DRAFT

DEPARTMENT OF THE NAVY

HRMC (NMD)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: HRMC-035-23

INCLUDES ALL CHANGES THROUGH 3/12/2023

INDEX

SHIP: HRMC-035-23

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-24 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 09/27/2022 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 09/27/2022 Original

009-03 Toxic and Hazardous Substance; control 09/27/2022 Original

009-04 Quality Management System; provide 09/27/2022 Original

009-05 Temporary Access; accomplish 09/27/2022 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

09/27/2022 Original

009-07 Confined Space Entry, and Certification; accomplish 09/27/2022 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/14/2022 Original

009-10 Asbestos-Containing Material (ACM); control 09/27/2022 Original

009-18 Mine Warfare Ships Magnetic Material; control 09/29/2022 Original

009-19 Provisioning Technical Documentation (PTD); provide 09/27/2022 Original

009-20 Government Property; control 09/27/2022 Original

009-21 Logistics and Technical Data; provide 09/27/2022 Original

009-23 Interference; remove and install 09/29/2022 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

09/27/2022 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/27/2022 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

09/27/2022 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

09/27/2022 Original

009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage 09/30/2022 Original

009-61 Shipboard Use of Fluorocarbons; control 09/27/2022 Original

009-67 Integrated Total Ship Testing; manage 09/27/2022 Original

009-69 Heavy Weather/Mooring Plan; provide 09/27/2022 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

09/27/2022 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 09/30/2022 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

09/30/2022 Original

009-74 Occupational, Safety and Health Plan; accomplish 09/30/2022 Original

009-80 Ship Facilities; maintain 09/27/2022 Original

009-81 Compartment Closeout; accomplish 09/30/2022 Original

009-82 Installation of Equal Component Vice Specified Component; report 09/27/2022 Original

009-84 Threaded Fastener Requirements; accomplish 09/30/2022 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

09/27/2022 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

09/27/2022 Original

SHIP: HRMC-035-23

ITEM_NO. TITLE CHANGE DATE CHANGE

009-99 Ship Departure Report; provide 09/27/2022 Original

009-100 Ship's Stability; maintain 09/30/2022 Original

009-101 Ship Transit and Berthing; accomplish 09/27/2022 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/27/2022 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/27/2022 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/27/2022 Original

009-111 Schedule and Associated Reports for non-CNO Availabilities; provide and manage

09/30/2022 Original

009-117 Combat Systems, Light-Off Suport; provide 09/30/2022 Original

009-118 CG Deck Loading; accomplish 09/27/2022 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/30/2022 Original

009-122 Temporary Padeye; install and remove 09/30/2022 Original

009-125 Boats Less Than 65 Feet Long; accomplish 10/25/2022 Original

099-01PH Waste Generated on Government Property, including Satellite Accumulation area (SAA), Managing and Disposing of Hazardous Waste (HW) and non-HW;

accomplish

01/20/2023 Original

099-02PH Dry Dock Requirement; accomplish 01/20/2023 Original

099-03PH Additional Environmental Requirements; accomplish 01/20/2023 Original

099-04PH Industrial Wastewater/Oily Wastewater Disposal; accomplish 01/20/2023 Original

099-08PH Safety of Ship Requirement; provide 01/17/2023 Original

099-40PH Additional Requirements for Contractor Cranes, Multi-Purpose machine, and

Material Handling Equipment at Joint Base Pearl Harbor Hawaii; accomplish

01/17/2023 Original

099-69PH Pier Laydown for Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF) Availability;

accomplish

02/08/2023 CH-1

SHIP: HRMC-035-23

CATEGORY II. FY-24 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-12 Weld, Fabricate, and Inspect; accomplish 09/27/2022 Original

009-32 Cleaning and Painting Requirements; accomplish 09/29/2022 Original

SHIP: HRMC-035-23

ITEM NO. TITLE

Hazardous Waste Produced on Naval Vessels; control077-00-001

Boat Alteration 32HS/6C, Generator Replace; accomplish311-11-001

Boat Alteration 32HS/3C, Electronic Navigation System Upgrade;

accomplish

423-11-001

Boat Alteration 32HS/3C, Electronic Navigation System Upgrade;

accomplish

423-11-002

Boat Alteration 32HS/3C, Electronic Navigation System Upgrade;

accomplish

423-11-003

Boat Alteration 32HS/9C, Electro-Optical Infrared Imaging System

Replace; accomplish

443-11-001

Boat Alteration 32HS/9C, Electro-Optical Infrared Imaging System

Replace; accomplish

443-11-002

Boat Alteration 32HS/9C, Electro-Optical Infrared Imaging System

Replace; accomplish

443-11-003

Transfer of Vessel and Trailer Custody; accomplish583-31-001

Transfer of Vessel and Trailer Custody; accomplish583-31-002

Transfer of Vessel and Trailer Custody; accomplish583-31-003

SHIP: ITEM NO: 077-00-001

COAR: 28 PCN: HSB1-L027

HSB1-L038

HSB1-L033

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 5 ITEM NO: 077-00-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

