SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

R-11SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

O & M

HOUSING DIV.

REVIEWED BY

UNITED STATES ARMY GARRISON DAEGU

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

DIRECTORATE OF PUBLIC WORK

HGFEDCBA

D - 22 - 01

CHON, HYON TAE

DESIGN REVIEW SIGNATURE

ORGANIZATION

USING AGENCY

36TH SIGNAL

MASTER PLN.

ENVIRONMENTAL

NAME SIGNATURE

O&M DIV.

FIRE DEPT.

SAFETY OFFICE

DPTMS(AT/FP)

188TH MP COM.

IND. HYGENIST

J1-10043-1J

UNIT #15746, APO AP 96218-5746

DRAWING NO.

CHIEF,

DESIGN & TECH. REVIEW Br.

YI, TONG KI

AS SHOWN

1 1 OF 1R - 1

T I T L E S H E E T

TITLE SHEET

DATE: 18 NOV 21

C - 12

C - 23

C - 34

M - 18

M - 29

CIVIL

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

CAMP WALKER & HENRY

PROJECT NO. J1-10043-1J, CAMP WALKER & HENRY

C - 45

C - 56

C - 67

M - 310 9 OF 16

M - 411 10 OF 16

M - 512 11 OF 16

M - 613 12 OF 16

M - 714 13 OF 16

M - 815 14 OF 16

E - 116 15 OF 16

E - 217 16 OF 16

MECHANICAL

ELECTRICAL

LOCATION PLAN (CAMP WALKER)

LOCATION PLAN (CAMP HENRY)

NOTES AND SCOPE OF WORKS

SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #304)

SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #452)

DETAILS

LEGEND AND ABBREVIATIONS

DETAIL DRAWING

ELECTRICAL SITE PLAN

GENERAL NOTES, SCOPE OF WORK AND EQUIPMENT SCHEDULE

EXISTING & REMOVAL FUEL OIL PIPING PLAN AND NEW FUEL OIL PIPING PLAN AT BLDG. #1211, CAMP HENRY

LEGEND, NOTES, SCOPE OF WORK AND ELECTRICAL SITE PLAN

EXISTING & REMOVAL FUEL OIL PIPING PLAN AT BLDG. #304, CAMP WALKER

NEW FUEL OIL PIPING PLAN AT BLDG. #304, CAMP WALKER

EXISTING & REMOVAL FUEL OIL PIPING PLAN AT BLDG. #452, CAMP WALKER

NEW FUEL OIL PIPING PLAN AT BLDG. #452, CAMP WALKER

CIVIL

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

GRAPHIC SCALE

(IN METERS)

0 60 120

N

SCALE: 1 : 3000

15 SCALE : 1 / 3000

THIS PROJECT

STOP

E

E

S

S

S

S-398

S-363

S-373

S-372 S-367

S-409

T-392 T-391T-390

T-235 Golf Course

S-468

T-445

S

T

S

S

T 9 S-470

S-457 T-465

T-466

S-450T-706

S-324

S-422

S-335

S-320

S-338

S-200

S-216T-213

S-452

T-720T-721

T-235 Golf Course

T-235 Golf Course

GATE 6

S-403

TMP Washrack

188TH MP S-431

S-430

T-433

S-441

GOLAN 10

T-442

S-414

S-411

S -416S

-410

T

S-440

S-711

T-712

S-358

S-349

S-408 T-421

S -420

T-342

T-387

S-701

S-348

T-235 Golf Course

KELLY FIELD

S-252

S-283

S

S-205

S-208

S-261

S-202

S-217

S-212

S

S-222

S-382

S-362

T

T

S-360

S-368

S-386

S-38

T-235 Golf Course

S-2

S-

S-148

S-149 S-163

T-164

S-165

S-166

S-565

S

S

S-161

T-158

S-617

S-57

S-57

S-574

S-556

S

S 1S-566

T-569

S-57

S-57

S-584

T-614

S

S -602

S-601

S

S

S

S

S-

S-

S

S-221

T-573

S

S-267

S

S-314

S-303

S-304

S-305

S-309

S-327

S-328

S-334

S-312

S-318

S

S-592

T-594

S

S

S-379

S-374

T

S-310

T-340

S-330

T-341

SUBSTATION

MIDDLE / HIGH SCHOOL

S-321

S-359

S-36

S-38 S-8

S-1

S-32

S-21 S-22

T-20

GATE 4

F A

M

IL

Y

H O

U S

IN

G

T

W E

R

P A

R K

S

R U

C T

U R

E

P A

R K

R U

C T

U R

E

TOWER 2

FAMILY HOUSING

P A

R K

R U

C T

U R

E

P A

R K

R U

C T

U R

E

TOWER 3

FAMILY HOUSING

T O

W E

R

F A

M

IL

Y

H

U S

IN

G

S-393

APSAN OVERPASS BRIDGE

APSAN OVERPASS BRIDGE

S-357

T-364

S-356

T-355

S-353 S-399

S-350

S-352

S-344 tank-1 water tank-2 water

ETC

STREET

WASHINGTON

S-556

S-

S-5

S-585

S

S

S

S

S-315

S

S-226

S-316

S

S

S

S-237

CDC

S-

S-

S-

S

S-182 S-555

S-557

S-228

S-230

S-227

S-261

S-260

S

S-265

C-1

1 5

LOCATION PLAN (CAMP WALKER)

PARK, WON CHAE

KU, HUN MO

18 NOV 21

J1-10043-1J

AS SHOWN

D - 22 - 01

LOCATION PLAN (CAMP WALKER)

SEE SITE PLAN

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

CAMP WALKER & HENRY

1 16

TVPC

-1

T-

T-1007

T-1319

T-1607

T-1407

S-1423

GATE 1

Memorial

3.1 Movement

Dol-Harubang

S

T S

T R

E E

T

T

H S

T R

E E

T

T

H S

T R

E E

T

S-1427

S-1504

S-1856

S-1305

T-1569

S-1703

S-1705

S-1712

T-1671

S-1684

S-111

S-1600

S-1624

T-1531

T-1325

S-1651

S-1106

S-1124

S-1307

S-1107

S-1121

S-1254

S-1505

S-1815

S-1639

S-1662

S -1

S-1501

S-1516

S-1521

S-1664

S -1

S-1425

S-1420

S-1522

S-1530

S-1814

S-1810

S -1

S-1805

S-1685

S-1669

S-1600

S-1109

S-1110

S-1220

S-1217

S -1

S-1410

S-1535

S-1131

S-1115

S-1154

S-1241

S-1208

S-1303

S-1650

S-1652

S-1540

S-1801

S-1715

T-1001

S-1653S-1654

S-1845

S-1844

S-1835

S-1680

S-1304

S-1701

S-1707

V P

C

S-2546

T-1706

S-2543

S-1622 S-1103

S-1153

S-1211

S-1222

S-1225

T-1229

S-1311

DFAC

BARRACK

C-2

S-1621

GATE

S -1

T -1

S-1543

LOCATION PLAN (CAMP HENRY)

THIS PROJECT

LOCATION PLAN (CAMP HENRY)

PARK, WON CHAE

KU, HUN MO

D - 22 - 01

CIVIL

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

AS SHOWN

SCALE : 1 / 1000-

GRAPHIC SCALE

(IN METERS)

0 20 40

SCALE: 1 :1000

N

S-1413S-1328

S-1329

J1-10043-1J

18 NOV 21

SEE THE MECH. DRAWING(S)

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

2 16

SOD WITH TOP SOIL AND SOLID SODDING.

REMOVE EXISTING WOOD STUMPS.

RESTORE EXISTING WOODEN FENCE SAME AS EXIST.

REROUTE UNDERGROUND UTILITY LINES.

3.

PARK, WON CHAE

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

14.

13.

10.

11.

12.

15.

16.

PRIOR TO COMMENCING WORK ON THE PROJECT.

