This document is a Request for Proposal (RFP) for the repair of a deteriorated and failing building, Building #212, at Camp Walker. The Solicitation Number is W90VN9-24-R-0143, and the closing date and time for responses is 19 July 2024, 12:59 PM (Korea Local Time and Date). The contracting agency is the Department of the Army Materiel Command Army Contracting Command. The RFP outlines the required products and services for the building repair, with details to be provided in the attached drawing. Responses must be submitted by the specified closing date and time, and the award will be made at a later date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP W90VN924R0143.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 24 - 32
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
UNIT #15746, APO AP 96218-5746
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
AS SHOWN
1 1 OF 1R - 1
T I T L E S H E E T
TITLE SHEET
USING AGENCY
DATE:25 JUN 24
P2-00511-0J
PROJECT NO. P2-00511-0J, CAMP WALKER
C - 3
C - 4
LOCATION PLAN
CAMP WALKER
CIVIL
C - 1
C - 2
FAILING BUILDING B#212
REPAIR DETERIORATED AND
FAILING BUILDING B 212
REPAIR DETERIORATED AND
AD101
AD102
AE101
AE104
AE106
AE102
AE103
AE302
AE303
AE201
AE301
23 AE404
AE402
AE403
M - 3
M - 4
M - 5
M - 1
M - 2
HVAC & PLUMBING REMOVAL PLAN
M - 6
M - 7
E - 3
E - 4
E - 5
E - 1
E - 2
ARCHITECTURAL
MECHANICAL
ELECTRICAL
A001
A002
AE105
AE401
SITE LAYOUT PLAN
TYPICAL SECTIONS
CONCRETE SIDEWALK DETAIL
SCOPE OF WORK
PARTITION WALL DETAILS - 2
PARTIAL SECTION DETAIL
ENTRANCE CANOPY DETAILS
EIFS DETAILS (TYP)
LEGEND AND ABBREVIATIONS
NEW HVAC DUCT & PIPING PLAN
NEW PLUMBING PIPING PLAN
DETAIL DRAWINGS - 1
DETAIL DRAWINGS - 2
LEGEND, NOTES AND SCOPE OF WORKS
LIGHTING PLAN AND LIGHTING FIXTURE DETAILS
34 OF 34 EXISTING AND MODIFIED PANEL SCHEDULE AND DETAIL OF ARC FLASH LABELS
EXISTING/ REMOVAL AND NEW ELECTRICAL POWER SITE PLAN
POWER PLAN - RECEPTACLE, EQUIPMENT, HVAC SYSTEM AND FIRE ALARM PLAN
EQUIPMENT SCHEDULE, GENERAL NOTES AND SCOPE OF WORK
(TYP), LAVATORY COUNTER DETAIL (TYP), PAPER TOWEL DESPENSER & WASTE RECEPTACLE DETAILS
GUTTER DETAIL (TYP), CONC SPLASH BLOCK DETAIL, GUTTER EXPANSION JOINT DETAILS, DOWNSPOUT DETAIL
GENERAL NOTES, SPECIFIC NOTES, MATERIAL NOTES
EXST / REMOVE FLOOR PLAN, EXST / REMOVE FOUNDATION PLAN
EXST / REMOVE ROOF PLAN, BULIDING PHOTO VIEW
NEW FLOOR PLAN, NEW CEILING PLAN
PARTITION WALL PLAN, CMU WALL OPENING DETAIL, CMU BLOCK-UP DETAIL
PARTIAL FLOOR PLANS, INTERIOR ELEVATIONS
DOOR SCHEDULE, DOOR TYPES, DOOR HARDWARE SCHEDULE, NOTES
WINDOW SCHEDULE, WINDOW TYPE, DOOR DETAILS (TYP), CLJ DETAIL, SLAB DETAIL
INTERIOR & EXTERIOR FINISH SCHEDULE, MATERIAL COLOR SCHEDULE, ABBREVIATION, NOTE, GENERAL NOTES
SIGNAGE DETAIL
SIZE & MOUNTING LOCATION OF SIGNAGE, SIGNAGE PLAN, BUILDING IDENTIFICATION, INTERIOR WALL MOUNTED
HANGER DETAILS, CEILING ACCESS, CEILING ACCESS (ATC)
SEMI-EXPOSED GRID ACOUSTICAL TILE CEILING DETAILS (TYP), GYPSUM BOARD CEILING DETAILS, TYPICAL
PARTITION WALL DETAILS - 1
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
1 SCALE : 1 / 3000
GRAPHIC SCALE
(IN METERS)
0 60 120
N
SCALE: 1 : 3000
CIVIL
CAMP WALKER
1 34
D - 24 - 32
CHI, K. K.
AS SHOWN C-1
LOCATION PLAN
LOCATION PLAN
25 JUN 24
P2-00511-0J
KU, HUN MO
THIS PROJECT
2-
1SEE THE PLAN
STOP
E
E
S
S
S
S-363
S-373S-372 S-367
S-409
T-235 Golf Course
S-468
T-445
S
T-444
S
S
T 9 S-470
S-457 T-465
T-466
S-450T-706
S-324
S-422
S-335
S-320
S-338
S-200
S-216T-213
S-452
T-720
T-235 Golf Course
T-235 Golf Course
GATE 6
S-403
TMP Washrack
188TH MP
S-431
S-430
T-433
S-441
GOLAN 10
T-442
S-414
S-411
S -416S
-410
T
S-440
S-711
T-712
S-358
S-349
S-408 T-421
S -420
T-342
T-387
S-701
S-348
T-235 Golf Course
KELLY FIELD
S-252
S-283
S-257
S-205
S-208
S-261
S
S-260
S-202
S-217
S-212
S-222
S-362
T
T
S-360
S-368
S-386
S-38
T-235 Golf Course
S-2
S-
S-148
S-149 S-163
T-164
S-165
S-166
S-565
S
S
S-161
T-158
S-617
S-57
S-57
S-574
S-556
S
S 1S-566
T-569
S-57
S-57
S-584
T-614
S
S -602
S-601
S
S
S
S
S-
S-221
T-573
S
S-267
S
S-314
S-303
S-304
S-305
S-309
S-327
S-328
S-334
S-312
S-318
S
S-592
T-594
S
S
S-379
S-374
S-310
T-340
S-330
T-341
SUBSTATION
S-321
S-359
GATE 4
S-393
APSAN OVERPASS BRIDGE
APSAN OVERPASS BRIDGE
S-357
T-364
S-356
T-355
S-353 S-399
S-350
S-352
S-344 tank-1 water tank-2 water
STREET
WASHINGTON
S-556
S-
S-5
S-585
S
S
S
S
S-315
S
S-226
S-316
S
S
S
S-237
S-
S-
S-
S
S-182 S-555
S-557
S-228
S-230
S-227
S-616
P A R
K
IN
G
S T R
U C T U
R E
P A R
K
IN
G
S T R
U C T U
R E
LOT
PARKING
LATRINE
S-265
S-232
S-250
POND
COURT
BASKETBALL
S-652
S-649
S-653
S-398
S-
T
S-669
FAMILY HOUSING
P A R
K
IN
G
S T R
U C T U
R E
FAMILY HOUSING
FAMILY HOUSING
FAMILY HOUSING
P A R
K
IN
G
S T R
U C T U
R E
MIDDLE / HIGH SCHOOL
CHILDREN DEVELOPMENT CENTER
LODGE
S-233
FAILING BUILDING B#212
REPAIR DETERIORATED AND
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
KU, HUN MO
CHI, K. K.
SITE LAYOUT PLAN
SITE LAYOUT PLAN
GRAPHIC SCALE
0SCALE : 1 / 75 30001500750
SCALE: 1 : 75
C-2
CAMP WALKER
P2-00511-0J
25 JUN 24
ITEMS TO BE REMOVED
LEGEND:
NOTES:
RESTORE IMMEDIATELY TO ITS ORIGINAL OR BETTER CONDITIONS.
A RESULT OF THE CONSTRUCTION WORK, CONTRACTOR SHALL
EXISTING UNDERGROUND UTILITY LINES HAVE BEEN DAMAGED AS
REQUIREMENTS).
