SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 21 - 07
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
81-00516-8J
UNIT #15746, APO AP 96218-5746
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
YI, TONG KI
AS SHOWN
1 1 OF 1R - 1
T I T L E S H E E T
TITLE SHEET
DATE: 05 APR 21
AE - 12
PROJECT NO. 81-00516-8J, BUSAN STORAGE FACILITY
BUSAN STORAGE FACILITY
AE - 23
BLDG. NO. S-1321
REPAIR BOX & CRAFT SHOP,
BLDG. NO. S-1321
REPAIR BOX & CRAFT SHOP,
ARCHITECTURAL
AE - 34
AE - 45
AE - 56
AE - 67
M - 111
E - 121
E - 222
M - 919
M - 818
M - 717
M - 616
M - 515
M - 414
M - 313
M - 212
MECHANICAL
ELECTRICAL
LEGEND AND ABBREVIATIONS
DETAIL DRAWINGS - 1
GENERAL NOTES, SPECIFIC NOTES, MATERIAL NOTES
SCOPE OF WORK, LOCATION PLAN
RUNNER AND INSULATION PLAN
NEW FLOOR PLAN, NEW ENLARGED FLOOR PLAN, INTERIOR & EXTERIOR FINISH SCHEDULE, METAL STUD, DOOR SCHEDULE, HARDWARE SETS, ELEVATION, WOOD BENCH DETAILS
DETAILS
TOILET PARTITON PLAN, ELEVATION AND DETAILS
GENERAL NOTES & EQUIPMENT SCHEDULE & SCOPE OF WORK
EXISTING & REMOVAL HVAC PLAN & EXISTING & REMOVAL PIPING PLAN
NEW SAW DUST COLLECTOR SYSTEM PLAN & NEW SAW DUST COLLECTOR SYSTEM ISOMETRIC DIAGRAM
LEGENDS, NOTES, SCOPE OF WORKS AND LIGHTING FIXTURE DETAIL
REMOVAL, LIGHTING, POWER PLAN AND PANEL SCHEDULE DIAGRAM "P1"
8 7 OF 21
AE - 89 8 OF 21
AE - 910 9 OF 21
M - 1020 19 OF 21 DETAIL DRAWINGS - 2
AE - 7
NOTE
FOUNDATION & GROUND PLAN, ROOF PLAN, ELEVATION PLAN, ROOF FRAMING PLAN, ENLARGED PARTIAL DETAIL, STRUCTURAL SECTION DETAIL, ENLARGED PARTIAL DETAIL, STRUCTURAL SCHEDULE
METAL GUTTER AND DOWNSPOUT DETAILS, METAL ROOF PANEL DETAILS
NEW VENTILATION PLAN
NEW DOMESTIC WATER PIPING PLAN & NEW SEWER AND VENT PIPING PLAN
NEW SAW DUST COLLECTOR SYSTEM DETAIL PALN
NEW SAW DUST COLLECTOR SYSTEM TURBO FAN DETAIL PLAN
1.
2.
3.
6.
OF CONSTRUCTION SHALL BE USED.
NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS
DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE
EXISTING UTILITIES AS A RESULT OF HIS/HER WORK.
OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL PAY FOR ALL DAMAGES TO
TO UTILITIES. NOTIFY THE OWNER’S REPRESENTATIVE OF ANY UNDERGROUND UTILITIES IN THE WAY
EXTREME CAUTION AND MUST EXERCISE PROPER CARE DURING EXCAVATION TO PREVENT DAMAGE
ACCURACY OR THE EXISTENCE OF OTHER OBSTACLES WHICH MAY BE ENCOUNTERED WORK WITH
PLANS ARE FROM THE LATEST AVAILABLE RECORDS BUT ARE NOT GUARANTEED AS TO THE
THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES AND STRUCTURES AS SHOWN ON THESE
4.
LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO VERIFY THEIR
WHEREVER CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE
THE PROJECT AREA PRIOR TO EXCAVATING. THE CONTRACTOR SHALL COORDINATE ALL WORK.
THE CONTRACTOR SHALL NOTIFY ALL AGENCIES TO VERIFY THE ACTUAL LOCATION OF ALL UTILITIES IN
5.
ADDITIONAL COSTS TO THE OWNER.
SCHEDULED TO REMAIN DURING THE CONSTRUCTION PERIOD WHICH SHALL BE REPAIRED AT NO
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES INCURRED TO EXISTING WORK
7.
PATCHING SHALL MATCH THE FINISH OF THE ADJACENT SURFACES.
THE CONTRACTOR SHALL PATCH ALL SURFACES EXPOSED FROM CUTTING, AND/OR REMOVAL WORK.
8.
ACCESSIBILITY GUIDELINES (ADAAG).
ALL STANDARDS, REQUIREMENTS AND GUIDELINES OF THE AMERICANS WITH DISABILITIES ACT
ALL GOVERNING AGENCIES. THIS WORK SHALL BE DESIGNED AND CONSTRUCTED TO CONFORM WITH
ALL WORK SHALL CONFORM TO ALL APPLICABLE LAWS, CODES, REGULATIONS, AND ORDINANCES OF
9. ALL DIMENSIONS SHOWN ON FLOOR PLAN ARE TO FACE OF FINISH, UNLESS OTHERWISE.
10.
PROVIDE DUST CONTROL MEASURES AS REQUIRED.
CLEAN AND FREE FROM ACCUMULATION OF WASTE MATERIALS AND RUBBISH. CONTRACTOR SHALL
AREA, THE OWNER’S PREMISES, INCLUDING STREETS AND OTHER AREAS USED BY THE CONTRACTOR
CONTRACTOR SHALL, AT ALL TIMES, DURING THE COURSE OF THE WORK, KEEP THE CONSTRUCTION
11.
OF OPERATIONS, INTERRUPTION OF MECHANICAL AND ELECTRICAL UTILITIES.
DELIVERY ACCESS TO AND FROM WORK, SPECIAL NOISY OPERATIONS, TIMING OF WORK, SEQUENCE
COORDINATE ALL OPERATIONS WITH THE OWNER’S REPRESENTATIVE FOR MATERIALS STORAGE,
12.
DEBRIS, RUBBISH, AND CONSTRUCTION MATERIAL AT TIME OF FINAL ACCEPTANCE.
REMOVE BARRICADE AFTER COMPLETION OF THE PROJECT AND CLEAN THE PROJECT AREA OF ALL
PREVENT PEOPLE FROM ENTERING THE PROJECT AREA AND TO PROTECT THE ENCLOSED PROPERTY.
CONTRACTOR SHALL PROVIDE BARRICADES, AS REQUIRED, AND ACCEPTABLE TO THE OWNER TO
13.
REPRESENTATIVE.
TRADE SHALL BE USED TO RESOLVE SUCH DISCREPANCIES AND MUST BE APPROVED BY THE OWNER’S
SUBMIT SHOP DRAWINGS ON HOW THEY WILL RESOLVE SUCH DISCREPANCIES. GENERAL PRACTICE OF
SHALL BE BORNE BY THE CONTRACTOR AND IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO
QUESTIONS RAISED DURING CONSTRUCTION PHASE THAT MAY RESULT IN EXTRA COST, SAID COST
ALL DISCREPANCIES FOUND ON DRAWINGS DURING CONSTRUCTION PHASE, ANY DISCREPANCIES OR
IT SHALL BE CONTRACTOR’S RESPONSIBILITY TO NOTIFY THE OWNER’S REPRESENTATIVE FOR ANY OR
14. CONTRACTORS SHALL VERIFY ALL QUANTITIES.
STATE PROPERTY IN ACCORDANCE WITH ALL LOCAL GOVERNING LAWS AND REGULATIONS.
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OUTSIDE THE LIMITS OF
ALL MATERIALS REQUIRED TO BE DISPOSED OF IN THIS PROJECT UNLESS REQUIRED TO BE SALVAGED, INTENDED TO LIMIT THE WORK REQUIRED IN ANY WAY.
TITLES, CAPTIONS, HEADINGS, ETC. ARE INTENDED FOR GENERAL REFERENCE AND ARE NOT
THE ABOVE NOTES APPLY TO THE FULL SET OF CONSTRUCTION DOCUMENTS.
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
AE-01
KIM, CHI SOP
81-00516-8J
1.
2.
3.
4.
GENERAL NOTES
OFFICER.
ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE CONTRACTING
PRIOR TO COMMENCING ANY CONSTRUCTION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION AND DIMENSIONS
THE CONTRACTING OFFICER.
AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS AS DIRECTED BY
THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING
TRAFFIC AND OPERATIONS.
NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY
BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL
THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, CONTRACTOR.
INCURRED FOR SPILL CONTAINMENT AND CLEAN-UP SHALL BE THE RESPONSIBILITY OF THE
OFFICER SHALL OVERSEE THE CLEAN-UP EFFORT AND RENDER THE SITE CLEAN. ALL COSTS
APPROPRIATE MEASURES TO CONTAIN AND ADEQUATELY CLEAN-UP THE SPILL. THE CONTRACTING
CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND UTILIZE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SEWAGE SPILLS CAUSED DURING
WORK.