JOB BY THE COR AND SHOULD BE APPROVED BY THE CONTRACTING OFFICER

2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY PORTION OF THE

CONTRACTING OFFICER.

REMOVING AT THE CONTRACTORS EXPENSE TO THE SATISFACTION OF THE

ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY DISMANTLING, DEMOLISHING, OR

3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/ RESTORATION TO THEIR

CONSTRUCTION OPERATIONS.

EXISTING UTILITY LINES, AND OTHER ITEMS WHICH WILL INTERFERE WITH THE

REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS UNDERGROUND ROCK BASE,

4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND CLEARED/

FOR VEHICLES DURING CONSTRUCTION PERIOD IF REQUIRED.

5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND DETOUR ROAD

MARKERS IN THE PROJECT LIMIT.

6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS AND OTHER UTILITY

THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE CIVIL SCOPE OF WORK.

ARMY INSTALLATION MANAGEMENT COMMAND" FORM AS A PART OF THIS PROJECT.

FOR O & MA PROJECT, KOREA, REVISION1, 30 OCTOBER 2015, DEPARTMENT OF THE

INSTALLATION MANAGEMENT COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS

FOR O & MA PROJECT, KOREA, 30 NOVEMBER 2015, DEPARTMENT OF THE ARMY

7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS,

UNLESS OTHERWISE NOTED.

8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF FROST DEPTH

SUCH AS FORMWORKS AND SHORING WITHOUT ANY ADDITIONAL COST.

9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES INCLUDING FALSEWORK

PROPERTY IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.

DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S. GOVERNMENT LEASED

THE CONTRACTOR BY THE GOVERNMENT.

THE CONSTRUCTION AREA AND NO LAY DOWN AREA SHALL BE PROVIDED FOR

BY C.O.R. ADMINISTRATIVE FIELD OFFICES AND STORAGE AREAS SHALL BE WITHIN

FACILITIES ACCORDING TO O&MA SPEC. AT THE LOCATION APPROVED/INDICATED

CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S TEMPORARY

THE WORK.

DESIGN AND TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO COMMENCING

THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL SUBMITTAL TO THE

THE PUBLIC AND/OR MILITARY TRAFFIC AND OPERATIONS.

SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF

FLARES, BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND

CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS,

STATIONS AND ELEVATIONS ARE IN METERS.

UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS AND

WITHIN THE WORK BOUNDARY.

CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND SOLID SODDING

UNLESS OTHERWISE NOTED.

1. ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT LIMITS INDICATED,

AND REQUIRED.

2. THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED AS INDICATED

FENCE, ETC.

PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF ROADWAY, EXISTING CHAIN-LINK

3. EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION FOR THE

ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK PAM 200-1.

4. ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE KOREAN

ORIGINAL OR BETTER CONDITIONS.

THE CONSTRUCTION WORK, CONTRACTOR SHALL RESTORE IMMEDIATELY TO ITS

6. EXISTING UNDERGROUND UTILITY LINES HAVE BEEN DAMAGED AS A RESULT OF

HANDLING METHODS.

WITHIN PROJECT LIMIT WITH COR CAREFULLY TO DETERMINE PROPER MATERIAL

CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE MATERIALS

1.

2.

4.

KU, HUN MO

18 NOV 21

THE DRAWING OR NOT, CONTRACTOR SHALL VERIFY THE LOCATION OF UTILITY LINES.

5. EXISTING UTILITY LINES (WATER, SEWER, STORM DRAIN, AND ELEC.) SHOWN ON

1.

5.

6.

7.

#1 (REPAIR/MAINTENANCE)

C-3

J1-10043-1J

3 16

D - 22 - 01

#1 (CONSTRUCTION/ALTERATION)

1.

#2 (REPAIR/MAINTENANCE)

2.

3.SOD WITH TOP SOIL AND SOLID SODDING.

REROUTE UNDERGROUND UTILITY LINES.4.

REMOVAL NOTES:

GENERAL NOTES: NOTES:

NOTES AND SCOPE OF WORKS

THE PROJECT SITE ORIENTATION PRIOR TO SUBMISSION OF CONTRACT PROPOSAL.

1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT

EXCAVATIONS OF FUEL LINE TO THE COR AND ENVIRONMENTAL DIVISION.

1. THE CONTRACTOR SHALL REPORT ANY CONTAMINATED SOIL DISCOVERED DURING

4. ALL UNDERGROUND FUEL OIL LINE(S) SHALL BE CONTINUOUSLY SLOPED TO SUMP(S).

SCOPE OF WORK (BLDG.# S-304, CAMP WALKER)

SCOPE OF WORK (BLDG.# S-452, CAMP WALKER)

REPLACE EXISTING CONCRETE SIDEWALK INCLUDING BASE COURSE.

REPLACE EXISITING STEEL GRATING COVERED CONCRETE DITCH.

CONSTRUCT CONCRETE SLAB AND WALLS.

REPLACE UNDERGROUND FUEL OIL LINE(S) INCLUDING NECESSARY ACCESSORIES.

SCOPE OF WORK (BLDG.# S-1211, CAMP HENRY)

REPLACE EXISTING CONCRETE SIDEWALK INCLUDING BASE COURSE.

ABOVEGROUND FUEL OIL LINE INCLUDING ACCESSORIES AND ETC.

3. SEE MECH. DRAWINGS FOR REMOVAL/INSTALLATION WORKS SUCH AS SUMP(S),

CLEANING THE EXTERIOR UNDER THE SUPERVISION OF COR.

2. FUEL OIL LINE PIPING INCLUDING ACCESSORIES SHALL BE REMOVED AFTER

WHICH HAVE POSSIBILITY OF OIL LEAKAGE, SHALL BE SEALED, BLOCKED OR CAPPED.

5. ALL LEAKED OIL SHALL BE COLLECTED TO THE SUMP AND ANY GAPS & JOINTS,

REPLACE EXISTING UNDERGROUND FUEL OIL LINE(S) INCLUDING NECESSARY ACCESSORIES.

*SEE THE MECH. DRAWING(S)

GRATING COVERED CONCRETE DITCH WHEN THE PENETRATION IS NEEDED.

6. FUEL OIL LINE SHALL HAVE 300MM CLEARANCE FROM THE INVERT OF THE STEEL

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

SCALE : 1 / 100

BLDG. #S-304

BLDG. #S-303

S

~SIDEWALK~

~SIDEWALK~

ELEC.

E/P

ELEC.

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

GRAPHIC SCALE

SCALE: 1 : 100

2000 4000

N

90.6

90.4

90.2

90.0

90.8

90.8

89.8

(ASSUMED) REMOVE EXISTING WOOD STUMPS

PROJECT WORK LIMIT

F

D - 22 - 01

4 16

KU, HUN MO

PARK, WON CHAE

C-4

18 NOV 21

J1-10043-1J

TO BE REPLACED

INCLUDING BASE COURSE

EXISTING CONCRETE SIDEWALK

CONCRETE DITCH TO BE REPLACED

EXISITING STEEL GRATING COVERED

TO BE RESTORED

EXISTING WOODEN FENCE

SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #304)

LEGEND:

TBM : TEMPORARY BENCH MARK

SCALE : 1 / 100

TO BE REPLACED

EXISTING UNDERGROUND FUEL OIL LINE

COVERED CONCRETE DITCH WITH NEW

REPLACE EXISITING STEEL GRATING

SAME AS EXIST.

RESTORE EXISTING WOODEN FENCE

(PROJECT WORK LIMIT)

SOD WITH TOP SOIL AND SOLID SODDING

(PROJECT WORK LIMIT)

REROUTE UNDERGROUND UTILITY LINES

EL=90.238

SEWER MANHOLE

TOP OF EXIST.

TBM

F

BLDG. #S-304

BLDG. #S-303

S

~SIDEWALK~

~SIDEWALK~

ELEC.