WITH THE USFK REGULATION 201-1, TABLE 2-7 (DUST REDUCTION
THE CONTRACTOR SHALL PERFORM THE WORKS IN ACCORDANCE
KOREA, USFK PAM 200-1.
APPLICABLE KOREAN ENVIRONMENTAL GOVERNING STANDARDS FOR
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE
ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.
FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF
EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION
AS INDICATED AND REQUIRED.
THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED
LIMITS INDICATED, UNLESS OTHERWISE NOTED.
ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT
6.
5.
4.
3.
2.
1.
1.
2.
3.
ACCORDANCE WITH OMA STANDARD SPECIFICATIONS.
EARTH WORKED AREA SHALL BE PROPERLY COMPACTED IN
SHALL BE FULLY COVERED WITH SOLID SODDING AND TOPSOIL.
ALL UNPAVED, CUT/FILLED AREAS WITHIN THE PROJECT WORK LIMIT
DRAINAGE SURFACE.
FINISH SURFACE SHALL BE WELL GRADED AND HAVE POSITIVE
REMOVAL NOTES:
INCLUDING BASE COURSE
NEW CONC. SIDEWALK
D - 24 - 32
SCOPE OF WORK
#1 (CONSTRUCTION/ALTERATION)
1.
#2 (REPAIR/MAINTENANCE)
1.
SEE GENERAL NOTES ON DRAWING REF. NO. C-2.
SEE REMOVAL NOTES ON DRAWING REF. NO. C-2.
1.
2.
#3 (GENERAL REQUIREMENTS)
CONSTRUCT CONCRETE SIDEWALK INCLUDING BASE COURSE.
4.
5.SOD WITH TOP SOIL AND SOLID SODDING.
REMOVE EXISTING RED BRICKS.
14.
13.
12.
15.
16.
GENERAL NOTES:
PROPER MATERIAL HANDING METHODS.
MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO DETERMINE
CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE
ENVIRONMENTAL GOVERNING STANDARD(EGS) CHAPTER 5 & CHAPTER 6.
CODE OF REGULATION 1910 SUBPART H AND USFK REGULATION 201-1,
DURING THE PROJECT MUST BE STORED IN ACCORADANCE WITH THE
ALL HAZARDOUS MATERAIL AND HAZARDOUS WASTE USED/ CREATED
1.
OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO SUBMISSION
THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND
2.
3.
4.
5.
6.
7.
CONTRACTING OFFICER PRIOR TO COMMENCING WORK ON THE PROJECT.
OF THE JOB BY THE COR AND SHOULD BE APPROVED BY THE
THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY PORTION
WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.
UNDERGROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER ITEM
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND
8.
9.
10.
11.
GOVERNMENT.
LAY DOWN AREA SHALL BE PROVIDED FOR THE CONTRACTOR BY THE
STORAGE AREAS SHALL BE WITHIN THE CONSTRUCTION AREA AND NO
APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE FIELD OFFICES AND
TEMPORARY FACILITIES ACCORDING TO O&MA SPEC. AT THE LOCATION
CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S
AND STATIONS AND ELEVATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS
SATISFACTION OF THE CONTRACTING OFFICER.
DEMOLISHING, OR REMOVING AT THE CONTRACTORS EXPENSE TO THE
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY DISMANTLING,
THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/RESTORATION
ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD IF REQUIRED.
CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND DETOUR
OTHER UTILITY MARKERS IN THE PROJECT LIMIT.
CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS AND
UTILIZED TO ACCOMPLISH THE CIVIL SCOPE OF WORK.
COMMAND" FORM AS A PART OF THIS PROJECT.THE DETAILS WILL BE
OCTOBER 2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT
TECHNICAL SPECIFICATIONS FOR O & MA PROJECT, KOREA, REVISION1, 30
OF THE ARMY INSTALLATION MANAGEMENT COMMAND" AND "STANDARD
DRAWINGS, FOR O & MA PROJECT, KOREA, 30 NOVEMBER 2015, DEPARTMENT
THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
DEPTH UNLESS OTHERWISE NOTED.
WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF FROST
ADDITIONAL COST.
FALSEWORK SUCH AS FORMWORKS AND SHORING WITHOUT ANY
CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES INCLUDING
LEASED PROPERTY IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.
DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S.GOVERNMENT
TO COMMENCING THE WORK.
TO THE DESIGN AND TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR
THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL SUBMITTAL
TRAFFIC AND OPERATIONS.
FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY
PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS
SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER
CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY
SODDING WITHIN THE WORK BOUNDARY.
CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND SOLID
17.
GL
GL
GL
GL
GL
GL
GL
GL
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
T-AC
T-AC
T-AC
PCC
PCC
PCC
PCC
PCC
PCC
CLF
WF
WF
BLDG
BLDG
STOOP
STOOP
TR
TR
STONE
STONE
80.043
80.119
80.157
80.322
80.471
80.025
80.333 80.218
79.975
79.945
80.415
80.507
80.543
80.531
80.462
80.500
80.511
80.508
80.445
80.062
80.158
80.224
80.326
80.044
80.085
80.006
80.014
80.070
80.543
80.158
80.042
80.086
80.054
80.015
79.973
79.965
79.957
80.283
80.410
80.515
80.601
80.427
80.592
80.619
80.655
80.322
80.815
80.257
80.111
BLDG. #S-212
W/V
EL=80.095 (ASSUMED)
WATER VALVE BOX
TOP OF EXIST.
TBM
FFE.=80.701 (ASSUMED)
1, ROAD
ROAD BLDG
TR.
AC
PCC PCC
PCC
PAD
PAD
PAD
PAD
PAD
SHRUB
ROAD
ROAD
ROAD ROAD
ROAD
80.841
80.70580.719 80.637
80.98180.971
80.690
80.566
80.611
80.607
80.589
80.567
80.570
80.54580.529
80.580
803596
80.709
803682
- 3
- 4
REMOVE EXISTING RED BRICKS
PROJECT WORK LIMIT
SOD WITH TOP SOIL AND SOLID SODDING
LOCATION INDICATED BY COR
REPLANT EXISTING TREE TO THE
SEE TYPICAL SECTIONS AND DETAIL
INCLUDING BASE COURSE
CONSTRUCT CONCRETE SIDEWALK
REMOVE EXISTING METAL FENCE
RESILIENT CONCRETE SIDEWALK
ASPHALT CONCRETE PAVEMENT, AND
REMOVE EXISTING CONCRETE SLAB,
REMOVE EXISTING METAL FENCE.
REPLANT EXISTING TREE TO THE LOCATION INDICATED BY COR.
AND RESILIENT CONCRETE SIDEWALK.
REMOVE EXISTING CONCRETE SLAB, ASPHALT CONCRETE PAVEMENT,
2.
3.
N
ACCORDANCE WITH DRAWING AND SPECIFICATIONS.>
<ALL FAILED OR FAILING SYSTEM SHALL BE REPAIRED IN
FAILING BUILDING B#212
2 34
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
NOT TO SCALE- 3
C-3
(ASSUMED)
EL.=80.600
(ASSUMED)
EL.=80.190
EXISTING COONCRETE CART TRACK
EXISTING COONCRETE CART TRACK
SLOPE
(T=100)
NEW CONCRETE SIDEWALK
(ASSUMED)
EXISTING GRADE
~ CONCRETE STOOP ~
12mm EXPANSION JOINT
12mm EXPANSION JOINT
FOR CANOPY
EXISTING STEEL COLUMN
NOT TO SCALE
- 3
(ASSUMED)
FFE=80.701
S-212
BLDG.#
(T Y P
SLOPE
(TYP.)
(T=100)
NEW CONCRETE SIDEWALK
(TYP.)
2% SLOPE SLOPE
EXISTING TREE
EXISTING COONCRETE CART TRACK
(ASSUMED)
EXISTING GRADE
TYPICAL SECTION-1
TYPICAL SECTION-2
TYPICAL SECTIONS
CAMP WALKER
P2-00511-0J
25 JUN 24
2,610 (TYP.) 6,325 (TYP.)
785 (TYP.) 1,500 SEE LAYOUT PLAN
(W=VAR.)
1,000 (TYP.)
D - 24 - 32
MATCH EXISTING STOOP EL.