OF THIS WORK MUST BE DONE TO INSURE ROUGH-IN WORK IS ACCOMPLISHED PRIOR TO FINISHING
REPLACEMENT OF MECHANICAL, ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM COORDINATION
CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING TO MAKE WAY FOR THE INSTALLATION AND
INCONVENIENCE TO THE CUSTOMER’S MISSION OPERATION.
APPROVAL FROM THE GOVERNMENT AND EXECUTE WORK STAGE BY STAGE WITHOUT ANY
THE CONTRACTOR SHALL SUBMIT WORK SCHEDULE PRIOR TO COMMENCING THE WORK AND GET
CONTRACTOR.
THAT MAY OCCUR DURING THE COURSE OF HIS WORK SHALL BE RESTORED AT THE EXPENSE OF THE
THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT EXISTING FACILITIES AND ANY DAMAGES
MATCHING EXISTING COLOR AND FINISH.
ANY STRUCTURAL STEEL MEMBERS EXPOSED TO INTERIOR SPACE SHALL BE RE-PAINTED WITH
CONTRACTING OFFICER AT THE LOCATION INDICATED BY CONTRACTING OFFICER.
SALVAGEABLE MATERIALS SHALL BE REMOVED FROM WORK SITE IN A MANNER AND TURNED OVER TO
SPECIFIC NOTES
1.
2.
3.
4.
CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.
SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL FIELD
SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACT FIELD CONDITIONS.
15. FILL EXISTING DUCT AND PIPE HOLE W/ CONCRETE.
16.
RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ACCESS DOOR AND WALL.
THE CONTRACTOR SHALL VERIFY THE NEW EQUIPMENT ACCESS CONDITIONS AT JOB SITE AND WILL BE
17.
18.
19.
AND SPECIFIC NOTES ON THE CONTRACT DRAWINGS.
THE CONTRACTOR SHALL FOLLOW THE CONSTRUCTION WORK AS INDICATED ON THE GENERAL NOTES
20.
CONTRACTOR SHALL SUBMIT ALL MATERIAL & COLOR SAMPLES TO DPW FOR APPROVAL.
COLOR AND PATTERN WHICH MANUFACTURERS STANDARD MUST APPROACH.
MATCH FOR MANUFACTURER COLOR IS NOT REQUIRED. THE SELECTIONS SERVE ONLY TO INDICATE
NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE MANUFACTURERS INDICATED. AN EXACT
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR IDENTIFICATION PURPOSES ONLY, AND
CONTRACT DRAWING.
THE CONTRACTING OFFICER. A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE
CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP DRAWINGS FOR APPROVAL TO
5.
INSTALLATION.
DETAILS AND DRAWING SHALL BE APPROVED BY THE C.O. OR HIS COR. BEFORE FABRICATION AND
INSTRUCTIONS. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR AND WINDOW
ALL DOORS AND WINDOWS SHALL BE FABRICATED I.A.W. SPECIFICATIONS AND MANUFACTURER’S
CONTRACT.
ACCOMPLISH THE ARCHITECTURAL SCOPE OF WORK AT NO ADDITIONAL COST TO THE PROJECT
AGENCY, KOREA REGION OFFICE" FROM A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED TO
PROJECTS, KOREA, NOVEMBER 30, 2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT
THE ARCHITECTURAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR O&MA 5.
6. REMOVE & CLEAN EXISTING FINISH MATERIAL & ADHESIVE BY GRINDING TO RECEIVE VCT & TILE.
7. REMOVE & CLEAN EXISTING PAINT BY SAND PAPER/ GRINDING FOR NEW PAINTING AND COATING.
8.
FREE.
SHEET (MSDS), WRITTEN IN ENGLISH, FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD
OF THIS PROJECT. THE CONTRACTOR WILL PROVIDE A CERTIFICATE OR MATERIAL SAFETY DATA
LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON-VOLATILE SOLIDS) DURING THE EXECUTION
THE CONTRACTOR IS REQUIRED TO USE "LEAD FREE" COATINGS (LIQUID PAINTS OR COATINGS WITH
9.
THROUGH COR.
NEW SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE
THE KOREA ENVIRONMENTAL GOVERINNG STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE
PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH
THE WORK AREA WILL NEED TO BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED
CONTRACTOR SHALL CASE WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER.
WORK. HOWEVER, IF SUSPECTED ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE
FREE. TESTS HAVE INDICATED THAT ASBESTOS IS NOT PRESENT IN THE REAS AFFECTED BY THIS
OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER VERIFYING THE PRODUCT IS ASBESTOS
WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL PROVIDE A CERTIFICATE
THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1 PERCENT BY
MATERIAR NOTES
SPECIFIC NOTES
GENERAL NOTES
KIM, DONG HWAN
05 APR 21
AND USER.
THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE CONTRACTING OFFICER
REQUIREMENTS MANUAL EM 385-1-1 LATEST EDITION.
THE CONTRACTOR SHALL PERFORM ALL WORKS IN ACCORDANCE WITH USACE SAFETY AND HEALTH
AND THE ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK REGULATION 201-1.
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE KOREAN ENVIRONMENTAL LAWS
CONTRACT, AND SHALL BE RESOLVED BEFORE PROCEEDING WITH THE WORK.
OMISSIONS OR CONFLICTS WHICH PREVENT HIM OR HER FROM FULFILLING THE TERMS OF THE
CONTRACTOR SHALL PROMPTLY NOTIFY THE OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES, WITH THE REQUIRED WORK.
SHALL VERIFY ALL CONDITIONS AND DIMENSIONS RELATING TO THE PROJECT BEFORE COMMENCING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND
WITHOUT WRITTEN APPROVAL OF THE OWNER’S REPRESENTATIVE.
THAT THE PROPER REVISIONS MAY BE MADE. MODIFICATION OF DETAILS SHALL NOT BE MADE
CONFLICT WITH THE DRAWINGS, THEY SHALL BE REPORTED TO THE OWNER’S REPRESENTATIVE SO
BEST PRESENT KNOWLEDGE, BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS
ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE
MATERIAL NOTES
6.
7.
8.
9.
10.
11.
12.
13.
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
1 21
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
PROJECT WORK LIMITS
AE 01
SCALE : 1 / 1000
LOCATION PLAN
S-1321
GATE
MAIN
T-1310
S-1500GUARD TOWER
T-1315
T-1317
T-1327
S-1322 T-1427
T-1426
T-1425
T-1419
T-1402
GUARD TOWER
S-1401
S-1422 S-1407
T-1408
GUARD TOWER
S-1410
S-1409S-1411 T-1413
S-1412
T-1420
S-1436
T-1437
GUARD TOWER
S-1438
S-1439
S-1440
S-1441
S-1442
GUARD TOWER
T-1443
T-1467
S-1490
WATER TREATMENT PLANT
T-1466
GUARD TOWER
S-1445
T-1444
S-1448
S-1463
T-1432
T-1431 T-1483
T-1482
T-1481
WATER STO. TANK
S-1460
T-1365
T-1415 T-1416
S-1417
S-1329
COLD STO.
T-1309
T-1306
S-1334
T-1304
S-1312
T-1341
SHED
GAS STATION
T-1345
BOOTH
GUARD
T-1335
S
S
S
S
S-1357
T-1358
S-1311
S-1369
T-1360T-1352
T-1461
S-1480 S-1393
S-1391
GUARD TOWER
S-1385
T-1372
T-1373
T-1347
T-1349
T-1351
T-1348
S-1491
S-1447
S-1324
T-1340
T-1336
T-1338
S-1313
S-1318
PCC
LUMBER LANE
PCC
AC
AC
AC
AC
MAIN STREET
FRONT STREET
ACC
N
D S
T R
E E
T
R
D S
T R
E E
T A
C C
T
H S
T R
E E
T
DRUM ROAD
ACC
RAMP
CONC.
RAMP
CONC.
RAMP
CONC.
AC
AREA
STORAGE
S-1505
S-1330
81-00516-8J
LOCATION PLAN
SCOPE OF WORK
SCOPE OF WORK
A. REPAIR / MAINTAINANCE : K - WORK
AE-02
REPLACE EXISTING FLOOR FINISH SYSTEM WITH NEW. (SEE INTERIOR FINISH SCHEDULE)
ACCESSORIES.
REPLACE EXISTING FLOOR TILE WITH NEW INCLUDING MORTAR BED, WATERPROOFING AND NECESSARY
5 REPLACE EXISTING WALL TILE WITH NEW INCLUDING NECESSARY ACCESSORIES.
7 REPLACE EXISTING TOILET PARTITION WITH NEW INCLUDING NECESSARY ACCESSORIES.
11 RESTORE EXISTING EXTERIOR FINISH SYSTEM FOR EXTERIOR WORK.
PAINT ON ALL INTERIOR SURFACE.
05 APR 21
SEALANT, FRAME AND NECESSARY ACCESSORIES.