E/P

ELEC.

90.6

90.4

90.2

90.0

90.8

90.8

89.8 F

PROJECT WORK LIMIT

(1,000 GAL)

FUEL OIL TANK

(1,000 GAL)

FUEL OIL TANK

FUEL OIL LINE

REMOVAL OF ABOVEGROUND

SEE THE MECH. DRAWINGS FOR

S

REMOVAL PLAN

SITE LAYOUT PLAN

INCLUDING NECESSARY ACCESSORIES

REPLACE EXISTING UNDERGROUND FUEL OIL LINE

SAME AS EXIST.

INCLUDING BASE COURSE

REPLACE EXISTING CONCRETE SIDEWALK

SEE THE MECH. DRAWING(S)

CONNETED TO BLDG.#304

FUEL OIL LINE TO BE

ABOVEGROUND FUEL OIL LINE AND ETC.

SUCH AS SUMP, CONCRETE PIT AND

SEE THE MECH. DRAWING(S) FOR WORKS

LEGEND:

ITEMS TO BE REMOVED

F

NEW FUEL OIL LINE

EXST. FUEL OIL LINE

FOR FUEL TANKS, S-304, S-452 & S-1211

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

N

GRAPHIC SCALE

SCALE: 1 : 50

1000 2000

SCALE : 1 / 50

78.024

BLDG

78.156

BLDG

78.577

BLDG

79.326

CLF

79.352

WFEN

78.765

WFEN

78.591

WFEN

78.3

PAD

78.294

PAD

78.213

PAD

78.515

PAD

78.852

PANEL

78.079

SWALK

77.927

GAS

77.981

GAS

E/P

S-452

BLDG. #

FUEL OIL TANK

(1,000 GAL)

78.024

BLDG

78.156

BLDG

78.577

BLDG

79.326

CLF

79.352

WFEN

78.765

WFEN

78.591

WFEN

78.3

PAD

78.294

PAD

78.213

PAD

78.515

PAD

.22

PAD

78.852

PANEL

77.927

GAS

77.981

GAS

E/P

S-452

BLDG. #

FUEL OIL TANK

(1,000 GAL)

SCALE : 1 / 50

F F

J1-10043-1J

KU, HUN MO

PARK, WON CHAE

C-5

SITE LAYOUT PLAN AND REMOVAL PLAN (BLDG. #452)

TO BE REPLACED

FUEL OIL LINE

EXISTING UNDERGROUND

BOX

JUNCTION

FORMER

TRANS-

FORMER

TRANS-

BOX

JUNCTION

(PROJECT WORK LIMIT)

SOD WITH TOP SOIL AND SOLID SODDING

(PROJECT WORK LIMIT)

REROUTE UNDERGROUND UTILITY LINES

PROJECT WORK LIMIT

(ASSUMED)

UNIT

A.C.

UNIT

A.C.

LEGEND:

ITEMS TO BE REMOVED

F EXST. FUEL OIL LINE

51 5

ABOVEGROUND FUEL OIL LINE AND ETC.

SUCH AS SUMP, CONCRETE PIT AND

SEE THE MECH. DRAWINGS FOR WORKS

ACCESSORIES.

OIL LINE(S) INCLUDING NECESSARY

REPLACE EXISTING UNDERGROUND FUEL

SEE THE SECTION AND DETAIL

CONSTRUCT CONCRETE SLAB AND WALLS

REMOVAL PLAN SITE LAYOUT PLAN

INCLUDING BASE COURSE

REPLACE EXISTING CONCRETE SIDEWALKTO BE REPLACED

INCLUDING BASE COURSE

EXISTING CONCRETE SIDEWALK

SEE THE MECH. DRAWINGS

CONNETED TO BLDG.#452

FUEL OIL LINE(S) TO BE

FUEL OIL LINE

REMOVAL OF ABOVEGROUND

SEE THE MECH. DRAWING(S) FOR

LEGEND:

F NEW FUEL OIL LINE

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

CAMP WALKER & HENRY

18 NOV 21

D - 22 - 01

5 16

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

FINISH GRADE

1, (M

IN

NEW CONCRETE WALL

1,100

1,100

~ EXISTING FUEL OIL STORAGE TANK ~

(1,000 GAL)

#8- (150 X 150)

WIRE MESH

TO REMAIN

EXISTING CONCRETE SADDLES

(TYP.)

EXPANSION JOINT

D13 @ 300 O.C.E.W

4,200

(TYP.)

EXISTING FUEL OIL

STORAGE TANK~

(1,000 GAL)

TO REMAIN

EXISTING CONCRETE SADDLES

NEW CONCRETE WALL D13 @ 300 O.C.E.W

FINISH GRADE

1, (M

IN

#8- (150 X 150)

WIRE MESH

200 200

SLOPE

150 150

150150 1,900

(TYP.)

C-6

J1-10043-1J

KU, HUN MO

PARK, WON CHAE

A

SECTION

B

SECTION

WARNING TAPE

SLOPE 1%

ACCESS 4’’ PIPE

- 6 NOT TO SCALE

NOT TO SCALE

2 FUEL OIL LINE CONNECTION

fy = 440 Mpa fy = 392 Mpa (GRADE 60)

Fnt = 310 Mpa fu = 482 Mpa

1. CONCRETE : (MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS)

ALL CONCRETE UNLESS NOTED OTHERWISE

HOT-ROLLED DEFORMED BAR

2. STEEL

WELDED WIRE FABRIC

4. BOLTS :

ASTM A307,

3. WELDING ELECTRODE:

CONCRETE

CONFORM TO ACI STANDARDS (ACI 318, ACI 301 ETC.)

1. ALL WORK FOR CONCRETE AND REINFORCING STEEL SHALL

CONCRETE FINISH

f’c = 21 MPa

SIDEWALK PATH.

1. APPLY BROOM FINISH PERPENDICULAR TO RAMP AND

MATERIAL STRENGTHS

INCLUDING ACCESSORIES

THE ABOVEGROUND FUEL OIL LINE

SEE MECH. DRAWINGS FOR

BLDG.

WITH THE MANUFACTURER’S GUIDANCE

OIL RETURN LINE IN ACCORDANCE

CAP THE UNUSED HOLE FOR THE FUEL

DETAILS

CONCRETE SLAB AND WALLS

(T=100)

NEW CONCRETE SLAB

(T=100)

NEW CONCRETE SLAB

TEST BOOT ASSEMBLY

TRANSITION ASSEMBLY

FUEL OIL LINE 3/4’’ PIPE

DOUBLE WALL FLEXIBLE

(PROVIDE DRAIN HOLE)

WITH LOCK DEVICE

OUTLET PIPE AND GATE VALVE, (D=50)

NOTE:

WITH THE MANUFACTURER’S TECHNICAL GUIDANCE.