FAILING BUILDING B#212
3 34
NOT TO SCALE
CONCRETE SIDEWALK
3R
AGGREGATE USED.
BUT NOT LESS THAN THE MAXIMUM NOMINAL SIZE OF THE
BE AT LEAST ONE - FOURTH OF THE SIDEWALK SLAB THICKNESS.
EXCEED 1.25. THE DEPTH OF THE CONTRACTION JOINT WILL
THAT THE RATIO OF SLAB LENGTH TO WIDTH WILL NOT
TRANSVERSE CONTRACTION JOINTS SHALL BE SPACED SO
CONTRACTION JOINT
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
JOINT FILLER JOINT SEALER
3R
AND WHERE WALKS ABUT OTHER CONCRETE STRUCTURES
STRAIGHT SECTIONS AND AT ALL RETURNS OF WALKS,
PROVIDE EXPANSION JOINTS AT MAXIMUM 15m INTERVALS FOR
EXPANSION JOINT
%(TYP)2
GRADE
FINISHED
MATERIAL BASE
COMPACTED NON-FROST-SUSCEPTIBLE
CONCRETE 21 MPA
SECTION
fy = 440 Mpa fy = 392 Mpa(GRADE 60)
Fnt = 310 Mpa fu = 482 Mpa
1. CONCRETE : (MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS)
ALL CONCRETE UNLESS NOTED OTHERWISE
HOT-ROLLED DEFORMED BAR
2. STEEL
WELDED WIRE FABRIC
4. BOLTS :
ASTM A307,
3. WELDING ELECTRODE:
CONCRETE
CONFORM TO ACI STANDARDS (ACI 318, ACI 301 ETC.)
1. ALL WORK FOR CONCRETE AND REINFORCING STEEL SHALL
CONCRETE FINISH
f’c = 21 MPa
SIDEWALK PATH.
1. APPLY BROOM FINISH PERPENDICULAR TO RAMP AND
MATERIAL STRENGTHS
CONCRETE SIDEWALK DETAIL
25 JUN 24
P2-00511-0J
C-4
4 34
CAMP WALKER
D - 24 - 32
1,500
FAILING BUILDING B#212
1.
2.
3.
6.
OF CONSTRUCTION SHALL BE USED.
NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS
DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE
EXISTING UTILITIES AS A RESULT OF HIS/HER WORK.
OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL PAY FOR ALL DAMAGES TO
TO UTILITIES. NOTIFY THE OWNER’S REPRESENTATIVE OF ANY UNDERGROUND UTILITIES IN THE WAY
EXTREME CAUTION AND MUST EXERCISE PROPER CARE DURING EXCAVATION TO PREVENT DAMAGE
ACCURACY OR THE EXISTENCE OF OTHER OBSTACLES WHICH MAY BE ENCOUNTERED WORK WITH
PLANS ARE FROM THE LATEST AVAILABLE RECORDS BUT ARE NOT GUARANTEED AS TO THE
THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES AND STRUCTURES AS SHOWN ON THESE
4.
LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO VERIFY THEIR
WHEREVER CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE
THE PROJECT AREA PRIOR TO EXCAVATING. THE CONTRACTOR SHALL COORDINATE ALL WORK.
THE CONTRACTOR SHALL NOTIFY ALL AGENCIES TO VERIFY THE ACTUAL LOCATION OF ALL UTILITIES IN
5.
ADDITIONAL COSTS TO THE OWNER.
SCHEDULED TO REMAIN DURING THE CONSTRUCTION PERIOD WHICH SHALL BE REPAIRED AT NO
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES INCURRED TO EXISTING WORK
7.
PATCHING SHALL MATCH THE FINISH OF THE ADJACENT SURFACES.
THE CONTRACTOR SHALL PATCH ALL SURFACES EXPOSED FROM CUTTING, AND/OR REMOVAL WORK.
8.
ACCESSIBILITY GUIDELINES (ADAAG).
ALL STANDARDS, REQUIREMENTS AND GUIDELINES OF THE AMERICANS WITH DISABILITIES ACT
ALL GOVERNING AGENCIES. THIS WORK SHALL BE DESIGNED AND CONSTRUCTED TO CONFORM WITH
ALL WORK SHALL CONFORM TO ALL APPLICABLE LAWS, CODES, REGULATIONS, AND ORDINANCES OF
9. ALL DIMENSIONS SHOWN ON FLOOR PLAN ARE TO FACE OF FINISH, UNLESS OTHERWISE.
10.
PROVIDE DUST CONTROL MEASURES AS REQUIRED.
CLEAN AND FREE FROM ACCUMULATION OF WASTE MATERIALS AND RUBBISH. CONTRACTOR SHALL
AREA, THE OWNER’S PREMISES, INCLUDING STREETS AND OTHER AREAS USED BY THE CONTRACTOR
CONTRACTOR SHALL, AT ALL TIMES, DURING THE COURSE OF THE WORK, KEEP THE CONSTRUCTION
11.
OF OPERATIONS, INTERRUPTION OF MECHANICAL AND ELECTRICAL UTILITIES.
DELIVERY ACCESS TO AND FROM WORK, SPECIAL NOISY OPERATIONS, TIMING OF WORK, SEQUENCE
COORDINATE ALL OPERATIONS WITH THE OWNER’S REPRESENTATIVE FOR MATERIALS STORAGE,
12.
DEBRIS, RUBBISH, AND CONSTRUCTION MATERIAL AT TIME OF FINAL ACCEPTANCE.
REMOVE BARRICADE AFTER COMPLETION OF THE PROJECT AND CLEAN THE PROJECT AREA OF ALL
PREVENT PEOPLE FROM ENTERING THE PROJECT AREA AND TO PROTECT THE ENCLOSED PROPERTY.
CONTRACTOR SHALL PROVIDE BARRICADES, AS REQUIRED, AND ACCEPTABLE TO THE OWNER TO
13.
REPRESENTATIVE.
TRADE SHALL BE USED TO RESOLVE SUCH DISCREPANCIES AND MUST BE APPROVED BY THE OWNER’S
SUBMIT SHOP DRAWINGS ON HOW THEY WILL RESOLVE SUCH DISCREPANCIES. GENERAL PRACTICE OF
SHALL BE BORNE BY THE CONTRACTOR AND IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO
QUESTIONS RAISED DURING CONSTRUCTION PHASE THAT MAY RESULT IN EXTRA COST, SAID COST
ALL DISCREPANCIES FOUND ON DRAWINGS DURING CONSTRUCTION PHASE, ANY DISCREPANCIES OR
IT SHALL BE CONTRACTOR’S RESPONSIBILITY TO NOTIFY THE OWNER’S REPRESENTATIVE FOR ANY OR
14. CONTRACTORS SHALL VERIFY ALL QUANTITIES.
STATE PROPERTY IN ACCORDANCE WITH ALL LOCAL GOVERNING LAWS AND REGULATIONS.
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OUTSIDE THE LIMITS OF
ALL MATERIALS REQUIRED TO BE DISPOSED OF IN THIS PROJECT UNLESS REQUIRED TO BE SALVAGED, INTENDED TO LIMIT THE WORK REQUIRED IN ANY WAY.
TITLES, CAPTIONS, HEADINGS, ETC. ARE INTENDED FOR GENERAL REFERENCE AND ARE NOT
THE ABOVE NOTES APPLY TO THE FULL SET OF CONSTRUCTION DOCUMENTS.
1.
2.
3.
4.
GENERAL NOTES
OFFICER.
ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE CONTRACTING
PRIOR TO COMMENCING ANY CONSTRUCTION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION AND DIMENSIONS
WORK.
OF THIS WORK MUST BE DONE TO INSURE ROUGH- IN WORK IS ACCOMPLISHED PRIOR TO FINISHING
REPLACEMENT OF MECHANICAL, ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM COORDINATION
CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING TO MAKE WAY FOR THE INSTALLATION AND
INCONVENIENCE TO THE CUSTOMER’S MISSION OPERATION.
APPROVAL FROM THE GOVERNMENT AND EXECUTE WORK STAGE BY STAGE WITHOUT ANY
THE CONTRACTOR SHALL SUBMIT WORK SCHEDULE PRIOR TO COMMENCING THE WORK AND GET
CONTRACTOR.
