This is a Statement of Work (SOW) for Trash Disposal Services for the U.S. Customs and Border Protection (CBP) Office of Border Patrol in the San Diego Sector. The contract covers trash removal and garbage collection services for 20 different locations across California, including border patrol stations, checkpoints, and maintenance facilities. The Period of Performance is one base year from 5/01/2026 to 4/30/2027, with four additional one-year option periods extending through 4/30/2031.
The services include weekly trash and recycling pickup using various sized front-load bins (2-6 yard), with frequencies ranging from once per week to multiple times per week depending on the specific location. Contractors must remove all trash, natural vegetation, and recyclables to EPA-approved disposal facilities, maintain clean and professional service, and comply with federal, state, and local regulations. Key requirements include providing all necessary management, labor, transportation, and equipment, identifying vehicles with company logos, and maintaining a quality control plan. The contract emphasizes minimal disruption to CBP operations and adherence to safety and security protocols at border patrol facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REQUEST FOR INFORMATION - Trash Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Trash Disposal Services U.S. Border Patrol / San Diego Sector U.S. Customs and Border Protection Page 1 of 8
U.S. Customs and Border Protection U.S. Border Patrol – San Diego Sector
1. INTRODUCTION
U.S. Customs and Border Protection (CBP) – Office of Border Patrol (OBP) conducts daily operations at a variety of locations across the San Diego Sector. As a result of these sustained operations, CBP has a requirement for 12 months of trash removal / garbage collection services to be procured from a commercially available source.
2. SCOPE
The contractor shall provide all management, supervision, labor, transportation, supplies, and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure a clean, neat and professional appearance for employees servicing CBP locations.
The Period of Performance (POP) shall be one base year and four (4) option years:
• Base Year POP: 5/01/2026 - 4/30/2027
• Option Year 1 POP: 5/01/2027 - 4/30/2028
• Option Year 2 POP: 5/01/2028 - 4/30/2029
• Option Year 3 POP: 5/01/2029 - 4/30/2030
• Option Tear 4 POP: b5/01/2030 - 4/30/2031
The Contractor shall provide trash removal / garbage collections services in accordance with the requirements of this SOW. Material changes in scope (i.e., additions/deletions of locations, bins, or frequencies) may be implemented by mutual agreement between the parties and through formal modification of the contract requirements.
3. GENERAL REQUIREMENTS
3.1 12-months of Trash removal / garbage collection shall be performed on/at U.S.
Customs and Border Protection (CBP) properties, by location, as identified within Attachment B, Waste Removal Task and Frequency Chart.
3.2 Contractor agrees that Attachment B, Waste Removal Task and Frequency Chart, will act as the minimum performance requirements for trash removal / garbage collection with regards to frequency and days for which services will be rendered.
3.3 All trash/garbage, natural vegetation, and recyclables shall be removed from the locations to a disposal facility (i.e., incinerator, landfill, etc.) approved by EPA as being in conformance with existing Federal, State and Local Regulations.
U.S. Customs and Border Protection Page 2 of 8
3.4 The Contactor shall identify all vehicles used in the performance of the service with the name/logo of the company for vehicle identification of the vehicle.
3.5 Contractor shall place the requested disposal bins/dumpsters, of the agreed upon size, at agreed upon location for each CBP Facility outlined in Attachment B, Waste Removal Task and Frequency Chart.
3.6 Typical trash removal / garbage collection work will be performed within a 5-to-7-day week observed by the building occupants, unless changes are specifically approved by the Contracting Officer’s Representative (COR) or other Government Authorized Representative (GAR).
3.7 No work shall be performed when the government has no workforce on duty and available for the inspection of the contractor's work unless prior approval of the COR or other GAR is obtained.
3.8 Changes to scheduled services (due to Federal holiday or otherwise) shall be coordinated with the COR or GARs for the affected location(s). Contractor will reschedule pick-ups for the next available working day between 7:00 a.m. and 9:00 a.m., Monday through Friday (with the exception of Government holidays).
3.9 Names/numbers of CBP on-site POCs are located in Attachment B, Waste Removal Task and Frequency Chart.
3.10 Contractor shall be held accountable for any repairs to Government furnished property caused by negligence on the part of contractor employee.
3.11 Contractor personnel shall be capable employees, trained and qualified in trash removal/ garbage collection services. Employee training shall include all applicable Occupational Safety and Health Act (OSHA) and other related standards.
3.12 No background checks are required for the contractor’s drivers to perform in accordance with the requirements of this document. The Contractor is required to establish and maintain an active status in the System for Award Management (www.sam.gov) so as to remain eligible for follow-on requirements.
