This is a Requirements/Specification Document for a federal procurement of 5G cellular base station equipment by the National Institute of Standards and Technology (NIST).
NIST's Communications Technology Laboratory, Spectrum Technology and Research Division, is procuring one outdoor Nokia 5G C-band Next-Generation NodeB (gNB) base station to modernize measurement and antenna calibration methodologies. The procurement includes three primary items: (1) a Radio Access Network (RAN) Base Station with a 5G Outdoor Baseband Unit featuring 2 x 100 MHz MIMO capabilities, GPS, and ACOC cabinet hardware; a 5G n77 MIMO Outdoor 64T64R unit with 1 x 100 MHz at 320W with 16 layers; and 5G Main Software and Value Packs at 1 x 100 MHz; (2) one year of annualized RAN CARES (Technical Support Services) Bronze support with 2 option periods; and (3) Nokia staging services including RAN commissioning, customer delivery project management, Low-Level Design, integration, and beamforming test support. The vendor must possess an Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) on SAM.gov at time of award. Delivery must be completed within 90 days after release of order to NIST-Boulder (Attn: Aziz Kord, Mail Stop 675.02, 325 Broadway, Boulder, CO 80305). The procurement includes mandatory on-site installation with vendor technician services, uncrating, equipment setup, and startup services, plus turnkey installation with RAN Low-Level Design, integration, and beamforming test support. Training for 10 personnel covering operation, maintenance, troubleshooting, and safety will be provided on-site and virtually by the vendor using PowerPoint presentations and electronic manuals. The base manufacturer warranty of one year covers labor, parts, travel, and return costs, with 2 option periods for maintenance covering software updates over 3 years. Inspection and acceptance are expected within 7 business days using basic functional testing and key performance indicators verification. Partial delivery is acceptable, with direct delivery to the designated NIST building required. US citizens are required on-site, with foreign nationals requiring preregistration 30 days prior. Power availability of 110V at 30A maximum current is available at the facility. Government-furnished material includes a 19-inch rack to host the equipment and current generation handsets. The vendor must allocate 40 hours of on-site time for installation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: 5G Cellular Base Station (Nokia)
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Spectrum Technology and Research Division Shared Spectrum Metrology Group (675.03)
General Statement of Need:
To modernize NIST’s measurement and antenna calibration methodologies, the Spectrum Technology and Research Division requires an outdoor Nokia 5G C-band Next-Generation NodeB (gNB). By incorporating advanced RF features and beamforming capabilities, this high-fidelity base station will allow researchers to replicate real-world deployment dynamics.
Item Specifications and Quantities:
Item 1: Radio Access Network (RAN) Base Station Hardware and Software Base Option
Quantity: 1 Each Specifications 1.1 5G Outdoor Baseband Unit (BBU) 2 x 100 MHz (mMIMO), GPS, ACOC, Cabinet HW + HWA
1.2 5G n77 mMIMO Outdoor 64T64R 1 x 100 MHz 320W 16
Layers HW + HWA
1.3 5G Main Software and 5G Value Packs 1 x 100 MHz 1SCC
= 20 MHz
Item 2: RAN CARES (See Warranty Section) Quantity: 1 years Annualized in Base Period, Option Period 1, and Option Period 2
Specifications: 2.1 Technical Support Services (CARES) Bronze
Item 3: RAN Service (See Installation section) Quantity: 1 Specifications: 3.1 Nokia Staging, incl RAN commissioning & Customer delivery PM. RAN LLD, Integration & beam forming test support.
Vendor Requirements
1. Possess at time of award/contracting an Export Control Classification Number (ECCN).
2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning Considerations ☐ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☒ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☐ NIST-Boulder
ATTN: Aziz Kord Mail Stop: 675.02 325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address] Shipping Criteria:
☒ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☒ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number]
☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
90 Days After Release of Order (ARO) Three months from the award date
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
Three months after the award date.
Electronic Media ☐ N/A
[Enter Electronic Media Requirements by Item.]
☒ Software ☒ Electronic Manuals ☐ License Key ☒ Other:
Annual Software Release Subscription for 5G Main Software and
5G Value Packs.
Requesting for Base Period, Option Period 1, Option Period 2
☒ US Government Email Address for Software Delivery:
azizollah.kord@nist.gov
Installation
[Enter Installation Requirements by Item]
☒ Vendor Technician on Site ☐ Rigging
☒ Uncrating / Unpackaging ☐ Removal of Packaging Material ☒ Equipment Set Up ☒ Start-Up Services
☒ Turnkey Installation ☒ Other:
RAN LLD, Integration & Beamforming Test Support NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☐ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☒ Power Available
Voltage: 110 (V) Maximum Current: 30 (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
☒ Inspection and Acceptance Plan:
Basic functional test and key performance indicators (KPIs) verification.
[Enter Other Requirements]
Training Training Requirements (Who, When, What, Where)
☒ Number of Trainees: 10
☒ On-Site
☒ Off-Site Location: Virtual Is Trainee Travel Required: NO Scope of Training ☒ Operation ☒ Maintenance ☒ Troubleshooting
☒ Safety ☐ Other ☐ Training Materials to be Provided by Government:
[Describe Materials] ☒ Training Materials to be Provided by Vendor:
PowerPoint presentation, electronic manual, or others.
☐ Other
NOTE: TPOC shall be coordination POC.
Warranty
Base Manufacturer Warranty is acceptable Warranty Period Length: 1 - Year What is included?
☒ Labor ☒ Parts ☒ Travel ☒ Cost and Liability for Returns
☒ Other Technical Support Services (CARES) Bronze Within 5 Business days.
☐ 1 Option Period ☒ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration [Describe Calibration Requirements Per Item]
Calibration Plan Length: [i.e. 3 - Years]
☒ N/A What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: 3-Years What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☒ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☒ 2 Option Periods
Government Furnished Material / Equipment ☐ N/A
A 19” rack to host the gNB equipment.
☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
[Enter Description] [Enter Serial Number]
NIST Property Number: [Enter NIST Property Number] ☒ Other: Current generation of handsets
Travel ☒ N/A
40 hours of onsite for installation.
☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.