Draft Specifications.pdf

PDF 311 KB Posted

Attached to
SOURCES SOUGHT: Spatial Light Modulator Federal contract opportunity
Solicitation number
NB672020-26-02299
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Requirements/Specification Document issued by the National Institute of Standards and Technology (NIST) Communications Technology Laboratory, Radio Frequency Technology Division, Electromagnetic Fields Group for the procurement of equipment to support a laser intensity imaging innovation project.

The procurement seeks one Spatial Light Modulator with the following key specifications: liquid cooling module included, high power handling capacity of ≤200 W/cm², SMA trigger output, 1920 x 1200 resolution, 8 micrometer pixel pitch, 650–1100 nanometer operating wavelength, ≥60 Hz frame rate, and <0.01% specification (likely referring to diffraction efficiency or similar optical performance metric). Additionally, one Benchtop Thermoelectric Liquid Chiller rated for 200 watts of cooling power is required, featuring an in-line filter, temperature range from -5°C to 45°C, and temperature stability of ±0.1°C under constant load. Vendors must possess an Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) registered on SAM.gov at the time of award. Delivery is to be made to NIST-Boulder at 325 Broadway, Boulder, Colorado 80305, with partial delivery acceptable. Inspection and acceptance will occur on-site with acceptance expected within 7 business days. The document indicates no requirements for electronic media, installation services, training, calibration, maintenance, travel, or government-furnished materials.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Spatial Light Modulator

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Electromagnetic Fields Group (672.02)

General Statement of Need:

We are working on a innovation in measurement science project for laser intensity imaging.

This project is to improve capabilities in advanced manufacturing and generation of structured light would be an enabling technology. To this end, we need a spatial light modulator to generate structured light for high power lasers.

Item Specifications and Quantities:

Item 1: Spatial Light Modulator Quantity: 1 Specifications: 1.1 Liquid Cooling Module Included

1.2 High Power Handling: ≤200 W/cm

1.3 SMA Trigger Output

1.4 1920 x 1200 resolution

1.5 8 um pixel pitch

1.6 650 - 1100 nm operating wavelength

1.7 ≥ 60 Hz frame rate

1.8 <0.01%

Item 2: Benchtop Thermoelectric Liquid Chiller, 200 W Quantity: 1 Specifications: 2.1 Up to 200 W of Cooling Power

2.2 In-Line Filter to Remove Debris in the Liquid Cooling Line

2.3 Temperature Range from -5 °C to 45 °C

2.4 Temperature Stability of ±0.1 °C Under a Constant Load

Vendor Requirements

1. Possess at time of award/contracting an Export Control Classification Number (ECCN).

2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).

Procurement Support Information and Ancillary Services:

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: TBA

Mail Stop: TBA 325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☒ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement]

Delivery Date Criteria:

☐ Delivery Shall Be Competed No Later Than:

Click or tap to enter a date.

☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation

[Enter Details] NOTE: TPOC shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration [Describe Calibration Requirements Per Item]

☒ N/A Calibration Plan Length: [i.e. 3 - Years]

What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description: [Enter Description]

☒ N/A Serial Number:

NIST Property Number:

[Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .