR
S-1
GROUND LEVEL
S-452
BLDG. #
SEE CIVIL DRAWING
FUEL OIL PIPE
REMOVE UNDER GROUND
SEE CIVIL DRAWING
FUEL OIL PIPE
REMOVE UNDER GROUND
TO REMAIN
EXISTING FUEL OIL TANK (1000 GAL)
GRAPHIC SCALE
SCALE: 1 : 50
1000 2000
N
WARM AIR FURANCE
CONTINUE TO
EXISTING OIL PIPE
FUEL OIL PIPE
REMOVE UNDERGROUND
UNIT
A.C.
FORMER
TRANS-
BOX
JUNCTION
LEGEND
TO BE REMOVED
SPECIFIC NOTES
TO DPW.
6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED
RECOMMENDATION AND SITE CONDITIONS.
2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S
PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.
1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL
TO ADJACENT CONSTRUCTION.
DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING
4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO
FILLED OR RESTORED.
5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND
7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.
EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.
3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,
WARM AIR FURANCE
CONTINUE TO EXISTING
MECH. ROOM
BLDG. #S-452
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-5
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
11 16
AT BLDG. #452, CAMP WALKER
EXISTING & REMOVAL FUEL OIL PIPING PLAN
COUPLINGS / ADAPTORS
(FASTENED TO WALL
OR FOUNDATION)
TEST BOOT ASSEMBLY
TRANSITION ASSEMBLY
WARNING TAPE
SLOPE 1%
ACCESS PIPE
FUEL OIL PIPE
SLOPE 1%
SLOPE 1%
ENTRY BOOT
CONDUIT
SUMP LEAK SENSOR
TEST BOOT ASSEMBLY
COUPLING
SHUT OFF BALL V/V
NOT TO SCALE
TEST BOOT ASSEMBLY
PIPE
FUEL OIL
CONTAINMENT SUMP
TAPE
WARNING
POC
M-6
S-1
D-1
M-8
SEE
WARM AIR FURANCE
CONTINUE TO EXISTING
(1000 GAL)
EXISTING FUEL OIL TANK
GROUND LEVEL GROUND LEVEL
MECH. ROOM FLOOR
FUEL OIL PIPE, SEE CIVIL DRAWING
NEW UNDERGROUND DOUBLE WALL
SLOPE 1%
OIL SUPPLY LINE
NEW 20mm FUEL
FUEL OIL FILTER
PIPE STRAINER
20mm GATE VALVE
M
IN
M
IN
NEW FUEL OIL SYSTEM SECTION (BLDG. #452)
TMS 2000
TANK SELECTMODE TEST
D-4
M-8
SEE
- M-6
P-1
SCALE : 1 / 50
POC
NEW FUEL OIL SYSTEM PLAN (BLDG. #452)
SEE CIVIL DRAWING
NEW CONCRETE DIKE
DRAIN HOLE
SUMP CONCRETE BOX,
LEGEND
FUEL OIL PIPE
SINGLE WALL
FUEL OIL PIPE
DOUBLE WALL
SPECIFIC NOTES
TO DPW.
6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED
RECOMMENDATION AND SITE CONDITIONS.
2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S
PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.
1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL
TO ADJACENT CONSTRUCTION.
DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING
4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO
FILLED OR RESTORED.
5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND
7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.
SEE CIVIL DRAWING
NEW CONCRETE PAVE MENT AND WALLS
1 CONTAINMENT SUMP
POC
S-452
BLDG. #
FUEL OIL PIPE
SINGLE WALL
NEW UNDERGROUND
(1000 GAL)
EXISTING FUEL OIL TANK
PIPE, SEE CIVIL DRAWING
DOUBLE WALL FUEL OIL
NEW UNDERGROUND
WARM AIR FURANCE
CONTINUE TO
EXISTING OIL PIPE
SUMP CONCRETE BOX
UNIT
A.C.