3.13 For locations that green recycling is not available/required, all vegetation is currently being removed by the United States Border Patrol (USBP) San Diego Sector ground’s maintenance contractor to disposal green waste dumpsters located at Chula Vista Station, in according with written agreement with the County of San Diego, Solid Waste Planning and Recycling Section.
4. DESCRIPTION OF TASKS AND DELIVERABLES
Contract Service Guidelines for the contractor are given below, including quality standards, but may be subject to change through mutual agreement of both parties. Any questions
U.S. Customs and Border Protection Page 3 of 8 regarding these requirements should be directed to the COR or other GARs.
4.1 Trash Removal / Garbage Collection Procedures
4.1.1 Dates and times of servicing shall be coordinated between the Contractor and the GAR for each location. The Contractor will ensure that pick-up services are performed so as to have little or no impact on the daily activities at the CBP facilities.
4.1.2 Contractor employees shall become familiar with and obey all location regulations, including fire, traffic, and security regulations.
4.1.3 Contractor personnel shall keep within the limits of the contract requirements and shall not enter any restricted areas unless required to do so and are cleared for such entry. The government reserves the right for security reasons to prohibit certain contractor employees from entering onto CBP locations.
4.1.4 Contractor employees must have a valid picture ID when working at/on CBP locations and will be escorted at all times by Government personnel.
4.1.5 Security checks will be initiated each time contactor employees enter secured areas. It usually takes around 5 to 10 minutes per check depending on the traffic at the gates. Contractor employees may be required to log-in and log-out of some locations.
4.1.6 Contractor employees are expected to quickly perform duties when servicing trash bins/dumpsters and exit CBP location(s) without delay.
4.1.7 Contractor employees shall not separate and/or segregate trash at/on CBP locations.
4.1.8 Government-owned containers shall not be removed from the premises.
4.1.9 Contractor employees shall dispose of any overflow trash, debris, and litter that may become scattered as a result of emptying bins/dumpsters or as part of the transportation process.
4.1.10 The Contractor shall clean and sanitize disposal bins/ dumpsters, at least one time per month, to ensure odors emitted from the units are minimized.
4.1.11 Contractor personnel will clean up fuel/hydraulic fluid leaks and/or spills caused by contractor equipment while on Government property. All clean-up activities shall be in compliance with Federal EPA, state and local regulations.
4.2 Reporting Requirements
4.2.1 Contractor shall prepare and submit a Monthly Status Report concurrently with each invoice presented for payment (both the COR and the Contract Administrator
U.S. Customs and Border Protection Page 4 of 8 copy).
4.2.2 The report shall cover the term for which the invoice is submitted and shall list by site, any significant events that occurred during the reporting period with respect to the accomplishment of the tasks, a summary of what work was accomplished, problems and resolutions (address problem areas, results obtained relating to previously identified problem areas, and recommendations involving impact on technical, price and scheduling).
5. GOVERNMENT FURNISHED ITEMS & EQUIPMENT
None
6. CONTRACTOR FURNISHED ITEMS & EQUIPMENT
6.1 Permits and Licenses
6.1.1 Contractor shall obtain and maintain in effect all necessary equipment, permits, insurance, personnel, and supervision required by Federal, State or Local government, or subdivisions thereof, or of any other duty constituted public authority.
6.1.2 Contractor and contractor personnel shall obey and abide by all applicable laws and ordinances pertaining to these services.
6.1.3 Contractor shall show appropriate valid Motor Vehicle Operator licenses to the Contracting Officer’s Representative (COR) for all operators prior to the award of the contract.
6.1.4 Contractor shall be responsible for maintaining his/her equipment in working order and shall not be relieved of performance requirements in the case of breakdowns. Any costs for correcting damage caused by the contractor shall be borne by the contractor.
6.2 Quality Control
6.2.1 The Contractor shall create a Quality Control Plan that ensures that the functions defined in this Statement of Work are carried out with the highest quality possible. A copy of the Contractor’s Quality Control Plant shall be submitted with the proposal.
An updated copy must be provided to the Contracting Officer on the contact start date and as changes occur. The plan shall include, at a minimum, the following elements:
6.2.1.1 Description of the inspection system utilized in this contract. The description shall include specifics as to the areas to be inspected on the scheduled or unscheduled bases, frequency of inspections, and the title and organizational placement of the inspector(s).