REPLACE EXISTING DETERIORATED FASCIA, SOFFIT AND NAILER WITH NEW INCLUDING INSULATION, SCREEN, NECESSARY ACCESSORIES.
REPLACE EXISTING DETERIORATED RAIN GUTTER, DOWNSPOUT AND SPLASH BLOCK WITH NEW INCLUDING
ACCESSORIES.
REPLACE EXISTING DETERIORATED DOOR AND FRAME WITH NEW INCLUDING HARDWARE AND NECESSARY
(SEE EXTERIOR FINISH SCHEDULE)
PAINT ON ALL EXTERIOR SURFACE INCLUDING EXISTING WINDOW FRAMES, MOLDING AND SECURITY GRILL.
15 PAINT ON THE NEW STEEL CANOPY SYSTEM SURFACES.
(SEE EXTERIOR FINISH SCHEDULE AND AE-07)
FOOTINGS, STRUCTURE STEEL COLUMNS, BEAM AND STEEL ROOF FRAME AND NECESSARY ACCESSORIES.
REPLACE EXISTING DETERIORATED WOODEN CANOPY WITH NEW STEEL CANOPY SYSTEM INCLUDING CONCRETE
(SEE EXTERIOR FINISH SCHEDULE)
SPLASH BLOCK AND NECESSARY ACCESSORIES.
ROOFING SYSTEM INCLUDING SHEET METAL FLASHING, METAL LINER, PROTECTED METAL GUTTER, DOWNSPOUT
REPLACE EXISTING ASPHALT SHINGLE ROOF SYSTEM AT WOODEN CANOPY WITH NEW PROTECTED METAL
(SEE FLOOR PLAN, ELEVATION AND TOILET ACCESSORIES SCHEDULE)
PROVIDE TOILET ACCESSORIES WITH NEW INCLUDING NECESSARY ACCESSORIES.
(SEE AE-07)
REPLACE EXISTING DETERIORATED CONCRETE RAMP WITH NEW AND NECESSARY ACCESSORIES.
AS REQUIRED FOR NEW STEEL CANOPY AND CONCRETE RAMP WORK.
REPAIR AS REPLACING EXISTING CONCRETE FLOOR WITH NEW AS EXISTS INCLUDING NECESSARY ACCESSORIES
NECESSARY ACCESSORIES. (SEE INTERIOR FINISH SCHEDULE)
REPLACE EXISTING GYPSUM BOARD CEILING WITH NEW INCLUDING METAL FRAME, INSULATION AND
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
2 21
7’-11"
1"
23’-0"
2’-7"
2’-11"
N
D1
101 102 103 104 105
106 107
D2 D3 D4 D5
D9
D7
D8
D6
D10 D11
D14
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
NO.
I N T E R I O R F I N I S H S C H E D U L E
FLOOR
ROOM
BASE WALL CEILING
A B B R E V I A T I O N S
CMT - CERAMIC MOSAIC TILE
CONC - CONCRETE
CMU - CONCRETE MASONRY UNIT
- EXPOSEDEXP
EXT - EXTERIOR
EP - EPOXY
FCNF - FACTORY COATED NATURAL FINISH
FCT - FLOOR CERAMIC TILE
GCWT
- FACTORY FINISH
GWB - GYPSUM WALLBOARD
FF
- GLAZED CERAMIC WALL TILE
VCB
VCT
- VINYL COVED BASE
STL - STEEL
SLM - SELF LEVELING MORTAR
- VINYL COMPOSITION TILE
E X T E R I O R F I N I S H S C H E D U L E
SURFACES MATERIAL FINISH COLOR
ROOF
FASCIA
SOFFIT
WALL
DOOR / DOOR FRAME STL
ALWINDOW
CANOPY ROOFING
PROTECTED METALGUTTER / DOWNSPOUT
CONC
MATCH TO EXISTING
MATCH TO EXISTING
MATCH TO EXISTING
MATCH TO EXISTING
MATCH TO EXISTING
MATCH TO EXISTING
REMARKS
REMARKS
AL - ALUMINUM
: VINYL COMPOSITION TILEVCT
EP : EPOXY, GLOSS
SAMHWA PAINT
MPI 77 SUPERPOXY 200
OR APPROVED EQUAL
LG HAUSYS
LDMY0084
450mm x 450mm X 3mm THK
OR APPROVED EQUAL
FCT : FLOOR CERAMIC TILE
NON-SLIP
SIZE : 200mm X 200mm X 8T
OR APPROVED EQUAL
GCWT
SIZE : 400mm X 250mm X 10T
OR APPROVED EQUAL
: GLAZED CERAMIC WALL TILE
ROOF SYSTEM
ASPHALT SHINGLE
PLYWOOD
PLYWOOD
AE-03
SCALE : 1 / 30AE 03
SCALE : 1 / 100 AE 03
2NEW FLOOR PLAN
(1)
EPOXY / NEW
EPOXY / NEW
EPOXY / NEW
VCT / NEW
VCT / NEW
VCT / NEW
EPOXY / NEW
VCT / NEW
FCT / NEW
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
GCWT / NEW
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
ETR / RE-PAINT
GWB / PAINT / NEW GWB :
WATERRESISTANT GWB
15 MM
(1)
NEW / PAINT
D12
NEW / PAINT
EIFS
NEW / PAINT
NEW / PAINT
NEW / PAINT
ETR - EXIST TO REMAIN
ETR / PAINT
MATCH TO EXISTING
ETR
STL ETR / PAINT MATCH TO EXISTING
AE 04
A
B
C
D
WOOD BENCH
M O
P
R A
C K
LAV LAV
SS
WC WC
UR
EXISTING DHW
SEE MECH. DWG
3 3
EXISTING STRUCTURE WALL
22mm FURRING CHANNEL @300mm
WATERPROOFING MEMBRANE SHEET WITH METAL LATH
GLAZED CERAMIC WALL TILE ON MORTAR BED
EXISTING STRUCTURE WALL
100mm BLANKET INSULATION WITH CHICKEN WIRE
92mm METAL STUD @ 300mm O.C.(UP TO ROOF SLAB)
WATERPROOFING MEMBRANE SHEET WITH METAL LATH
GLAZED CERAMIC WALL TILE ON MORTAR BED
EXISTING STRUCTURE WALL
50mm BLANKET INSULATION WITH CHICKEN WIRE
52mm METAL STUD @ 300mm O.C.(UP TO ROOF SLAB)
WATERPROOFING MEMBRANE SHEET WITH METAL LATH
GLAZED CERAMIC WALL TILE ON MORTAR BED3
EXISTING STRUCTURE WALL
50mm BLANKET INSULATION WITH CHICKEN WIRE
52mm METAL STUD @ 300mm O.C.(UP TO ROOF SLAB)
WATERPROOFING MEMBRANE SHEET WITH METAL LATH
GLAZED CERAMIC WALL TILE ON MORTAR BED4
GLAZED CERAMIC WALL TILE ON MORTAR BED
WATERPROOFING MEMBRANE SHEET WITH METAL LATH
50mm BLANKET INSULATION WITH CHICKEN WIRE
52mm METAL STUD @ 300mm O.C.(UP TO ROOF SLAB)
WATERPROOFING MEMBRANE SHEET WITH METAL LATH
GLAZED CERAMIC WALL TILE ON MORTAR BED
MATERIAL & COLOR SCHEDULE
NOTESNOTES
OR USER REQUESTS.
THIS SECTOR PLAN IS SUBJECT TO CHANGE ACCORDING TO SITE CONDITIONS
UR
1.1.
AE
NEW ENLARGED FLOOR PLAN
05 APR 21
METAL STUD, RUNNER AND INSULATION PLAN
METAL STUD, RUNNER AND INSULATION PLAN
INTERIOR & EXTERIOR FINISH SCHEDULE
NEW ENLARGED FLOOR PLAN
NEW FLOOR PLAN,
LIGHT DUTY
SHELF METAL
ETR
AND SECURITY GRILL
WINDOW FRAMES, MOLDING,
D13
GWB / PAINT / NEW
STEEL CANOPY STRUCTURES STEEL NEW / PAINT
PROTECTED METAL
FOR WORK SCOPE NO.#09 & #10
DASHED LINE FOR ROOF (ABOVE)
SCHEME AS APPROVED BY DPW.
BE IN ACCORDANCE WITH CAMP / INSTALLATION EXTERIOR COLOR
SELECTION OF EXTERIOR PAINT AND APPLIED FACTORY COLORS SHALL
GWB / PAINT / NEW
INSULATION
(1) (1)
100THK BLANKET INSULATION
INSULATION :
GWB / PAINT / NEW
INSULATION
(1)
GWB / PAINT / NEW
INSULATION
(1)
GWB / PAINT / NEW
INSULATION
(1)
GWB / PAINT / NEW
INSULATION
(1)
GWB / PAINT / NEW
INSULATION
(1)
GWB / PAINT / NEW
INSULATION
(1)
(1)
100THK BLANKET INSULATION
INSULATION :
(1)
100THK BLANKET INSULATION
INSULATION :
(1)
100THK BLANKET INSULATION
INSULATION :
(1)
100THK BLANKET INSULATION
INSULATION :
(1)
100THK BLANKET INSULATION
INSULATION :
(1)
100THK BLANKET INSULATION
INSULATION :
STOOP
L E G E N D
AS REQUIRED FOR NEW STEEL CANOPY AND CONCRETE RAMP WORK.
