Drawing.pdf

PDF 2 MB Posted

Attached to
Replace Hot Water Heater, Bldg No. S-310, CW
Solicitation number
W90VN920R0048
Issued by

View the file

Other files

File Type Posted
W90VN920R0048_amend 01.pdf PDF
W90VN920R0048.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

R-11SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

O & M

HOUSING DIV.

REVIEWED BY

UNITED STATES ARMY GARRISON DAEGU

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

DIRECTORATE OF PUBLIC WORK

HGFEDCBA

D - 20 - 17

CHON, HYON TAE

DESIGN REVIEW SIGNATURE

ORGANIZATION

USING AGENCY

36TH SIGNAL

MASTER PLN.

ENVIRONMENTAL

NAME SIGNATURE

O&M DIV.

FIRE DEPT.

SAFETY OFFICE

DPTMS(AT/FP)

188TH MP COM.

IND. HYGENIST

J1-00629-0J

UNIT #15746, APO AP 96218-5746

M - 3

DRAWING NO.

CHIEF,

DESIGN & TECH. REVIEW Br.

M - 2

YI, TONG KI

AS SHOWN

1 1 OF 1R - 1

T I T L E S H E E T

TITLE SHEET

DATE: 16 JUL 20

CAMP WALKER

M - 12

PROJECT NO. J1-00629-0J, CAMP WALKER

MECHANICAL

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

M - 45 4 OF 6

M - 56 5 OF 6

M - 67 6 OF 6

LEGEND AND ABBREVIATIONS

NEW MECH. ROOM PIPING PLAN

EQUIPMENT SCHEDULE AND SCOPE OF WORK

GENERAL NOTES

EXISTING / REMOVAL MECH. ROOM PIPING PLAN

NEW MECH. ROOM PIPING ISOMETRIC DIAGRAM

LEGEND AND ABBREVIATIONS

SCH

SA

SAN

QTY

R12, R22

RA

RDTR

RPM

RT

PG

PH

POC

POL

PPM

PRV

QT

OA

OAIL

OD

OS&Y

Pa

NTS

BUTTERFLY

CUBIC METER PER HOUR

AIR CONDITION (-ING,-ED)

AIR CONDITION UNIT (S)

AIR COOLED CONDENSING UNIT

CHILLED/HOT WATER RETURN

CHILLED/HOT WATER SUPPLY

REFRIGERANT LIQUID

CAP CAPACITY

CUBIC METER

COMPRESSOR

CONTINUE

CONNECTION

CPRSR

CU M

CONT

CONN

COUNTER CLOCKWISE

COEFFICIENT

CIRCUIT

CAST IRON PIPE

CHILLED WATER

CKT

CMH

COEF

CHW

CCW

CIP

ALARM CHECK VALVEACV

AVG AVERAGE

BAROMETER(-TRIC)

CENTIGRADEC

BARO

AMPERE(AMP, AMPS)

ALUMINUM

APPROX

AMP

AIR COND

AHU

AL

AIR COOLED

ACU

ACLD

ACCU

CHWS

CHWR

CHR

CHS

D

RL

DRAIN

KILOCALORIE PER HOUR

KILOGRAM PER SQ. CENTIMETER

KILOGRAM

THERMAL CONDUCTIVITY

IRON PIPE SIZE

ISOMETRIC

DIAMETER, INSIDE

FACE AREA OR FRESH AIR

EXTERNAL STATIC PRESSURE

EVAPORAT (-E,-ING,-ED,-OR)

ENTERING WATER TEMP

FIRE HOSE CABINET

EXPLOSION PROOF

FHC

FA

ESP

EVAP

EWT

EFF

ENT

EQPT

EP

EFFICIENCY

ENTERING

EQUIPMENT

KG

K

IPS

ISO

ID

NIC

N.O.

NO

MPS

N.C.

