Drawing_CDTF_Water_Piping_20250820.pdf

PDF 204 KB Posted

Attached to
CDTF Water Piping Installation Services
Solicitation number
PANNGB25P0000027740
Issued by

About this file

This document is a Water Routing Plan (A1) for a waterline project at JFTB - Los Al (Job # 8.18.25). The plan details a water service installation featuring a 3/4" copper Type L pipe with a back flow preventer. The routing includes a trailer point of contact (POC) area and specifies that components should be attached with clamps as required. The technical drawing provides a schematic layout of the water routing, focusing on the precise positioning and specification of water infrastructure components for the specified location.

View the file

Other files

File Type Posted
Draft PWS_CDTF_Water_Installation Piping_Services_20250822.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BACK FLOW

3/4" COPPER TYPE L

TRAILER POC

(E) WATER SERVICE

ATTACHED w/ CLAPS AS REQ'D

WATER ROUTING PLAN A1

JOB #

DATE

LOCATION

CD JFTB WATERLINE

8.18.25

JFTB - LOS AL

Sheets and Views
A1

File details come from the government source that posted it. Updated .