FORMER
TRANS-
BOX
JUNCTION
E-1
M-6 SCALE : 1 / 20
ENLARGED PLAN
POC
FUEL OIL FILTER
PIPE STRAINER
E-1
M-6
SEE
D-4
M-8
SEE
N
D-1
M-8
SEE
D-3
M-8-
D-3
M-8-
EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.
3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,
(WEATHERPROOF)
CONTROL PANEL
LEAK DETECTION
WALL MOUNTED
(WEATHERPROOF)
CONTROL PANEL
LEAK DETECTION
WALL MOUNTED
MECH. ROOM
BLDG. #S-452
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
12 16
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-6
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
AT BLDG. #452, CAMP WALKER
NEW FUEL OIL PIPING PLAN
MECH. ROOM
(1500 GAL)
FUEL OIL TANK
NOT TO SCALE
SLOPE 1%
GENERATOR ROOM
CONTINUE TO
EXISTING OIL PIPE
P-1 EXISTING & REMOVAL FUEL OIL PIPING PLAN (BLDG. #1211)
NEW FUEL OIL PIPING PLAN (BLDG. #1211)
KEY PLAN (BLDG. #1211, CP HENRY)
M-7 M-7
M-7
P-2 S-2
POC
NOT TO SCALE
GENERATOR ROOM
CONTINUE TO
EXISTING OIL PIPE
M-7
S-1
POC
POR
SPECIFIC NOTES
TO DPW.
6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED
RECOMMENDATION AND SITE CONDITIONS.
2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S
PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.
1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL
TO ADJACENT CONSTRUCTION.
DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING
4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO
FILLED OR RESTORED.
5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND
AT BLDG. #1211, CAMP HENRY
AND NEW FUEL OIL PIPING PLAN
EXISTING & REMOVAL FUEL OIL PIPING PLAN
/W FITTINGS
& ABOVE GROUND OIL PIPE
REMOVE EXISTING UNDER
7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.
MECH. ROOM
BLDG. #S-1211
GROUND LEVEL
GROUND LEVEL
MECH. ROOM
BLDG. #S-1211
SUPPLY LINE
NEW 20mm FUEL OIL
POR
OIL SUPPLY LINE
REMOVE 20MM FUEL
GROUND OIL PIPE /W FITTINGS
REMOVE EXISTING UNDER & ABOVE
GENERATOR ROOM
EXISTING OIL PIPE CONTINUE TO
MECH. ROOM
BLDG. #S-1211
POC
POC
GENERATOR ROOM
EXISTING OIL PIPE CONTINUE TO
SUPPLY LINE
NEW 20mm FUEL OIL
POR
LEGEND
TO BE REMOVED
MECH. ROOM
BLDG. #S-1211
ROOM
GENERATOR
BLDG. #S-1211
BLDG. #S-1211
NEW FUEL OIL PIPING SECTION (BLDG. #1211)
EXISTING & REMOVAL FUEL OIL PIPING SECTION (BLDG. #1211)
POC
FUEL OIL FILTER
SCALE : 1 / 50
SCALE : 1 / 50
BLDG. #S-1211
ROOM
GENERATOR
BLDG. #S-1211
OIL PIPE /W FITTINGS
INSTALL NEW ABOVE GROUND
CONCRETE DIKE CONDITION
RECOVER & MATCH WITH EXISTING
EXISTING WALL CONDITION
RECOVER & MATCH WITH
EXISTING FUEL OIL TANK (1500 GAL)
OIL PIPE /W FITTINGS
INSTALL NEW ABOVEGROUND
100mm FLANGED STEEL PIPE COVER
OIL STORAGE TANK(1500 GAL)
EXISTING ABOVEGROUND
OIL STORAGE TANK(1500 GAL)
EXISTING ABOVEGROUND
TO REMAIN
EXISTING FUEL OIL TANK(1500 GAL)
LEAKING FUEL OIL OUTLET
GRAPHIC SCALE
SCALE: 1 : 50
1000 2000
N
EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.
