DRAFT Statement of Work.pdf

PDF 892 KB Posted

Attached to
Propulsion Test Facility (PTF) Complex Operations & Maintenance (O&M)
Solicitation number
N66604-25-R-0330
Issued by

About this file

This is a Draft Statement of Work (SOW) for the Propulsion Test Facility (PTF) Complex Operations & Maintenance (O&M) contract at the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT). The SOW describes comprehensive services for operating, maintaining, and upgrading the PTF, which provides critical torpedo testing capabilities for the US Navy. Key services include testing services for Mk 48 and Mk 54 torpedoes, test equipment services, engineering services, technical services, and facility maintenance across multiple test systems such as the Deep Depth Test Facility, Drag Disc Test Stand, Combustion Test Stand, and Accessories Test Stand.

The contractor will be responsible for a wide range of technical tasks, including test planning, test execution, facility documentation, instrumentation management, digital engineering, systems engineering, and cybersecurity compliance. The contract will be an Indefinite Delivery Indefinite Quantity (IDIQ) with an ordering period of 60 months, potentially using Firm Fixed Price or Cost Plus Fixed Fee mechanisms. The work supports multiple sponsors including PMS 404, PMS 495, and the Office of Naval Research, with funding sources including Research, Development, Test and Evaluation, Weapons Procurement, and Foreign Military Sales. The NAICS code is 541330 - Engineering Services, with a size standard of $22.5 million.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V4.2_FEBRUARY2025

STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS)

Propulsion Test Facility (PTF) Complex Operations & Maintenance (O&M)

1.0 Background

The Propulsion Test Facility (PTF) Complex, located at the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT), provides key test, engineering, and prototype development services to the United States (US) Navy Torpedo fleet and other customers in the undersea systems domain. The PTF houses the only Land-based Testing (LBT) system capable of testing a Mk 48 Torpedo Afterbody throughout its entire operational envelope, the Deep Depth Test Facility (DDTF). This is a legacy test system with aging, one-of-a-kind components that require significant upkeep and engineering to keep operational.

The PTF is capable of Mk 48 and 54 Torpedo LBT, Torpedo component testing, proof and lifecycle testing of various submarine components, and combustion analysis testing, with the agility to accommodate new customers as required by the Mission. The PTF provides Torpedo Test Equipment services including, but not limited to prototyping, troubleshooting, refurbishing, fabricating, and managing obsolescence, for the US Navy and her allies. The PTF also provides prototyping and development services for research and development, in-service and obsolescence efforts to rapidly deploy capabilities to customers for evaluation. The PTF is a national asset and continues to provide invaluable services to the Torpedo fleet.

1.1 Places of Performance

Propulsion Test Facility (PTF) at NUWC Division Newport (NUWCDIVNPT), contractor’s Site, and off-site locations as required.

1.2 Authorized Users

Code 8524 – Undersea Vehicles Mechanical Systems

1.3 Sponsors

PMS 404

PMS 495

Office of Naval Research (ONR)

1.4 Types of Funding

Research, Development, Test and Evaluation, Navy (RDTE, Navy) Weapons Procurement, Navy (WPN) Operations and Maintenance, Navy (OMN) Foreign Military Sales (FMS) Shipbuilding and Conversion, Navy (SCN)

2.0 Scope

The contractor shall operate, maintain, and upgrade the facilities that comprise the NUWCDIVNPT PTF Complex.

The contractor shall perform Testing services, (including, but not limited to, assembly, integration, and breakdown of Test Articles, execution of tests, and troubleshooting of test systems), Test Equipment services (including, but not limited to fabrication, refurbishment, upgrades, and mitigating obsolescence issues), Engineering Services (including, but not limited to, design, drafting, and prototyping), Technical Services (including, but not limited to, remote technical support and troubleshooting), and Facility Maintenance.

The Contractor shall operate and maintain the PTF in compliance with all Explosive Safety, System Safety, NAVSTA, OSHA, Navy, Environmental, Calibration and Security policies.

2.1 Program or Systems Supported

Mk 48 Heavyweight Torpedo Mk 54 Lightweight Torpedo Undersea Targets and Sensors Unmanned Underwater Vehicles (UUV) Submarine Sensors and Equipment

The PTF test systems and their test capabilities are as follows:

Deep Depth Test Facility (DDTF):

Land-based Mk 48 Heavyweight Torpedo propulsion system testing through its entire operating envelope

Rapid cyclic pressure testing (CPT) for submarine lifecycle simulation Hydrostatic testing

Drag Disc Test Stand (DDTS):

Land-based Mk 54 Lightweight Torpedo propulsion system testing through its entire operating envelope

Combustion Test Stand (CTS):

Torpedo propellant grain testing Otto Fuel II (OF II) testing

Accessories Test Stand (ATS):

Mk 48 torpedo accessories testing

Conical Shock Tube:

Shockwave testing

Ad hoc Testing Tests utilizing PTF support systems and infrastructure

Each Test system’s boundaries, equipment, sub-systems and required support infrastructure for each is detailed in the facility Piping & Instrumentation Diagrams (P&IDs), test system schematics, process diagrams, Standard Operating Procedures (SOPs) and equipment lists provided in the ADs and Government Furnished Information (GFI).

3.0 Applicable Documents

The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs).

NUMBER TITLE

REVISION/

DATE

APPLICABLE

SOW TASK

3.1 DoD Issuances

3.1.1 DOD-STD-2101 Classification of

Characteristics 10 May 1979 ALL

3.1.2 DODI 8500.01 Cybersecurity 7 Oct 2019 ALL

3.1.3 DoD Directive 8140.01, Cyberspace

Workforce Management 5 Oct 2020 ALL

3.1.4

DoD Instruction 8140.02, Identification, Tracking, And Reporting of Cyberspace Workforce Requirements

21 Dec 2021 ALL

3.1.5 DoD Manual 8140.03, Cyberspace Workforce Qualification And Management Program

15 Feb 2023 ALL

3.1.6 MIL-STD-882E CH 1– System

Safety Program Requirements 27 Sep 2023 ALL

3.1.7

MIL-STD-810H CH 1 -

Environmental Engineering Considerations and Laboratory Tests

18 May 2022 ALL

3.1.8 MIL-STD-31000B Standard

Practice Technical Data Packages 21 Aug 2023 ALL

3.1.9

MIL-STD-1686C - Electrostatic discharge control program for protection of Electrical and Electronic parts, assemblies, and equipment (excluding electrically initiated explosive devices)

25 Oct 1995 ALL

3.1.10

UFC 4-390-01Unified Facilities Criteria (UFC) Operation and Maintenance: Unmanned Pressure Test Facilities Safety Certification Manual