THAT MAY OCCUR DURING THE COURSE OF HIS WORK SHALL BE RESTORED AT THE EXPENSE OF THE
THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT EXISTING FACILITIES AND ANY DAMAGES
CONTRACTING OFFICER AT THE LOCATION INDICATED BY CONTRACTING OFFICER.
SALVAGEABLE MATERIALS SHALL BE REMOVED FROM WORK SITE IN A MANNER AND TURNED OVER TO
1.
2.
3.
4.
CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.
SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL FIELD
SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACT FIELD CONDITIONS.
15. FILL EXISTING DUCT AND PIPE HOLE W/ CONCRETE.
16.
RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ACCESS DOOR AND WALL.
THE CONTRACTOR SHALL VERIFY THE NEW EQUIPMENT ACCESS CONDITIONS AT JOB SITE AND WILL BE
17.
18.
19.
AND SPECIFIC NOTES ON THE CONTRACT DRAWINGS.
THE CONTRACTOR SHALL FOLLOW THE CONSTRUCTION WORK AS INDICATED ON THE GENERAL NOTES
20.
CONTRACTOR SHALL SUBMIT ALL MATERIAL & COLOR SAMPLES TO DPW FOR APPROVAL.
COLOR AND PATTERN WHICH MANUFACTURERS STANDARD MUST APPROACH.
MATCH FOR MANUFACTURER COLOR IS NOT REQUIRED. THE SELECTIONS SERVE ONLY TO INDICATE
NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE MANUFACTURERS INDICATED. AN EXACT
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR IDENTIFICATION PURPOSES ONLY, AND
CONTRACT DRAWING.
THE CONTRACTING OFFICER. A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE
CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP DRAWINGS FOR APPROVAL TO
5.
INSTALLATION.
DETAILS AND DRAWING SHALL BE APPROVED BY THE C.O. OR HIS COR. BEFORE FABRICATION AND
INSTRUCTIONS. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR AND WINDOW
ALL DOORS AND WINDOWS SHALL BE FABRICATED I.A.W. SPECIFICATIONS AND MANUFACTURER’S
5.
6. REMOVE & CLEAN EXISTING FINISH MATERIAL & ADHESIVE BY GRINDING TO RECEIVE VCT & TILE.
7. REMOVE & CLEAN EXISTING PAINT BY SAND PAPER/ GRINDING FOR NEW PAINTING AND COATING.
8.
FREE.
SHEET (MSDS), WRITTEN IN ENGLISH, FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD
OF THIS PROJECT. THE CONTRACTOR WILL PROVIDE A CERTIFICATE OR MATERIAL SAFETY DATA
LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON- VOLATILE SOLIDS) DURING THE EXECUTION
THE CONTRACTOR IS REQUIRED TO USE "LEAD FREE" COATINGS (LIQUID PAINTS OR COATINGS WITH
9.
REQUIREMENTS MANUAL EM 385-1-1 LATEST EDITION.
THE CONTRACTOR SHALL PERFORM ALL WORKS IN ACCORDANCE WITH USACE SAFETY AND HEALTH
AND THE ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK REGULATION 201-1.
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE KOREAN ENVIRONMENTAL LAWS
CONTRACT, AND SHALL BE RESOLVED BEFORE PROCEEDING WITH THE WORK.
OMISSIONS OR CONFLICTS WHICH PREVENT HIM OR HER FROM FULFILLING THE TERMS OF THE
CONTRACTOR SHALL PROMPTLY NOTIFY THE OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES, WITH THE REQUIRED WORK.
SHALL VERIFY ALL CONDITIONS AND DIMENSIONS RELATING TO THE PROJECT BEFORE COMMENCING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND
WITHOUT WRITTEN APPROVAL OF THE OWNER’S REPRESENTATIVE.
THAT THE PROPER REVISIONS MAY BE MADE. MODIFICATION OF DETAILS SHALL NOT BE MADE
CONFLICT WITH THE DRAWINGS, THEY SHALL BE REPORTED TO THE OWNER’S REPRESENTATIVE SO
BEST PRESENT KNOWLEDGE, BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS
ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE
6.
7.
8.
9.
10.
11.
12.
13.
SPECIFIC NOTES MATERIAL NOTES
MATCHING EXISTING COLOR AND FINISH.
ANY STRUCTURAL STEEL MEMBERS EXPOSED TO INTERIOR SPACE SHALL BE RE -PAINTED WITH
THROUGH COR.
NEW SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE
THE KOREA ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE
PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH
THE WORK AREA WILL NEED TO BE RE SURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED
CONTRACTOR SHALL CASE WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER.
WORK. HOWEVER, IF SUSPECTED ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE
FREE. TESTS HAVE INDICATED THAT ASBESTOS IS NOT PRESENT IN THE AREA AFFECTED BY THIS
OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER VERIFYING THE PRODUCT IS ASBESTOS
WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL PROVIDE A CERTIFICATE
THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1 PERCENT BY
TRAFFIC AND OPERATIONS.
NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY
BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL
THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, AND USER.
THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE CONTRACTING OFFICER
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
14.
THE CONTRACTING OFFICER.
AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS AS DIRECTED BY
THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING
CONTRACTOR.
INCURRED FOR SPILL CONTAINMENT AND CLEAN- UP SHALL BE THE RESPONSIBILITY OF THE
OFFICER SHALL OVERSEE THE CLEAN- UP EFFORT AND RENDER THE SITE CLEAN. ALL COSTS
APPROPRIATE MEASURES TO CONTAIN AND ADEQUATELY CLEAN- UP THE SPILL. THE CONTRACTING
CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND UTILIZE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SEWAGE SPILLS CAUSED DURING
CONTRACT.
ACCOMPLISH THE ARCHITECTURAL SCOPE OF WORK AT NO ADDITIONAL COST TO THE PROJECT
AGENCY, KOREA REGION OFFICE" FROM A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED TO
PROJECTS, KOREA, NOVEMBER 30, 2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT
THE ARCHITECTURAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR O&MA
201-1, ENVIRONMENTAL GOVERNING STANDARD(EGS) CHAPTER 5 & CHAPTER 6.
STORED IN ACCORDANCE WITH THE CODE OF REGULATION 1910 SUBPART H AND USFK REGULATION
ALL HAZARDOUS MATERIAL AND HAZARDOUS WASTE USED/ CREATED DURING THE PROJECT MUST BE
A001
MATERIAL NOTES
SPECIFIC NOTES
GENERAL NOTES
ARCHITECTURAL
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
15.
DRAWINGS AND SPECIFICATIONS.
ALL FAILED OR FAILING SYSTEM SHOULD BE REPAIRED IN ACCORDANCE WITH THE ATTACHED
FAILING BUILDING B#212
REPAIR DETERIORATED AND
25 JUN 24
D - 24 - 32
5 34
SCOPE OF WORK
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
#1. REPAIR / MAINTENANCE : K - WORK
#2. GENERAL REQUIREMENTS
1.
CUT AND REMOVE THE EXISTING CEMENT MASONRY UNIT WALL.
SEE GENERAL REQUIREMENTS ON DRAWING REF. NO. A001.
REPLACE EXISTING FLOOR FINISH WITH WALL BASE.
A002
SCOPE OF WORK
D - 24 - 32
ARCHITECTURAL
CAMP WALKER
LIM, WG
KIM, CS
REPLACE EXISTING DOOR, DOOR FRAME AND DOOR HARDWARE INCLUDING NECESSARY ACCESSORIES.
REPLACE EXISTING GYPSUM WALL BOARD WITH METAL STUD WALL INCLUDING NECESSARY ACCESSORIES.
PROVIDE GRAB BARS AND TOILET ACCESSORIES.
REPLACE EXISTING CONCRETE FLOOR AND FOUNDATION WITH NEW INCLUDING NECESSARY ACCESSORIES.
BLOCK-UP EXISTING OPENING WITH CEMENT MASONRY UNIT WALL AND RESTORE EXTERIOR INSULATION AND FINISH SYSTEM.
REPLACE EXISTING METAL STUD, GLAZED CERAMIC WALL TILE AND NON-SLIP FLOOR TILE WITH WATERPROOFING MEMBRANE.