U.S. Customs and Border Protection Page 5 of 8
6.2.1.2 Description of the methods to be used to identify and prevent defects in the quality of service to be performed.
6.2.1.3 Safety procedures to be utilized by the contractor in the performance of his daily duties.
6.2.1.4 Description of the records that the contractor will keep to document inspections and corrective or preventive actions taken.
6.2.2 Contractor shall maintain and make available to the Contracting Officer, upon request, the records of inspections throughout the contract period and for the period after contract completion until final settlement of all claims under this contract.
6.2.3 A proposed Quality Control Plan shall be submitted within 15 calendar days of award. If the contractor chooses to make any changes to the plan during the contract performance period, such changes shall not be effective until they are submitted in writing to the Contracting Officer, and the contractor receives written acceptance by the Government of such changes.
6.2.4 The Government shall conduct a Quality Assurance Program to verify and validate the performance of the contractor’s plan.
6.3 Quality Assurance
6.3.1 Quality Assurance Procedures
6.3.1.1 In order to have an effective contract administrative program that ensures a successful business relationship between the Government and the Contractor, all parties involved in the services delivery process must work as a team and foster open and honest communication at all times. Close coordination and active cooperation on a continuous basis between the Contractor, CO, COR, and GARs is necessary to ensure smooth performance of the contract.
6.3.1.2 Contractor performance will be documented by means of written inspections, customer surveys, and records, which will be retained as part of the official contract file.
6.3.2 Effectiveness of Quality Control
6.3.2.1 The quality and timeliness of the contractor’s performance of the required trash removal and disposal service will be used to access the overall delivery.
6.3.2.2 The Contractor will document requests for service and responses. This record will be available for inspection by the COR at all times.
U.S. Customs and Border Protection Page 6 of 8
6.3.3.3 The COR will make tours and inspections of the areas covered by the contract with the contactor’s representative whenever possible, to ascertain the level of services being performed. The Contractor will be informed of less than satisfactory performance within 1-2 day after inspection.
7. SAFETY STANDARDS
7.1. Work Environment
7.1.1 Contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities.
7.1.2 Contractor shall avoid interruption of Government operations in the performance of this contract.
7.2 Corrective Actions
7.2.1 Whenever the Contracting officer becomes aware of any noncompliance with these requirements or any condition that poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of noncompliance and that corrective action is required.
7.2.2 After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take correction action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause
8. INDEMNIFICATION
8.1 Responsibility for Government Property
8.1.1 The Contractor assumes full responsibility for and shall indemnify the Government against any and all losses or damage of whatsoever kind and nature to any and all Government property, including any equipment, supplies, accessories, or parts furnished, while in his custody and service to be performed under the terms of this contract, resulting in whole or in part from the negligent acts or omissions of the Contractor, any subcontractor, or any employee, agent or representative of the Contractor or subcontractor.
8.1.2 If due to the fault, negligent acts (whether of commission or omission) and/or
U.S. Customs and Border Protection Page 7 of 8 dishonesty of the Contractor or its employees, any Government-owned or controlled property is lost or damaged as a result of the Contractor’s performance of this contact, the Contractor shall be responsible to the Government for such loss or damage, and the Government, at its option, may in lieu of payment thereof, require the Contractor to replace at his own expense, all property lost or damaged.
8.2 Hold Harmless and Indemnification Agreement
8.2.1 The Contractor shall save and hold harmless and indemnify the Government against any and all liability claims, and cost of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any Contractor property or property owned by a third party occurring in connection with or in any way incident to raising out of the occupancy, use, service, operation, or performance of work under the terms of this contract, resulting in whole or in part from the acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor.
8.3 Government’s Right of Recovery
8.3.1 Nothing in the above paragraphs shall be considered to preclude the Government from receiving the benefits of any insurance the contractor may carry which provides for the indemnification of any loss or destruction of, or damages to property in the custody and care of the Contractor where such loss, destruction or damage is to Government property. The Contractor shall do nothing to prejudice the Government’s right to recover against third parties for any loss, destruction of, or damage to Government property, and upon the request of the Contracting Officer shall, at the Government’s expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.
8.4 Government Liability
8.4.1 The Government shall not be liable for any injury to the Contractor’s personnel or damage to the Contractor’s property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.
9. CHANGES TO THE SOW
No changes to this SOW or cost increases shall be incurred without written prior approval of the Contracting Officer (CO). Any changes or cost increases will not take effect until the CO executes a written modification. The CO is the only individual with authority to amend a contract.