23 Jul 2003 4.1, 4.2

3.1.11 DoDM 5200.01, Vol 1, DoD Information Security Program, Change 2

28 July 2020 ALL

3.1.12 DoDM 5200.01, Vol 2, DoD Information Security Program, Change 4

28 July 2020 ALL

3.1.13 DoDM 5200.01, Vol 3, DoD Information Security Program, Change 3

28 July 2020 ALL

3.1.14 DoDM 5200.48 Controlled

Unclassified Information 06 Mar 2020 ALL

3.1.15 DRT 4500.9-R Defense Transportation Regulation, Cargo Movement (Part II)

3 Oct 2024 ALL

3.1.16 GIDEP Form PN-01-2022 – Product Change Notices

20 Jan 2022 4.3

3.1.17 DoD 85701.01-M - Information Assurance Workforce Improvement Program, Change 4

10 November 2015 ALL

3.2 Navy Issuances

3.2.1 OPNAVINST 5090.1E (June 2021), Environmental Readiness Program Manual

25 Jun 2021 ALL

3.2.2

OPNAVINST 5102.1D CH2 (Jan 2005), Navy & Marine Corps Mishap and Safety Investigation, Reporting, and Record Keeping

7 Jan 2005 ALL

3.2.3

SECNAVINST 5510.36B (Jul 2019), Department of the Navy Information Security Program Regulation

12 Jul 2019 ALL

3.2.4

NUWCDIVNPTINST 4734.1

NUWCDIVNPT Metrology and Calibration (METCAL) Program

30 Apr 2020 ALL

3.2.5

NUWCDIVNPTINST 4000.1

Receipt, Delivery, Inspection, and Shipment of Material

11 Sep 2023 ALL

3.2.6 NUWCDIVNPTINST 5000.7C

Policy for Systems Engineering

9 Feb 2016 ALL

3.2.7

NUWCDIVNPTINST 5090.3E

Hazardous Material Control Program

7 Jan 2016 ALL

3.2.8

NUWCDIVNPTINST 5090.4E

National Environmental Policy Act and Executive Order 12114 Compliance

3 May 2023 ALL

3.2.9

NUWCDIVNPTINST 5100.5C

Naval Undersea Warfare Center Division, Newport Occupational Safety and Health Program

24 May 2018 ALL

3.2.10 NUWCDIVNPTINST 5100.7J (Mar 2019) System Safety Requirements

6 Mar 2019 ALL

3.2.11

NUWCDIVNPTINST 5100.14G

Management of Weight Handling Equipment

24 Jan 2017 ALL

3.2.12

NUWCDIVNPTINST 5500.4

NUWCDIVNPT Command Security Manual

19 April 2023 ALL

3.2.13

NUWCDIVNPTINST 8015.1F

Conventional Ordnance Inventory Accountability

19 Feb 2019 4.1, 4.2

3.2.14

NUWCDIVNPTINST 8020.4E

NUWCDIVNPT Explosive Safety Policies, Requirements, and Procedure manual

03 March 2022

ALL

3.2.15

NUWCDIVNPTINST 8020.9

NUWCDIVNPT Conventional Ordnance/Explosive Handling Qualifications and Certification

09 March 2022

ALL

3.2.16 NAVSTANPT 081-1283-00 Spill Prevention Control and Counter Measure plan

Nov 2021 ALL

3.2.17 Code 1023 V 2 Rev 5 Environmental Control, Accidental Discharge/Slug Control Plan

6Apr 2023 4.1, 4.2

3.2.18 NUWCDIVNPT Environmental

Policy

Oct 2020 ALL

3.2.19 NUWCDIVNPT Environmental Management System Manual Ver 2 Rev 4

6 Jul 2023 ALL

3.2.20

NAVSUP PUBLICATION 538,

0530-LP-642-6711 Rev 6 Management of Materials Handling Equipment (MHE) and Shipboard Mobile Support Equipment (SMSE)

1 Apr 2012 ALL

3.2.21 NAVFAC P-307 Management of

Weight Handling Equipment

June 2016 ALL

3.2.22

SECNAV M-5239.2, Cyberspace Information Technology and Cybersecurity Workforce Management and Qualification Manual, (As amended 20 May 2020 by DoN CIO Memorandum)

June 2016 ALL

3.2.23 OPNAVINST 5100.23, CH-3, Navy Occupational Safety and Health (NAVOSH) Program Manual

18 Jun 2024 ALL

3.2.24

NAVSEA OP 5 – Ammunition and Explosive Safety Ashore Regulations for Handling, Storing, Production, Renovation, and Shipping

1 March 2020

ALL

3.2.25 OTTO FUEL II – Safety, Storage, and Handling Instructions

28 February 2019 4.1, 4.2

3.2.26

NOSSA 8020.22 Explosives Safety Site Approval Documentation Requirements, Submittal, Review, Approval, and Oversight

8 February 2023

ALL

3.2.27

NOSSA 8023.11 DON Standard Operating Procedures Development, Implementation, and Maintenance for Ammunition and Explosives

29 August 2019

ALL

3.2.28 OPNAV 5530-1 AAE Personnel Screening Form

August 2018 4.1

3.2.29 SECNAVINST 5200.45 - General Equipment Accountability and Management Instruction

13 Feb 2019

ALL

3.2.30

NAVSEA M5510.1 NAVSEA

Security Program Manual

July 2022

ALL

3.2.31

NSWCHQ/NUWCHWINST 5510.1

Security Program Manua

09 November 2020

ALL

3.3 Industry Standards

3.3.1 ASME/BPVC SEC VIII-1 Division

1 Rules for Construction of Pressure Vessels

01 Jul 2023 ALL

3.3.2 ASTM G93/G93M-19 Standard

Practice for Cleaning Methods and Cleanliness Levels for Material and Equipment Used in Oxygen- Enriched Environments (2019 Version)

01 Oct 2019 4.1, 4.2

3.3.3 SAE EIA-649C Configuration

Management Standard 19 Feb 2024 ALL

3.3.4 IEEE/EIA 12207.1 - Standard for

Information Technology-Software Life Cycle Processes

15 Jul 2024 ALL

3.3.5 ASME B31.1 Power Piping 23 Jun 1905 ALL

3.3.6 Code of Federal Regulations (CFR)

Title 10 Part 19 - Notices, Instructions and Reports to Workers:

Inspection and Investigations

08 Aug 2024 ALL

3.3.7 Code of Federal Regulations (CFR)

Title 10 Part 20 - Standards for Protection Against Radiation

08 Aug 2024 ALL

3.3.8 Code of Federal Regulations (CFR)

Title 10 Part 34 - Licenses for Industrial Radiography and Radiation Safety Requirements for Industrial Radiographic Operations

23 Sep 2020 ALL

3.3.9 Code of Federal Regulations (CFR)

Title 10 Part 37 - Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material

01 Feb 2024 ALL

3.3.10 29 CFR Part 1910 - Occupational Safety and Health Standards 08 Aug 2024 ALL

3.3.11 29 CFR Park 1926 - Fall Protection 08 Aug 2024 ALL

3.3.12 40 CFR Part 260 - Hazardous Waste

Management System: General 08 Aug 2024 ALL

3.3.13 40 CFR Part 261 - Identification' and Listing of Hazardous Waste 08 Aug 2024 ALL