REPLACE ASPHALT SHINGLE ROOF WATERPROOFING SYSTEM WITH METAL FLASHING INCLUDING NECESSARY ACCESSORIES.
PAINT INTERIOR SURFACE AND EXTERIOR SURFACE.
REPLACE EXISTING ENTRANCE CANOPY WITH DOWNSPOUTS INCLUDING NECESSARY ACCESSORIES.
PROVIDE COUNTER TOP. (FOOD PREPARATION AREA)
PROVIDE ROOM & BUILDING SIGNAGE WITH NEW.
REPLACE EXISTING RAIN GUTTER AND DOWNSPOUT INCLUDING NECESSARY ACCESSORIES.
PROVIDE VANITY CABINET WITH COUNTER TOP AND MIRROR GLASS INCLUDING NECESSARY ACCESSORIES.
PROVIDE STAINLESS STEEL ACCESS DOOR. (MEN’S TOILET)
PROVIDE INSULATED METAL ROLL UP DOOR INCLUDING NECESSARY ACCESSORIES.
PROVIDE ALUMINUM SWING/SLIDING AUTOMATIC DOOR AND DOOR FRAME INCLUDING NECESSARY ACCESSORIES.
REPLACE EXISTING WOOD TRIM WITH NEW.
REPLACE EXISTING CEILING SUSPENSION SYSTEM INCLUDING NECESSARY ACCESSORIES.
REPLACE EXISTING WINDOW AND WINDOW FRAME INCLUDING NECESSARY ACCESSORIES.
REPLACE EXISTING WOOD CHAIR RAIL ON INTERIOR WALL
REPLACE EXISTING FASCIA AND SOFFIT.
PROVIDE REINFORCED CONCRETE COLUMN AT BOTH SIDE OF DOOR OPENING.
REPLACE EXISTING INSULATION ON EXISTING WOODEN SUPPORTING FRAME WITH NEW INCLUDING NECESSARY ACCESSORIES.
P2-00511-0J
< ALL FAILED OR FAILING SYSTEM SHOULD BE REPAIRED IN ACCORDANCE WITH DRAWINGS AND SPECIFICATION. >
FAILING BUILDING B#212
REPAIR DETERIORATED AND
25 JUN 24
6 34
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
N
L E G E N D
7 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
REMOVE EXST DOOR WITH DOOR FRAME
REMAIN EXST CMU WALL
32’-8"
12’-1"
5’-3"
4’-7"
7’-6"
3’-3"
REMOVE EXST CMU WALL AND EIFS
REMOVE PARTITION WALL, GWB
SCALE : 1 / 50
1 EXST / REMOVE FLOOR PLAN
AD 101
SCALE : 1 / 50
2 EXST / REMOVE FOUNDATION PLAN
AD 101
AD101
REPLACE CONCRETE FLOOR SLAB AND FOUNDATION FOR NEW SEWER LINE
(SEE MECH DWG)
REPLACE FLOOR CERAMIC TILE WITH MORTAR BED ON WATERPROOFING
MEMBRANE ON EXST CONC FLOOR SLAB
EXST / REMOVE FOUNDATION PLAN
EXST / REMOVE FLOOR PLAN
N
32’-8"
12’-1"
5’-3"
4’-7"
7’-6"
3’-3"
REMOVE EXST DOOR WITH DOOR FRAME
NOTES:
1.
FIRE ALARM SYSTEM. (SEE ELEC DWG)
REMOVE/REINSTALL AND RELOCATE EXISTING ELECTRIC PANEL BOARD, CATV SYSTEM AND
FAILING BUILDING B#212
25 JUN 24
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
N
L E G E N D
8 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
10925 35’-10"
SCALE : 1 / 50
1 EXST / REMOVE ROOF PLAN
AD 102
AD102
REMOVE EXST ASPHALT SHINGLE WATERPROOFING SYSTEM WITH METAL FLASHING
REMOVE EXST RAIN GUTTER, DOWNSPOUT
REMOVE ASPHALT
SHINGLE
WATERPROOFING
SYSTEM WITH
METAL FLASHING
REMOVE EXST
ENTRANCE
CANOPY W/
DOWNSPOUTS
9’-3"
REMOVE EXST
FASCIA AND
SOFFIT
BULIDING PHOTO VIEW
EXST / REMOVE ROOF PLAN
REPLACE EXST ENTRANCE
CANOPY W/ DOWNSPOUTS
REPLACE EXST RAIN
GUTTER, DOWNSPOUT
REPLACE EXST FASCIA
AND SOFFIT
REPLACE EXST RAIN
GUTTER, DOWNSPOUT
BUILDING PHOTO VIEW
AD 102
NOT TO SCALE
REPLACE
EXST FASCIA
AND SOFFIT
REPLACE EXST
DOOR AND DOOR
FRAME
REPLACE EXST ASPHALT
SHINGLE WATERPROOFING
SYSTEM WITH METAL
FLASHING
REPAINT EXST DOOR
AWNING
REPAINT EXTERIOR SURFACE
FAILING BUILDING B#212
REPAIR DETERIORATED AND
25 JUN 24
NAIL SEALABILITY (ASTM D1970)
ENHANCED SLIP RESISTANCE
: SYNTHETIC ICE & WATER BARRIER
SUREGUARD PLUS , OWENSCORNING (OR APPROVED EQUAL)
b. SPECIFICATION
a. SIZE : 1T (16m L X 1m W)
*. PLYWOOD
THICKNESS : 15mm
KS F 3101 , WATER RESISTANT TYPE(TYPE-1)
*. WATERPROOFING SHEET *. ROOFING SHINGLE
a. SPECIFICATION
OAKRIDGE PRO 30 SUPER , OWENSCORNING (OR APPROVED EQUAL)
ASTM D3462
ASTM D3018
WIND RESISTANCE ASTM D3161, 177mph(110MPH)
:UL790, CLASS A,
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
9 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
L E G E N D
200 MM METAL STUD / RUNNER
GLAZED CERAMIC WALL TILE ON 12 MM CEMENT BOARD
GLAZED CERAMIC WALL TILE ON MORTAR BED W/ METAL LATH AND ASPHALT FELT
12.5T GYPSUM BOARD
(WATER RESISTANT TYPE)
SCALE : 1 / 50
AE 101
NEW FLOOR PLAN
SCALE : 1 / 50AE 101
NEW CEILING PLAN
AE101
NEW CEILING PLAN
NEW FLOOR PLAN
100 MM METAL STUD / RUNNER
90 MM METAL STUD / RUNNER
N
COUNTER TOP
REF.
SINK
N
ON 12 MM CEMENT BOARD
GLAZED CERAMIC WALL TILE ON MORTAR BED W/ METAL LATH AND ASPHALT FELT
15.9T ACOUSTIC CEILING TILE
15.9T X-TYPE GYPSUM BOARD (2PLY)
50 MM METAL STUD / RUNNER
C1
C2C2
C1
1’
SINGLE DOOR / DOOR FRAME
7"
@150
STIRRUP
HD13
4-HD16
1’-2"
@150
STIRRUP
HD13
6-HD16
COLUMN DETAIL
1. CONCRETE: (MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS)
F’ = 27 MPac
2. STEEL
F = 392 Mpa (GRADE 60)y
ALL CONCRETE UNLESS NOTED OTHERWISE
HOT-ROLLED DEFORMED BAR
C1
C2
AL SWING/SLIDING DOOR / DOOR FRAME
METAL ROLL UP DOOR
SST ACCESS DOOR
AL FIXED WINDOW W/ BLIND
NOTES:
1. PROVIDE WALL ACCESS DOOR IN MEN’S TOILET (SST, 400X1200MM)
BLOCK UP EXISTING OPENING WITH CEMENT MASONRY UNIT WALL WITH EIFS
2. SEE MECH DWG FOR THE LOCATION OF FLOOR DRAIN.
CAULK AT ALL THE INCORNER OF TILE FINISHED WALL AND JOINT.3.