REPAIR AS REPLACING EXISTING CONCRETE FLOOR WITH NEW AS EXISTS INCLUDING NECESSARY ACCESSORIES
WORK SCOPE NO.#13, #14 & #15.
NEW STEEL CANOPY STRUCTURES (SEE AE-07)
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
3 21
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
DOOR SCHEDULE
TYPE
MATERIAL
ROUGH
OPENING
FRAME WIDTH HEIGHT
HARDWARE
SET NO.
REMARKS
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
HW-1
(W x H)
GLAZING
LOUVER
R.O.
R .O
R.O.
R .O
DOOR W/ METAL FRAME
THRMAL INSULATED METAL
W/ METAL FRAME
METAL HOLLOW CORE DOOR
METAL DOOR W/ METAL FRAME
PAIR THRMAL INSULATED
(WHERE OCCURS)
AS SCHEDULE
VISION GLASS
SEE SCHEDULE
LOUVER
DOOR
DOOR TYPE HARDWARE SETS
DOOR
NO.
A B
C
A
A
A
A
A
B
B
B
C
METAL METAL
METAL METAL
METAL METAL
METAL METAL
METAL METAL
METAL METAL
METAL METAL
METAL METAL
METAL METAL
METAL
METAL
METAL
METAL
METAL
C
METAL
METAL
METAL
METAL
METAL
C
C
C
C
200X800
200X800
200X800
200X800
200X800
* G1
* G1
* G1
* G1
* G1
* G1
GLASS #1 : 6MM LAMINATED GLASS
HW-1
HW-1
HW-1
HW-2
HW-3
HW-4
HW-3
1 - LOCKSET : 1000-1, F07(LEVER TRIM)
1 - DUMMY TRIM
2 - FLUSH BOLT L04081
1 - DUST PROOF STRIKE L04021
1 - ASTRAGAL : R0Y635
1 - THRESHOLD : J32100
1SET WEATHERSTRIP
3PR - HINGES : A5111, 114 x 114, NRP
HDW-02
3PR - HINGES : A5111, 114 x 114, NRP
1 - ASTRAGAL : R0Y834
2 - KICK PLATE : J102, SST
1 - THRESHOLD : J32100
1SET WEATHERSTRIP
HDW-01
1-1/2PR - HINGES : A5111, 114 x 114-NRP
1 - CLOSER : C02021
1 - KICK PLATE J102, SST
1SET WEATHERSTRIP
1 - THRESHOLD : J32100
HDW-3
1 - DOOR STOP : L02141
1 - KICK PLATE J102, SST
HDW-5
2 - DOOR STOP
2 - DOOR STOP
1 - DOOR STOP
1 - EXIT DEVICE : TYPE 3-FUNCTION 01
1-1/2PR - HINGES : A5111, 114 x 114-NRP
1 - CLOSER : C02021
1 - KICK PLATE J102, SST
1SET WEATHERSTRIP
1 - THRESHOLD : J32100
HDW-4
1 - DOOR STOP
HW-5
HW-5
HW-5
HW-5
HW-5
HW-5
1 - EXIT DEVICE : TYPE 2-FUNCTION 08
W/LEVER HANDLE TYPE
1 - EXIT DEVICE : TYPE 2-FUNCTION 01
2 - CLOSER : C02021
1 - EXIT DEVICE : TYPE 3-FUNCTION 08
W/LEVER HANDLE TYPE
1 - CLOSER : C02011
1 - LOCKSET : 1000-1, F04(LEVER TRIM)
1 - THRESHOLD
1-1/2PR - HINGES : A8111, 114 x 114
AE-04
SCALE : 1 / 30AE 04
A B D
MOP RACK
D7
WOOD BENCH
LIGHT DUTY
SHELF METAL
ELEVATIONELEVATION
FLOORFLOOR
2A
2B
2C
2D
PIPE SUPPORT (AT END)(AT END)
BOLT
EXPANSION
BOLT OR
TOGGLE
6mm DIA
BOLT
6 mm DIA. SST MACH
SST CLIP WITH
TYPE 38x51x38
38 WIDE YOKE
AT 1219 mm O.C.
32 DIA. SST PIPE
SHALL BE RED OAK
ALL EXPOSED WOOD
NOTE:
2B
AT 1219 mm O.C.
38x89 WOOD
AT FLOOR (AT SLEEVE)(AT SLEEVE)
PIPE SLEEVE
EMBEDDED
CONCRETE
JOINT
THREADED
MORTAR BED
2C
POCELAIN TILE
MOSAIC TILE OR
CERAMIC
EXPANSION BOLT
TOGGLE BOLT OR
WITH 6mm DIA
38x89 CONT
EXPANSION BOLT
TOGGLE BOLT OR
6mm DIA
EXPANSION BOLT
TOGGLE BOLT OR
WITH 6mm DIA
38x89 CONT
EXPANSION BOLT
TOGGLE BOLT OR
6mm DIA
WALL LINE
BOLT
BOLT OR EXPANSION
DIA. SST TOGGLE
SIDES WITH 6mm
BRACKET AT END
38x89 WOOD
SECTION
2D
(AT WALL)
STAIN FINISH
WOOD SEAT FLAT
38x87 HARD
NOT TO SCALE
WOOD BENCH DETAILS (TYP)
C
AE 04
ELEVATION @ NEW TOILET
URINAL SCREEN
METAL TOILET PARTITION
SHOWER CURTAIN ROD
CONCRETE PAD
SEE MECH. DWG
CONCRETE PAD
SEE MECH. DWG
ROBE HOOK
MG
PTD
MG
PTD
LAV LAV
SDSD
URINAL SCREEN
LINE
WALL
LINE
WALL
3.173.17
38 50
FFL
N T S
N T S
CLCL
13 13 13
87 87 87
WOOD BENCH DETAILS
ELEVATION
DOOR SCHEDULE, HARDWARE SETS
URUR
SS
LIGHT DUTY
SHELF METAL
D13
NOTES
1.
AND SHALL BE APPROVED BY THE COR. BEFORE APPLICATION.
THE CONTRACTOR SHALL BE PREPARE SHOP DRAWINGS FOR SINGLE MASTER KEYING SYSTEM DIAGRAM
THE CONTRACTOR SHALL PREPARE THREE (3) EACH OR MORE KEYING FOR EXTRA.2.
3.
WINDOW SCHEDULE AND DETAIL DRAWING TO COR FOR APPROVAL.
WITH ANCHOR BOLT AND WELDING. CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR ALL DOOR AND
THRU B-3.1.4 ALL EXTERIOR DOOR FRAME AND WINDOW FRAME SHOULD BE CONNECTED TO STRUCTURE
ALL EXTERIOR DOOR, GLAZED WINDOW: SEE SEPCIFICATION AND UFC 4-010-01, PAG B-9 & 10, PARA B-3.1
SEE SCHEDULE
LOUVER
X4EA
300X300
W/BIRD SCREEN
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
05 APR 21
D - 21 - 07
4 21
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
AE-05
"A"
SST BRACKET
W/ 2-6 DIA TOGGLE BOLTS
OR EXT AHR TO
MATCH BRACKET
SST SHELF
"A"
ELEVATION
SECTION "A"-"A"PLAN
NOT TO SCALE
SHELF METAL LIGHT DUTY DETAILS
ELEVATION SECTION
NOT TO SCALE
WALL PLATE
CONCEALED SST
SST FLANGE
50mm x 50mm
HOOK
BAR FORMS
100mm WIDE
SST FLANGE
50mm x 50mm
HOOK
BAR FORMS
100mm WIDE
SCREW
LOCK
59100
6A 6B
ROBE HOOK DETAILS (TYP)
1%SLOPE TO DRAIN
FABRIC REINF
WALL BEYOND
SEALANT
CONCRETE
MORTAR BED
1%SLOPE TO DRAIN
BOND COAT
(LEAD)
SHOWER PAN
HORIZ EMBED MIN 50.8MM
AT 304MM O.C. W/ 13BAR
13 BAR VERTICAL DOWELS
SEALANT
STRUCTURE
BTM OF EXST
EXTEND TO
SCHEDULE
INTERIOR FNSH
CEILING PER
AND ROD
SHOWER CURTAIN
SLOPE
SHOWER AREA
1B SHOWER HEAD1A SHOWER CURB
SHOWER SIDE
M A
X
6 6
T
F
L
(C
L G
H G
T
)SCHEDULT)
(SEE INT FINISH
FLOOR TILE MEMBRANE
WATER PROOFING
@300mm O.C.