3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,
PIPE STRAINER
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
13 16
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-7
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
GROUND ROD CABLE
LEAK SENSOR
SENSOR CABLE
SUMP LEAK
SUMP
CONTAINMENT
WATERPROOFING
MEMBRANE
BACK UP
MATERIAL
(CLOSED CELL
FLEXIBLE FOAM
RUBBER OR
PLASTIC)
SEALANT #2
WATERPROOFING
CLAMPING FLANGE
EXTERIOR WALL
P
IP
E
D
IA
m m
(I N
C L U
D
IN
G
IN
S U
L A T
IO
N
) ANCHOR
CONCRETE OR
MASONRY WALL
METAL JACKET
INSULATION
PIPE W/ INSULATION
PIPE WITHOUT
INSULATION
MIN. 7 CLEARANCE
ALL AROUND
SEALANT #10
BACK UP MATERIAL
PIPE SLEEVE
PIPE L
C
NOT TO SCALE--
NOT TO SCALE
FUEL OIL TANK SYSTEM CABLE CONTROL DIAGRAMD-1 PIPE SLEEVE-THRU FOOTING DETAIL
D-2
M-8M-8
FUEL OIL TANK
DIFFERENT THAN FIRE ALARM SIGNAL SO AS NOT TO BE CONFUSED.
NOTE : VISUAL DEVICE MUST BE YELLOW (LENS) AND AUDIBLE ALARM MUST BE
GROUND LEVEL GROUND LEVEL
TMS 2000
TANK SELECTMODE TEST
CONRETE BOX
DRAIN HOLE
("FLEXWORK.CO.LTD." MODEL PST-4630 OR APPROVED EQUAL)
CONTAINMENT SUMP
GROUND LEVEL
6"THK GRAVEL BED
CONRETE BOX
@ 10" O.C.
D13 STEEL BAR
D13 STEEL BAR
@ 10" O.C.
NOT TO SCALE
D-4
M-8
CONTAINMENT SUMP & SUMP CONCRETE BOX DETAIL
510 610
200 1120 200
200 200610
G.L
TO POWER SOURCE
#8 AWG "BC"
15C
W/ WELDING CONNECTION
20mm DIA x 2400mm L
COPPER CLAD STEEL
GROUND ROD
SUMP LEAK SENSOR CABLE
LEVEL GAUGING, TANK LEAK &
NOT TO SCALE
D-3
M-8
CONDUIT SUPPORT(TYP.)
OUTSIDE WALL OF MECH. ROOM
(W/ NEMA 3 ENCLOSURE BOX, AUDIBLE ALARM & ALARM LIGHTS)
LEVEL LEAK MONITORING PANEL (1KW, 1PH, 120V)
CONTROL PANEL (WEATHERPROOF)
WALL MOUNTED LEAK DETECTION
LEAK DETECTION CONTROL PANEL DETAIL
DETAIL DRAWING
CHANG, TAE HO
NAM, TAE CHIN
J1-10043-1J
14 16
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-8
D - 22 - 01
G
18 NOV 21
CAMP WALKER & HENRY
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
ELECTRICAL
KIM, CK
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISION DAEGU
DIRECTORATE OF PUBLIC WORK
UNIT #15746, APO AP 96218-5746
DATE:
N O T E S
3.
2.
MOUNTING HEIGHTS ARE AS BELOW. MEASUREMENT IS TO CENTER OF OUTLET.
WIRES IS INDICATED AS FOLLOW;
AND ONE (1)-#12AWG GROUND WIRE IN 16mm CONDUIT. A GREATER NUMBER OF
ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES TWO (2)-#12AWG WIRES
3-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.
4-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.
PANELBOARD, CIRCUIT BREAKER------------------------SEE SPECIFICATION
CAULKING MATERIAL SHALL BE VERIFIED BY F&ES OFFICE PRIOR TO CONSTRUCTION.
BOTH SIDE OF FIRE WALLS, FIRE-PARTITIONS AND FIRE-RATED PIPE CHASE WALLS.
ALL PIPE PENETRATIONS SHALL BE SEALED WITH FIRE RATED CAULKING MATERIAL ON
1.