3.3.14 49 CFR Part 171 - General Information, Regulations and Definitions

08 Aug 2024 ALL

3.3.15 49 CFR Part 172 - Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency

08 Aug 2024 ALL

Response Information, and Training Requirements

3.3.16 49 CFR Part 173 - Shippers-General Requirements for Shipments and Packaging

08 Aug 2024 ALL

3.3.17 ASME/BPVC SEC VIII-1 Division

1 Rules for Construction of Pressure Vessels

01 Jul 2023 ALL

3.3.18 ASTM G93/G93M-19 Standard

Practice for Cleaning Methods and Cleanliness Levels for Material and Equipment Used in Oxygen- Enriched Environments (2019 Version)

01 Oct 2019 ALL

3.3.19 SAE EIA-649C Configuration

Management Standard 19 Feb 2024 ALL

3.3.20 IEEE/EIA 12207.1 - Standard for

Information Technology-Software Life Cycle Processes

15 Jul 2024 ALL

3.3.21 ASME B31.1 Power Piping 23 Jun 1905 ALL

3.4 PTF Standard Operating

Procedures

3.4.1 PTF Documentation Control Policy 01 Jun 2006 ALL

3.4.2 PTF-10-024 - PTF Maintenance Procedures (Rev A, CH1)

04 Dec 2019 4.1, 4.2

3.4.3 PTF-10-038 - Building 1303 Non- Contact Cooling Water System Operating Manual (Rev C)

23 May 2022 4.1, 4.2

3.4.4 PTF-10-051 - Hydrostatic Test Procedure Using Hand Pump

6 Feb 1997 4.1, 4.2

3.4.5

PTF-10-065 (Ch 1) - PTF Exhaust Collection System Piping Configuration for Buildings 179 and 1303 (Rev B)

22 Sep 2004

4.1, 4.2

3.4.6

PTF-10-066 - PTF Bail Hoist Assembly Inspection and Maintenance Procedure

5 January 1999 4.1, 4.2

3.4.7 PTF-10-073 - PTF Instrumentation

Calibration (Rev A)

18 March 2003 4.1, 4.2

3.4.8

PTF-10-078 (Ch2) - Preparation for Testing in the Deep Depth Test Facility (MOD 6&7) (Rev C)

27 August 2020 4.1, 4.2

3.4.9 PTF-10-080 - Torpedo Mk 54 Mod 0 Engine Assembly and Accessories Preparation (Rev A, CH 1)

13 January 2010 4.1, 4.2

3.4.10

PTF-10-081 - Torpedo MK 48 6 AT Afterbody Preparation for Testing in the Deep Depth Test Facility

20 May 2008 4.1, 4.2

3.4.11

PTF-10-082 - General Operating Procedure for Preservation or Demilitarization for Disposal of Historic Torpedoes

9 Sept 2008

4.1, 4.2

3.4.12 PTF-10-086 - Camera Memory Card SOP (Rev C)

4 August 2021

ALL

3.4.13 PTF-10-087 - Non-Government

Laptop in PTF SOP

28 October 2014

ALL

3.4.14

PTF-10-091 - TORPEDO MK48

INERT CHAMBER AND VALVE

TEST ON ACCESSORIES TEST

STAND (ATS)

22 January 2020

4.1, 4.2

3.4.15 PTF-20-007 - Compressor

Operations

12 May 1996 4.1, 4.2

3.4.16 PTF-20-014 - POD Seal Maintenance Procedure

25 March 1997 4.1, 4.2

3.4.17 PTF-20-016 - Unclassified Data Transfer by External USB Hard Disk Drive

28 Nov 2011 4.1, 4.2

3.4.18 PTF-30-016 - Hazardous Liquid Waste Storage Tank Pumping SOP (Rev B)

19 Nov 2008 4.1, 4.2

3.4.19

PTF-30-017 - Setup Operation and Shutdown of Thermal Oxidizer (Rev D)

14 Oct 2022 4.1, 4.2

3.4.20 PTF-30-054 - SOP for Pumped Remote Fuel Delivery Systems Turnaround (Rev C)

6 Nov 2018 4.1, 4.2

3.4.21

PTF-30-059 - Torpedo MK48 MOD 5/6 Disassembly for the DDTF in PTF (Rev B)

16 Nov 2021 4.1, 4.2

3.4.22 PTF-30-062 - Hydrostatic Testing in the Deep Depth Test Facility (Rev C)

9/4 Sept 2020 4.1, 4.2

3.4.23

PTF-30-064 - Torpedo Mk 54 Mod 0 Afterbody Disassembly for Testing the Lightweight Torpedo Drag Disk Stand

27 Oct 2009

4.1, 4.2

3.4.24 PTF-30-071 - Complex Lift Plan:

Overhead Cranes and Rigging of Accessory Test Stand Hardware

12 Dec 2022 4.1, 4.2

3.4.25

PTF-40-019 - Torpedo Mk 54/Mk 46 Propulsion System Testing on the Lightweight Torpedo Drag Disk Test Stand (Rev D)

21 Oct 2021

4.1, 4.2

3.4.26 PTF-40-034 - Combustion Test

Stand Performance Testing (Rev G)

23 Feb 2021 4.1, 4.2

3.4.27

PTF-40-036 (ch3) - MK48 After body Assembly Testing in the Deep Depth Test Facility (Rev K)

22 June 2022 4.1, 4.2

3.4.28

PTF-40-038 - TORPEDO MK48

MOD 6 & 7 UNIT UNDER TEST

(UUT) ASSEMBLY PROCEDURE

FOR TESTING IN THE DDTF

(Rev J)

26 Jan 2021

4.1, 4.2

3.4.29

PTF-40-050 - Torpedo Mk 54 Mod 0 Afterbody Assembly Procedure for Testing on the Lightweight Torpedo Drag Disk Stand (Rev C)

29 March 2022

4.1, 4.2

3.4.30 PTF-40-052 - Overhead Cranes and Rigging of Ordnance in the PTF SOP (Rev A)

9 May 2016

ALL

3.4.31

PTF-40-053 - Heavyweight Grain Removal from Chamber and Valve (C&V) Assembly

14 Apr 2016 4.1, 4.2

3.4.32 PTF-50-003 - Data Transfer

Standard Operating Procedure

6 Oct 2000

ALL

3.4.33

PTF-50-005 - Road Guard Deployment Procedures (Rev B, CH1)