N/A

MM

MPH

MIN

MAX

NOT IN CONTRACT

NORMALLY OPEN

NUMBER

NORMALLY CLOSED

METERS PER SECOND

METERS PER HOUR

MINIMUM OR MINUTE

NOT APPLICABLE

MILLIMETER

MAXIMUM

HERTZ

HOSE BIBB

HEAD

HORSEPOWER

HOUR(S)

HOT WATER

HOT WATER HEATER

HORIZONTAL

FIBERGLASS REINFORCED PLASTIC

FREQUENCY

FLUSH VALVE

FEED WATER PUMP

FIXTURE

GAGE OR GAUGE

GALVANIZED STEEL

FUEL OIL

FEMALE PIPE THREAD

CIRCULATING WATER PUMPCWP

FRP

DECIBEL OR DRY BULB

DRY BULB TEMPERATURE

ENTERING AIR TEMPERATURE

DRY PIPE VALVE

DIRECT EXPANSION

DO DIESEL OIL

EAT

DPV

DX

DIV

DIAG

DIFF

DB

DBT

DIVISION

DIAMETER

DIAGRAM

DIFFERENCE

DEGREE

HR

HZ

HW

HWH

HORIZ

HB

HD

HP

GA

GALVS

FV

FWP

FXTR

CLOCKWISE OR COLD WATERCW

PLUG VALVE

THREE WAY

FREQ

FO

FPT

GATE, GLOBE

GATE, ANGLE

GLOBE

CONTROL

GATE

M

LPS

LWT

LT

LPH

LPD

LL

LG

LBS

LAT

LAV

L

KWH

KW

LITERS PER SECOND

LITERS PER HOUR

LEAVING WATER TEMPERATURE

METERS

LAUNDRY TRAY

LITERS PER DAY

LIQUID LINE

LEAVING AIR TEMPERATURE

POUNDS

LAVATORY

LENGTH

KILOWATT HOUR

KILOWATT

LITERS

P

STRAINER, BLOW OFF

STRAINER

PUMP (INDICATE USE)

KG/ SM KILOGRAM PER SQ. METER

REFRIGERANT SUCTION

REFRIGERANT DISCHARGE

PIPE TO BE REMOVED

MEDIUM TEMPERATURE HOT WATER RETURN

MEDIUM TEMPERATURE HOT WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

RS

RD

(NAME)

(NAME)E EXISTING PIPE

HWR

HWS

MTWR

MTWS

CR

CS

PIPING

SANITARY DRAIN

CHECK, SWING

PIPE SLEEVE WITH FIRE STOPPING

VENT THRU ROOF

BFP

PLAN

HOSE BIBB

BALL

ELEV.

PIPE SLEEVE

BACKFLOW PREVENTER

FLOOR DRAIN

FLOOR CLEANOUT

FD

FCO

FLEXIBLE CONNECTOR

ANCHOR, INTERMEDIATE

ANCHOR, MAIN

EXPANSION JOINT

EXPANSION LOOP

EJ

RELIEF

SAFETY

HOSE END DRAIN

LOCK SHIELD

NEEDLE

PRESSURE REDUCING

CONTROL, PNEUMATIC-ELECTRIC

CONTROL, ELECTRIC-PNEUMATIC

CHECK, NON-SLAM

S

R

EP

PE

COLD WATER

VENT

AD FD

QUANTITY

TEMPERATURE DIFFERENCE

TONS OF REFRIGERATION

SCHEDULE

SUPPLY AIR

SANITARY

REFRIGERANT (12, 22, ETC)

RETURN AIR

REVOLUTIONS PER MINUTE

REFRIGERATION TON

RADIATOR

TYP TYPICAL

UNIT HEATER

URINAL

UH

UR

SYMBOL

TEMPERATURE

THICKNESS

TONS

THK

TEMP

SYM

TD

OUTSIDE AIR INTAKE LOUVER

PRESSURE REDUCING VALVE

PHASE (ELECTRIC)

PETROLEUM, OIL AND LUBRICANTS

POINT OF CONNECTION

PARTS PER MILLION

PERCENT/

QUART

PRESSURE GAGE

DIAMETER, OUTSIDE

OUTSIDE SCREW & YOKE

PASCAL

POLE

SPR SPRINKLER

STAINLESS STEEL

SQUARE

STEAM

STANDARD

STEEL

ST

STD

STL

SQ

SST

SPECIFICATION

SQUARE METER

STATIC PRESSURE

SPEC

SP

SM

OUTSIDE AIR

NOT TO SCALE

SECONDSEC

VAV VARIABLE AIR VOLUME

WATER CLOSET

VENTILATION

W/

WT

WC

WD

WITH

WEIGHT

WIDTH

W

WB

VOL

VEL

VENT

VERT

WATT

WET BULB

VOLUME

VELOCITY

VERTICAL

SMOKE DAMPER (PROVIDE ACCESS DOOR)

