This document contains technical drawings and specifications related to the relocation of equipment and removal of hazardous materials at Building 362 in Camp Walker. The key details are:

The solicitation number is W90VN924R0047, and the title is "Relocate Equipment and Removal of Hazmat Material at B362, Camp Walker". The work involves disconnecting and relocating an existing generator, fuel tanks, and load bank, as well as draining and properly disposing of hazardous materials such as oil, coolant, and refrigerants from various equipment. The contractor shall coordinate with the Environment Division POC, Mr. Kim Myong Han, regarding the handling and disposal of hazardous materials. Additionally, the contractor shall be responsible for repairing any damages caused during construction and verifying all existing conditions and dimensions prior to commencing work. The drawings provide details on the locations and sizes of the equipment to be relocated. No specific award date or pricing terms are included in the provided documents.

View the file

Other files

File Type Posted
W90VN924R0047 Amend 2.pdf PDF
Manifest Template for B362.xlsx XLSX spreadsheet
W90VN924R0047 Amend 01.pdf PDF
W90VN924R0047.pdf PDF
Attachment 5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HGFEDCBA

392391

KELLY FIELD

Golf Course

Tennis Court

DRIVING

RANGE

Golf Course

Golf Course

Golf Course

SKATE

PARK

661662

PENNSYLVANIA AVENUE

W I S

C O

N S I N

S

T R

E E

T

IN

DI

ANA

AVENUE

W

IS

C O

N S

IN

S T R E E T

U T

A H

S T R E E T

GEORGIA STREET

T E

X A S

S T

R E E T

R H

O D

E

IS

L A

N D

S

T R

E E

T T

E X

A S

S

T R

E E

T

WASHINGTON STREET

C A L

IF

O R

N

IA

S T

R E E T

GEORGIA STREET

N E

B R

A S

K A

S

T R

E E

T

C A L

IF

O R

N

IA

S T

R E E T

R H

O D

E

IS

L A

N D

S

T R

E E

T

P E N N S Y L V A N

IA

A V E N U E

GEORGI

A

STREET

T E

X A S

S T

R E E T

Substation

Gate #6

Gate #4

SHEET 1 OF 5

B362, CAMP WALKER

THIS PROJECT

LOCATION PLAN

LOCATION: B362, CAMP WALKER

FEWR NO: J7-00001-3J

HGFEDCBA

SHEET 2 OF 5

ITEMS LIST AND GENERAL NOTE

LOCATION: B362, CAMP WALKER

FEWR NO: J7-00001-3J

GENERAL NOTE

HANDING METHODS.

WITH COR CAREFULLY TO DETERMINE PROPER MATERIAL

AND RECYLABLE MATERIALS WITHIN PROJECT LIMIT

7. CONTRACTOR SHALL COORDINATE ANY SALVAGEABLE

POC: MR. KIM, MYONG HAN

INSTRUCTION OF ENVIRONMENT DIVISION.

BEFORE REMOVAL HAZMAT MATERIAL. AND FOLLOW

6. CONTRACTOR SHALL COORDINATE ENVIRONMET DIV.

CONTRACTOR

CLEAN UP SHALL BE THE RESPONSIBILITY OF THE

ALL COSTS INCURRED FOR SPILL CONTAINMENT AND

TO CONTAIN AND ADEQUATELY CLEAN UP THE SPILL.

