This document is a Sources Sought Notice issued by the U.S. Coast Guard Surface Forces Logistics Center to identify sources capable of providing dry dock repairs to the U.S. Coast Guard Cutter KANAWHA and a 130-foot barge. The repairs are anticipated to be performed from September 3rd, 2024 to November 11th, 2024 at the contractor's facility. Interested parties are requested to provide information on their capabilities and past performance by March 6th, 2024. The applicable NAICS code is 336611 for Ship Building and Repairing with a size standard of 1,300 employees. This notice seeks information for market research purposes only and does not constitute a solicitation. The agency reserves the right to use any provided information to develop a future solicitation as deemed necessary.

View the file

Other files

File Type Posted
Sources Sought USCGC KANAWHA DD.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC KANAWHA (WLR 75407)

USCG 130 BARGE (13073)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2024

Developed By: William A Baker2 (Draft-3, 28 February 2024)

TABLE OF CONTENTS

iv

Revisions Record v

Consolidated List of References xiii

Consolidated List of Government-furnished Property xv

Consolidated List of Critical Inspection Items xvi

Principal Characteristics - Tender xvii

Principal Characteristics - Barge

General Requirements

WORK ITEM 1: Fire Prevention Requirements «TYPE»

WORK ITEM 2: Hull Plating, U/W Body, Inspect - Tender

WORK ITEM 3: Hull Plating, U/W Body, Ultrasonic Testing - Tender

WORK ITEM 4: U/W Body, Preserve, 100 percent - Tender

WORK ITEM 5: Hull Plating Freeboard, Preserve, 100 Percent - Tender

WORK ITEM 6: Hull and Structural Plating, _____ Steel Plate, Renew

WORK ITEM 7: Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Tender

WORK ITEM 8: Appendages, U/W, Leak Test - Tender

WORK ITEM 9: Appendages, U/W, Internal, Preserve - Tender

WORK ITEM 10: Voids, Non-Accessible, Leak Test - Tender

WORK ITEM 11: Voids, Non-Accessible, Internal Surfaces, Preserve

WORK ITEM 12: Tanks, MP Fuel Service, Clean and Inspect - Tender

WORK ITEM 13: Tanks, Potable Water, Clean and Inspect - Tender

WORK ITEM 14: Navigation Light and Panel, Upgrade

WORK ITEM 15: Propulsion Shafting, Strain Gage Alignment, Inspect

WORK ITEM 16: Propulsion Shafting, Straighten

WORK ITEM 17: Propulsion Shafting, Optical or Laser Alignment Check

WORK ITEM 18: Propulsion Shaft Seals, Mechanical Clean and Inspect

WORK ITEM 19: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew

WORK ITEM 20: Propulsion Shafting, Straighten

WORK ITEM 21: Propulsion Shaft Bearings, External, Renew

WORK ITEM 22: Propulsion Shaft Bearings, External, Check Clearances

WORK ITEM 23: Propulsion Shaft Bearings (External), Renew

WORK ITEM 24: Stern Tube Interior Surfaces, Preserve, 100 Percent

WORK ITEM 25: Propeller, Perform Minor Repairs and Reconditioning

WORK ITEM 26: Propellers, Remove, Inspect, and Reinstall

WORK ITEM 27: Keel Coolers, Clean, Inspect and Hydro

WORK ITEM 28: Fathometer Transducer, General Maintenance

WORK ITEM 29: Sea Strainers, All Sizes, Renew

WORK ITEM 30: Point of Use Potable Water Filters, Install

WORK ITEM 31: Rudder Assembly, Remove, Inspect And Reinstall

WORK ITEM 32: Rudders, Preserve, 100 Percent

WORK ITEM 33: Rudder Stock Housing, Lower, Renew

WORK ITEM 34: Rudder Stock Housing, Upper, Renew

WORK ITEM 35: Rudder Stock, Rebuild

WORK ITEM 36: Spuds, Overhaul - Tender

WORK ITEM 37: Spud Wells, Preserve - Tender

WORK ITEM 38: Spud Wells, Inspect - Tender

WORK ITEM 39: Sewage Holding Tanks, Clean and Inspect - Tender

WORK ITEM 40: Tanks (Sewage Holding), Preserve, Partial - Tender

WORK ITEM 41: Tanks, Potable Water, Preserve, Partial, - Tender

WORK ITEM 42: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Tender

WORK ITEM 43: Cathodic Protection, Magnesium Anodes, Renew, - Tender

WORK ITEM 44: Drydock - Tender

WORK ITEM 45: Temporary Services, Provide - Tender

WORK ITEM 46: Sea Trial Performance, Support, Provide

WORK ITEM 47: Hull Plating, U/W Body, Inspect - Barge

WORK ITEM 48: Hull Plating, U/W Body, Ultrasonic Testing - Barge

WORK ITEM 49: Hull Plating, Freeboard, Ultrasonic Testing - Barge

WORK ITEM 50: Hull and Structural Plating, _____ Steel Plate, Renew - Barge

WORK ITEM 51: Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Barge

WORK ITEM 52: Appendages, U/W, Leak Test - Barge

WORK ITEM 53: Appendages, U/W, Internal, Preserve - Barge

WORK ITEM 54: Tanks, MP Fuel Service, Clean and Inspect - Barge

WORK ITEM 55: Tanks, Potable Water, Clean and Inspect - Barge

WORK ITEM 56: Tanks, Ballast, Clean and Inspect - Barge

WORK ITEM 57: Keel Coolers, Clean, Inspect and Hydro - Barge

WORK ITEM 58: Tanks, Ballast, Preserve, 100 Percent - Barge

WORK ITEM 59: Tanks, MP Fuel Service, Preserve, Partial - Barge

WORK ITEM 60: Tanks, Potable Water, Preserve, Partial - Barge

WORK ITEM 61: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Barge

WORK ITEM 62: U/W Body, Preserve, 100 percent - Barge

WORK ITEM 63: Hull Plating Freeboard, Preserve, 100 Percent - Barge

WORK ITEM 64: Cathodic Protection, Magnesium Anodes, Renew - Barge

WORK ITEM 65: Temporary Services, Provide - Barge Barge

WORK ITEM 66: Sea Trial Performance, Support, Provide - Barge

WORK ITEM 67: Sea Strainers, Duplex, All Sizes, Overhaul - Barge

WORK ITEM 68: Point of Use Potable Water Filters, Install - Barge

WORK ITEM 69: Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge

WORK ITEM 70: Spuds, Overhaul - Barge

WORK ITEM 71: Spud Wells, Preserve - Barge

WORK ITEM 72: Spud Wells, Inspect - Barge

WORK ITEM 73: Decks – Exterior (Buoy or Construction Deck), Preserve 100%

WORK ITEM 74: Drydock - Barge

WORK ITEM 75: Bridge Equipment Emergency Power System, Install

WORK ITEM 76: MDE Control Panel, Power Supply Modification

WORK ITEM 77: Boat Davit Winch, Shrink Wrap

WORK ITEM 78: Buoy and Cargo Handling Crane, Shrink Wrap

WORK ITEM 79: Potable Water System Valves, Overhaul or Renew

WORK ITEM 80: System Piping, Renew

WORK ITEM 81: Piping Insulation, Renew

WORK ITEM 82: Galley Deck, Repair