SHIP:

SSP: HRMC-035-23 2 of 5 ITEM NO: 077-00-001

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

SSP: HRMC-035-23 3 of 5 ITEM NO: 077-00-001

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Rust Preventative)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________ __________

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ __________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludges (Contaminated with a known hazardous waste) _____

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Lube/Fuel Oil Soaked Rags _____ ____________ __________

Paint/Flakes (Pressure Washing _____ ____________ ________

Ext Hull Surfaces)

SSP: HRMC-035-23 4 of 5 ITEM NO: 077-00-001

Fuel Oil(Residual) _____ ____________ __________

Bilge Water _____ ____________ __________

Oil/Water _____ ____________ __________

AFFF/Water _____ ____________ __________

MEK Contaminated Rags _____ ____________ __________

3.5.1 Provide 0 dollars for managing and disposing of all hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or

SSP: HRMC-035-23 5 of 5 ITEM NO: 077-00-001 toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: ITEM NO: 311-11-001

COAR: 28 PCN: HSB1-L032

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 311-11-001

1. SCOPE:

1.1 Title: Boat Alteration 32HS/6C, Generator Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-1), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32037K616 APL Number: 72A160114, Hull Registry Number:

32HS1604

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-KT-BIB-010 Rev 2, Boat Information Book for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1301 thru 32HS1317, 32HS1401 thru 32HS1412, 32HS1501 thru 32HS1504, and 32HS1601 thru 32HS1609

2.3 TO300-AU-SPN-010, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls

2.4 S9086-TX-STM-010 Rev 7, Naval Ships' Technical Manual Chapter 583, Volume 1, Boats and Small Craft

2.5 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.6 311-5112229, 32FT Harbor Security (Metal Shark) Generator Replacement-Electrical Modifications

2.7 501-5112228, 32FT Harbor Security (Metal Shark) Generator Replacement-Mechanical Modifications

2.8 FPB-M-001-001, Drawing Index

2.9 FPB-M-311-001, Generator Cooling System Schematic

2.10 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.11 FPB-M-320-002, DC Electrical Components

2.12 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.13 FPB-M-320-004, AC Electrical Components

2.14 FPB-M-512-001, Compartment Ventilation

2.15 FPB-M-555-001, Fuel System Schematic

2.16 Westerbeke Engines & Generators, Multi-Port Single Phase Marine Gasoline Generators Operators Manual,7.5 MCGA or 5.0 MCGA 60 HZ, 6.2 MCGA or 4.2 MCGA 50 HZ

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/6C in accordance with 2.6 and 2.7, using 2.2, 2.4, 2.8 through 2.15 as guidance.

SSP: HRMC-035-23 2 of 2 ITEM NO: 311-11-001

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.5.

3.1.2 All aluminum fabrication, welding and inspection shall be in accordance with 2.3.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with general note 16 of 2.6 and general note 13 of 2.7.

(V)(G) "GENERATOR BREAK-IN"

3.2 Accomplish test notes T-1 and T-2 in accordance with 2.6 and 2.16

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish test notes T-1 through T-5 in accordance with 2.7 and 2.16.

3.4 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.5 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.5.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 423-11-001

COAR: 28 PCN: HSB1-L031

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 423-11-001

1. SCOPE:

1.1 Title: Boat Alteration 32HS/3C, Electronic Navigation System Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-1), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32037K616, APL Number: 72A160114, Hull Registry Number:

32HS1604

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-KT-BIB-010 Rev 2, Boat Information Book for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1301 thru 32HS1317, 32HS1401 thru 32HS1412, 32HS1501 thru 32HS1504, and 32HS1601 thru 32HS1609

2.3 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.4 423-5111606 Rev A, 32FT Harbor Security (Metal Shark) (FY 16 & 17 Hulls) Electronic Navigation System Upgrade

2.5 FPB-M-001-001, Drawing Index

2.6 FPB-M-070-001, General Arrangement

2.7 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.8 FPB-M-320-002, DC Electrical Components

2.9 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.10 FPB-M-400-001, Cabin Roof Top Components ISO View

2.11 FPB-M-410-001, Navigation Equipment

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/3C in accordance with 2.4 and using 2.2, 2.5 through 2.11 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 System set up for interfacing equipment shall be accomplished by a certified Furuno technician and in accordance with the manufacturer's installation manual.

3.1.2.1 Accomplish updating BOATALT Label Plates in accordance with general note 17 of 2.4.

(V)(G) "OPERATIONAL TEST"

3.2 Conduct an operational test of new electronic in accordance with the

SSP: HRMC-035-23 2 of 2 ITEM NO: 423-11-001 operators manual.