NOTIFY TO COR AND UTILIZE APPROPRIATE MEASURES

CAUSED DURING CONSTRUCTION. CONTRACTOR SHALL

5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SPILLS

ACCORDING TO ACTUAL FIELD CONDITIONS

SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR

MATCH EXACTLY FIELD CONDITIONS. SUCH DETAILS

4. SOME DETAILS SHOWN ON THIS DRAWING MAY NOT

TO ADJACENT AREAS AS DIRECTED BY COR

BY THIS PROJECT AND TO MATCH CONDITION

OR REPAIR ALL DAMAGES TO EXISTING AREAS CAUSED

3. CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT

DOCUMENT, THE CONTRACTOR SHALL NOTIFY TO COR

2. IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT

COMMENCING ANY CONSTRUCTION OR RENOVATION

ALL EXISTING CONDITION AND DEMENSIONS PRIOR TO

1. CONTRACTOR SHALL BE RESPONSIBLE IN VERYFING

HGFEDCBA

SHEET 3 OF 5

GENERATOR ROOM

BATTERY ROOMCOMPUTER ROOM

FLOOR PLAN

LOCATION: B362, CAMP WALKER

FEWR NO: J7-00001-3J

EXISTING FUEL TANK AND GENERATOR

HGFEDCBA

SHEET 4 OF 5

COMPUTER ROOM A/C AND SPLIT A/C UNIT

AIR COOLED CONDENSING UNIT

EXISTING CHILLER ON THE ROOF

HAZMAT REMOVAL PLAN

LOCATION: B362, CAMP WALKER

FEWR NO: J7-00001-3J

KEY PLAN

POC OF ENV DIV: MR. KIM, MYONG HAN

OF HAZMAT MATERIAL

CONSULT WITH POC OF ENV DIV AND CHECK THE LOCATION AND QUANTITY

CONTRACTOR SHALL VERIFY ALL HAZMAT MATERIAL AND

- NOTE -

AND THEN, MOVE ALL DRUMS TO B470 IN CAMP WALKER

IN 50 GAL PLASTIC DRUM

VERIFY, DRAIN OUT COOLANT FROM GENERATOR AND PUT THEM

AND PUT THEM IN 50 GAL STEEL DRUM

VERIFY, DRAIN OUT ALL TYPE OF OIL FROM GENERATOR AND FUEL TANK.

* VERIFY THE LOCATION OF ALL ITEMS WITH USER

* SEE ATTAHCED LIST ITEMS SHEET

AND THEN, MOVE THEM TO B470 IN CAMP WALKER

AND PUT THEM IN 50 GAL CYLINDER

COMPUTER ROOM A/C AND SPLIT A/C UNIT

VERIFY, DRAIN OUT FREON GAS FROM CHILLERS, A/C OUTDOOR UNIT,

- SCOPE OF WORKS -

VERIFY 55 GALLON OIL DRUMS AND MOVE THEM TO B470 IN CAMP WALKER

4B

U

L

C

F

L

O

G

HGFEDCBA

SHEET 5 OF 5

Golf Course

IN

DI

ANA

AVENUE

M M

EXISTING UPS BATTERY

B362 PARKING LOT

SIZE: 4100MM L X 2800MM W X 2400MM H

EXISTING FUEL TANK (2000 GALLON)

EXISTING FUEL TANK

(100 GALLON)

SIZE: 6200MM L X 5000MM W X 5800MM H

EXISTING GENERATOR

SIZE: 20000MM L X 2000MM W X 2400MM H

EXISTING LOAD BANK

RELOCATION PLAN

LOCATION: B362, CAMP WALKER

FEWR NO: J7-00001-3J

KEY PLAN

- SCOPE OF WORKS -

AFTER RELOCATING GENERATOR

4) BLOCK UP EXHAUST FAN, WALL AND ALL HOLES

3) REMOVE AND RE-INSTALL 2 SIDES OF HEAVY DUTY PROTECTIVE WALL

2) REMOVE AND RE-INSTALL EXHAUST FAN ON THE WALL

1) DISCONNECT ALL ELECTIRC LINE RELATED WITH GENERATOR AND LOAD BANK

WHEN CONTRACTOR REMOVES EXISTING GENERATOR,

- NOTE -

AND THEN, LOAD THEM IN THE TRUCK

RELOCATE 2EA FUEL TANKS TO B362 PARKING LOT IN CAMP WALKER

WALL SIZE: 3700MM W X 3000MM H X 600MM THK

AND THEN, LOAD THEM IN THE TRUCK

AFTER RELOCATING THEM, ASSEMBLE THEM TO ORIGINAL CONDITION

IN CAMP WALKER, DISASSEMBLE THEM.

WHEN RELOCATING GENERATOR TO B362 PARKING LOT

AND THEN, LOAD THEM IN THE TRUCK

RELOCATE LOAD BANK TO B362 PARKING LOT IN CAMP WALKER

MR. MIN, TONG HYON, MSC-K (B606, CAMP CARROLL)

POC: MR. KIM, MYONG HAN, ENV DIV.

TO THE B603 IN CAMP CARROLL BY TRUCK

AFTER SEPERATING BATTERIES, RELOCATE THEM

d1
d2
d3
d4
d5