FUEL OIL LINE SHALL BE DOUBLE WALL FLEXIBLE PIPES AND ACCESSORIES FOR THE FUEL OIL LINE SHALL BE IN ACCORDANCE

FOR FUEL TANKS, S-304, S-452 & S-1211

REPLACE UNDERGROUND SINGLE WALL PIPES

CAMP WALKER & HENRY

18 NOV 21

D - 22 - 01

6 16

SCH

SA

SAN

QTY

R12, R22

RA

RDTR

RPM

RT

PG

PH

POC

POL

PPM

PRV

QT

OA

OAIL

OD

OS&Y

Pa

NTS

BUTTERFLY

CUBIC METER PER HOUR

AIR CONDITION (-ING,-ED)

AIR CONDITION UNIT (S)

AIR COOLED CONDENSING UNIT

CHILLED/HOT WATER RETURN

CHILLED/HOT WATER SUPPLY

REFRIGERANT LIQUID

CAP CAPACITY

CUBIC METER

COMPRESSOR

CONTINUE

CONNECTION

CPRSR

CU M

CONT

CONN

COUNTER CLOCKWISE

COEFFICIENT

CIRCUIT

CAST IRON PIPE

CHILLED WATER

CKT

CMH

COEF

CHW

CCW

CIP

ALARM CHECK VALVEACV

AVG AVERAGE

BAROMETER(-TRIC)

CENTIGRADEC

BARO

AMPERE(AMP, AMPS)

ALUMINUM

APPROX

AMP

AIR COND

AHU

AL

AIR COOLED

ACU

ACLD

ACCU

CHWS

CHWR

CHR

CHS

D

RL

DRAIN

KILOCALORIE PER HOUR

KILOGRAM PER SQ. CENTIMETER

KILOGRAM

THERMAL CONDUCTIVITY

IRON PIPE SIZE

ISOMETRIC

DIAMETER, INSIDE

FACE AREA OR FRESH AIR

EXTERNAL STATIC PRESSURE

EVAPORAT (-E,-ING,-ED,-OR)

ENTERING WATER TEMP

FIRE HOSE CABINET

EXPLOSION PROOF

FHC

FA

ESP

EVAP

EWT

EFF

ENT

EQPT

EP

EFFICIENCY

ENTERING

EQUIPMENT

KG

K

IPS

ISO

ID

NIC

N.O.

NO

MPS

N.C.

N/A

MM

MPH

MIN

MAX

NOT IN CONTRACT

NORMALLY OPEN

NUMBER

NORMALLY CLOSED

METERS PER SECOND

METERS PER HOUR

MINIMUM OR MINUTE

NOT APPLICABLE

MILLIMETER

MAXIMUM

HERTZ

HOSE BIBB

HEAD

HORSEPOWER

HOUR(S)

HOT WATER

HOT WATER HEATER

HORIZONTAL

FIBERGLASS REINFORCED PLASTIC

FREQUENCY

FLUSH VALVE

FEED WATER PUMP

FIXTURE

GAGE OR GAUGE

GALVANIZED STEEL

FUEL OIL

FEMALE PIPE THREAD

CIRCULATING WATER PUMPCWP

FRP

DECIBEL OR DRY BULB

DRY BULB TEMPERATURE

ENTERING AIR TEMPERATURE

DRY PIPE VALVE

DIRECT EXPANSION

DO DIESEL OIL

EAT

DPV

DX

DIV

DIAG

DIFF

DB

DBT

DIVISION

DIAMETER

DIAGRAM

DIFFERENCE

DEGREE

HR

HZ

HW

HWH

HORIZ

HB

HD

HP

GA

GALVS

FV

FWP

FXTR

CLOCKWISE OR COLD WATERCW

PLUG VALVE

THREE WAY

FREQ

FO

FPT

GATE, GLOBE

GATE, ANGLE

GLOBE

CONTROL

GATE

M

LPS

LWT

LT

LPH

LPD

LL

LG

LBS

LAT

LAV

L

KWH

KW

LITERS PER SECOND

LITERS PER HOUR

LEAVING WATER TEMPERATURE

METERS

LAUNDRY TRAY

LITERS PER DAY

LIQUID LINE

LEAVING AIR TEMPERATURE

POUNDS

LAVATORY

LENGTH

KILOWATT HOUR

KILOWATT

LITERS

P

STRAINER, BLOW OFF

STRAINER

PUMP (INDICATE USE)

KG/ SM KILOGRAM PER SQ. METER

REFRIGERANT SUCTION

REFRIGERANT DISCHARGE

PIPE TO BE REMOVED

MEDIUM TEMPERATURE HOT WATER RETURN

MEDIUM TEMPERATURE HOT WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

RS

RD

(NAME)

(NAME)E EXISTING PIPE

HWR

HWS

MTWR

MTWS

CR

CS

PIPING

SANITARY DRAIN

CHECK, SWING

PIPE SLEEVE WITH FIRE STOPPING

VENT THRU ROOF

BFP

PLAN

HOSE BIBB

BALL

ELEV.

PIPE SLEEVE

BACKFLOW PREVENTER

FLOOR DRAIN

FLOOR CLEANOUT

FD

FCO

FLEXIBLE CONNECTOR

ANCHOR, INTERMEDIATE

ANCHOR, MAIN

EXPANSION JOINT

EXPANSION LOOP

EJ

RELIEF

SAFETY

HOSE END DRAIN

LOCK SHIELD

NEEDLE

PRESSURE REDUCING

CONTROL, PNEUMATIC-ELECTRIC

CONTROL, ELECTRIC-PNEUMATIC

CHECK, NON-SLAM

S

R

EP

PE

COLD WATER

VENT

AD FD

QUANTITY

TEMPERATURE DIFFERENCE

TONS OF REFRIGERATION

SCHEDULE

SUPPLY AIR

SANITARY

REFRIGERANT (12, 22, ETC)

RETURN AIR

REVOLUTIONS PER MINUTE

REFRIGERATION TON

RADIATOR

TYP TYPICAL

UNIT HEATER

URINAL

UH

UR

SYMBOL

TEMPERATURE

THICKNESS

TONS

THK

TEMP

SYM

TD

OUTSIDE AIR INTAKE LOUVER

PRESSURE REDUCING VALVE

PHASE (ELECTRIC)

PETROLEUM, OIL AND LUBRICANTS

POINT OF CONNECTION

PARTS PER MILLION

PERCENT/

QUART

PRESSURE GAGE

DIAMETER, OUTSIDE

OUTSIDE SCREW & YOKE

PASCAL

POLE

SPR SPRINKLER

STAINLESS STEEL

SQUARE

STEAM

STANDARD

STEEL

ST

STD

STL

SQ

SST

SPECIFICATION

SQUARE METER

STATIC PRESSURE

SPEC

SP

SM

OUTSIDE AIR

NOT TO SCALE

SECONDSEC

VAV VARIABLE AIR VOLUME

WATER CLOSET

VENTILATION

W/

WT

WC

WD

WITH

WEIGHT

WIDTH

W

WB

VOL

VEL

VENT

VERT

WATT

WET BULB

VOLUME

VELOCITY

VERTICAL

SMOKE DAMPER (PROVIDE ACCESS DOOR)

MANUAL VOLUME DAMPER

VAC

V

VACUUM

VOLT

SPLITTER DAMPER

AD

SD

VD

TEE, SINGLE SWEEP

TEE, OUTLET DOWN

REDUCER, ECCENTRIC (STRAIGHT, DOWN)

REDUCER, ECCENTRIC (STRAIGHT, INVERT)

ELBOW, TURNED DOWN

UNION, FLANGED

UNION, SCREWED

TEE, OUTLET UP

TEE

LATERAL

ELBOW, TURNED UP

CONNECTION, TOP

CONNECTION, BOTTOM

BUSHING

CAP

FIRE DAMPER (PROVIDE ACCESS DOOR)

BDD

TURNING VANES

TRANSITION

FLEXIBLE CONNECTION

FLEXIBLE DUCT

FC

DUCT WORK

A B B R E V I A T I O N S

L E G E N D

PG

TM

AAV

FOS

3-WAY VALVE (MOTORIZED)

PRESSURE GAUGE

THERMOMETER

AUTOMATIC AIR VENT

GATE VALVE

CHECK VALVE

FUEL OIL SUPPLY

FLEXIBLE JOINTFJ

& STRAINER

M

CS

SD

SHOWER DRAIN

DEG

DIA or o

CEAT CONDENSER ENTERING AIR TEMP

LCWT LEAVING CHILLED WATER TEMP

FAIL FRESH AIR INTAKE LOUVER

EXPANSION JOINTEXPJT

EXST EXISTING

A / C AIR CONDITIONING

APPROXIMATELY

ARCH ARCHITECTURAL

BLDG BUILDING

CONC CONCRETE

DWG DRAWING

EA EACH

F.C.U. FAN COIL UNIT

MECH MECHANICAL

KCAL/ HR

KG/ SQ CM

HOT WATER SUPPLY

HOT WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

V

DOMESTIC HOT WATER SUPPLY

DOMESTIC HOT WATER RETURN

AAV

ED EXHAUST DUCT

AUTOMATIC AIR VENT

AIR HANDLING UNIT

GROUND LEVELGL

REGISTER, SIDEWALL

SUPPLY AIR GRILLE OR

REGISTER, CEILING

SUPPLY AIR GRILLE OR

(200mm NECK DIAMETER)