SPECIFICATIONS FOR O&MA PROJECTS, AND SPECIFICATIONS.
ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE, TECHNICAL STANDARD
ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE NATIONAL
CONDUIT WHICH IS TO BE BONDED TO THE MAIN GROUNDING SYSTEM AT BOTH ENDS.
GROUNDING WIRE SHALL BE GREEN INSULATED COPPER WIRE IN RIGID GALVANIZED STEEL
MAGNETIC MOTOR STARTER
L E G E N D
NEWEXSTREMOVE
PANELBOARD OR LOAD CENTER
+ WIRING CONCEALED IN UNDERGROUND
HOMERUN CIRCUIT TO PANELBOARD OR ENCLOSURE
///// C C CONTROL CIRCUITC
SCOPE OF WORK
SHEET OF
E-1
US ORIGIN MATERIAL:
CHANGES SHALL BE APPROVED BY THE CONTRACTING OFFICE.
BE RESPONSIBLE TO RESIZE AND PROVIDE THE REQUIRED WIRING AND OVER CURRENT DEVICES. THE
IF EQUIPMENT OTHER THAN INDICATED ON THE PLANS ARE PROVIDED, THEN THE CONTRACTOR SHALL
INDICATED ON THE DRAWINGS.
INTERNET SITE (http//www.cckbid.com). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE AS
DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT
REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS
ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL
SIN, YS
D - 22 - 01
1.
A. REPAIR/ MAINTENANCE
15 16
///// WIRING CONCEALED IN FLOORS OR WALL
WIRING CONCEALED IN CEILINGS OR WALL
WIRING EXPOSED ON CEILINGS OR WALL
J1-10043-1J
4.
5.
6.
GRAPHIC SCALE
0 1000 3000 5000
SCALE : 1 : 100
S
BLDG. #S-303
BLDG. #S-304
N
"PM"
SCALE : 1 / 100-
P-1 E01
ELECTRICAL SITE PLAN(BLDG. #304)
18 NOV 21
AND ELECTRICAL SITE PLAN
LEGEND, NOTES, SCOPE OF WORK
PM-5
ASSOCIATED WIRING.
CONNECT POWER LINE ON THE LEAK DETECTION CONTROL PANEL INCLUDING, JUNCTION BOXES AND
PANEL(UNDER MECH. ITEM)
NEW LEAK DETECTION CONTROLMECH. ROOM
BLDG. #S-304
FOR FUEL TANKS, S-304, S-452 & S-1211
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
KIM, CK
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISION DAEGU
DIRECTORATE OF PUBLIC WORK
UNIT #15746, APO AP 96218-5746
DATE:
SHEET OF
ELECTRICAL
SIN, YS
D - 22 - 01
GRAPHIC SCALE
E-02
16 16
S-452
BLDG. #
UNIT
A.C.
FORMER
TRANS-
BOX
JUNCTION
1000 2500
SCALE : 1 : 50
P-1 E02
ELECTRICAL SITE PLAN(BLDG. #452)
SCALE : 1 / 50
J1-10043-1J
18 NOV 21
ELECTRICAL SITE PLAN
MECH. ROOM
BLDG. #S-452
"P"
P-20
N
PANEL(UNDER MECH. ITEM)
NEW LEAK DETECTION CONTROL
FOR FUEL TANKS, S-304, S-452 & S-1211
| J1-10043-1J_T01 |
| J1-10043-1J_C01 |
| J1-10043-1J_C02 |
| J1-10043-1J_C03 |
| J1-10043-1J_C04 |
| J1-10043-1J_C05 |
| J1-10043-1J_C06 |
| J1-10043-1J_M01 |
| J1-10043-1J_M02 |
| J1-10043-1J_M03 |
| J1-10043-1J_M04 |
| J1-10043-1J_M05 |
| J1-10043-1J_M06 |
| J1-10043-1J_M07 |
| J1-10043-1J_M08 |
| J1-10043-1J_E01 |
| J1-10043-1J_E02 |
File details come from the government source that posted it. Updated .