24 Mar 2021 4.1

3.4.34 PTF-50-006 - Standard Operating

Procedure for Building 124

5 Feb 2018

ALL

3.5 Intermediate Maintenance

Activity (IMA) Test Equipment Procedures

3.5.1 Heavyweight ATE MK 660 Mod 1 Procedure 12 Feb 2021 4.3

3.5.2 Heavyweight ATE MK 660 Mod 2 Procedure 19 Nov 2015 4.3

3.5.3 Cable Test Set Mk556 Mod 4 & 5 Procedures 19 Nov 2015 4.3

3.5.4 Cable Test Set Mk556 Mod 6 Procedures 19 Nov 2015 4.3

3.5.5 Steering Assembly Test Set Mk 659 Mod 0 Procedures 19 Nov 2015 4.1, 4.3

3.5.6 Fuel Delivery Assembly Test Set Mk 658 Mod 1 Procedures 06 Nov 2016 4.1, 4.3

3.5.7 Flushing Stand Procedures 19 Nov 2015 4.3

3.5.8 Calibration Console Procedures 19 Nov 2015 4.3

3.5.9 Lightweight ATE Mk 695 Mod 0 Procedures 12 Oct 2017 4.3

3.5.10 Lightweight ATE Mk 695 Mod 1 Procedures 03 Nov 2020 4.3

3.5.11 Lightweight ATE Mk 695 Mod 2 Procedures 30 Jul 2024 4.3

3.5.12 Exploder Test Set Mk 525 Mod 3 Procedures 19 Nov 2015 4.3

3.5.13 Exploder Test Set Mk 525 Mod 4 Procedures 10 Oct 2019 4.3

3.5.14 TFEE Mk 1 Mod 0 Procedures 19 Nov 2015 4.3

3.5.15 TFEE Mk 1 Mod 1 Procedures 05 Jan 2018 4.3

3.5.16 Otto Fuel Detector Procedures 20 May 2022 4.3

3.6 Depot & Factor TE

Procedures

3.6.1 Speed Control Valve Test Set Procedures 19 Nov 2015 4.1, 4.3

3.6.2 Wirelink Interface Assembly Test Set Procedures 04 May 2022 4.3

3.6.3 Tuning Box Test Set 10 Feb 2022 4.3

3.7 Torpedo Test Equipment

Technical Data Packages (TDPs)

3.7.1 Heavyweight ATE MK 660 Mod 1

TDP

24 October 2024 4.3

3.7.2 Heavyweight ATE MK 660 Mod 2

TDP

24 October 2024 4.3

3.7.3 Cable Test Set Mk556 Mod 4 & 5

TDP

24 October 2024 4.3

3.7.4 Cable Test Set Mk556 Mod 6 TDP 24 October 2024 4.3

3.7.5 Steering Assembly Test Set Mk 659 Mod 0 TDP

24 October 2024 4.3

3.7.6 Fuel Delivery Assembly Test Set Mk 658 Mod 1 TDP

24 October 2024 4.3

3.7.7 Flushing Stand TDP 24 October 2024 4.3

3.7.8 Calibration Console TDP 24 October 2024 4.3

3.7.9 Lightweight ATE Mk 695 Mod 0

TDP

24 October 2024 4.3

3.7.10 Lightweight ATE Mk 695 Mod 1

TDP

24 October 2024 4.3

3.7.11 Lightweight ATE Mk 695 Mod 2

TDP

24 October 2024 4.3

3.7.12 Exploder Test Set Mk 525 Mod 3

TDP

24 October 2024 4.3

3.7.13 Exploder Test Set Mk 525 Mod 4

TDP

24 October 2024 4.3

3.7.14 TFEE Mk 1 Mod 0 TDP 24 October 2024 4.3

3.7.15 TFEE Mk 1 Mod 1 TDP 24 October 2024 4.3

3.7.16 Otto Fuel Detector TDP 24 October 2024 4.3

3.7.17 Mk 707 Speed Control Valve Test Set TDP

24 October 2024 4.3

3.7.18 Wirelink Interface Assembly Test Set TDP

24 October 2024 4.3

3.7.19 Tuning Box Test Set TDP 24 October 2024 4.3

3.8 PTF Technical Data

Packages (TDPs)

3.8.1 PTF Test Equipment TDPs 24 October 2024 4.3

3.8.2 Mk 48 Torpedo Shape TDPs 24 October 2024 4.3

3.8.3 Building 179 Facility Drawing TDP 24 October 2024 ALL

3.8.4 Building 1303 Facility Drawing

TDP

24 October 2024 ALL

3.8.5 Building 1302 Facility Drawing

TDP

24 October 2024 ALL

3.8.6 Building 1301 Facility Drawing

TDP

24 October 2024 ALL

3.8.7 Building 1259 Facility Drawing

TDP

24 October 2024 ALL

3.8.8 Building 1256 Facility Drawing

TDP

24 October 2024 ALL

3.8.9 Building 1180 Facility Drawing

TDP

24 October 2024 ALL

3.8.10 Accessories Test Stand (ATS) TDP 24 October 2024 4.1, 4.2

3.8.11 Spray Combustion Test Stand

(SCTS) TDP

24 October 2024 4.1, 4.2

3.8.12 Lightweight Drag Disk Test Stand

(DDTS) TDP

24 October 2024 4.1, 4.2

3.8.13 Deep Depth Test Facility (DDTF)

TDP

24 October 2024 4.1, 4.2

3.8.14 PTF Software List 17 April 2025 ALL

4.0 Technical Requirements

In accordance with individual Task and Delivery orders, applicable documents, and utilizing GFI, the contractor shall perform all services as assigned by the PTF Task Request system, hosted on the PTF Website. All tasking shall be reviewed, approved, detailed and assigned through the PTF Task Request System. Each task shall have a unique identifying Task Request (TR) number. Assigned TRs shall provide pertinent information to perform the task.

Level of Effort Task Orders and Delivery Orders will be administered via Technical Instruction (TIs).

4.1 Testing Services

The contractor shall perform testing services utilizing the capabilities of the Propulsion Test Facility (PTF), its various test systems, their sub-systems, and the support infrastructure of the PTF. The contractor shall perform tests on the test system designated by the TR. Torpedo test equipment tests, and other ad hoc tests shall be performed as designated by the TR.

4.1.1 The contractor shall prepare and review all test planning documentation assigned to the testing task. The TR system identifies test planning documentation requirements depending on the complexity of the test. Test planning documentation includes Test Plans, Hardware & Integration Plans, and PTF Standard Operating Procedures (SOPs).

Deliverables:

CDRL A001 – Test Plan CDRL A002 – Hardware, Software and Firmware Utilization Matrix (HSFUM):

Hardware & Integration Plans CDRL A003 – Instrumentation Plan CDRL A004 – Test Procedure: PTF Standard Operating Procedures (SOP)

4.1.2 The contractor shall prepare the test system, all relevant facility controls and data streams, and the PTF control room in accordance with the test planning documentation.

4.1.3 The contractor shall build the unit under test (UUT) and integrate the UUT into the test system designated by the applicable TR and its associated Test planning documentation.

4.1.4 The contractor shall keep a test log for each test, documenting progress, troubleshooting, checkouts, and any other instance where data was taken. Test logs shall document electrical, software, and mechanical operations.

Deliverable: CDRL A005 – Test Information Sheet (TIS): Test Logs

4.1.5 The contractor shall participate in testing drills ahead of the execution of any test involving explosive hazards. Testing pace and priority is set by the PTF TR System.