MANUAL VOLUME DAMPER

VAC

V

VACUUM

VOLT

SPLITTER DAMPER

AD

SD

VD

TEE, SINGLE SWEEP

TEE, OUTLET DOWN

REDUCER, ECCENTRIC (STRAIGHT, DOWN)

REDUCER, ECCENTRIC (STRAIGHT, INVERT)

ELBOW, TURNED DOWN

UNION, FLANGED

UNION, SCREWED

TEE, OUTLET UP

TEE

LATERAL

ELBOW, TURNED UP

CONNECTION, TOP

CONNECTION, BOTTOM

BUSHING

CAP

FIRE DAMPER (PROVIDE ACCESS DOOR)

BDD

TURNING VANES

TRANSITION

FLEXIBLE CONNECTION

FLEXIBLE DUCT

FC

DUCT WORK

A B B R E V I A T I O N S

L E G E N D

PG

TM

AAV

FOS

3-WAY VALVE (MOTORIZED)

PRESSURE GAUGE

THERMOMETER

AUTOMATIC AIR VENT

GATE VALVE

CHECK VALVE

FUEL OIL SUPPLY

FLEXIBLE JOINTFJ

& STRAINER

M

CS

SD

SHOWER DRAIN

DEG

DIA or o

CEAT CONDENSER ENTERING AIR TEMP

LCWT LEAVING CHILLED WATER TEMP

FAIL FRESH AIR INTAKE LOUVER

EXPANSION JOINTEXPJT

EXST EXISTING

A / C AIR CONDITIONING

APPROXIMATELY

ARCH ARCHITECTURAL

BLDG BUILDING

CONC CONCRETE

DWG DRAWING

EA EACH

F.C.U. FAN COIL UNIT

MECH MECHANICAL

KCAL/ HR

KG/ SQ CM

HOT WATER SUPPLY

HOT WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

V

DOMESTIC HOT WATER SUPPLY

DOMESTIC HOT WATER RETURN

AAV

ED EXHAUST DUCT

AUTOMATIC AIR VENT

AIR HANDLING UNIT

GROUND LEVELGL

REGISTER, SIDEWALL

SUPPLY AIR GRILLE OR

REGISTER, CEILING

SUPPLY AIR GRILLE OR

(200mm NECK DIAMETER)

CEILING DIFFUSER, ROUND TYPE

REGISTER, CEILING

EXHAUST AIR GRILLE OR

GRILLES, REGISTERS AND DIFFUSERS

SQUARE TYPE

CEILING DIFFUSER,

EG

ER

SG

SR

SG

SR

RG

RR

CD

200mm NCD

COWL, (GOOSENECK) AND FLASHING

(810mm WIDTH x 400mm DEPTH)

DUCT SIZES SHOWN810mm x 400mm

M

ELECTRIC MOTOR OPERATED DAMPER

S

MOTORIZED DAMPER

MD

SUPPLY AIR DUCT RISER

RETURN OR EXHAUST AIR DUCT RISER

SUPPLY AIR DUCT SECTION

RETURN AIR DUCT SECTION

GATE, GLOBE OR BALL VALVE

CHECK VALVE (FLOW)

ANGLE VALVE

STRAINER

DRIP CHECK VALVE

RESTRICTED ORIFICE

FILL CUP

PRESSURE GAUGE

SOLENOID VALVE

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLEXIBLE PIPE CONNECTION

RELAY

HOSE VALVE

TEST HEADER

SMOKE DAMPER

R

SD

S

: WATER MOTER ALARM GONG

SPRINKLER SYSTEM

: UP-RIGHT TYPE SPRINKLER

: PENDENT TYPE SPRINKLER

: SIDE WALL TYPE SPRINKLER

REMOVAL WORK

RELOCATED WORK

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

SA

RA

EA

DEMPERS

VALVES, SPECIAL DUTY

HEATING

AIR CONDITIONING & REFRIGERATION

PLUMBING

VALVES : (for selective actuators)