CEILING DIFFUSER, ROUND TYPE

REGISTER, CEILING

EXHAUST AIR GRILLE OR

GRILLES, REGISTERS AND DIFFUSERS

SQUARE TYPE

CEILING DIFFUSER,

EG

ER

SG

SR

SG

SR

RG

RR

CD

200mm NCD

COWL, (GOOSENECK) AND FLASHING

(810mm WIDTH x 400mm DEPTH)

DUCT SIZES SHOWN810mm x 400mm

M

ELECTRIC MOTOR OPERATED DAMPER

S

MOTORIZED DAMPER

MD

SUPPLY AIR DUCT RISER

RETURN OR EXHAUST AIR DUCT RISER

SUPPLY AIR DUCT SECTION

RETURN AIR DUCT SECTION

GATE, GLOBE OR BALL VALVE

CHECK VALVE (FLOW)

ANGLE VALVE

STRAINER

DRIP CHECK VALVE

RESTRICTED ORIFICE

FILL CUP

PRESSURE GAUGE

SOLENOID VALVE

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLEXIBLE PIPE CONNECTION

RELAY

HOSE VALVE

TEST HEADER

SMOKE DAMPER

R

SD

S

: WATER MOTER ALARM GONG

SPRINKLER SYSTEM

: UP-RIGHT TYPE SPRINKLER

: PENDENT TYPE SPRINKLER

: SIDE WALL TYPE SPRINKLER

REMOVAL WORK

RELOCATED WORK

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

SA

RA

EA

DEMPERS

VALVES, SPECIAL DUTY

HEATING

AIR CONDITIONING & REFRIGERATION

PLUMBING

VALVES : (for selective actuators)

BACK DRAFT DAMPER

CIRCUIT SETTER

POINT OF CONNECTIONPOC

POR POINT OF REMOVAL

TcH THERMOSTAT HEATING/COOLING

THERMOSTAT OF HEATING

REGISTER, CEILING

RETURN AIR GRILLE OR

Th

REDUCER, CONCENTRIC

LEGEND AND ABBREVIATIONS

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

7 16

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-1

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

FOR FUEL TANKS, S-304, S-452 & S-1211

WORK CLASS: "K" (REPAIR/ MAINTENANCE WORK)

GENERAL NOTES

SCOPE OF WORK

THROUGH COR.

SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE

ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE NEW

TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA

BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED PRIOR TO ANY WORK

AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK AREA WILL NEED TO

CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CASE WORK IN THE

NOT PRESENT IN THE AREA AFFECTED BY THIS WORK. HOWEVER, IF SUSPECTED ASBESTOS

VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS

PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER

PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL

17. THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1

CONSTRUCTION.

16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING

START OF CONSTRUCTION.

PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW AND THE USER, PRIOR TO THE

USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING

SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE

FACILITY BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR

15. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, IF IT IS REQUIRED THAT THE

SPECIFICATIONS.

CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT

OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON

SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS

14. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL

VERIFIED AT THE JOB SITE.

13. LOCATION AND SIZES OF EXISTING EQUIPMENT, PIPING, ETC, ARE APPROXIMATE AND SHALL BE

ADDITIONAL COST TO THE PROJECT CONTRACT.

THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO

O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.

12. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR

SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".

11. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL

TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.

EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED

10. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW

REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.

9. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL

FOR APPROVAL.

DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION

8. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE

PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS CONTRACTOR.

THE EXISTING EQUIPMENT, NEW EQUIPMENT, PIPING AND ETC. DAMAGES DUE TO THE WORK

7. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

6. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.

AS DIRECTED BY THE CONTRACTING OFFICER.

EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS

5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.

4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND

PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.

ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR

3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE

TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE DESIGN &

2.THIS DRAWING IS ONLY FOR GOVERNMENT COSTING PURPOSE ONLY AT CONCEPTUAL LEVEL. THE

CONTRACTING OFFICER’S APPROVAL.

REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR

IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S

PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.

EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R

1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,

COMMENCING CONSTRUCTION.

SHALL PROVIDE SHOP DRAWINGS OF THE FUEL OIL SYSTEM FOR APPROVAL BEFORE

SPECIFICATIONS AND MANUFACTURER’S WRITTEN INSTRUCTIONS. THE CONTRACTOR

ACCORDANCE WITH THE REQUIREMENTS OF THE NFPA 30 & 31, O&MA STANDARD

18. THE FUEL OIL SYSTEM SHALL BE DESIGNED, INSTALLED, TESTED AND CLEANED IN

TAPE SHALL BE PROVIDED FOR WARNING AND IDENTIFICATION OF BURIED PIPING.

20. DETECTABLE ALUMINUM FOIL PLASTIC-BACKED TAPE OR DETECTABLE MAGNETIC PLASTIC

D E S C R I P T I O NQ’ TY

NO.

ITEM

CONTAINMENT SUMP SYSTEM2

EQUIPMENT SCHEDULE

"OPW" MODEL NO. PST-4630 TRANSITION SUMP OR APPROVED EQUAL

- ADJUSTABLE TO A MINIMUM OF 26"

STRUCTURAL RIGIDITY

- LARGE, HEAVILY RIBBED POLYETHYLENE CONTAINMENT CHAMBER PROVIDES

POLYETHYLENE SUMP / FIBERGLASS TOP

BLDG. #304, #452, CP WALKER

BLDG. #1211, CP HENRY

US ORIGIN MATERIALS:

AS INDICATED ON THE DRAWINGS.

INTERNET SITE HTTP:// WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE

DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT

REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS",

ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL

MANUFACTURER.

AND NFPA 30. INSTALLATION SHALL BE PERFORMED BY INDIVIDUALS TRAINED BY THE

SECONDARILY CONTAINED THAT IS DESIGNED AND LISTED IN COMPLIANCE WITH UL 971

19. ABOVEGROUND PIPING SHALL BE STEEL. UNDERGROUND PIPING SHALL BE OF FLEXIBLE,

SAMPLE FROM CREDIBLE LABORATORY.

THE CONTRACTOR SHALL BE SUBMITTED CERTIFIED REPORT OF CONTAMINATED SOIL

METERS MUST BE TRANSPORTED TO THE LAND FARM FACILITY AT CAMP CARROLL.

METERS FOR THE TOTAL PROJECT SITES. ANY CONTAMINATED SOIL ABOVE 50 CUBIC

CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF CONTAMINATED SOIL UP TO 50 CUBIC

MUST HANDLE BY GUIDANCE UNDER SUPERVISION OF ENVIRONMENTAL DIVISION. THE

CONTAMINATED SOIL HAS BEEN DETECTED ON REMOVAL SITE. THE CONTAMINATED SOIL

21. THE CONTRACTOR SHALL REPORT TO C.O.R. AND ENVIRONMENTAL DIVISION, WHEN

AND PARTS.

CABINET, SUMP LEAK SENSOR, EMERGENCY ALARM, CONDUIT AND ALL NECESSARY ACCESSORIES

2. INSTALL NEW OIL LEAK DETECTION CONTROL SYSTEM INCLUDING CONTROL PANEL, CONTROL

PAINTING AND ALL NECESSARY ACCESSORIES AND PARTS.

OIL STEEL PIPE INCLUDING FITTINGS, PIPE SUPPORTS, PIPE STRAINER, FUEL OIL FILTER, VALVES

1. REPLACE EXISTING UNDERGROUND FUEL OIL STEEL PIPE WITH NEW ABOVE GROUND FUEL

NECESSARY ACCESSORIES AND PARTS.