Testing drills shall involve a close reading of the PTF Test SOP and Hazard Control Briefings therein, evaluate operators’ experience with their test execution assignments, and allow time for practicing responses to off-nominal or emergency scenarios.

4.1.6 The contractor shall execute testing in accordance with the applicable PTF SOP called out. The contractor shall perform testing under the oversight of a Government Test Director. The contractor shall assign a Test Coordinator when required by the PTF TR System. The contractor shall provide test data to the customer and Code 8524. The contractor shall store test data on the PTF Closed Enclave, using a naming convention that links the data file to an entry in the PTF Test Database, located on the PTF Website.

Deliverable: CDRL A006 – Test Data

4.1.7 The contractor shall restore the test system, its subsystems, and any facility infrastructure involved with the test, IAW the test planning documentation used to perform the test. At the conclusion of the test, the contractor shall compile a facility performance report, containing plots of all data streams relevant to monitoring the health of the equipment, IAW the test planning documentation used to perform the test.

Deliverable: CDRL A007 – Test/Inspection Report: Facility Performance Report

4.1.8 After the test completion, the contractor shall disassemble, clean, and analyze the UUT IAW the test planning documentation used to perform the test. The contractor shall prepare a UUT Teardown report documenting any noted issues with the hardware during teardown and cleaning.

Deliverable: CDRL A008 – Acquisition and Sustainment Data Package (ASDP): UUT Teardown Report

4.2 Operations and Maintenance Services

In accordance with applicable documents, the PTF TR System, and utilizing GFI, the Contractor shall operate and maintain the PTF.

4.2.1 Ninety (90) days after contract award, the contractor shall draft a routine maintenance plan, for Government approval. The routine maintenance plan shall address all routine maintenance applicable to the facility, including manufacturer recommended equipment maintenance, hazardous waste tank inspections, eyewash and shower maintenance, high and low pressure air system maintenance, and thermal oxidizer maintenance. The contractor shall update the routine maintenance plan when new equipment is installed and commissioned at the PTF.

Deliverable: CDRL – A009: Reliability-Centered Maintenance (RCM) Class Maintenance Plan (CMP): Routine Maintenance Plan

4.2.1.1 Upon completion of each routine or breakdown maintenance task, the contractor shall complete a Maintenance Log. The contractor shall enter, submit, and store Maintenance Logs on the PTF Website.

Deliverable: CDRL – A010: Reliability-Centered Maintenance (RCM) Class Maintenance Plan (CMP): Routine Maintenance Logs

4.2.2 Upon discovery of an issue, problem, breakdown, or capability gap within the facility, including mechanical equipment, electrical equipment, IT equipment, building infrastructure, software, and documentation, the contractor shall submit an Issue to the Issue Tracker on the PTF Website. The contractor shall participate in the weekly Issue Review Board (IRB), which reviews all new entries in the Issue Tracker, and discuss the associated risks and recommended courses of action. The contractor shall execute the corrective actions in the priority order set within the Issue Tracker. The contractor shall prepare an IRB agenda ahead of and take minutes during each IRB meeting.

Deliverable:

CDRL A011 – Presentation Material: IRB Agenda CDRL A012 – Meeting Minutes: IRB Minutes

4.2.2.1 The PTF Engineering Change Request (ECR) database on the PTF Website shall assign a new entry to Issues requiring an engineering change to the facility. The contractor shall complete the ECR per the requirements determined by the IRB. ECRs shall, at a minimum, contain a description of the engineering change, a justification for the change, and the resulting actions to take in order to make the change. ECRs can include a Systems Engineering Plan (SEP), design documentation, Technical Data Package (TDP) updates, incidental engineering artifacts (including calculations, models, drawings, analysis, white paper reports, and manufacturer documentation), a Test Plan, as determined by the IRB Chair.

Deliverable:

CDRL A013 – Systems Engineering Plan (SEP) CDRL A014 – ECR Artifacts

4.2.2.2 Issues that do not result in an engineering change to the facility shall be assigned as action items, which are tracked in the Action Item Database. The contractor shall complete Action Items in the priority order set within the Issue Tracker.

4.2.2.3 The contractor shall complete and submit an Equipment Operation Log for issues involving the breakdown or malfunction of facility equipment or software, which is required for completion of an ECR or an action item.

Deliverable: CDRL A015 – Equipment Operation Log: Breakdown Maintenance

4.2.3 The contractor shall follow hazardous material handling and disposal requirements set forth in NUWCDIVNPT 5090.3E – Hazardous Material Control Program.

4.2.4 The contractor shall complete and maintain a suite of Facility Documentation detailing the overall network of Test Systems and Support Infrastructure in the Facility. This Documentation shall include the PTF Facility Manual, System Diagrams, and SOPs. The contractor shall ensure the resulting documentation complies with all governing bodies of NUWCDIVNPT (e.g., Naval Facilities (NAVFAC), Metrology and Calibration (METCAL), Navy Hyperbaric Chambers), and Engineering Best Practices (e.g., ASME, ASTM, INCOSE).

Deliverable: CDRL A016 – Technical Report: Facility Documentation

4.2.4.1 The contractor shall update, maintain, and improve PTF Mechanical System Diagrams (schematics that detail the piping, controls, valves, gauges, and instrumentation specific to each test system, subsystem, and piece of support infrastructure).

4.2.4.2 The contractor shall update and maintain both Facility Piping & Instrumentation

Diagrams (P&ID) and Test System Schematics for the PTF Facility, including all Test Systems and Support Systems.

4.2.4.3 The contractor shall update and maintain Electrical System Diagrams (ESD) for the PTF

Facility, including all Test Systems and Support Systems. If an ESD is found to be missing, or deficient (per the discretion of the PTF Facility Manager), the Contractor shall develop a new ESD for that system or subsystem.

4.2.4.4 The contractor shall continuously review SOPs for the PTF Facility, providing input on step-by-step instructions for Test and Maintenance operations. If a SOP is found to be deficient, or a new process is identified that requires an SOP (as determined by an applicable TR), the contractor shall submit a draft or redlined copy of a SOP for review and approval through document control.

4.2.5 The contractor shall participate in testing process reviews, which are testing process reviews in place at the PTF are Build Readiness Reviews (BRRs), Integration Readiness Reviews (IRRs), and Test Readiness Reviews (TRRs). Contractor participation includes assisting the Test Director with the generation of testing process review documentation packages (slides, checklists, associated Engineering Change Requests (ECRs)), reviewing documentation packages, attending the review meeting, and responding to action items resulting from the review meeting.

Deliverable: CDRL A017 – Presentation Material: Testing Process Review

4.2.6 The contractor shall manage PTF instrumentation equipment, including pressure transducers and gauges, pressure differential transducers, thermocouples, flowmeters, accelerometers, gas detectors, position sensors, electrical sensors, cameras, microphones, cables and connectors. The contractor shall ensure test systems are instrumented according to the operating requirements set in the test planning documentation for the applicable TR.