STL STUDS
WALL TILE
MORTAR BED
NOT TO SCALE
SHOWER CURB & HEAD DETAILS
SECTION
2A
NOT TO SCALE
MOP RACK DETAILS
HOOK
A
C D
BB76
MOP HOLDER
DRYING ROD
A (mm)
B (mm)
C (mm)
D (mm)
HOLDERS
(EA)
HOOKS
(EA)
1067 229 191 229 5 4
FASTENER
18 GA SST SHELF
SST MOP HOLDER
SST HOOK
2-16 GA SST SHELF
BRACKET W/ 2-350
TOGGLE BOLT & 1065
CENTER BRKT17
& 1220 NEED
FFL
CEILING
URINAL SCREEN
METAL
ELEVATION
S E E
IN
T E
R
IO
R
F
IN
IS
H
S C
H E
D U
L E
METAL
WALL
BRACKET
L WALL
FASTENING
AS REQ’D
METAL
URINAL
SCREEN
DETAIL
CEILING
SUSPENSION
SYSTEM
ADDITIONAL
SUPPORT
SLEEVE
AS REQ’D
STILE
STEEL SHOE
STAINLESS
x6MM CONT.
L-76x76
13MM THK
GWB CEILING
BOLT ASSEMBLY
LEVELING
PLATE
MOUNTING
DETAIL
METAL
URINAL
SCREEN
FASTENING
WALL
METAL
WALL
BRACKET
AS REQ’D
DETAIL SECTION
POST
SUPPORT
METAL
URINAL SCREEN
FULL HEIGHT
"U" BRACKET
FULL HGT
" " BRACKET
WALL
FASTENER
AS REQ’D
FACE OF
WALL
STILE
x6MM CONT.
L-76x76
PIPE
SLEEVE
CEILING
SUSPENSION
SYSTEM
SHOE
RETAINER
STAINLESS
STEEL SHOE
2-10mm DIA.
ANCHOR BOLTS
GWB CEILING
BOLT ASSEMBLY
MOUNTING
@ WALL BEYOND
L-76x76 x6x200mm CLIP
DETAIL
LEVELING PLATE
13MM THK
NOT TO SCALE
URINAL SCREEN DETAILS
ELEVATION SECTION
NOT TO SCALE
GLASS MIRROR DETAILS
FASTENER
PLATE
METAL
FRAMED
GLASS
MIRROR
1.2 THK 12x12 SST FRAME
RUBBER
BACKING
LINE OF
MIRROR
RUBBER LINER
F F L
PLATE GLASS MIRROR
1.2 THK 12x25 GALV STL
FRAME FASTENED
OR @600 O.C
W/ 60 BOLTS, 2-PER SIDE
W/PIN KNOT SCREWS,
@600 O.C
2-PER SIDE OR
AE 05
AE 05
AE 05
3A
3E
3B
3D
3C
3B 3C 3D 3E
3F
3F
AE 05
4A 4B
4C
(F
O R
S T
A N
D A
R D
AE 05
5A
5B
5B
AE 05
RM#109
L
DETAILS
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
05 APR 21
D - 21 - 07
5 21
6"
2’-3"
9"
2’-3"
5"
1’
1’
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
AE-06NOT TO SCALE
TOILET PARTITION PLAN & ELEVATION & DETAILS (TYP)
1C
1E1F 1D
1G
1A
TOILET PARTITION FLOOR PLAN (TYP)
1B
1I
1B
ELEVATION
1C
ELEVATION
PILASTER/DOOR DETAIL
WALL
FACE OF
SEX NUT
SCREW &
SHOULDER
FASTENINGS
FULL HG’T WALL
PILASTER
DOOR
1D
(CONT)
" " BRACKET
PTN/PILASTER DETAIL
SEX NUT
SCREW &
SHOULDER
SCREW
MACHINE
PARTITION
" " BRACKET
PILASTER DOOR
1E
BUMPER
HOOK &
PILASTER/DOOR DETAIL
& KEEPER
STOPPER
DOOR
PER SPEC
CORE
PILASTER
DOOR
1E
PTN/PILASTER DETAIL
SEX NUT
SCREW &
SHOULDER
SCREW
MACHINE
PARTITION
"F" BRACKET
PILASTERDOOR
PTN AT WALL DETAIL
WALL
FACE OF
SEX NUT
SCREW &
SHOULDER
(CONT)
" " BRACKET
FASTENING
WALL
FULL HG’T
PARTITION
1F
1G
1H
PILASTER/RAIL DETAIL
AS REQ’D
FASTENINGS
WALL
W/ BRACKET
HEAD RAILING
25mm x 50mm
1H
1J
& ASSEMBLY
DOOR CASTING
TOP PIVOT
PILASTER/DOOR DETAIL
METAL BRACKET
DOOR PIVOT PIN
1I
& ASSEMBLY
DOOR CASTING
BOTTOM PIVOT
PIN
DOOR PIVOT
PILASTER/DOOR DETAIL
METAL BRACKET
1J
1K
PILASTER/RAIL DETAIL
SCREW
MACHINE
HEAD RAIL
OR METAL
ALUMINUM
EXTRUDED
PER SPEC
CORE
PILASTER
1K
BRACKET (AT WALL)
METAL HEADRAIL
HEAD RAIL
OR METAL
ALUMINUM
EXTRUDED
WALL BRACKET DETAIL
SEX NUT
SCREW &
SHOULDER
AS REQ’D
FASTENINGS
WALL
BRACKET
HEADRAIL
METAL
1L
1L 1O
1L
PILASTER AT FLOOR
CLIP
SPRING
EXP SHIELD
10mm DIA.
PILASTER
FFL
1M
STIRRUP
FLOOR
SINGLE PIECE
BOLT
LEVELING
JACKSCREW
S.S.TRIM
POLISHED
CLIP
SPRING
PILASTER AT FLOOR
BOLT & NUT
5mm DIA.
EXP SHIELD
10mm DIA.
FFL
1N
1M 1N
SEX NUT
SCREW &
SHOULDER
SCREW
MACHINE
RETURN BRACKET
METAL HEADRAIL
RETURN BRACKET DETAIL
BRACKET
RETURN
METAL
HEAD RAIL
OR METAL
ALUMINUM
EXTRUDED
PILASTER
1O
5.
O / MA SPECIFICATION, DISTANCE DIMENSION AS O/MA STD. DETAIL BOOK.
TOILET ACCESSORIES SIZES AND QUALITY FOLLOW TO ASTM AND
6.
CAULK AT ALL THE INCORNER OF TILE FINISHED WALL AND JOINT.
1.
2.
3.
4.
SPECIFIC NOTES
7.
CERAMIC TILES.
FLOOR FINISH MATERIALS OF TOILET & SHOWER SHALL BE NON-SLIP
CERAMIC TILES.
WALL FINISH MATERIALS OF TOILET & SHOWER SHALL BE GLAZED
FINISHED WALL.
CORNER BEAD SHALL BE INSTALLED AT ALL THE OUTCORNER OF TILE
FOR COLOR SELECTION.
CONTRACTOR SHALL PROVIDE COLOR SAMPLES TO USER THROUGH COR
SYSTEM INCLUDING NECESSARY ACCESSORIES TO DPW FOR APPROVAL.
CONTRACTOR SHALL SUBMIT DETAIL SHOP DRAWINGS OF RESTROOM
8.
AND LOCATIONS.
REFER TO TOILET FLOOR PLANS FOR EXACT PARTITION CONFIGURATION
9.
STEEL UNLESS SPECIFIED OTHERWISE.
ALL SCREWS, NUTS, WASHERS AND FITTINGS SHALL BE OF STAINLESS
TOILET PARTITION SHALL BE CONSTRUCTED IAW TECHNICAL SPECS.
356-406
560-410
RH ROBE HOOK (TO CENTER)
WC
SS
UR
PLUMBING FIXTURE
TOILET ACCESSORY/
QUANTITY
SERVICE SINK
MTG. HGT.
STANDARD
TTD
SD
MG
SOAP DISPENSER (BTM)
ABBREV.
URINAL (TO RIM)
WATER CLOSET (SEAT TOP)
MTP
MOP RACKMOPR/S
TOILET ACCESSORIES SCHEDULE
LAV LAVATORY (TO RIM) 813
US -
WOOD BENCH DETAILS WB
SMLD
SCR
SH
PTD
(TO BTM)
PAPER TOWEL DISPENSER
(TO CENTER)
TOILET TISSUE DISPENSER
MIRROR GLASS (TO BTM) 1200
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
AND PLANS
SEE ELEVS,
(TO CENTER)
SHOWER HEAD
(IN MM ABOVE FFL)
AE 06
FFLFFL
(1220mm HGT)
URINAL SCREEN
METAL TOILET PARTITION
(TO CENTER)
SHOWER CURTAIN ROD
SHELF METAL LIGHT DUTY
05 APR 21
AND DETAILS
TOILET PARTITON PLAN, ELEVATION
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
6 21
D3 D4D3 D4
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
05 APR 21
AE-07
1’-4"
15’-5"
15’-5"
A B C
A B C
15’-5"
15’-5"
1’-4"
DASHED LINE FOR ROOF (ABOVE)
ROOF EAVE LINE
PROTECTED METAL GUTTER
PROTECTED SHEET METAL ROOF
EXISTING BUILDING
DOWNSPOUT
15’-5"
15’-5"
A B C
EXISTING BUILDING
6 6
SCALE : 1 / 10 SCALE : 1 / 10
ENLARGED PARTIAL DETAIL-2
AE 07
SCALE : 1 / 10
ENLARGED PARTIAL DETAIL-1
SB-1 SB-1
S B
S B
S B
PARTIAL FOUNDATION & GROUND PLAN
PARTIAL ROOF PLAN
PARTIAL ELEVATION PLAN
ENLARGED ROOF FRAMING PLAN
SCALE : 1 / 50SCALE : 1 / 50
SCALE : 1 / 50
SCALE : 1 / 50
AE 07
40 115 115 40
4-M16 A.B.