SEE AE.101 COLUMN DETAIL (TYP)
*C1 AND *C2
REINFORCED CONCRETE COLUMN
4. PROVIDE DESIGN SAMPLE OF CONTERTOP TO USER FOR APPROVAL.
4. KITCHEN SINK AND REFRIGERATOR WILL BE PROVEDED BY FMWR.
14’-6"
32’-8"
7"
6"
8’-6"
3’-9"
5’-3"
5’-7"
6"
6’-8"
4’-7"
2’-2"
1’-5"
1’ " 2
11’-1"
6’-9"
3’-7"
7’-11"
3’-4"
32’-8"
1’
14’-6"
32’-8"
7"
6"
8’-6"
3’-9"
5’-3"
5’-7"
6"
6’-8"
4’-7"
2’-2"
1’-5"
1’ " 2
11’-1"
6’-9"
3’-7"
7’-11"
3’-4"
32’-8"
1’
FAILING BUILDING B#212
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
10 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
AE102
SCALE : 1 / 50
PARTITION WALL PLAN
AE 102
A
A
LINTEL
PRECAST CONCRETE
T-BAR
B-BAR STIRRUP
NOTE2
(NOTE1)
GRUOT SOLID
OPENING
200mm 200mm
NOTES :
SOLID TO GREATEST EXTENT POSSIBLE
1. AFTER CUTTING OPENING, GROUT JAMBS
OR LOUVER FRAME
2. DIMENSION AS REQUIRED FOR DOORS, WINDOW,
3. SEE ARCH PLAN FOR DOOR SIZE AND LOCATION
CMU WALL
EXISTING
T-BAR
B-BAR
STIRRUP
40mm CLR
MORTAR
ELEVATION SECTION A-A
LINTEL SCHEDULE
T-BARS B-BARS STIRRUPS
2-HD13 2-HD13 HD10@150 O.C.
m m
NOT TO SCALEAE
2 CMU WALL OPENING DETAIL
IN-FILL
@ 800mm OC ON
HD13 BAR
SOLID GROUT
OPENING
LIMIT OF EXISTING
CMU
EXISTING
800mm OC (MAX)
HD13 HORIZ BARS
MORTAR @ GROUTED CELLS.
1. 150mm DEEP HOLE W/EPOXY
CELLS DO NOT OCCUR
GROUT SOLID WHERE GROUTED
2. BREAK OUT BLOCK WEB &
PAPER FILLER @ CASE 2
MORTAR
150mm DEEP HOLE W/ EPOXY
AE NOT TO SCALE
3 CMU BLOCK-UP DETAIL
CMU BLOCK-UP DETAIL
CMU WALL OPENING DETAIL
PARTITION WALL PLAN
1A
2A
(FROM FLOOR TO 2,600mm HGT)
15mm THK GWB
90mm METAL STUD @ 300mm O.C.
12mm THK. CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
CERAMIC WALL TILE
3A
4A
5A
6A
2B
(FROM FLOOR TO 2,600mm HGT)
15mm THK GWB
200mm METAL STUD @ 300mm O.C.
12mm THK. CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
CERAMIC WALL TILE
4B
4C
(FROM FLOOR TO 2,600mm HGT)
15mm THK GWB
90mm METAL STUD @ 300mm
#15 ASPHALT FELT
METAL LATH
25mm THK MORTAR BED
CERAMIC WALL TILE
6B
6C
7A
(FROM FLOOR TO 2,600mm HGT)
90mm METAL STUD @ 300mm
#15 ASPHALT FELT (BOTH SIDE)
METAL LATH (BOTH SIDE)
25mm THK MORTAR BED (BOTH SIDE)
CERAMIC WALL TILE (BOTH SIDE)
190mm THK CMU WALL (EXST)
(FROM FLOOR TO 2900mm HGT)
50mm THK BLANKET INSULATION
90mm METAL STUD @ 400mm
(FROM FLOOR TO 2600mm HGT)
15mm THK GWB
190mm THK CMU WALL (EXST)
(FROM TO FLOOR TO 2,900mm HGT)
50mm THK BLANKET INSULATION
90mm METAL STUD @ 300mm O.C.
(FROM TO FLOOR TO 2,600mm HGT)
12mm THK. CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
CERAMIC WALL TILE
(FROM FLOOR TO 2,900mm HGT)
50mm THK BLANKET INSULATION
50mm METAL STUD @ 300mm
(FROM FLOOR TO 2,600mm HGT)
#15 ASPHALT FELT
METAL LATH
25mm THK MORTAR BED
CERAMIC WALL TILE
(FROM FLOOR TO 2,900mm HGT)
50mm THK BLANKET INSULATION
90mm METAL STUD @ 300mm
(FROM FLOOR TO 2,600mm HGT)
#15 ASPHALT FELT
METAL LATH
25mm THK MORTAR BED
CERAMIC WALL TILE
FLOOR WALL PLAN
NOT TO SCALE
2A
3A
5A
5A
2B
4A 4B
4C
6A
6B
6C
6A
6C
7A
1A 1A
3A
3A
6A
6A
4D
(FROM FLOOR TO 2,600mm HGT)
15.9mm THK GWB (X-TYPE)
100mm METAL STUD @ 300mm
50mm THK BLANKET INSULATION
15.9mm THK GWB (X-TYPE)
4D
190mm THK CMU WALL (EXST)
(FROM CEILING TO 2900mm HGT)
50mm THK BLANKET INSULATION
190mm THK CMU WALL (EXST)
(FROM CEILING TO 2900mm HGT)
50mm THK BLANKET INSULATION
(FROM FLOOR TO 2,600mm HGT)
#15 ASPHALT FELT
METAL LATH
25mm THK MORTAR BED
CERAMIC WALL TILE
(FROM TO FLOOR TO 2600mm HGT)
CERAMIC WALL TILE
(300mm HGT)
WATERPROOFING MEMBRANE
12mm THK. CEMENT BOARD
15.9mm THK GWB (X-TYPE)
50mm THK BLANKET INSULATION
100mm METAL STUD @ 300mm O.C.
15.9mm THK GWB (X-TYPE)
(FROM FLOOR TO 2,600mm HGT)
CERAMIC WALL TILE
25mm THK MORTAR BED
METAL LATH
#15 ASPHALT FELT
6mm THK. CEMENT BOARD
15.9mm THK GWB (X-TYPE)
50mm THK BLANKET INSULATION
100mm METAL STUD @ 300mm
15.9mm THK GWB (X-TYPE)
ABA GENERAL NOTES
1.
2.
3.
4.
REFER TO PLASNS, ELEVATIONS, AND DETAILS FOR ADDITIONAL MOUNTING LOCATION INFORMATION NOT SHOWN HERE.
THIS SHEET IS FOR REFERENCE ONLY. NOT ALL CONDITIONS SHOWN MAY APPLY.
IT IS THE CONTRACTOR’S RESPONSIBLILTY TO CONSTRUCT THIS FACILITY IN COMPLIANCE WITH ARCHITECTURAL BARRIERS ACT(ABA).