4.2.6.1 The contractor shall manage the PTF Instrumentation Database, located on the PTF Closed Enclave. The contractor shall ensure all PTF instrumentation has a unique identifying number to track its capabilities, calibration status and allocate it to a particular system.

4.2.6.2 The contractor shall align and calibrate all instrumentation in accordance with the PTF

SOP that pertains to the system being instrumented. The contractor shall use Navy METCAL calibrated instrumentation where specified in the applicable PTF SOP.

4.2.7 The contractor shall provide logistics services to the PTF and its customers per the applicable TR.

4.2.7.1 The contractor shall fulfill all approved Purchase Requests (PRs). PRs can only be made in support of an active TR.

4.2.7.2 The contractor shall perform document control services. The contractor shall manage the

PTF Official Documents folder, and ensure that the most up-to-date policies, test planning documentation, presentations, drawings, models, and reports are organized and readily available. The contractor shall distribute the most up-to-date testing and facility documentation upon request. The contractor shall format draft documents and presentations. The contractor shall route final draft documentation and presentations for approvals. The contractor shall enter finished drawings and models into the PTF Drawing Database. The contractor shall enter final Test Logs into the PTF Test Database.

4.2.7.3 The contractor shall provide project scheduling services, including the creation and management of an Integrated Master Schedule (IMS), as directed by the TR System. The contractor shall make IMSs using Microsoft Project.

Deliverable: CDRL A018 – Technical Report – Study/Services: Integrated Master Schedule (IMS)

4.3 Engineering and Technical Services

In accordance with the ADs, the PTF TR System, and utilizing GFI, the contractor shall perform Engineering and Technical Services (ETS). The contractor shall perform ETS at the PTF Complex and the contractor’s facility. The contractor shall provide the Government Budget and schedule documents as determined by the TR system. The contractor shall submit to the Government all engineering services documentation, such as models, drawings, analysis, data, engineering workbooks, schematics, presentations, bills of materials, test plans, test reports, and white papers, as determined by the TR system. The contractor shall deliver to the Government all software, software documentation, software test plans, and source code in an ETS Software Package.

Deliverables:

CDRL A019 – Technical Report – Study/Services: ETS Budget and Schedule CDRL A020 – Technical Report – Study/Services: ETS Documentation/Software Package

4.3.1 The contractor shall engineer upgrades to and new capabilities for the PTF Facility IAW an applicable TR. The contractor shall complete and submit an ECR to document Government acceptance of the upgrade or new capability.

4.3.2 The contractor shall perform Torpedo Test Equipment services at the contractor’s facility.

4.3.2.1 The contractor shall fabricate Torpedo Test Equipment per the most up-to-date TDP

(located in CMPRO) and applicable Test Equipment Job Sheets (in the Electronic Data Management System (EDMS)). Upon approval of the TR, the contractor shall submit a budget (including estimates for any known costs and materials) and schedule to be approved by the Government.

4.3.2.2 The contractor shall generate and deliver drawings, specifications, and parts lists for each new design or design update. The contractor shall update the applicable TDP or generate a new TDP for the Test Set, as required by the applicable TR.

Deliverable: CDRL A021 – Product Drawings/Models and Associated Lists: Test Sets

4.3.2.3 Upon approval of a TR for Test Set prototyping, the contractor shall submit a budget (including estimates for any known costs and materials) and schedule to be approved by the Customer. The contractor shall design, prototype, test, and document new Torpedo Test Set systems. Upon completion of the TR, the contractor shall submit all documentation, drawings, and models in an ETS Documentation Package.

4.3.2.4 IAW an applicable PTF TR, the Contractor shall evaluate the price and lead times of items identified in the Test Set TDPs to manage potential obsolescence and material supportability issues per the applicable PTF TR. The contractor shall participate in the Government Industry Data Exchange Program (GIDEP) in accordance with AD (3.1.18) and shall review Diminishing Manufacturing Sources and Material Shortages (DMSMS)/GIDEP reports as part of this evaluation and make recommendations to the Government for corrective actions.

Deliverable: CDRL A022 – Technical Report: Test Set Obsolescence Report

4.3.2.5 The contractor shall manage software for Torpedo Test Equipment. The contractor shall document new software packages, or updates to existing software, including detailed design descriptions, software requirements documents, build procedures, build environment information, and test plans. The contractor shall generate software documentation (including Software Requirements Documents, Software Development Reports, Software Test Plans, and Software Operating Manuals) for Torpedo Test Equipment software. The Contractor shall provide copies of software and firmware images, with associated source code and documentation to the Government in an ETS Software Package.

4.3.3 The contractor shall perform design engineering services. Design engineering services include mechanical, electrical, and software design of a new piece of material, documentation, or software suite to meet the customer requirements, defined in an approved TR. Budget, schedule, design, and documentation requirements shall be agreed upon between the Government and the contractor during the review process for the TR.

4.3.3.1 The contractor shall design, model, draw, analyze, test, and document mechanical parts and assemblies as required by the applicable TR or ECR. The contractor shall model and draw all PTF mechanical parts in Solid Works. The contractor shall draw all piping drawings and schematics in AutoCAD. Exceptions may be allowed based on customer requirements submitted with the initial TR request.

4.3.3.2 The contractor shall design, model, analyze, test, and document electrical parts and systems as required by the applicable TR or ECR. The contractor shall draw all electrical drawings in OrCAD, unless otherwise specified in the customer requirements.

4.3.3.3 The contractor shall provide all Engineering Documentation generated in the execution of

PTF Tasks to the Government, including but not limited to Mechanical parts, assemblies, drawings, Electrical drawings, design analysis, systems engineering plans, system requirements documents, interface control documents and diagrams, engineering notebook entries, and any presentations associated with the engineering tasks assigned in the PTF TR and ECR System.

4.3.3.4 The contractor shall develop, fabricate and test prototypes of designs to test their efficacy. Prototype design and testing documentation shall be submitted to the Government as ETS Documentation Package.

4.3.4 The contractor shall perform Systems Engineering services. Systems Engineering services include the generation of system documentation (SEPs, system architecture, test plans, interface control documents (ICDs), technical studies, Analyses of Alternatives (AoAs), use case diagrams, planning documents, engineering notebooks, system drawings and schematics), process definition and improvement, project management, risk management, and system safety. Budget, schedule, design, and documentation requirements shall be agreed upon between the Government and the contractor during the review process for the TR. For systems engineering services pertaining to the PTF Facility, the contractor shall submit all work and documentation through the PTF ECR System. For systems engineering services pertaining to PTF Customers outside the PTF Complex, the contractor shall submit all resulting documentation in an ETS Documentation Package upon the completion of the project.