BASE PL W/
200x310x14THK
6040 40
W/ 2-M20 HSB
9THK GUSSET PLATE
PURLIN
P-1
P-1
P-1
P-1
BASE PLATE DETAIL(SC-1)
-150x150x6
SC-1
H-150x150x7x10
SB-1
SB-1
SB-1
EXISTING BUILDING
AE 07
AE 07
AE 07
AE 07
AE 07
STANDARD TECHNICAL SPECIFICATIONS FOR O&MA PROJECTS, KOREA
- ALL WELDING WORKS SHALL BE DONE IN COMFORMANCE WITH
6. WELD :
- SHALL BE HEADED TYPE AND CONFORM TO ASTM A 307 OR KS B 1016.
5. ANCHOR BOLTS :
- SHALL CONFORM TO ASTM A325, KS B 1010 OR KS B 2819
4. BOLTS :
STANDARD TECHNICAL SPECIFICATIONS FOR O&MA PROJECTS, KOREA
- ALL STEEL SHALL BE PAINTED PER
- SHALL CONFORM TO ASTM A615, GRADE 60, OR KS D3504
3. REINFORCING STEEL :
- COMPRESSIVE STRENGTH AT 28 DAYS : 24.0 MPa
2. CONCRETE
ON THE DRAWINGS SHALL BE BOLTED OR WELDED.
1. SHOP AND FIELD CONNNECTIONS NOT SPECIFICALLY DETAILED
* NOTE
ENLARGED PARTIAL DETAIL, NOTE
ELEVATION PLAN, ROOF FRAMING PLAN
FOUNDATION & GROUND PLAN, ROOF PLAN
A B C
EXISTING BUILDING
PROTECTED SHEET METAL ROOF
D3 D4
SB-1SB-1
NEW CONCRETE RAMP NEW CONCRETE RAMP
16 16
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
7 21
1’-2"
WP
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
05 APR 21
AE-08
l’b’
SIZES
REINFORCEMENT REMARKSTYPE
6-HD16 w/ D10 HOOP BAR @ 150
HEADED
4-M16x400 LG
SEE
REMARKS
TYPEANCHOR BOLTS
BASE PLATE
SIZE
MARK
SERIES
METRIC
STEEL COLUMN SCHEDULE
-150x150x6T 310x200x14T
REMARKSMARK
STEEL BEAM SCHEDULE
HEADED STUDSCAMBER
METRIC SERIES
H-150x150x7x10
MARK REMARKSMETRIC SERIES
C-150x75x25x3.2T
PURLIN SCHEDULE
b’ l’
PD-1
D10 HOOP BAR @ 150
6-HD16 w/
STRUCTURAL SECTION DETAIL
SCALE : 1 / 25AE 08
SCALE : 1 / 10AE 08
SCALE : 1 / 10AE 08
3 ENLARGED PARTIAL DETAIL-1
SCALE : 1 / 10AE 08
4 ENLARGED PARTIAL DETAIL-2
4-M16
MORTAR
BEDDING
25THK
50505050
AE 07
-150x150x6
SC-1
WELDED /W SB1 AND L-ANGLE
C-150x75x25x3.2
P-1 @820
H-150x150x7x10
SB-1
-150x150x6
SC-1
P-1
SB-1
SC-1
PD-1
DOWNSPOUT
PD-1 DETAIL
WELDED /W P-1 AND SB-1
L-75x75x6 100mm LG.
PROTECTED METAL GUTTER
ROOF LINER (TYP)
PROTECTED METAL
P-1
SB-1
STRUCTURAL SCHEDULE
ENLARGED PARTIAL DETAIL
STRUCTURAL SECTION DETAIL
COLUMN SPREAD FOOTING SCHEDULE
STRUCTURAL FILL
FFL
SCHEDULE
& REINF, SEE
FOOTING SIZE
ELEVATIONPLAN
SC-1
PD-1
EXISTING BUILDING
PD-1
SC-1
H
SIZES
REINFORCEMENT REMARKSTYPE
6-HD16 w/ D10 HOOP BAR @ 150F-1 300
250 350
B L
B
600 2150
F-1 h
H
L h
5’-11"
F-1
NEW RAMP
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
8 21
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
KIM, CHI SOP
KIM, DONG HWAN
81-00516-8J
05 APR 21
AE-09
1A 1B
B
SL
OP
E
SOLDER
RIVET &
12 METERS 12 METERS
GUTTER
DOWNSPOUT SIZE - 100MM X 50MM
GUTTER SIZE - 152MM WIDTH X 127MM DEPTH
DOWNSPOUT
STRAP HANGER
& NUT (TYP)
SCREW W/ WASHER
6.35mm DIA. x 3�" CAP
RECTANGULAR
PLAIN
38 38
.4
DOWN
ROOF
SLOPES
CL
LOCATION
FASTENER
GROOVE
SEALANT
SEALANT
300300300
OR EXP AHR (TYP)
9.53mm DIA. TOGGLE BOLT
"Z" CLOSURE
1.5mm THK
1C
.7
BACK (MIN)
LOWER THAN
FRONT 12.70mm
NOT TO SCALE
EXPANSION JOINT
LAP TYPE GUTTER
SECTION
NOT TO SCALE
GUTTER DESIGN
RECTANGULAR
NOT TO SCALE
GUTTER
ENDS
LAP
GUTTER
2. GUTTERS SHALL BE HUNG WITH HIGH POINTS EQUIDISTANT FROM DOWNSPOUTS AND HALL HAVE A SLOPE NOT LESS THAN 1.59mm PER 305mm.
1. THE REAR SIDE OF THE GUTTER SHALL NOT BE LESS THAN 12.70mm HIGHER THAN THE OPPOSITE SIDE.
NOTES:
2A
NOT TO SCALE
DS HANGER DETAIL
2B
NOT TO SCALE
DS SHAPE
2. DO NOT USE SMALLER THAN 177.8 SQ. MM. AREA EXCEPT FOR CANOPIES.
1. SPACE DOWNSPOUTS 6096mm MIN.,15240mm MAX.
NOTES:
4A
NOT TO SCALE
ROOF PANEL CROSS SECTION
4C
NOT TO SCALE
METAL LINER CROSS SECTION
LINES
OF PANEL SHOWN AS DARK
ENTIRE LENGTH AND WIDTH
SEALANT APPLIED ALONG
SLOTS NOT REQUIRED ON LOWER EDGE)
PANEL (OCCUR ONUPPER EDGE ONLY,
CONTRACTION WITH FACTORY PUNCHED
SLOTTED HOLES FOR EXPANSION AND
4B
NOT TO SCALE
SEALANT APPLICATION
4D
NOT TO SCALE
ISOMETRIC OF ROOF PANEL
HOLE
SLOTTED
4F
NOT TO SCALE
SIDE LAP DETAIL
4E
NOT TO SCALE
FASTENER INSTALLATION DETAILS
PANELS
METAL ROOFING
PROTECTED
PURLIN
SPLICE
FASTENERS
PANEL TO STRUC
DETAIL
SEE SIDE LAP
FASTENERS
PANEL TO PANEL
SPACING
750 MAX
FASTENERS
SIDE LAP
SEE STRUC
PURLIN,
INTERMEDIATE
5A
NOT TO SCALE
"Z" CLOSURE DETAIL
5B
NOT TO SCALE
DETAIL
INSECT SCREEN
PVC SADDLE WITH
RECOMMENDATION
MANUFACTURER’S
OR ADHESIVE PER
MASTIC SEALANT
METAL ROOFING
RIB (DEPTH = 29mm)
PVC SADDLE INSIDE EACH
CANOPY
AE 09
1 METAL GUTTER & EXPANSION JOINT DETAIL
NOT TO SCALE
NOT TO SCALEAE 09
2 DOWNSPOUT DETAILS
NOT TO SCALEAE 09
3 CONCRETE SPLASHBLOCK
NOT TO SCALEAE 09
4 METAL ROOF PANEL DETAILS
NOT TO SCALEAE 09
5 "Z" CLOSURE DETAIL
STEEL PURLIN,
METAL ROOF PANEL DETAILS
METAL GUTTER AND DOWNSPOUT DETAILS
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
BUSAN STORAGE FACILITY
D - 21 - 07
9 21
LEGEND AND ABBREVIATIONS
SCH
SA
SAN
QTY
R12, R22
RA
RDTR
RPM
RT
PG
PH
POC
POL
PPM
PRV
QT
OA
OAIL
OD
OS&Y
Pa
NTS
BUTTERFLY
CUBIC METER PER HOUR
AIR CONDITION (-ING,-ED)
AIR CONDITION UNIT (S)
AIR COOLED CONDENSING UNIT
CHILLED/HOT WATER RETURN
CHILLED/HOT WATER SUPPLY
REFRIGERANT LIQUID
CAP CAPACITY
CUBIC METER
COMPRESSOR
CONTINUE
CONNECTION
CPRSR
CU M
CONT
CONN
COUNTER CLOCKWISE
COEFFICIENT
CIRCUIT
CAST IRON PIPE
CHILLED WATER
CKT
CMH
COEF
CHW
CCW
CIP
ALARM CHECK VALVEACV
AVG AVERAGE
BAROMETER(-TRIC)
CENTIGRADEC
BARO
AMPERE(AMP, AMPS)
ALUMINUM
APPROX
AMP
AIR COND
AHU
AL
AIR COOLED
ACU
ACLD
ACCU
CHWS
CHWR
CHR
CHS
D
RL
DRAIN
KILOCALORIE PER HOUR
KILOGRAM PER SQ. CENTIMETER
KILOGRAM
THERMAL CONDUCTIVITY
IRON PIPE SIZE
ISOMETRIC
DIAMETER, INSIDE
FACE AREA OR FRESH AIR
EXTERNAL STATIC PRESSURE
EVAPORAT (-E,-ING,-ED,-OR)
ENTERING WATER TEMP
FIRE HOSE CABINET
EXPLOSION PROOF
FHC
FA
ESP
EVAP
EWT
EFF
ENT
EQPT
EP
EFFICIENCY
ENTERING
EQUIPMENT
KG
K
IPS
ISO
ID
NIC
N.O.