U.S. Customs and Border Protection Page 8 of 8
10. ATTACHMENTS
A. Site Descriptions / Building Entity Codes B. Waste Removal Task and Frequency Matrix
ATTACHMENT A
STATEMENT OF WORK
Site Descriptions / Building Entity (BE) Codes
LOCATION ADDRESS CITY STATE ZIP CODE BE BU
BEYER BLVD ‐ GARAGE 3752 Beyer Blvd San Diego CA 92173 CA0141 CA0418
BEYER BLVD ‐ OLD HEADQUARTERS 3752 Beyer Blvd San Diego CA 92173 CA0141 CA15723
BROWNFIELD BPS 7560 Brittania Ct San Diego CA 92173 CA1333 CA0290
FOREST GATE PROCESSING 3 Forest Gate Rd Campo CA 91942 CA0120 CA8501
CAMPO GARAGE 995 Parker Rd Campo CA 91942 CA0124 CA0609
ELECTRONICS BLDG 7680 Pogo Row San Diego CA 92154 CA0186 CA4026
HEAVY EQUIPMENT LOT 2251 Dairymart Rd San Ysidro CA 92173 CA0314 CA15741
OAK GROVE CHECKPOINT 35955 Hwy 79 Warner Springs CA 92086 CA0185 CA0488
HWY 80 CHECKPOINT 29810 Old Hwy 80 Pine Valley CA 91962 CA0183 CA0486
HWY 8 CHECKPOINT (West Bound) 728 Interstate 8 W‐bound Pine Valley CA 91962 CA0261 CA16597
HWY 8 CHECKPOINT (East Bound) I‐8 East Chkpt Jacamba CA 91934 CA13958 CA20557
HWY 94 CHECKPOINT 15430 Hwy 94 Dulzura CA 91917 CA0176 CA0248
IMPERIAL BEACH BPS 1802 Saturn Blvd. San Diego CA 92154 CA0173 CA0275
FACILITY MAINTENANCE 7684 Pogo Row San Diego CA 92154 CA0186 CA0094
RANGE 2301 McCain Rd San Diego CA 92101 CA0180 CA0250
SAN CLEMENTE BPS/CKPT Mile Marker 67.5 I‐5 N‐Bound San Clemente CA 92674 CA0178 CA0460
MURRIETA BPS (NEWTON/AZRAK) 25762 Madison Ave Murrieta CA 92562 CA0123 CA4027
I‐15 CHECKPOINT 47960 I‐15 Temecula CA 92562 CA0189 CA0491
VEHICLE MAINTENANCE 7682 Pogo Row San Diego CA 92154 CA0186 CA4024
CAMPO BPS 32355 Old Hwy 80 Pine Valley CA 92962 CA0124 CA4040
BOULEVARD BPS 2463 Ribbonwood Rd Boulevard CA 91905 CA11560 CA15008
ATTACHMENT B
Waste Removal Task and Frequency Matrix
Line #
Locations
Bins Sizes / Types # of Bins at Sites
Frequency of Pickups
1001 CHULA VISTA BPS-BEYER (OLD SECTOR HEADQUARTERS)
3752 Beyer Blvd, San Ysidro, CA 92173
3YD FRONT LOAD
3YD RECYCLE/CARDBOARD
9 EA
5 EA
WKLY -- TUE (9EA) / THUR (9EA)
/ SAT (9EA)
WKLY -- THUR (5EA)
1002 BROWN FIELD STATION
7560 Brittania Ct, San Diego, CA 92173
3YD FRONT LOAD/RECYCLE
4 EA
2 EA
WKLY -- MON (4EA) / WED (4EA)
/ FRI (4EA) / SAT (4EA)
WKLY -- MON (2EA) / WED (2EA)
/ FRI (2EA)
1003 CAMPO STATION (OLD STATION)
3 Forest Gate Rd. Campo, CA 91942
6YD FRONT LOAD
6YD FRONT LOAD/RECYCLE
3 EA
2 EA
WKLY -- WED (3EA) / THUR (3EA)
WKLY -- THUR (2EA)
1004 CAMPO GARAGE
995 Parker Rd. Campo, CA 91906
6YD FRONT LOAD 1 EA WKLY -- SAT (1EA)
1005 ELECTRONICS
7680 Pogo Row San Diego, CA 92154
1 EA
1 EA
WKLY -- THUR (1EA)
1006 HEAVY DUTY EQUIPMENT LOT
2251 Dairy Mart Rd, San Ysidro CA 92173
3YD FRONT LOAD 3 EA WKLY -- THUR (3EA)
1007 HWY 79 CHECKPOINT (OAKGROVE)