4.3.5 The contractor shall perform Digital Engineering services. Digital engineering services include Model Based Systems Engineering (MBSE), Product Lifecycle Management (PLM), Product Data Management (PDM), data modeling, database improvements, data sharing between applications and networks using Application Product Interfaces (APIs), cloud computing and hosting, and system integration. Budget, schedule, design, and documentation requirements shall be agreed upon between the Government and the contractor during the review process for the TR. The contractor shall provide copies of any software and firmware images, with associated source code and documentation, system models, system descriptions, data models, entity relationship diagrams, use case diagrams, documentation, and any data generated as a result of performing Digital Engineering services to the Government in an ETS Documentation Package and an ETS Software Package (if software was developed) at the conclusion of the project.

4.3.5.1 The contractor shall perform all MBSE tasks using the SysML modeling language using

Cameo Systems Modeler.

4.3.5.2 The contractor shall develop and maintain a comprehensive system model of the PTF Complex, its test systems, and its various subsystems, per the drawings, schematics, diagrams, and other PTF system documentation provided in the ADs. Subsystem models shall contain function physics-based modeling.

Deliverable: CDRL – A023 Technical Report: PTF Complex System Model

4.3.5.3 The contractor shall develop all web applications and improvements to the PTF Website using the asp.net programming language. Web applications shall be compatible with Microsoft Azure servers for hosting.

4.3.5.4 The contractor shall perform all database improvement, construction, and maintenance tasking using, or for use with Microsoft SQL Server.

4.4 Cyberspace/Cyber Workforce (CWF)

4.4.1 Cyberspace Qualifications

Per DFARS 252.239-7001 ‘Information Assurance Contracting Training and Certification,’ all personnel performing cyber functions must be trained and qualified. In addition, personnel shall maintain the appropriate security clearance per SECNAV M-5510.30C to perform the tasks associated with their assigned positions.

Note: DFARS uses Information Assurance (IA) which is the old title and acronym; it has been replaced by Cyberspace/Cyber Workforce (CWF).

The contractor is required to earn and maintain appropriate baseline certification as identified in DOD 8570.01-M for the position and tasking being performed.

If privileged access is required, the contractor shall complete a privileged access agreement, SECNAV 5239/1, and submit it to the COR. Contractors have up to 6 months to obtain applicable operating system and computing environment training or the account(s) will be suspended. The contractor shall provide a copy of the certificate(s) of completion to the COR.

4.4.2 Cyberspace Reporting

The contractor shall provide a list of all personnel assigned to the contract performing cyber functions as a part of a monthly CWF Report. The report shall include employee name, contract number, the applicable CWF category and level, required certifications and fulfillment status.

Note that Contractor CWF personnel must receive designation approval in writing by the Commanding Officer, or the C-ISSM via “By Direction” authority, prior to performing CWF functions.

The contractor shall submit new hire information for tasking requiring cyber functions to the COR at least seven (7) days prior to the new hire employee beginning performance of any cyber functions. New hire information shall include name, contract number, list of applicable cyber functions category, level, required certifications and fulfillment status, as well as a copy of the baseline certification documentation. Per DFARS 252.239-7001(c), “Contractor personnel who do not have proper and current certifications shall be denied access to DoD information systems for the purpose of performing information assurance functions, and therefore may not be allowed to charge to the contract.

Deliverable: CDRL A024 – Technical Report: CWF Report

4.4.3 PTF Software and IT Infrastructure

In accordance with ADs and utilizing GFI, the contractor shall maintain, update and service all workstations, peripherals, databases, PTF control and instrumentation software (3.8.14), and COTS software that make up the PTF Closed Enclave network, the PTF Website, and the PTF’s NREN stations. Website documentation and software shall be submitted in a PTF Website Development Package and attached to any ECRs associated with the creation, repair, or maintenance of the website. Upon updating the PTF Website, the contractor shall write and submit a changelog to document the changes made with each subversion.

The contractor shall develop, upgrade, and maintain all PTF control and instrumentation software using the LabView Real Time programming language for use on the PTF Closed Enclave. All PTF control and instrumentation software releases shall be documented with version and subversion notes, operating manuals and test plans. The contractor shall provide copies of software and firmware images, with associated source code and documentation to the Government in a Software Development Package. Software documentation shall be included in the Software Development Package and attached to any ECRs associated with the creation, repair, or maintenance of the software. Upon updating control and instrumentation software, the contractor shall write and submit a changelog to document the changes made with each subversion.

Deliverable: CDRL A025 – Technical Report: PTF Website/Control & Instrumentation Software Development Package

5.0 Progress Reports

5.1 Contract Status Report

The Contractor shall prepare a Contractor’s Status Report that indicates the progress of work, status of the program(s), and existing or potential problem areas for all assigned tasks. The Contractor shall submit the Contract Status Report for the same timeframe as each invoice submitted in the Wide Area Workflow (WAWF) Module of the Procurement Integrated Enterprise Environment (PIEE).

Deliverable: CDRL A026 – Contract Status Report

5.2 Training

5.2.1 The Contractor shall require all Contractor employees performing work at any NUWC

Division Newport site, who has a Common Access Card (CAC) and an NMCI Account, to complete all required Mandatory trainings.

5.2.2 The Contractor shall require Contractor employees to complete any applicable Limited

Audience required training(s). Note: Limited Audience required training(s) may be applicable regardless of performance site location.

5.2.3 The Contractor shall fill out and submit to the Government the Training Completion

Status Report, GFI 6.2.4, affirming all Mandatory training and any applicable Limited Audience required training(s) are completed. The required training and required training schedule are available at the following website: [WILL BE PROVIDED AT AWARD] under Mandatory Training Instructions. See the .pdf Mandatory Training Instruction – Contractors Only.

5.2.4 The Contractor shall validate the Government’s DRAFT Limited Audience Training

Applicability List GFI 6.2.6 for accuracy and completeness and submit to the Government a finalized Limited Audience Training Applicability List. The following Limited Audience required training(s) are applicable to this requirement:

Hazardous Waste Generator Training Spill Prevention Control and Countermeasures Training Organic Solvent Degreaser Training Category 3 Crane Training Occupational Safety & Health Administration (OSHA) 10 Hour Training

Contractors involved in explosive operations shall fulfill all requirements set forth in the Explosive Qual Cert Training Plan 6.1.29. The contractor shall monitor and maintain the Explosive Qual Cert compliance of all personnel involved in explosive testing operations in an Explosive Qual Cert Roster.

Deliverable: CDRL A027 Technical Report: Explosive Qual/Cert Roster

5.2.5 The Training Completion Status Report and Limited Audience Training Applicability

List shall include the contract number, contactor employee name, specific training course title and identification number, and completion date for all contractor employees asserting training completion. Contact the COR identified in Section G if additional access instructions are needed. If specific training questions arise, contact the POC listed for the training in the above-specified .pdf(s).

Deliverable: CDRL A028 Technical Report: Training Completion Status Report.

6.0 Government Furnished Information

The following Government Furnished Information (GFI) will be made available under this contract.