NO
MPS
N.C.
N/A
MM
MPH
MIN
MAX
NOT IN CONTRACT
NORMALLY OPEN
NUMBER
NORMALLY CLOSED
METERS PER SECOND
METERS PER HOUR
MINIMUM OR MINUTE
NOT APPLICABLE
MILLIMETER
MAXIMUM
HERTZ
HOSE BIBB
HEAD
HORSEPOWER
HOUR(S)
HOT WATER
HOT WATER HEATER
HORIZONTAL
FIBERGLASS REINFORCED PLASTIC
FREQUENCY
FLUSH VALVE
FEED WATER PUMP
FIXTURE
GAGE OR GAUGE
GALVANIZED STEEL
FUEL OIL
FEMALE PIPE THREAD
CIRCULATING WATER PUMPCWP
FRP
DECIBEL OR DRY BULB
DRY BULB TEMPERATURE
ENTERING AIR TEMPERATURE
DRY PIPE VALVE
DIRECT EXPANSION
DO DIESEL OIL
EAT
DPV
DX
DIV
DIAG
DIFF
DB
DBT
DIVISION
DIAMETER
DIAGRAM
DIFFERENCE
DEGREE
HR
HZ
HW
HWH
HORIZ
HB
HD
HP
GA
GALVS
FV
FWP
FXTR
CLOCKWISE OR COLD WATERCW
PLUG VALVE
THREE WAY
FREQ
FO
FPT
GATE, GLOBE
GATE, ANGLE
GLOBE
CONTROL
GATE
M
LPS
LWT
LT
LPH
LPD
LL
LG
LBS
LAT
LAV
L
KWH
KW
LITERS PER SECOND
LITERS PER HOUR
LEAVING WATER TEMPERATURE
METERS
LAUNDRY TRAY
LITERS PER DAY
LIQUID LINE
LEAVING AIR TEMPERATURE
POUNDS
LAVATORY
LENGTH
KILOWATT HOUR
KILOWATT
LITERS
P
STRAINER, BLOW OFF
STRAINER
PUMP (INDICATE USE)
KG/ SM KILOGRAM PER SQ. METER
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
PIPE TO BE REMOVED
MEDIUM TEMPERATURE HOT WATER RETURN
MEDIUM TEMPERATURE HOT WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
RS
RD
(NAME)
(NAME)E EXISTING PIPE
HWR
HWS
MTWR
MTWS
CR
CS
PIPING
SANITARY DRAIN
CHECK, SWING
PIPE SLEEVE WITH FIRE STOPPING
VENT THRU ROOF
BFP
PLAN
HOSE BIBB
BALL
ELEV.
PIPE SLEEVE
BACKFLOW PREVENTER
FLOOR DRAIN
FLOOR CLEANOUT
FD
FCO
FLEXIBLE CONNECTOR
ANCHOR, INTERMEDIATE
ANCHOR, MAIN
EXPANSION JOINT
EXPANSION LOOP
EJ
RELIEF
SAFETY
HOSE END DRAIN
LOCK SHIELD
NEEDLE
PRESSURE REDUCING
CONTROL, PNEUMATIC-ELECTRIC
CONTROL, ELECTRIC-PNEUMATIC
CHECK, NON-SLAM
S
R
EP
PE
COLD WATER
VENT
AD FD
QUANTITY
TEMPERATURE DIFFERENCE
TONS OF REFRIGERATION
SCHEDULE
SUPPLY AIR
SANITARY
REFRIGERANT (12, 22, ETC)
RETURN AIR
REVOLUTIONS PER MINUTE
REFRIGERATION TON
RADIATOR
TYP TYPICAL
UNIT HEATER
URINAL
UH
UR
SYMBOL
TEMPERATURE
THICKNESS
TONS
THK
TEMP
SYM
TD
OUTSIDE AIR INTAKE LOUVER
PRESSURE REDUCING VALVE
PHASE (ELECTRIC)
PETROLEUM, OIL AND LUBRICANTS
POINT OF CONNECTION
PARTS PER MILLION
PERCENT/
QUART
PRESSURE GAGE
DIAMETER, OUTSIDE
OUTSIDE SCREW & YOKE
PASCAL
POLE
SPR SPRINKLER
STAINLESS STEEL
SQUARE
STEAM
STANDARD
STEEL
ST
STD
STL
SQ
SST
SPECIFICATION
SQUARE METER
STATIC PRESSURE
SPEC
SP
SM
OUTSIDE AIR
NOT TO SCALE
SECONDSEC
VAV VARIABLE AIR VOLUME
WATER CLOSET
VENTILATION
W/
WT
WC
WD
WITH
WEIGHT
WIDTH
W
WB
VOL
VEL
VENT
VERT
WATT
WET BULB
VOLUME
VELOCITY
VERTICAL
SMOKE DAMPER (PROVIDE ACCESS DOOR)
MANUAL VOLUME DAMPER
VAC
V
VACUUM
VOLT
SPLITTER DAMPER
AD
SD
VD
TEE, SINGLE SWEEP
TEE, OUTLET DOWN
REDUCER, ECCENTRIC (STRAIGHT, DOWN)
REDUCER, ECCENTRIC (STRAIGHT, INVERT)
ELBOW, TURNED DOWN
UNION, FLANGED
UNION, SCREWED
TEE, OUTLET UP
TEE
LATERAL
ELBOW, TURNED UP
CONNECTION, TOP
CONNECTION, BOTTOM
BUSHING
CAP
FIRE DAMPER (PROVIDE ACCESS DOOR)
BDD
TURNING VANES
TRANSITION
FLEXIBLE CONNECTION
FLEXIBLE DUCT
FC
DUCT WORK
A B B R E V I A T I O N S
L E G E N D
PG
TM
AAV
FOS
3-WAY VALVE (MOTORIZED)
PRESSURE GAUGE
THERMOMETER
AUTOMATIC AIR VENT
GATE VALVE
CHECK VALVE
FUEL OIL SUPPLY
FLEXIBLE JOINTFJ
& STRAINER
M
CS
SD
SHOWER DRAIN
DEG
DIA or o
CEAT CONDENSER ENTERING AIR TEMP
LCWT LEAVING CHILLED WATER TEMP
FAIL FRESH AIR INTAKE LOUVER
EXPANSION JOINTEXPJT
EXST EXISTING
A / C AIR CONDITIONING
APPROXIMATELY
ARCH ARCHITECTURAL
BLDG BUILDING
CONC CONCRETE
DWG DRAWING
EA EACH
F.C.U. FAN COIL UNIT
MECH MECHANICAL
KCAL/ HR
KG/ SQ CM
HOT WATER SUPPLY
HOT WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
V
DOMESTIC HOT WATER SUPPLY
DOMESTIC HOT WATER RETURN
AAV
ED EXHAUST DUCT
AUTOMATIC AIR VENT
AIR HANDLING UNIT
GROUND LEVELGL
REGISTER, SIDEWALL
SUPPLY AIR GRILLE OR
REGISTER, CEILING
SUPPLY AIR GRILLE OR
REGISTER, CEILING
EXHAUST AIR GRILLE OR
GRILLES, REGISTERS AND DIFFUSERS
EG
ER
SG
SR
SG
SR
RG
RR
CD
200mm NCD
COWL, (GOOSENECK) AND FLASHING
(810mm WIDTH x 400mm DEPTH)
DUCT SIZES SHOWN810mm x 400mm
M
ELECTRIC MOTOR OPERATED DAMPER
S
MOTORIZED DAMPER
MD
SUPPLY AIR DUCT RISER
RETURN OR EXHAUST AIR DUCT RISER
SUPPLY AIR DUCT SECTION
RETURN AIR DUCT SECTION
GATE, GLOBE OR BALL VALVE
CHECK VALVE (FLOW)
ANGLE VALVE
STRAINER
DRIP CHECK VALVE
RESTRICTED ORIFICE
FILL CUP
PRESSURE GAUGE
SOLENOID VALVE
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLEXIBLE PIPE CONNECTION
RELAY
HOSE VALVE
TEST HEADER
SMOKE DAMPER
R
SD
S
: WATER MOTER ALARM GONG
SPRINKLER SYSTEM
: UP-RIGHT TYPE SPRINKLER
: PENDENT TYPE SPRINKLER
: SIDE WALL TYPE SPRINKLER
REMOVAL WORK
RELOCATED WORK
SUPPLY AIR DUCT
RETURN AIR DUCT
EXHAUST AIR DUCT
SA
RA
EA
DEMPERS
VALVES, SPECIAL DUTY
HEATING
AIR CONDITIONING & REFRIGERATION
PLUMBING
VALVES : (for selective actuators)
BACK DRAFT DAMPER
CIRCUIT SETTER
POINT OF CONNECTIONPOC
POR POINT OF REMOVAL
TcH THERMOSTAT HEATING/COOLING
THERMOSTAT OF HEATING
REGISTER, CEILING
RETURN AIR GRILLE OR
Th
REDUCER, CONCENTRIC
MECHANICAL
05 APR 21
CHANG, TAE HO
NAM, TAE CHIN
81-00516-8J
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
M-1
D - 21 - 07
G
10 21
SQUARE TYPE
CEILING DIFFUSER,
BUSAN STORAGE FACILITY
(200mm NECK DIAMETER)
CEILING DIFFUSER, ROUND TYPE
BLDG. NO. S-1321
REPAIR BOX & CRATE SHOP,
SCOPE OF WORK
WORK CLASS: "K" (REPAIR / MAINTENANCE WORK)
D E S C R I P T I O N
NO.
