Drawing.pdf

PDF 7 MB Posted

Attached to
Culvert Pipe Replacement at Potomac Garrett State Forest
Solicitation number
BPM020067
Issued by
Garrett County, Maryland

About this file

This document contains drawings and notes related to the replacement of a culvert pipe along Potomac Camp Road in the Potomac Garrett State Forest in Maryland's Garrett County. The project involves the installation of a new 42-inch HDPE culvert pipe with precast concrete headwalls, as well as the stabilization of the stream bed upstream and downstream of the culvert. The contractor will be required to follow guidelines set forth in permits from the Maryland Department of the Environment (MDE) and the U.S. Army Corps of Engineers, including restrictions on in-stream work during certain times of the year. The work also includes traffic control, erosion and sediment control, backfilling, asphalt patching, and site restoration with topsoil, seed, and mulch.

The pricing terms, set-asides, or funding details are not provided in this document. However, the contract opportunity is for the culvert pipe replacement work at the Potomac Garrett State Forest in Garrett County, Maryland.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P

O

T

O

M

A

C

C

A

M

P

R

O

A

D

PIPE REPLACEMENT / INSTALLATION NOTES:

1. CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION TO EXISTING ASPHALT

PAVEMENT.

2. REPLACEMENT CULVERT PIPES SHALL MAINTAIN THE EXISTING INVERT ELEVATIONS

AND PIPE SLOPES.

3. REPLACEMENT CULVERT PIPES SHALL BE INSTALLED DURING AN EXPECTED PERIOD

OF DRY WEATHER.

4. PROJECT SCHEDULE SHALL MINIMIZE FACILITY DISRUPTIONS.

5. CONTRACTOR SHALL PROVIDE SHA CERTIFIED TRAFFIC CONTROLLERS AS

REQUIRED.

6. CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS WITH CLEAN TOPSOIL, SEED,

AND MULCH.

7. STEEL TRACK EQUIPMENT WILL NOT BE ALLOWED ON PAVED SURFACES.

8. CONTRACTOR WILL BE REQUIRED TO FOLLOW THE TIME OF YEAR STREAM

RESTRICTIONS SET FORTH IN THE JOINT MDE / ARMY CORP PERMITS.

8.1. NO IN STREAM WORK SHALL TAKE PLACE BETWEEN OCTOBER 1ST - APRIL

30TH INCLUSIVE OF ANY YEAR.

9. CONTRACTOR SHALL FOLLOW ALL GUIDELINES SET FORTH IN THE MDE / ARMY CORP

PERMITS ATTACHED TO THIS BID PACKAGE.

State of Maryland

DEPARTMENT OF NATURAL RESOURCES

Engineering & Construction

C.1

RIP RAP LOW FLOW

CONSTRUCTED STREAM

CHANNEL. CHANNEL WORK SHALL

COMPLY WITH MDE STANDARD

DETAIL D-4-1-C - ROCK OUTLET

PROTECTION. REFERENCE SHEET

C.2 FOR DETAILS.

WIDEN ROADWAY AS SHOWN.

DASHED LINE REPRESENTS

EDGE OF EXISTING ROADWAY.

HORIZONTAL SCALE

1" = 20'

CULVERT REPLACEMENT PLAN

SCALE: 1" = 20'

40201020

NEW 42" Ø HDPE CULVERT PIPE

W/ PRECAST CONCRETE HEADWALLS.

INVERT ELEV = 2515.99

PRECAST CONCRETE HEADWALLS.

INVERT ELEV = 2515.29

PATCH ROADWAY AS REQUIRED

AFTER PIPE REPLACEMENT.

NEATLY MATCH ADJACENT

ASPHALT SURFACES -PROVIDE FOR

A SMOOTH AND UNIFORM

TRANSITION BETWEEN OLD AND

NEW PAVED SURFACES.

STAGING / STORAGE AREA

PERMIT DRAWING REFERENCE

SCALE: AS NOTED

SEQUENCE OF CONSTRUCTION:

1. INSTALL TRAFFIC CONTROL DEVICES AND SIGNAGE ALONG POTOMAC CAMP ROAD.

2. INSTALL ALL EROSION AND SEDIMENT CONTROL DEVICES.

3. INSTALL A SAND BAG DAM / DIVERSION ABOVE AND BELOW THE PIPE, IN CONJUNCTION

WITH A BYPASS PUMPING SYSTEM. SYSTEM SHALL INCLUDE AN INTAKE HOSE W/

SCREEN, PUMP, AND A HOSE OUTLET STRUCTURE INTO A SEDIMENT BAG. PLACE THE

DEWATERING INTAKE AT THE DOWNSTREAM DAM TO CAPTURE WATER FROM THE

CONSTRUCTION AREA. REFERENCE DETAILS MGWC 1.1 AND 1.2.

4. AFTER THE PIPE AND WORK AREA HAS DRIED OUT, THE DETERIORATED CMP'S SHALL

BE EXCAVATED AND REMOVED FROM THE SITE.

5. NEW CORRUGATED HDPE PIPE SHALL BE INSTALLED TO REPLACE THE DETERIORATED

CMP CULVERT PIPE.

5.1 AFTER THE PIPE HAS BEEN INSTALLED, THE STREAM BED SHALL BE

STABILIZED UPSTREAM AND DOWNSTREAM. RIP RAP SHALL BE INSTALLED TO

STABILIZE AND INCREASE THE STREAM INVERT AT THE OUTFALL TO THE

NATURAL STREAM BED OVER 10'. (LOW FLOW CHANNEL)

6. AFTER THE NEW HDPE PIPE HAS BEEN INSTALLED, AND PROPERLY CONNECTED TO THE

CONCRETE HEADWALLS, CR-6 BACKFILL WILL BE INSTALLED AROUND THE

PIPE (COMPACTED IN 6” LIFTS) CR-6 FILL SHALL BE INSTALLED UP TO THE ADJACENT

SUBGRADE.

6.1 THE SANDBAG DIVERSIONS SHALL REMAIN IN PLACE FOR 36 HRS. AFTER

PLACEMENT OF CONCRETE OR GROUTING OPERATIONS.

7. PATCH ASPHALT DRIVEWAY AS REQUIRED.

8. 4” OF CLEAN TOP SOIL FILL MATERIAL SHALL THEN BE INSTALLED OVER ALL DISTURBED

AREAS AND GRADED TO MATCH THE ADJACENT TOPOGRAPHY. ALL DISTURBED AREAS

WILL BE STABILIZED WITH SEED AND MULCH.

9. UPON COMPLETION OF ALL STABILIZATION TASKS, THE E&S DEVICES SHALL BE

REMOVED AS DIRECTED BY THE MDE INSPECTOR.

State of Maryland

DEPARTMENT OF NATURAL RESOURCES

Engineering & Construction

C.2

TYPICAL BACKFILL DETAIL - ROADWAY SHOULDER

NOT TO SCALE

File details come from the government source that posted it. Updated .