Number Title Applicable SOW

Task Number

6.1 PTF Specific Information

6.1.1 PTF Task Request (TR) System ALL

6.1.2 PTF Purchase Request (PR) System ALL

6.1.3 PTF Issue Tracker 4.1, 4.2

6.1.4 PTF Engineering Change Request (ECR) Database 4.1, 4.2

6.1.5 PTF Action Item Database ALL

6.1.6 PTF Drawing Database ALL

6.1.7 PTF Test Database 4.1, 4.2

6.1.8 PTF Electronic Engineering Notebook (EEN) ALL

6.1.9 PTF Maintenance Logs 4.1, 4.2

6.1.10 PTF Library Catalog ALL

6.1.11 PTF Test Plans 4.1, 4.2

6.1.12 PTF Hardware & Integration Plans 4.1, 4.2

6.1.13 PTF Instrumentation Plans 4.1, 4.2

6.1.14 PTF Active Procedures ALL

6.1.15 PTF Archived Procedures ALL

6.1.16 PTF Testing Readiness Presentations ALL

6.1.17 PTF Operating Policies & Instructions ALL

6.1.18 PTF Software Documentation ALL

6.1.19 PTF Data Management Project Documentation ALL

6.1.20 PTF Digital Engineering Artifacts ALL

6.1.21 C2-19; Digital Speed Control System 4.1, 4.2

6.1.22 PTF Data Sources Presentation ALL

6.1.23 7261739-707; System/Subsystem Spec for the FDS ALL

6.1.24 NA; Fuel Delivery System CONOPS 4.1, 4.2

6.1.25 3995(B3-02); Development Spec for a FDS (MK48 Engine Test Stand) 4.1, 4.2

6.1.26 3742(A3-04); Development Spec for a FDS (DDTF - 179) 4.1, 4.2

6.1.27 SEP-002; Automated Air Spin Console 4.1, 4.2

6.1.28 DDTF Process Diagram 4.1, 4.2

6.1.29 PTF RDTE Explosive Qual-Cert Training Plan 4.1, 4.2

6.2 NUWC Specific Information ALL

6.2.1 Network Patch Cable and Wall Plate Labeling Requirements 4.1, 4.2

6.2.2 User information from the PBX 4.1, 4.2

6.2.3 Facilities System Move Requests ALL

6.2.4 Training Completion Status Report ALL

6.2.5 Monthly CWF Report template ALL

6.2.6 Limited Audience Training Applicability List ALL

6.3 PTF Technical Data Packages (TDPs)

6.3.1 Test Equipment TDPs (JS listed in tab) 4.3

6.3.2 Mk 48 Torpedo Shape TDPs 4.3

6.3.3 Building 179 Facility Drawing TDP ALL

6.3.4 Building 1303 Facility Drawing TDP ALL

6.3.5 Building 1302 Facility Drawing TDP ALL

6.3.6 Building 1301 Facility Drawing TDP ALL

6.3.7 Building 1259 Facility Drawing TDP ALL

6.3.8 Building 1256 Facility Drawing TDP ALL

6.3.9 Building 1180 Facility Drawing TDP ALL

6.3.10 Accessories Test Stand (ATS) TDP 4.1, 4.2

6.3.11 Spray Combustion Test Stand (SCTS) TDP 4.1, 4.2

6.3.12 Lightweight Drag Disk Test Stand (DDTS) TDP 4.1, 4.2

6.3.13 Deep Depth Test Facility (DDTF) TDP 4.1, 4.2

6.3.14 PTF Software List ALL

6.4

Torpedo Test Equipment Technical Data Packages (TDPs)

6.4.1 Heavyweight ATE MK 660 Mod 1 TDP 4.3

6.4.2 Heavyweight ATE MK 660 Mod 2 TDP 4.3

6.4.3 Cable Test Set Mk556 Mod 4 & 5 TDP 4.3

6.4.4 Cable Test Set Mk556 Mod 6 TDP 4.3

6.4.5 Cable Test Set Mk556 Mod 7 TDP 4.3

6.4.6 Steering Assembly Test Set Mk 659 Mod 0 TDP 4.3

6.4.7 Fuel Delivery Assembly Test Set Mk 658 Mod 1 TDP 4.3

6.4.8 Flushing Stand Mk 712 Mod 1 TDP 4.3

6.4.9 Calibration Console Mk 125 Mod 0 TDP 4.3

6.4.10 Lightweight ATE Mk 695 Mod 0 TDP 4.3

6.4.11 Lightweight ATE Mk 695 Mod 1 TDP 4.3

6.4.12 Lightweight ATE Mk 695 Mod 2 TDP 4.3

6.4.13 Exploder Test Set Mk 525 Mod 3 TDP 4.3

6.4.14 Exploder Test Set Mk 525 Mod 4 TDP 4.3

6.4.15 TFEE Mk 1 Mod 0 TDP 4.3

6.4.16 TFEE Mk 1 Mod 1 TDP 4.3

6.4.17 Otto Fuel Detector Mk 15 Mod 0 TDP 4.3

6.4.18 Speed Control Valve Test Set Mk 707 Mod 1 TDP 4.3

6.4.19 Wirelink Interface Assembly Test Set TDP 4.3

6.4.20 Tuning Box Test Set TDP 4.3

6.4.21 Hydraulic Filling Unit Mk 5 Mod 0 TDP 4.3

6.4.22 Otto Fuel Filling Unit Mk 6 Mod 0 TDP 4.3

6.4.23 Depth Sensor Assembly Test Set TDP 4.3

6.4.24 Fuel Pump Test Set Mk 558 Mod 0 TDP 4.3

6.4.25 Common Exercise Head Test Set Mk 562 Mod 3 TDP 4.3

7.0 Government Furnished Property

The Government may provide Government Furnished Property (GFP) as listed in Attachment X.

As specified in DFARS Clause 252.245–7005, the Contractor shall submit all GFP Reports via the GFP Module of the Procurement Integrated Enterprise Environment (PIEE). Monthly, the Contractor shall prepare a Government Property Inventory Report indicating the monthly consumption of GFP.

Deliverable: CDRL A029 – Government Property Inventory Report

The contractor shall perform monthly inventory checks on all Government owned, Contractor Managed Material (CMM) at the PTF site. The contractor shall deliver an on-site inventory update to the Government via a quarterly onsite inventory report.

Deliverable: CDRL A030 – Monthly Onsite Inventory Report

8.0 Quality Surveillance and Performance Standards

The Government will conduct quality surveillance via various methods including formal and informal meetings, review of technical reports, review of monthly progress reports, and review of deliverables. Contractor performance will be evaluated in the areas of technical quality, cost control, schedule/timeliness, management, utilization of small business, and regulatory compliance as follows:

Technical Quality: The government will evaluate technical quality using the criteria defined in the Performance Requirements Summary Table (PRST), Attachment X;

Cost Control: The government will evaluate the contractor’s effectiveness in forecasting, managing, and controlling…

This is the start of the file's text. The full file is on GovTribe.