BACK DRAFT DAMPER

CIRCUIT SETTER

POINT OF CONNECTIONPOC

POR POINT OF REMOVAL

TcH THERMOSTAT HEATING/COOLING

THERMOSTAT OF HEATING

REGISTER, CEILING

RETURN AIR GRILLE OR

Th

REDUCER, CONCENTRIC

1 6

MECHANICAL

16 JUL 20

CHANG, TAE HO

NAM, TAE CHIN

J1-00629-0J

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

M-1

D - 20 - 17

G

CAMP WALKER

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

GENERAL NOTES

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.

4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND

AS DIRECTED BY THE CONTRACTING OFFICER.

EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS

5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO

PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.

ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR

3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE

CONTRACTING OFFICER’S APPROVAL.

REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR

IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S

PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.

EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R

1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,

FOR APPROVAL.

DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION

10. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE

TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE DESIGN &

2.THIS DRAWING IS ONLY FOR GOVERNMENT COSTING PURPOSE ONLY AT CONCEPTUAL LEVEL. THE

AND SHALL BE VERIFIED AT THE JOB SITE.

15. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC, ARE APPROXIMATE

CONSTRUCTION.

18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING

THROUGH COR.

SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE

ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE NEW

TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA

BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED PRIOR TO ANY WORK

AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK AREA WILL NEED TO

CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CASE WORK IN THE

NOT PRESENT IN THE AREA AFFECTED BY THIS WORK. HOWEVER, IF SUSPECTED ASBESTOS

VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS

PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER

PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL

19. THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1

SPECIFICATIONS.

CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT

OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON

SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS

16. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL

CEILING, ROOF, EQUIPMENT, PIPE, DUCT AND ELECTRICAL ITEMS.

PREVENTION SYSTEM WITH NO ADDITIONAL COST TO THE GOVERNMENT SUCH AS WALLS,

ITEMS TO MAKE WAY FOR THE INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE

17. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND REINSTALL THE OBSTRUCTED

SUCH AS ANCHORS, HANGERS, SUPPORTS, ETC.

6. ALL PIPES, DRAINS AND DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES

7. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/ NEW) SHALL BE SEALED PER SPEC.

A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

8. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.

CONTRACTOR.

THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS

THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO

9. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.

11. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL

TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.

EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED

12. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW

SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".

13. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL

ADDITIONAL COST TO THE PROJECT CONTRACT.

THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO

O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.

14. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR

7. THE CONTRACTOR SHALL PERFORM THE TRAINING ABOUT GAS SUPPLY SYSTEM TO O&M DIVISION.

AND GAS PIPING LINES TO DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.

5. THE CONTRACTOR SHALL SUBMIT THE DETAILED SHOP DRAWING OF GAS DISTRIBUTION SYSTEM

NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION.

TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)" SECTION 33 51 15,

1. GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE AS WELL AS "STANDARD

THE DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.

6. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION OF GAS DISTRIBUTION SYSTEM TO

GAS DISTRIBUTION GENERAL NOTES

ADJUSTMENTS, RELOCATIONS AND/ OR REPAIRS WILL BE MADE AT THE CONTRACTOR’S COST.

AS A RESULT OF THE CONTRACTOR’S CONSTRUCTION. ALL DAMAGE TO GAS FACILITIES REQUIRING

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO GAS FACILITIES DURING OR

ACCESSORIES.

8. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR THE INSTALLATIONS OF GAS PIPING AND

9. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR GAS PIPING SIZE.

TO D&TR BRANCH THROUGH THE COR.

10. THE CONTRACTOR SHALL PERFORM A GAS LEAKING TEST AND SUBMIT THE GAS LEAKING TEST REPORT

20151030)" SECTION 33 51 15, PART 2 PRODUCTS.