REVIEW AT THE PROJECT SITE. THESE STANDARDS ARE ABAILABLE AT NO COST FROM THE U.S. ACCESS BOARD WEBSITE.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE CURRENT ABA STANDARDS AND TO HAVE THEM AVAILABLE FOR
FAILING BUILDING B#212
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
NOT TO SCALE
PARTITION WALL DETAILS - 1
AE 103
AE103
FIN FLR LN
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
INSULATION
SIZED AS SCHEDULED
METAL STUD,
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
INT FIN SCHED
WALL BASE PER
15mm GWB
MAX
304mm
ON 12mm THK CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
WALL TILE WITH TILE BOND
ON CONC. FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
2A 90
-2B 200
MAX
304mm
WOOD CHAIR RAIL
PER SCHED
FLR FINISH
WOOD CHAIR RAIL
WALL HEIGHT : 2,600mm
WOOD CHAIR RAIL
WALL HEIGHT : 2,600mm
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
INSULATION
50mm
FIN FLR LN
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
SIZED AS SCHEDULED
METAL STUD,
WALL FIN PER SCHED
15mm GWB
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
INT FIN SCHED
WALL BASE PER
PER SCHED
FLR FINISH
MAX
406mm 1A
" WOOD CHAIR RAIL
EXST WALL
WOOD CHAIR RAIL
STUD HEIGHT : 2,900mm
WALL HEIGHT : 2,600mm
TYPE
PARTITION
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
@ CEILING ABOVE
SECTION
STRUCTURE
BOTTOM OF
FIN FLR LN
INSULATION
NOTES
REMARKS/
50mm90
MAX
304mm 3A
SIZED AS SCHEDULED
METAL STUD,
ON 12mm THK CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
WALL TILE WITH TILE BOND
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
ON CONC. FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
SIZE
STUD
SPACING
STUD
EXST WALL
STUD HEIGHT : 2,900mm
WALL HEIGHT : 2,600mm
FIN FLR LN
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
INSULATION
SIZED AS SCHEDULED
METAL STUD,
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
INT FIN SCHED
WALL BASE PER
MAX
406mm
50mm
ON CONC. FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
PER SCHED
FLR FINISH
4A 100
’X’TYPE GWB ON BOTH SIDE
WALL HEIGHT : 2,600mm
"X TYPE"
15.9mm GWB
ON 15.9mm GWB "X TYPE"
ON 12mm THK CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
WALL TILE WITH TILE BOND
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
INSULATION
FIN FLR LN
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
PER SCHED
WALL FIN
ON EXST CONC FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
4B 100
MAX
406mm 50mm
’X’TYPE GWB ON BOTH SIDE
WALL HEIGHT : 2,600mm
SIZED AS SCHEDULED
METAL STUD,
ON 15.9mm GWB "X TYPE"
ON 6mm THK CEMENT BOARD
ON #15 ASPHALT FELT
ON METAL LATH
ON 25mm MORTAR BED
CERAMIC TILE
INT FIN SCHED
WALL BASE PER
PER SCHED
FLR FINISH
"X TYPE"
15.9mm GWB
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
INSULATION
FIN FLR LN
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
"X TYPE"
15.9mm GWB
PER SCHED
WALL FIN
ON EXST CONC FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
4C 100
MAX
406mm 50mm
’X’TYPE GWB ON BOTH SIDE
WALL HEIGHT : 2,600mm
SIZED AS SCHEDULED
METAL STUD,
INT FIN SCHED
WALL BASE PER
PER SCHED
FLR FINISH
"X TYPE"
15.9mm GWB
" WOOD CHAIR RAIL
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
INSULATION
50mm
FIN FLR LN
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
WALL FIN PER SCHED
INT FIN SCHED
WALL BASE PER
PER SCHED
FLR FINISH
MAX
406mm
EXST WALL
SUPPORTING FRAME
ON EXISTING WOODEN
WITH ROOF INSULATION
FOR CONNECTION
WALL INSULATION
4D
SUPPORTING FRAME
ON EXISTING WOODEN
WITH ROOF INSULATION
FOR CONNECTION
WALL INSULATION
SUPPORTING FRAME
ON EXISTING WOODEN
WITH ROOF INSULATION
FOR CONNECTION
WALL INSULATION
FAILING BUILDING B#212
REPAIR DETERIORATED AND
25 JUN 24
11 34
PARTITION WALL DETAILS - 1
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
12 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
AE104
PARTITION WALL DETAILS - 2
FIN FLR LN
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
INSULATION
SIZED AS SCHEDULED
METAL STUD,
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
MAX
304mm
ON #15 ASPHALT FELT
ON METAL LATH
ON 25mm MORTAR BED
CERAMIC WALL TILE
ON EXST CONC FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
7A 90 WALL HEIGHT : 2,600mm50
MAX
304mm 50mm
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
INSULATION
FIN FLR LN
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
EXST WALL
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
SIZED AS SCHEDULED
METAL STUD,
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
FLOOR SLAB
ON EXST CONC
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
6B
ON #15 ASPHALT FELT
ON METAL LATH
ON 25mm MORTAR BED
CERAMIC TILE
STUD HEIGHT : 2,900mm
WALL HEIGHT : 2,600mm
MAX
304mm
50mm6C STUD HEIGHT : 2,900mm
WALL HEIGHT : 2,600mm
SUPPORTING FRAME
ON EXISTING WOODEN
WITH ROOF INSULATION
FOR CONNECTION
WALL INSULATION
TYPE
PARTITION
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
@ CEILING ABOVE
SECTION
STRUCTURE
BOTTOM OF
FIN FLR LN
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
INSULATION
NOTES
REMARKS/
--5A
ON CONC FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
SIZE
STUD
SPACING
STUD
EXST WALL
50mm-5A -
SUPPORTING FRAME
ON EXISTING WOODEN
WITH ROOF INSULATION
FOR CONNECTION
WALL INSULATION
WALL HEIGHT : 2,600mm
ON #15 ASPHALT FELT
ON METAL LATH
ON 25mm MORTAR BED
CERAMIC WALL TILE
TYPE
PARTITION
SIZE
STUD
SPACING
STUD
NOTES
REMARKS/
INSULATION
FIN FLR LN
STRUCTURE
BOTTOM OF
STRUCT ABOVE
SECTION @
@ CEILING
SECTION
@ PARTITION
PLAN SECTION
FLR BELOW
SECTION @
INT FIN SCHEDULES
APPLICABLE, SEE
LINE OF CEILING WHERE
600MM O.C. MAX
WITH FASTENER AT
STEEL STUD TRACK
PER SCHED
WALL FIN
ON EXST CONC FLOOR SLAB
MEMBRANE
ON WATERPROOFING
FCT W/MORTAR BED
6A MAX
304mm
INT FIN SCHED
WALL BASE PER
PER SCHED
FLR FINISH
WOOD CHAIR RAIL
WALL HEIGHT : 2,600mm
SIZED AS SCHEDULED
METAL STUD,
ON #15 ASPHALT FELT
ON METAL LATH
ON 25mm MORTAR BED
CERAMIC TILE
15mm GWB
"RAIL
WOOD CHAIR
NOT TO SCALE
PARTITION WALL DETAILS - 2
AE 104
FAILING BUILDING B#212
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
RUNNER
MEMBRANE
ON WATERPROOFING
ON MORTAR BED
EPOXY COATING
2F
NOT TO SCALE
PARTIAL SECTION DETAIL
AE 105
CONC SLAB
MECH. RM
5’-9"
1"
4A 4B
IS APPLIED TO #103(MECH RM)
NOTES
*FIRE RATED METAL FRAME CEILING SYSTEM
INTERIOR SCHEDULE
FINISH PER
15.9mm THK GWB (X-TYPE)
100mm METAL STUD @ 300mm
15.9mm THK GWB (X-TYPE)
6mm THK CEMENT BOARD
#15 ASPHALT FELT
METAL LATH
25mm THK MORTAR BED
CERAMIC WALL TILE
15.9mm THK GWB (X-TYPE)
100mm METAL STUD @ 300mm O.C.
15.9mm THK GWB (X-TYPE)
12mm THK CEMENT BOARD
(300mm HGT)
WATERPROOFING MEMBRANE
CERAMIC WALL TILE WITH TILE BOND
W/ 100mm METAL STUD @ 400mm
15.9mm "X TYPE" GWB BOTH SIDE
@ 400mm O.C. (MAX)
100mm METAL CHANNEL
AS SHOWNAS SHOWN
D - 24 - 32
AE105
PARTIAL SECTION DETAIL
ARCHITECTURAL
CAMP WALKER
LIM, WG
KIM, CS
CAMP WALKER
P2-00511-0J
FAILING BUILDING B#212
REPAIR DETERIORATED AND
25 JUN 24
13 34
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
14 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
AE106
6.76mm Laminated Glass
6.76mm Laminated Glass
6.76mm Laminated Glass
6.76mm Laminated Glass
COUNTER TOP
REF.