ITEM
Q’ TY
EQUIPMENT SCHEDULE
AIR COMPRESSOR1
CAPACITIES, USE WATER-REPELLENT FILTER CLOTH, VARIETY OF DUST COLLECTION.
BAG FILTER TYPE, CONTINUOUS DUST REMOVAL METHOD, HANDLING A VARIETY OF
TECHNICAL SPECIFICATIONS.
COMPRESSOR SHALL BE FOLLOWED SECTION 23 09 23. 13 20, O & MA STANDARD
AND PRESSURE SWITCH FOR AUTOMATIC STARTING AND STOPPING. AIR
ELECTRIC-MOTOR DRIVEN, EQUIPPED WITH A CHECK VALVE, SHUT-OFF VALVE
AIR COMPRESSOR SHALL BE SINGLE STAGE OIL-FREE TYPE, AIR-COOLED,
SIZE: 1450 x 520 x 1090
TANK SIZE: 150 L
ELEC. POWER: 220 V, 5.5KW, 3 PH, 60 HZ
MOTOR POWER: 7.5 HP, 5.5KW, 680 RPM
"HANSHIN" MODEL NO. NH-7 OR APPROVED EQUAL
SAW DUST COLLECTOR
FLEXIBLE ARM DUCT
MAX VACUUM: 1500 Pa
MAX TEMPERATURE EXTRACTED AIR: 70 C
CAPACITY: 400 - 600 CFM
LENGTH: 3M
TYPE: ROLL
SIZE: 150
MATERIAL TYPE: POLYURETHANE
LENGTH: 15M
TYPE: ROLL
SIZE: 100
5 3
RE-ROLLING BY SPRING.
STOPPING AT THE DESIRED LENGTH THROUGH RATCHET WHEEL, AUTOMATICALLY
AIR LINE SHOULD BE CELLING INSTALLATION, FLEXIBLE HOSE, EXTRACTION UNIT,
AIR HOSE & AIR GUN
MATERIAL TYPE: POLYURETHANE
LENGTH: 15M
TYPE: ROLL,
EXTERNAL DIAMETER: 12
INTERNAL DIAMETER: 8
"MYUNG JIN MACHINERY IND CO LTD" MODEL NO. CBX-1010 OR APPROVED EQUAL
INTEGRATED IN WALL.
RETARDANT, TEMPERATURE RANGE -40 C TO 90 C, SPRING STEEL WIRE
FLEXIBLE HOSE, EXTRACTION UNIT, DEDUSTING SYSTEM, FILTER SYSTEM, FLAME-
11 WARM AIR FURNACE
ROTARY VALVE: 220V, 3PH, 1.5KW, SQ300-2HP
TURBO FAN: 220V, 3PH, 18.5KW, 100CMM x 600mmAq, BELT TYPE
BAG FILTER: 156x2500L, POLYESTER, WATER REPELLENT COATING
HOPPER: SS400 4.5t
BODY: SS400 4.5t
05 APR 21
81-00516-8J
CHANG, TAE HO
NAM, TAE CHIN
THERMOSTAT, VENT KIT AND AHRI CERTIFIED.
OIL FIRED, UNIT SHALL BE PROVIDED WITH ELEC. AIR CLEANER, PROGRAMMABLE
Q’ TY
NO.
ITEM
POWER SUPPLY
(CFM)
FAN CAPACITY
ROOM NO.
1/20 HP, 115 V, 1 PH, 60 HZ
ROOF EXHAUST FAN7
TOILET & SHOWER ROOM
100 CFM AT 1/8" SP
DRAFT DAMPER.
MOTOR MOUNTED WITH RESILIENT ANTI-VIBRATION MOUNTS, AUTOMATIC BACK
TYPE BLOWER WHEEL, PERMANENTLY LUBRICATED AND THERMALLY PROTECTED
HOUSING W/ ACOUSTIC INSULATION, DYNAMICALLY BALANCED CENTRIFUGAL
ROOF MOUNTED, VERTICAL DISCHARGE, METAL GRILLE, GALVANIZED STEEL
GENERAL NOTES
THROUGH COR.
SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE
ENVIRONMENTAL GOVERINNG STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE NEW
TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA
BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED PRIOR TO ANY WORK
AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK AREA WILL NEED TO
CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CASE WORK IN THE
NOT PRESENT IN THE REAS AFFECTED BY THIS WORK. HOWEVER, IF SUSPECTED ASBESTOS
VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS
PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER
PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL
19. THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1
CONSTRUCTION.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING
SPECIFICATIONS.
CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT
OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON
SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS
17. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL
ADDITIONAL COST TO THE PROJECT CONTRACT.
THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO
O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.
16. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR
SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".
15. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL
TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.
EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED
14. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW
REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.
13. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL
FOR APPROVAL.
DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION
12. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE
CONTRACTOR.
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS
THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO
11. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
10. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.
9. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/ NEW) SHALL BE SEALED PER SPEC.
SUCH AS ANCHORS, HANGERS, SUPPORTS, ETC.
8. ALL PIPES, DRAINS AND DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES
THE REQUIREMENTS OF SEAL CLASS C.
TO SMACNA STATIC PRESSURE CONSTRUCTION CLASS 500PA AND DUCTWORK SHALL MEET
7. THE SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING
AS ORIGINALLY INTENDED.
AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT CONNECTION TO FUNCTION
ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION, REMOVE THE EXISTING DUCTWORK
& LOCATION PRIOR TO INSTALL NEW HAVC AND PLUMBING PIPING. IF THE EXISTING DUCT
6. THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING DUCTWORK AND PIPING ELEVATION
AS DIRECTED BY THE CONTRACTING OFFICER.
EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.
4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND
PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR
3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE
AND SHALL BE VERIFIED AT THE JOB SITE.
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC, ARE APPROXIMATE
CONTRACTING OFFICER’S APPROVAL.
REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S
PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.
EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,
CONFORM TO PL 93-523 AND NSF/ANSI 61
STEEL COVER BOLTS, AIR GAP, ASSE APPROVED, AWWA STANDARD
SILICONE RUBBER DISK, REPLACEABLE POLYMER CHECK SEATS, STAINLESS
REDUCE PRESSURE ZONE BACKFLOW ASSEMBLY, LEAD FREE BRONZE BODY,
BACKFLOW PREVENTER & PRESSURE REDUCING STATION
SIZE: 50 mm
MAX. WORKING PRESSURE: 175 PSI (12.1 BAR)
TEMP…