35955 Hwy 79, Warner Springs, CA 92086
2YD FRONT LOAD 1 EA WKLY -- WED (1EA)
1008 I-8 CHECKPOINT (OLD HWY 80)
29810 Old Hwy 80, Pine Valley, CA 91962 (Btwn Sunrise & Buckman Springs Rd)
3YD FRONT LOAD 1 EA WKLY -- WED (1EA)
1009 I-8 CHECKPOINT (WEST BOUND)
728 I-8 Westbound, Pine Valley, CA 91962 (Btwn RdSunrise & Buckmen Springs Rd)
6YD FRONT LOAD 1 EA WKLY -- WED (1EA)
1010 I-8 CHECKPOINT (EASTBOUND - JACUMBA)
47969 Old Hwy 80, Jacumba CA 91934
3YD FRONT LOAD 1 EA ONE TIME PER MONTH -- WED (1EA)
1011 HWY 94 CHECKPOINT
15430A Campo Rd (CA-94), Jamul, CA 91935
6YD FRONT LOAD 1 EA WKLY -- THUR (1EA)
1012 IMPERIAL BEACH STATION
1802 Saturn Blvd, San Diego, CA 92154
4 EA
WKLY -- MON (4EA) / WED (4EA)
/ THUR (4EA) / FRI (4EA)
EVERY OTHER WEEK -- TUE (2EA)
1013 MAINTENANCE DEPARTMENT
7684 Pogo Row, San Diego, CA 92154
40YD Waste Container
1 EA
1 EA
1 EA
WKLY -- THUR (1EA)
WKLY -- THUR (1EA)
MONTHLY - End of month
1014 RANGE BLDG 569
2301 McCain Rd, San Diego, CA 92133
4YD FRONT LOAD
4YD FRONT LOAD/RECYCLE
1 EA
WKLY -- MON (1EA) / WED (1EA)
/ FRI (1EA)
WKLY -- MON (2EA) / WED (2EA)
/ FRI (2EA)
1015 SAN CLEMENTE STATION
I-5 North Bound, Checkpoint (MM 67.5), San Clemente, CA 92674
3YD FRONT LOAD
3YD FRONT LOAD/RECYCLE
4 EA
1 EA
WKLY -- FRI (4EA)
WKLY -- FRI (1EA)
1016 MURRIETA STATION (NEWTON/AZRAK)
25762 Madison Avenue, Murrieta, CA 92562
4YD COMMERCIAL BIN
3YD FRONT LOAD/RECYCLE
2EA
2EA
WKLY -- MON (2EA) / THU (2EA)
1017 I-15 CHECKPOINT (TEMECULA)
47960 I-15, Temecula, CA 92562
4YD FRONT LOADER 1 EA WKLY -- TUE (1EA)
1018 VEHICLE MAINTENANCE
7682 Pogo Row, San Diego, CA 92154
1 EA
1019 CAMPO STATION
32355 OLD HWY 80, Pine Valley, CA 91962
6YD FRONT LOAD
6YD FRONT LOAD/RECYCLE
9 EA
1 EA
WKLY -- THUR (9EA)
1020 BOULEVARD STATION
2463 Ribbonwood Rd, Boulevard, CA 91905
6 EA
2 EA
WKLY -- WED (6EA) / SAT (6EA)
| 1. INTRODUCTION |
| 2. SCOPE |
| 3. GENERAL REQUIREMENTS |
| 4. DESCRIPTION OF TASKS AND DELIVERABLES |
| 4.1 Trash Removal / Garbage Collection Procedures |
| 4.2 Reporting Requirements |
| 5. GOVERNMENT FURNISHED ITEMS & EQUIPMENT |
| 6. CONTRACTOR FURNISHED ITEMS & EQUIPMENT |
| 6.1 Permits and Licenses |
| 6.2 Quality Control |
| 6.3 Quality Assurance |
| 6.3.2 Effectiveness of Quality Control |
| 7. SAFETY STANDARDS |
| 7.1. Work Environment |
| 7.2 Corrective Actions |
| 8. INDEMNIFICATION |
| 8.1 Responsibility for Government Property |
| 8.2 Hold Harmless and Indemnification Agreement |
| 8.3 Government’s Right of Recovery |
| 8.4 Government Liability |
| 9. CHANGES TO THE SOW |
| 10. ATTACHMENTS |
| ATTACHMENT B STATEMENT OF WORK |
| ATTACHMENT B STATEMENT OF WORK |
| ATTACHMENT B STATEMENT OF WORK |
| ATTACHMENT B STATEMENT OF WORK |
File details come from the government source that posted it. Updated .