3.3 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.4 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.4.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 423-11-002

COAR: 28 PCN: HSB1-L037

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 423-11-002

1. SCOPE:

1.1 Title: Boat Alteration 32HS/3C, Electronic Navigation System Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-9), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32D58L919, APL Number: 72A180063, Hull Registry Number:

32HS1807

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-ME-OMP-010, Operation and Maintenance Manual with Illustrated Parts Breakdown for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1701 thru 32HS1706, and 32HS1801 thru 32HS1810

2.3 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.4 423-5111606 Rev A, 32FT Harbor Security (Metal Shark) Electronic Navigation System Upgrade

2.5 FPB-M-001-001, Drawing Index

2.6 FPB-M-070-001, General Arrangement

2.7 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.8 FPB-M-320-002, DC Electrical Components

2.9 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.10 FPB-M-400-001, Cabin Roof Top Components ISO View

2.11 FPB-M-410-001, Navigation Equipment

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/3C in accordance with 2.4 and using 2.2, 2.5 through 2.11 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 System set up for interfacing equipment shall be accomplished by a certified Furuno technician and in accordance with the manufacturer's installation manual.

3.1.2.1 Accomplish updating BOATALT Label Plates in accordance with general note 17 of 2.4.

SSP: HRMC-035-23 2 of 2 ITEM NO: 423-11-002 operators manual.

3.3 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.4 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.4.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 423-11-003

COAR: 28 PCN: HSB1-L042

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 423-11-003

1. SCOPE:

1.1 Title: Boat Alteration 32HS/3C, Electronic Navigation System Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-10), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32D59M919, APL Number: 72A180064, Hull Registry Number:

32HS1808

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-ME-OMP-010, Operation and Maintenance Manual with Illustrated Parts Breakdown for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1701 thru 32HS1706, and 32HS1801 thru 32HS1810

2.3 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.4 423-5111606 Rev A, 32FT Harbor Security (Metal Shark) Electronic Navigation System Upgrade

2.5 FPB-M-001-001, Drawing Index

2.6 FPB-M-070-001, General Arrangement

2.7 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.8 FPB-M-320-002, DC Electrical Components

2.9 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.10 FPB-M-400-001, Cabin Roof Top Components ISO View

2.11 FPB-M-410-001, Navigation Equipment

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/3C in accordance with 2.4 and using 2.2, 2.5 through 2.11 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 System set up for interfacing equipment shall be accomplished by a certified Furuno technician and in accordance with the manufacturer's installation manual.

3.1.2.1 Accomplish updating BOATALT Label Plates in accordance with general note 17 of 2.4.

SSP: HRMC-035-23 2 of 2 ITEM NO: 423-11-003 operators manual.

3.3 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.4 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.4.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 443-11-001

COAR: 28 PCN: HSB1-L030

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 443-11-001

1. SCOPE:

1.1 Title: Boat Alteration 32HS/9C, Electro-Optical Infrared Imaging System Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-1), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32037K616 APL Number: 72A160114, Hull Registry Number:

32HS1604

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-KT-BIB-010 Rev 2, Boat Information Book for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1301 thru 32HS1317, 32HS1401 thru 32HS1412, 32HS1501 thru 32HS1504, and 32HS1601 thru 32HS1609

2.3 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.4 443-5112794 Rev A, 32FT Harbor Security (Metal Shark) Electro- Optical Infrared Imaging System Replacement

2.5 FPB-M-001-001, Drawing Index

2.6 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.7 FPB-M-320-002, DC Electrical Components

2.8 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.9 FPB-M-320-004, AC Electrical Components

2.10 FPB-M-150-001, Cabin

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/9C in accordance with 2.4, using 2.5 through 2.9 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 Secure cables and wiring to existing cableways using cable ties.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with general note 16 of 2.4.

3.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7.

3.1.4.1 Remove and modify existing cabin radar mast in

accordance with 2.10, sheet 9 of 11.

SSP: HRMC-035-23 2 of 2 ITEM NO: 443-11-001

(V)(G) "OPERATIONAL TEST"

3.2 Conduct an operational test of the electro-optical imaging system in accordance with operational manual.

3.3 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.4 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.4.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 443-11-002

COAR: 28 PCN: HSB1-L036

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 443-11-002

1. SCOPE:

1.1 Title: Boat Alteration 32HS/9C, Electro-Optical Infrared Imaging System Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-9), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32D58L919, APL Number: 72A180063, Hull Registry Number:

32HS1807

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-ME-OMP-010, Operation and Maintenance Manual with Illustrated Parts Breakdown for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1701 thru 32HS1706, and 32HS1801 thru 32HS1810

2.3 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.4 443-5112794 Rev A, 32FT Harbor Security (Metal Shark) Electro- Optical Infrared Imaging System Replacement

2.5 FPB-M-001-001, Drawing Index

2.6 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.7 FPB-M-320-002, DC Electrical Components

2.8 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.9 FPB-M-320-004, AC Electrical Components

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/9C in accordance with 2.4, using 2.5 through 2.9 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 Secure cables and wiring to existing cableways using cable ties.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with general note 16 of 2.4.