AS WELL AS "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 -

2. ALL MATERIALS OF GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FACILITY SHARE OF THE EXPENSES.

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

G

CHANG, TAE HO

NAM, TAE CHIN

M-2

GENERAL NOTES

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

CAMP WALKER

16 JUL 20

J1-00629-0J D - 20 - 17

2 6

D E S C R I P T I O N

E Q U I P M E N T S C H E D U L E

Q’ TY

NO.

ITEM WORK CLASS "K" (REPAIR / MAINTENANCE WORK)

SCOPE OF WORK

(KW)

OUTPUT

GROSS

111.6

(LPH)

RECOVERY

HEAT

ELEC. POWER

FLA: 2, 120 V, 1 PH, 60 HZ

TEMP.

SUPPLY

RISE

TEMP.

60 C 16.7 C

TANK SIZE: 52" DIA x 9’ LG

TANK CAPACITY: 800 GALLONS

ACROSS-THE-LINE MAGNETIC CONTROLLER IN A NEMA 250 AND NEMA MG 1.

ALL BRONZE CONSTRUCTION. MOTORS SHALL BE EQUIPPED WITH AN

IN-LINE CLOSED COUPLED CENTRIFUGAL TYPE, FLANGE CONNECTION AND

ACROSS-THE-LINE MAGNETIC CONTROLLER IN A NEMA 250 AND NEMA MG 1.

ALL BRONZE CONSTRUCTION. MOTORS SHALL BE EQUIPPED WITH AN

IN-LINE CLOSED COUPLED CENTRIFUGAL TYPE, FLANGE CONNECTION AND

DOMESTIC HOT WATER RE-CIRCULATING PUMP

DOMESTIC HOT WATER CIRCULATING PUMP

DOMESTIC HOT WATER STORAGE TANK

DOMESTIC HOT WATER HEATER

SPS-KTIC B 1005-1933, KOREA METAL TANK INDUSTRY COOPERATIVE CERTIFIED.

HORIZONTAL ROUND TYPE, STAINLESS STEEL CONSTRUCTION W/ INSULATION,

MOTOR: 1/6 HP, 115 V, 1 PH, 60 HZ, 1,750 RPM

CAPACITY: 5 GPM AT 20 FT TDH

MOTOR: 1/4 HP, 115 V, 1 PH, 60 HZ, 1,750 RPM

CAPACITY: 12 GPM AT 52 FT TDH

PRODUCT.

FILTER, WATER SOFTENER AND STANDARD ACCESSORIES, ASME CERTIFIED

CASCADE SYSTEM, MODULE TYPE CONDENSING WATER HEATER WITH MAGNETIC

WITH ALL NECESSARY ACCESSORIES AND PARTS.

TANK, PUMPS WITH NEW ONES INCLUDING PIPING, VALVES, CONCRETE PAD, SMOKE STACKS, INSULATION

1. REPLACE EXISTING DETERIORATED DOMESTIC HOT WATER HEATER, DOMESTIC HOT WATER STORAGE

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

G

CHANG, TAE HO

NAM, TAE CHIN

M-3

AND SCOPE OF WORK

EQUIPMENT SCHEDULE

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

CAMP WALKER

16 JUL 20

J1-00629-0J D - 20 - 17

3 6

P-1

M-4 SCALE = 1 : 200

SPECIFIC NOTES

AND RETURNED TO DPW.

3. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE CLEANED

IN FIELD.

THEREFORE, EXACT SIZE, LOCATION AND DIRECTION SHALL BE VERIFIED

1. EXISTING & REMOVAL PLANS MAY NOT EXACTLY MATCH WITH THE FIELD.

SHALL BE PATCHED AND FILLED OR RESTORED.

2. THE OPENING RESULTING FROM THE REMOVAL OF UNITS & PIPES

KEY PLAN

MECH. ROOM

N

WATER LINE

EXISTING 100mm DOMESTIC

EXISTING HOT WATER HEATING BOILER TO REMAIN

GRAPHIC SCALE

SCALE: 1 : 50

2000mm1000

EXISTING / REMOVAL MECH. ROOM PIPING PLAN

CONCRETE PAD INCLUDING ALL ACCESSORIES AND PARTS.