SINK
CBA D
REFR REFR
SINK
COUNTER TOP
UR
SD
MG
UR
WC
WC
CBA D
SD
MG
WC
WC
SCALE : 1 / 50
INTERIOR ELEVATIONS (HALLWAY)
AE
1"
4’-5"
3’-3"
6"
11’-6"
2’-11"
6"
9’-4"
1’
6’-8"
9"
2’-2"
7’-2"
6’-8"
2’-2"
1’
9"
6’-8"
2’-2"
5’-4"
5’-8"
3’-6"
10’-9"
2’-11"
6"
14’-2"
2’-7"
6’-8"
3’-7"
7’-11"
2’-4"
23’-2"
SCALE : 1 / 50AE
PARTIAL FLOOR PLAN (HALLWAY)
SCALE : 1 / 50AE
PARTIAL FLOOR PLAN (KITCHEN)
SCALE : 1 / 50
INTERIOR ELEVATIONS (KITCHEN)
AE
SCALE : 1 / 50AE
SCALE : 1 / 50AE
SCALE : 1 / 50AE
SCALE : 1 / 50AE
PARTIAL FLOOR PLAN (WOMEN’S TOILET)
PARTIAL FLOOR PLAN (MEN’S TOILET)
CBA D
CBA D
UR
INTERIOR ELEVATIONS (MEN’S TOILET)
INTERIOR ELEVATIONS (WOMEN’S TOILET)
KEY
ELEV.
INT.
A
B
C
D
KEY
ELEV.
INT.
A
B
C
D
KEY
ELEV.
INT.
A
B
C
D
KEY
ELEV.
INT.
A
B
C
D
14’-6"
INTERIOR ELEVATIONS
PARTIAL FLOOR PLANS
PTD
PTD
TTD
TTD
PTD
1’
GCWT GCWT GCWT GCWT
GCWT GCWT GCWT GCWT
GCWT GCWT GCWT GCWT
PTD
PTD
WOOD CHAIR RAILWOOD CHAIR RAIL WOOD CHAIR RAIL/SLIDING DOOR
AL SWING
DOOR
ACCESS
SST
5’-10"
FAILING BUILDING B#212
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
D - 24 - 32
ARCHITECTURAL
15 34
CAMP WALKER
LIM, WG
KIM, CS
P2-00511-0J
SCALE : 1 / 25AE
AE201
ENTRANCE CANOPY DETAILS
ENTRANCE CANOPY DETAILS
MATERIAL INFORMATION
WELDED WITH EXST STL COLUMNS
W/ 3.2mm THK STL CAP PLATE BOTH SIDE
GAL STL TUBE, L=2800mm
WELDED WITH STL TUBE
(ROUND SHAPE FABRICATING), R=4950mm
100x100, 3.2mm THK STL SQUARE TUBE
EIFS
SCALE : 1 / 25
ENLARGED PLAN FOR CANOPY2A
8’-6"
EXST ENTRANCE
CONC STOOP
EXST STL
COLUMN
EIFS
ON 6T CEMENT BOARD
EXTERIOR FINISH SYSTEM
ANCHOR BOLT
50x50 L-ANGLE &
CONC COLUMN W/
SQUARE TUBE AND
WELDED TO EXST STL
(HORIZONTAL)
TUBE @ 600
75X75, 2.3T STL SQUARE
SCALE : 1 / 25
ENTRANCE WALL1A
" 2
1’
1’
1’
1’
ANCHOR BOLT
50x50 L-ANGLE &
CONC COLUMN W/
SQUARE TUBE AND
WELDED TO EXST STL
(HORIZONTAL)
TUBE @ 520
75X75, 2.3T STL SQUARE
11"
7’-11"
11"
WELDED WITH GAL STL TUBE
CUT EXST STL COLUMN AND
17° 17°
R m m
WELDED WITH EXST STL COLUMNS
W/ 3.2mm THK STL CAP PLATE BOTH SIDE
GAL STL TUBE, L=2800mm
100x50, 2.3mm THK STL SQUARE TUBE
W/ 2.3mm THK STL CAP PLATE BOTH SIDE
WELDED WITH ROUND SHAPE STL SQUARE TUBEW/ AL MOLDING, SST SCREW
4.5mm THK POLYCARBONATE SHEET
100x100, 3.2mm THK STL
SQUARE TUBE
(ROUND SHAPE FABRICATING),
R=4950mm
WELDED WITH STL TUBE
SECTION
SCALE : 1 / 25
3A
CAULKING
AT BOTH SIDE
100x50, 2.3mm THK STL
SQUARE TUBE
W/ 2.3mm THK STL CAP PLATE
BOTH SIDE
WELDED WITH ROUND SHAPE
STL SQUARE TUBE
: 100x50, 2.3mm THK (KSD 3568 SGT275)
: 100x100, 3.2mm THK (KSD 3568 SGT275)
- STL SQUARE TUBE
: 101.6mm DIA, 3.2mm THK (KSD 3566, SGT275)
- GAL STL TUBE
FAILING BUILDING B#212
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
EXIT DEVICE
INSULATED STEEL DOOR W/
STL FRAME
HOLLOW CORE STEEL DOOR W/
STL FRAME
STL FRAME
SOLID CORE WOOD DOOR W/
D O O R T Y P E S
AS SCHEDULE
A
B
C
BY MFR
PHOTO BEAMS
BY MFR
PHOTO BEAMS
AUTOMATIC DOOR
KEEP MOVING
PANEL
SLIDE/SWING
SX
SIDELITE
FIXED
O
6’-8"
D
AL SLIDING AUTOMATIC DOOR W/
AL FRAME
E
INSULATED METAL ROLL UP DOOR
MOTOR OPERATED W/SAFETY LASER SENSOR
/PUSH BUTTON, KEY SWITCH CONTROL STATION
(SUPPLY BY MFR)
REMARKS
HDW
SET
NOTHICK
NOS
TYPE
DOOR
WIDTH HEIGHT MATL
DOOR FRAME
MATL
OPENING
DEPTHGLAZING
NOS
ROOM
101 101.1 2200
STL
45 STL2200 -
45 - STL2200
D O O R S C H E D U L E
ALD
C
E 1600 2500
900 WD
STL
MFR
MFR -
-AL
MFR 6
* 6.75MM LAMINATED GLASS + 12MM AIR + 7.52MM LAMINATED GLASS
1 - KICK PLATE J102, SST
1 - DOOR CLOSER : C02021
: DOOR SWEEP - R3B435
: HEAD AND JAMB - R3C165
1SET WEATHERSTRIP
D O O R H A R D W A R E S C H E D U L E
1 - THRESHOLD : J32100 (ADA TYPE)
1 - DOOR STOP L02141
1 1/2PR - HINGES : A5111, 114 x 114
1 - LOCKSET F82 (LEVER HANDLE TYPE)
HDW-6 (SLIDING & SWING EXIT DOOR)
- WEATHER RESISTANT GASKETING
- THRESHOLD WITH INTEGRAL GUIDE TRACK
- EMERGENCY BREAK-AWAY PIVOTS AT DOOR LEAF AND SIDE LITE PANEL
- INTERIOR AND EXTERIOR MOTION SENSORS
ALL HARDWARE BY SLIDING DOOR MFR, TO INCLUDE:
HDW-1 (EXIT DOOR)
HDW-2 (PREPERATION AREA)
HDW-5 (ROLL UP DOOR)
THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOORS AND ALUMINUM WINDOWS
AS ACTUAL SIZE, AND DRAWINGS SHALL BE APPROVED BY THE CONTRACTING OFFICER BEFORE
FABRICATION AND INSTALLATION.
MANUFACTURERS LISTED ARE FOR IDENTIFICATION PURPOSES ONLY AND ARE NOT INTENDED TO LIMIT
SELECTIONS OF PRODUCTS. AN EXACT MATCH OF THE MANUFACTURERS FUNCTION, GRADE, COLOR &
QUALITY ARE NOT REQUIRED. BUT CONTRACTOR SHOULD INSTALL HIGH QUALITY AND GRADE PRODUCTS
WITH APPROVAL TO COR.
1. ALL DOORS AND WINDOWS SHALL BE FABRICATED IN ACCORDANCE WITH SPECIFICATIONS.
2.
3. ALL WOOD FLUSH DOORS SHALL BE FINISHED FACTORY COATED NATURAL COLOR FINISH.
( FINISH TO BE DETERMINED BY ARCH.)
4. FIRE DOORS AND FRAMES SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 80 FIRE DOORS AND
FIRE WINDOWS ASTM E119.
ELECTRONIC NETWORKED LOCKSET SHALL BE "SALTO" OR APPROVED EQUAL.
ALL LOCKS EXCEPT ELECTRONIC LOCKSET SHALL BE INTERCHANGEABLE CORE, "BEST-LOCK"
OR APPROVED EQUAL.
THE CONTRACTOR…