SUPPORTS, VALVES, TEST BOOT ASSEMBLYS, ENTRY BOOT CONDUITS, PAINTING AND ALL

SUMP CONCRETE BOXS, ENTRY FITTINGS, FUEL OIL FILTERS, PIPE STRAINERS, STEEL PIPES, PIPE

1. REPLACE EXISTING FUEL OIL SYSTEMS WITH NEW ONES INCLUDING CONTAINMENT SUMPS,

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

G

CHANG, TAE HO

NAM, TAE CHIN

M-2

AND EQUIPMENT SCHEDULE

GENERAL NOTES, SCOPE OF WORK

18 NOV 21

J1-10043-1J D - 22 - 01

8 16

CAMP WALKER & HENRY

POR

POR

ABANDON EXISTING OIL PIPE

CUT & CAP EXISTING OIL PIPE

SEE CIVIL DRAWING

FUEL OIL PIPE

REMOVE UNDERGROUND

SEE CIVIL DRAWING

FUEL OIL PIPE

REMOVE UNDERGROUND

(1000 GAL)

EXISTING FUEL OIL TANK TO REMAIN

GROUND LEVEL GROUND LEVEL

MECH. ROOM FLOOR

GROUND LEVEL

OIL SUPPLY LINE

REMOVE 20mm FUEL

POR

EXISTING / REMOVAL FUEL OIL SYSTEM SECTION (BLDG. #304)

DIKE TO REMAIN

EXISTING CONCRETE

BLDG. #S-303

BLDG. #S-304

S-1 M-3

P-1 M-3

EXISTING / REMOVAL FUEL OIL SYSTEM PLAN (BLDG. #304)

NOT TO SCALE

POR

SCALE : 1 / 100

(1000 GAL)

EXISTING FUEL OIL TANK TO REMAIN

S

SEE CIVIL DRAWING

REMOVE ASSUMED EXISTING OIL PIPE

DOMESTIC HOT WATER HEATER

EXISTING OIL PIPE CONTINUE TO

POR

FUEL OIL PIPE

ABANDON EXISTING

FUEL OIL PIPE

CUT & CAP EXISTING

E-1

M-3 SCALE : 1 / 20

ENLARGED PLAN

E-1

M-3

SEE

DOMESTIC HOT WATER HEATER

EXISTING OIL PIPE CONTINUE TO

GRAPHIC SCALE

SCALE: 1 : 100

2000 4000

N

LEGEND

TO BE REMOVED

SPECIFIC NOTES

TO DPW.

6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED

RECOMMENDATION AND SITE CONDITIONS.

2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S

PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.

1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL

TO ADJACENT CONSTRUCTION.

DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING

4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO

FILLED OR RESTORED.

5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND

7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.

EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.

3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,

HOT WATER HEATER

CONTINUE TO DOMESTIC

MECH. ROOM

BLDG. #S-304

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

9 16

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-3

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

AT BLDG. #304, CAMP WALKER

EXISTING & REMOVAL FUEL OIL PIPING PLAN

NOT TO SCALE

S-1 NEW FUEL OIL SYSTEM SECTION (BLDG. #304)

COUPLINGS / ADAPTORS

OR FOUNDATION)

TEST BOOT ASSEMBLY

TRANSITION ASSEMBLY

WARNING TAPE

SLOPE 1%

ACCESS PIPE

FUEL OIL PIPE

SLOPE 1%

SLOPE 1%

ENTRY BOOT

CONDUIT

SUMP LEAK SENSOR

TEST BOOT ASSEMBLY

COUPLING

SHUT OFF BALL V/V

TEST BOOT ASSEMBLY

PIPE

FUEL OIL

CONTAINMENT SUMP

TAPE

WARNING

D-1

M-8

SEE

POC

POC

SLOPE 1%

(1000 GAL)

EXISTING FUEL OIL TANK

MECH. ROOM FLOOR

GROUND LEVEL

OIL SUPPLY LINE

NEW 20mm FUEL

FUEL OIL PIPE, SEE CIVIL DRAWING

NEW UNDERGROUND DOUBLE WALL

GROUND LEVEL

M

IN

M

IN

FUEL OIL FILTER

PIPE STRAINER

20mm GATE VALVE

EXISTING CONCRETE DIKE

TMS 2000

TANK SELECTMODE TEST

SUMP CONCRETE BOX

D-4

M-8

SEE

M-4

BLDG. #S-303

BLDG. #S-304

SUMP CONCRTET BOX

P-1

M-4

NEW FUEL OIL SYSTEM PLAN (BLDG. #304)

D-4

M-8

SEE

POC

SCALE : 1 / 100

(1000 GAL)

EXISTING FUEL OIL TANK

SEE CIVIL DRAWING

FUEL OIL PIPE

DOUBLE WALL

NEW UNDERGROUND

S

FUEL OIL PIPE

SINGLE WALL

NEW UNDERGROUND

DRAIN HOLE

CONTAINMENT SUMP

(FASTENED TO WALL

DOMESTIC HOT WATER HEATER

EXISTING OIL PIPE CONTINUE TO

SINGLE WALL FUEL OIL PIPE

HOT WATER HEATER

CONTINUE TO DOMESTIC

LEGEND

FUEL OIL PIPE

SINGLE WALL

FUEL OIL PIPE

DOUBLE WALL

E-1

M-4 SCALE : 1 / 20

ENLARGED PLAN

POC

FUEL OIL FILTER

PIPE STRAINER

E-1

M-4

SEE

SPECIFIC NOTES

TO DPW.

6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED

RECOMMENDATION AND SITE CONDITIONS.

2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S

PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.

1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL

TO ADJACENT CONSTRUCTION.

DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING

4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO

FILLED OR RESTORED.

5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND

7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.

D-1

M-8

SEE

N D-3

M-8-

D-3

M-8-

EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.

3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,

(WEATHERPROOF)

CONTROL PANEL

LEAK DETECTION

WALL MOUNTED

(WEATHERPROOF)

CONTROL PANEL

LEAK DETECTION

WALL MOUNTED

MECH. ROOM

BLDG. #S-304

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

10 16

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-4

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

AT BLDG. #304, CAMP WALKER

NEW FUEL OIL PIPING PLAN

NOT TO SCALEM-5

(1000 GAL)

EXISTING FUEL OIL TANK

GROUND LEVEL

MECH. ROOM FLOOROIL SUPPLY LINE

REMOVE 20MM FUEL

DIKE TO REMAIN

EXISTING CONCRETE

EXISTING / REMOVAL FUEL OIL SYSTEM SECTION (BLDG. #452)

- M-5

P-1

SCALE : 1 / 50

FUEL OIL FILTER

PIPE STRAINER

POR

EXISTING / REMOVAL FUEL OIL SYSTEM PLAN (BLDG. #452)

POR

S-1

GROUND LEVEL

S-452

BLDG. #

SEE CIVIL DRAWING

FUEL OIL PIPE

REMOVE UNDER GROUND

SEE CIVIL DRAWING

FUEL OIL PIPE

REMOVE UNDER GROUND

TO REMAIN

EXISTING FUEL OIL TANK (1000 GAL)

GRAPHIC SCALE

SCALE: 1 : 50

1000 2000

N

WARM AIR FURANCE

CONTINUE TO

EXISTING OIL PIPE

FUEL OIL PIPE

REMOVE UNDERGROUND

UNIT

A.C.

FORMER

TRANS-

BOX

JUNCTION

LEGEND

TO BE REMOVED

SPECIFIC NOTES

TO DPW.

6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED

RECOMMENDATION AND SITE CONDITIONS.

2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S

PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.

1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL

TO ADJACENT CONSTRUCTION.

DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING

4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO

FILLED OR RESTORED.

