Drawing.pdf

PDF 869 KB Posted

Attached to
Repair Kitchen Area and Paint Rooms at Bldg. #452, Camp Walker
Solicitation number
W90VN924R0089
Issued by

About this file

This document is a set of drawings and a related federal contract opportunity for the repair of the kitchen area and painting of rooms in Building #452 at Camp Walker.

The drawings provide detailed specifications for the renovation work, including replacing existing VCT flooring tiles, wall tiles, ceiling tiles, and kitchen cabinets. The work also includes replacing lighting fixtures, electrical receptacles, and painting the interior surfaces. The federal contract opportunity, Solicitation Number W90VN924R0089, is requesting proposals for this renovation project. The closing date for proposals is May 20, 2024 at 1:00 PM Korea local time. The contracting agency is the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
Amendment 0001-W90VN924R0089.pdf PDF
Attachment-Range Hood Specification.pdf PDF
RFP W90VN924R0089.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEWR NO. : J5-10001-1J

LOCATION : B452, CAMP WALKER

LOCATION PLAN

THIS LOCATION

:B452, CAMP WALKER

1/8

FLOOR PLAN

THIS LOCATION

:B452, CAMP WALKER

2/8

H:2500

UNIT : MM

13285

17605

CHIEF

ASSISTANT

OFFICE BREAK ROOM

KITCHEN

AREA

FLOOR TILE PLAN

LEGEND

: REPLACE EXISITING VCT TILE WITH NEW

VCT TILE INCLUDING WOODEN BASE BOARD,

AND CAULKING.

(REPLACE VCT TILE IN FRONT OF THE

BREAK ROOM,)

3/8

: REPLACE EXISITING THRESHOLD WITH NEW

TRESHOLD.

WALL TILE PLAN 4/8

LEGEND

: REPLACE EXISITING WALL TILE WITH

CERAMIC WALL TILE INCLUDING CAULKING.

: REPLACE GYPSUM BOARD WALL WITH

REMOVE EXISTING WALL TILE.

CEILING TILE PLAN

SP

5/8

LEGEND

: REPLACE EXISTING CEILING TILE WITH NEW

ACOUSTIC CEILING TILES.

: REPLACE EXISTING DIFFUSER WITH NEW

DIFFUSER ON THE CEILING.

: REMOVE AND RE-INSTALL SPEAKER HEAD.

: REMOVE AND RE-INSTALL DETECTOR HEAD.

SP

D

D

KITCHEN CABINET PLAN 6/8

LEGEND

: REPLACE EXISTING KITCHEN BASE AND WALL

CABINETS WITH NEW BASE AND WALL CABINETS

INCLUDING MARBLE COUNTER TOP, SINK BOWL,

FAUCET INCLUDING NECESSARY PLUMBING LINE

ACCESSORY, BACK SPLASH AND RANGE HOOD AT

DESIGNATED AREA.

: REPLACE INSULATION FROM RAGNE HOOD TO

METAL GRILL ON THE CEILING.

- REMOVE AND RE-INSTALL WET CHEMICAL FIRE

SUPPRESSION SYSTEM.

ELECTRICAL PLAN 7/8

LEGEND

: REPLACE EXISTING 3EA (1′X4′) LED

LIGHTING FIXTURES WITH LED LIGHTING

FIXTURES.

: REPLACE EXISTING 1EA (1′X4′) LED

LIGHTING FIXTURE WITH LED LIGHTING

WITH EM BATTERY PACK.

: REPLACE 2EA GFCI TYPE 110V RECEPTACLES

ON THE KITCHEN WALL.

: REPLACE 2EA GFCI TYPE 220V RECEPTACLES

ON THE KITCHEN WALL.

PAINT PLAN 8/8

LEGEND

: AFTER PREPRATION ON INTERIOR SURFACE,

PAINT ON THE INTERIOR SURFACE WITH

CAULKING.

(REMARK)

: PAINT FOR CEILING AND WALL AT CHIEF

ASSISTANT OFFICE AREA.

: PAINT FOR CEILING AND WALL AT BREAK

ROOM AREA.

: PAINT FOR WALL AT KITCHEN AREA.

: PAINT FOR WOODEN BASE BOARD AT

DESIGNATED AREA.

CHIEF

ASSISTANT

OFFICE BREAK ROOM

KITCHEN

AREA