WATER STORAGE TANK, PUMPS, SMOKE STACK, CONNECTED PIPING,

REMOVE EXISTING DOMESTIC HOT WATER HEATER, DOMESTIC HOT

EXISTING GAS PIPING TO REMAIN

AND REGULATOR TO REMAIN

EXISTING GAS METER

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

G

CHANG, TAE HO

NAM, TAE CHIN

M-4

PIPING PLAN

EXISTING / REMOVAL MECH. ROOM

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

CAMP WALKER

16 JUL 20

J1-00629-0J D - 20 - 17

4 6

DRAWING AND DETAIL DRAWING FOR CONSTRUCTION.

1. THE CONTRACTOR SHALL VERIFY SITE CONDITIONS AND SUBMIT THE SHOP

SPECIFIC NOTES

RECOMMENDATIONS AND SITE CONDITIONS.

2. SIZES AND LAYOUTS MAY CHANGE DEPENDING ON MANUFACTURER’S

3. ALL DOMESTIC WATER PIPING SHALL BE INSULATED.

4. THE CONTRACTOR SHALL INSTALL GAUGES WHERE NECESSARY.

OF GAS PIPING AND ACCESSORIES.

5. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR THE INSTALLATIONS

SMOKESTACK.

EACH UNITS, SO ALL INDIVIDUAL STACKS SHALL BE COMBINED INTO ONE

7. THE CASCADE TYPE OF DOMESTIC HOT WATER HEATER HAVE STACKS IN

EQUIPMENT TO BE INSTALLED.

8. ALL EQUIPMENT PADS SHALL BE COORDINATED WITH THE ACTUAL

P-1 M-5

KEY PLAN

MECH. ROOM

DOMESTIC HOT WATER HEATER1

3 DOMESTIC HOT WATER RE-CIRCULATING PUMP

2 DOMESTIC HOT WATER STORAGE TANK

DOMESTIC HOT WATER CIRCULATING PUMP

EXISTING HOT WATER HEATING BOILER

WATER LINE

EXISTING 100mm DOMESTIC

N

SCALE = 1 : 50

GRAPHIC SCALE

SCALE: 1 : 50

2000mm1000

NEW MECH. ROOM PIPING PLAN

AND REGULATOR

EXISTING GAS METER

6. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR GAS PIPE SIZING.

NEW 40mm GAS PIPE W/ FITTING

EXISTING GAS PIPING

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

G

CHANG, TAE HO

NAM, TAE CHIN

M-5

NEW MECH. ROOM PIPING PLAN

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

CAMP WALKER

16 JUL 20

J1-00629-0J D - 20 - 17

5 6

P-1

M-6 NOT TO SCALE

DOMES

TIC

H

OT

WAT

ER

H

EAT

ER

DOMES

TIC

H

OT

WAT

ER

S

TO

RAGE

TA

NK

DOMES

TIC

H

OT

WAT

ER

R

E-

CI

RCULA

TIN

G

PUMP

DOMES

TIC

H

OT

WAT

ER

C

IR

CULA

TIN

G

PUMP

EXIS

TIN

G

HOT

WAT

ER

H

EAT

IN

G

BOI

LE

R

WAT

ER

L

IN

E

EXIS

TIN

G 0m m

DOMES

TIC

NEW MECH. ROOM PIPING ISOMETRIC DIAGRAM

EXIS

TIN

G

GAS

R

EGULA

TO

R

EXIS

TIN

G

GAS

M

ET

ER

NEW

mm

GAS

P

IPE

W / F

ITT

IN

G

H

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

EDCBA

AS SHOWN

DATE:

MECHANICAL

G

CHANG, TAE HO

NAM, TAE CHIN

M-6

ISOMETRIC DIAGRAM

NEW MECH. ROOM PIPING

WATER HEATER BLDG NO. S-310

REPLACE DEFECTIVE DOMESTIC HOT

CAMP WALKER

16 JUL 20

J1-00629-0J D - 20 - 17

6 6

J1-00629-0J_T01
J1-00629-0J_M01
J1-00629-0J_M02
J1-00629-0J_M03
J1-00629-0J_M04
J1-00629-0J_M05
J1-00629-0J_M06

File details come from the government source that posted it. Updated .