5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND

7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.

EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.

3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,

WARM AIR FURANCE

CONTINUE TO EXISTING

MECH. ROOM

BLDG. #S-452

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-5

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

11 16

AT BLDG. #452, CAMP WALKER

EXISTING & REMOVAL FUEL OIL PIPING PLAN

COUPLINGS / ADAPTORS

(FASTENED TO WALL

OR FOUNDATION)

TEST BOOT ASSEMBLY

TRANSITION ASSEMBLY

WARNING TAPE

SLOPE 1%

ACCESS PIPE

FUEL OIL PIPE

SLOPE 1%

SLOPE 1%

ENTRY BOOT

CONDUIT

SUMP LEAK SENSOR

TEST BOOT ASSEMBLY

COUPLING

SHUT OFF BALL V/V

NOT TO SCALE

TEST BOOT ASSEMBLY

PIPE

FUEL OIL

CONTAINMENT SUMP

TAPE

WARNING

POC

M-6

S-1

D-1

M-8

SEE

WARM AIR FURANCE

CONTINUE TO EXISTING

(1000 GAL)

EXISTING FUEL OIL TANK

GROUND LEVEL GROUND LEVEL

MECH. ROOM FLOOR

FUEL OIL PIPE, SEE CIVIL DRAWING

NEW UNDERGROUND DOUBLE WALL

SLOPE 1%

OIL SUPPLY LINE

NEW 20mm FUEL

FUEL OIL FILTER

PIPE STRAINER

20mm GATE VALVE

M

IN

M

IN

NEW FUEL OIL SYSTEM SECTION (BLDG. #452)

TMS 2000

TANK SELECTMODE TEST

D-4

M-8

SEE

- M-6

P-1

SCALE : 1 / 50

POC

NEW FUEL OIL SYSTEM PLAN (BLDG. #452)

SEE CIVIL DRAWING

NEW CONCRETE DIKE

DRAIN HOLE

SUMP CONCRETE BOX,

LEGEND

FUEL OIL PIPE

SINGLE WALL

FUEL OIL PIPE

DOUBLE WALL

SPECIFIC NOTES

TO DPW.

6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED

RECOMMENDATION AND SITE CONDITIONS.

2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S

PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.

1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL

TO ADJACENT CONSTRUCTION.

DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING

4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO

FILLED OR RESTORED.

5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND

7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.

SEE CIVIL DRAWING

NEW CONCRETE PAVE MENT AND WALLS

1 CONTAINMENT SUMP

POC

S-452

BLDG. #

FUEL OIL PIPE

SINGLE WALL

NEW UNDERGROUND

(1000 GAL)

EXISTING FUEL OIL TANK

PIPE, SEE CIVIL DRAWING

DOUBLE WALL FUEL OIL

NEW UNDERGROUND

WARM AIR FURANCE

CONTINUE TO

EXISTING OIL PIPE

SUMP CONCRETE BOX

UNIT

A.C.

FORMER

TRANS-

BOX

JUNCTION

E-1

M-6 SCALE : 1 / 20

ENLARGED PLAN

POC

FUEL OIL FILTER

PIPE STRAINER

E-1

M-6

SEE

D-4

M-8

SEE

N

D-1

M-8

SEE

D-3

M-8-

D-3

M-8-

EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.

3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,

(WEATHERPROOF)

CONTROL PANEL

LEAK DETECTION

WALL MOUNTED

(WEATHERPROOF)

CONTROL PANEL

LEAK DETECTION

WALL MOUNTED

MECH. ROOM

BLDG. #S-452

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

12 16

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-6

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

AT BLDG. #452, CAMP WALKER

NEW FUEL OIL PIPING PLAN

MECH. ROOM

(1500 GAL)

FUEL OIL TANK

NOT TO SCALE

SLOPE 1%

GENERATOR ROOM

CONTINUE TO

EXISTING OIL PIPE

P-1 EXISTING & REMOVAL FUEL OIL PIPING PLAN (BLDG. #1211)

NEW FUEL OIL PIPING PLAN (BLDG. #1211)

KEY PLAN (BLDG. #1211, CP HENRY)

M-7 M-7

M-7

P-2 S-2

POC

NOT TO SCALE

GENERATOR ROOM

CONTINUE TO

EXISTING OIL PIPE

M-7

S-1

POC

POR

SPECIFIC NOTES

TO DPW.

6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED AND RETURNED

RECOMMENDATION AND SITE CONDITIONS.

2. SIZES AND LAYOUTS OF FUEL OIL PIPING MAY CHANGE DEPENDING ON MANUFACTURER’S

PIPING SYSTEMS AND EQUIPMENT SHOWING LOCATIONS.

1. THE CONTRACTOR SHALL PROVIDE MANUFACTURER’S DETAILED SHOP DRAWINGS OF OIL

TO ADJACENT CONSTRUCTION.

DEMOLITION OF PIPING, CONDUITS, DUCTWORK, ETC AND SHALL MATCH FINISH AND RATING

4. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENING THAT ARE CREATED DUE TO

FILLED OR RESTORED.

5. THE OPENING RESULTING FROM THE REMOVAL OF UNITS, PIPES SHALL BE PATCHED AND

AT BLDG. #1211, CAMP HENRY

AND NEW FUEL OIL PIPING PLAN

EXISTING & REMOVAL FUEL OIL PIPING PLAN

/W FITTINGS

& ABOVE GROUND OIL PIPE

REMOVE EXISTING UNDER

7. CONTRACTOR SHALL INSTALL PIPE SUPPORTS WHERE NECESSARY.

MECH. ROOM

BLDG. #S-1211

GROUND LEVEL

GROUND LEVEL

MECH. ROOM

BLDG. #S-1211

SUPPLY LINE

NEW 20mm FUEL OIL

POR

OIL SUPPLY LINE

REMOVE 20MM FUEL

GROUND OIL PIPE /W FITTINGS

REMOVE EXISTING UNDER & ABOVE

GENERATOR ROOM

EXISTING OIL PIPE CONTINUE TO

MECH. ROOM

BLDG. #S-1211

POC

POC

GENERATOR ROOM

EXISTING OIL PIPE CONTINUE TO

SUPPLY LINE

NEW 20mm FUEL OIL

POR

LEGEND

TO BE REMOVED

MECH. ROOM

BLDG. #S-1211

ROOM

GENERATOR

BLDG. #S-1211

BLDG. #S-1211

NEW FUEL OIL PIPING SECTION (BLDG. #1211)

EXISTING & REMOVAL FUEL OIL PIPING SECTION (BLDG. #1211)

POC

FUEL OIL FILTER

SCALE : 1 / 50

SCALE : 1 / 50

BLDG. #S-1211

ROOM

GENERATOR

BLDG. #S-1211

OIL PIPE /W FITTINGS

INSTALL NEW ABOVE GROUND

CONCRETE DIKE CONDITION

RECOVER & MATCH WITH EXISTING

EXISTING WALL CONDITION

RECOVER & MATCH WITH

EXISTING FUEL OIL TANK (1500 GAL)

OIL PIPE /W FITTINGS

INSTALL NEW ABOVEGROUND

100mm FLANGED STEEL PIPE COVER

OIL STORAGE TANK(1500 GAL)

EXISTING ABOVEGROUND

OIL STORAGE TANK(1500 GAL)

EXISTING ABOVEGROUND

TO REMAIN

EXISTING FUEL OIL TANK(1500 GAL)

LEAKING FUEL OIL OUTLET

GRAPHIC SCALE

SCALE: 1 : 50

1000 2000

N

EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED IN FIELD.

3. EXISTING & REMOVAL PLAN(SECTION) MAY NOT EXACTLY MATCH THE FIELD. THEREFORE,

PIPE STRAINER

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

13 16

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-7

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

GROUND ROD CABLE

LEAK SENSOR

SENSOR CABLE

SUMP LEAK

SUMP

CONTAINMENT

WATERPROOFING

MEMBRANE

BACK UP

MATERIAL

(CLOSED CELL

FLEXIBLE FOAM

RUBBER OR

PLASTIC)

SEALANT #2

WATERPROOFING

CLAMPING FLANGE

EXTERIOR WALL

P

IP

E

D

IA

m m

(I N

C L U

D

IN

G

IN

S U

L A T

IO

N

) ANCHOR

CONCRETE OR

MASONRY WALL

METAL JACKET

INSULATION

PIPE W/ INSULATION

PIPE WITHOUT

INSULATION

MIN. 7 CLEARANCE

ALL AROUND

SEALANT #10

BACK UP MATERIAL

PIPE SLEEVE

PIPE L

C

NOT TO SCALE--

NOT TO SCALE

FUEL OIL TANK SYSTEM CABLE CONTROL DIAGRAMD-1 PIPE SLEEVE-THRU FOOTING DETAIL

D-2

M-8M-8

FUEL OIL TANK

DIFFERENT THAN FIRE ALARM SIGNAL SO AS NOT TO BE CONFUSED.

NOTE : VISUAL DEVICE MUST BE YELLOW (LENS) AND AUDIBLE ALARM MUST BE

GROUND LEVEL GROUND LEVEL

TMS 2000

TANK SELECTMODE TEST

CONRETE BOX

DRAIN HOLE

("FLEXWORK.CO.LTD." MODEL PST-4630 OR APPROVED EQUAL)

CONTAINMENT SUMP

GROUND LEVEL

6"THK GRAVEL BED

CONRETE BOX

@ 10" O.C.

D13 STEEL BAR

D13 STEEL BAR

@ 10" O.C.

NOT TO SCALE

D-4

M-8

CONTAINMENT SUMP & SUMP CONCRETE BOX DETAIL

510 610

200 1120 200

200 200610

G.L

TO POWER SOURCE

#8 AWG "BC"

15C

W/ WELDING CONNECTION

20mm DIA x 2400mm L

COPPER CLAD STEEL

GROUND ROD

SUMP LEAK SENSOR CABLE

LEVEL GAUGING, TANK LEAK &

NOT TO SCALE

D-3

M-8

CONDUIT SUPPORT(TYP.)

OUTSIDE WALL OF MECH. ROOM

(W/ NEMA 3 ENCLOSURE BOX, AUDIBLE ALARM & ALARM LIGHTS)

LEVEL LEAK MONITORING PANEL (1KW, 1PH, 120V)

CONTROL PANEL (WEATHERPROOF)

WALL MOUNTED LEAK DETECTION

LEAK DETECTION CONTROL PANEL DETAIL

DETAIL DRAWING

CHANG, TAE HO

NAM, TAE CHIN

J1-10043-1J

14 16

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

M-8

D - 22 - 01

G

18 NOV 21

CAMP WALKER & HENRY

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

ELECTRICAL

KIM, CK

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

UNITED STATES ARMY GARRISION DAEGU

DIRECTORATE OF PUBLIC WORK

UNIT #15746, APO AP 96218-5746

DATE:

N O T E S

3.

2.

MOUNTING HEIGHTS ARE AS BELOW. MEASUREMENT IS TO CENTER OF OUTLET.

WIRES IS INDICATED AS FOLLOW;

AND ONE (1)-#12AWG GROUND WIRE IN 16mm CONDUIT. A GREATER NUMBER OF

ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES TWO (2)-#12AWG WIRES

3-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.

4-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.

PANELBOARD, CIRCUIT BREAKER------------------------SEE SPECIFICATION

CAULKING MATERIAL SHALL BE VERIFIED BY F&ES OFFICE PRIOR TO CONSTRUCTION.

BOTH SIDE OF FIRE WALLS, FIRE-PARTITIONS AND FIRE-RATED PIPE CHASE WALLS.

ALL PIPE PENETRATIONS SHALL BE SEALED WITH FIRE RATED CAULKING MATERIAL ON

1.

SPECIFICATIONS FOR O&MA PROJECTS, AND SPECIFICATIONS.

ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE, TECHNICAL STANDARD

ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE NATIONAL

CONDUIT WHICH IS TO BE BONDED TO THE MAIN GROUNDING SYSTEM AT BOTH ENDS.

GROUNDING WIRE SHALL BE GREEN INSULATED COPPER WIRE IN RIGID GALVANIZED STEEL

MAGNETIC MOTOR STARTER

L E G E N D

NEWEXSTREMOVE

PANELBOARD OR LOAD CENTER

+ WIRING CONCEALED IN UNDERGROUND

HOMERUN CIRCUIT TO PANELBOARD OR ENCLOSURE

///// C C CONTROL CIRCUITC

SCOPE OF WORK

SHEET OF

E-1

US ORIGIN MATERIAL:

CHANGES SHALL BE APPROVED BY THE CONTRACTING OFFICE.

BE RESPONSIBLE TO RESIZE AND PROVIDE THE REQUIRED WIRING AND OVER CURRENT DEVICES. THE

IF EQUIPMENT OTHER THAN INDICATED ON THE PLANS ARE PROVIDED, THEN THE CONTRACTOR SHALL

INDICATED ON THE DRAWINGS.

INTERNET SITE (http//www.cckbid.com). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE AS

DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT

REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS

ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL

SIN, YS

D - 22 - 01

1.

A. REPAIR/ MAINTENANCE

15 16

///// WIRING CONCEALED IN FLOORS OR WALL

WIRING CONCEALED IN CEILINGS OR WALL

WIRING EXPOSED ON CEILINGS OR WALL

J1-10043-1J

4.

5.

6.

GRAPHIC SCALE

0 1000 3000 5000

SCALE : 1 : 100

S

BLDG. #S-303

BLDG. #S-304

N

"PM"

SCALE : 1 / 100-

P-1 E01

ELECTRICAL SITE PLAN(BLDG. #304)

18 NOV 21

AND ELECTRICAL SITE PLAN

LEGEND, NOTES, SCOPE OF WORK

PM-5

ASSOCIATED WIRING.

CONNECT POWER LINE ON THE LEAK DETECTION CONTROL PANEL INCLUDING, JUNCTION BOXES AND

PANEL(UNDER MECH. ITEM)

NEW LEAK DETECTION CONTROLMECH. ROOM

BLDG. #S-304

FOR FUEL TANKS, S-304, S-452 & S-1211

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

KIM, CK

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

UNITED STATES ARMY GARRISION DAEGU

DIRECTORATE OF PUBLIC WORK

UNIT #15746, APO AP 96218-5746

DATE:

SHEET OF

ELECTRICAL

SIN, YS

D - 22 - 01

GRAPHIC SCALE

E-02

16 16

S-452

BLDG. #

UNIT

A.C.

FORMER

TRANS-

BOX

JUNCTION

1000 2500

SCALE : 1 : 50

P-1 E02

ELECTRICAL SITE PLAN(BLDG. #452)

SCALE : 1 / 50

J1-10043-1J

18 NOV 21

ELECTRICAL SITE PLAN

MECH. ROOM

BLDG. #S-452

"P"

P-20

N

PANEL(UNDER MECH. ITEM)

NEW LEAK DETECTION CONTROL

FOR FUEL TANKS, S-304, S-452 & S-1211

J1-10043-1J_T01
J1-10043-1J_C01
J1-10043-1J_C02
J1-10043-1J_C03
J1-10043-1J_C04
J1-10043-1J_C05
J1-10043-1J_C06
J1-10043-1J_M01
J1-10043-1J_M02
J1-10043-1J_M03
J1-10043-1J_M04
J1-10043-1J_M05
J1-10043-1J_M06
J1-10043-1J_M07
J1-10043-1J_M08
J1-10043-1J_E01
J1-10043-1J_E02

File details come from the government source that posted it. Updated .