(V)(G) "OPERATIONAL TEST"

3.2 Conduct an operational test of the electro-optical imaging system in accordance with operational manual.

3.3 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification

SSP: HRMC-035-23 2 of 2 ITEM NO: 443-11-002 sheets, and warranty information to the SUPERVISOR.

3.4 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.4.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 443-11-003

COAR: 28 PCN: HSB1-L041

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 443-11-003

1. SCOPE:

1.1 Title: Boat Alteration 32HS/9C, Electro-Optical Infrared Imaging System Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 32-Foot Harbor Security (HS) Boat (HSB-10), Manufacturer: Metal Sharks Boat, Manufacturer Hull Identification Number: GAJ32D59M919, APL Number: 72A180064, Hull Registry Number:

32HS1808

2. REFERENCES:

2.1 Standard Items, (FY 24)

2.2 S9008-ME-OMP-010, Operation and Maintenance Manual with Illustrated Parts Breakdown for 32-Foot Harbor Security (HS) Boat, Hulls 32HS1701 thru 32HS1706, and 32HS1801 thru 32HS1810

2.3 300-5107858, Standard Electrical Installation Requirements and Nomenclature

2.4 443-5112794 Rev A, 32FT Harbor Security (Metal Shark) Electro- Optical Infrared Imaging System Replacement

2.5 FPB-M-001-001, Drawing Index

2.6 FPB-M-320-001, DC Power Distribution General Notes and Legend

2.7 FPB-M-320-002, DC Electrical Components

2.8 FPB-M-320-003, Power Distribution 120VAC Schematic Diagram

2.9 FPB-M-320-004, AC Electrical Components

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 32HS/9C in accordance with 2.4, using 2.5 through 2.9 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 Secure cables and wiring to existing cableways using cable ties.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with general note 16 of 2.4.

(V)(G) "OPERATIONAL TEST"

3.2 Conduct an operational test of the electro-optical imaging system in accordance with operational manual.

3.3 Upon completion of all new installations specified in this work item, turn over all manuals, design instructions, product specification

SSP: HRMC-035-23 2 of 2 ITEM NO: 443-11-003 sheets, and warranty information to the SUPERVISOR.

3.4 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

3.4.1 Ensure all surplus and removed material for final disposition are palletized, boxed, crated and secure for turnover.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 583-31-001

COAR: 28 PCN: HSB1-L028

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 583-31-001

1. SCOPE:

1.1 Title: Transfer of Vessel and Trailer Custody; accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (One EA), 32 Foot Harbor Security (HS) Boat (HSB-1), Manufacturer: Metal Shark, Manufacturer Hull Identification Number:

GAJ32037K616, APL Number: 72A160114, Hull Registry Number: 32HS1604

1.3.2 Quantity (One EA), HSB-1 Boat Trailer, Manufacturer: Evolution Trailer Technologies, Model Number: MSB-32-FPBM, Vehicle Identification Number (VIN): 1E9E1BT30GF513566, License Plate Number: USN N97-53254BT

2. REFERENCES:

2.1 Attachment (A):, Boat and Trailer Custody Form

3. REQUIREMENTS:

3.1 The CONTRACTOR shall pick up and deliver the vessel via trailer to contractor's facility.

3.1.1 The GOVERNMENT will provide the trailer for vessel transport and the CONTRACTOR shall place the vessel on jack stands and keel blocks or vessel cradle.

3.1.1.1 The trailer shall not to be used as a “vessel stand”

during the accomplishment of repairs for the vessel listed in 1.3.1.

3.1.2 The CONTRACTOR shall be responsible for the vessel and trailer listed in 1.3 from the time of delivery to the CONTRACTOR, to the return of the vessel and trailer to the GOVERNMENT.

3.2 Upon receiving custody of the vessel and trailer listed in 1.3 from the activity, complete Part A of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the vessel and trailer.

3.3 After returning custody of the vessel and trailer listed in 1.3 to the activity, complete Part B of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR, within 24 hours after redelivery of the vessel and trailer.

3.3.1 The CONTRACTOR shall be responsible for delivery to and from boat launch ramp for all necessary sea trials and operational tests to prove all work has been completed in accordance with the requirements of each Work Item within the availability.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

SSP: HRMC-035-23 2 of 2 ITEM NO: 583-31-001

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 583-31-002

COAR: 28 PCN: HSB1-L034

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 583-31-002

1. SCOPE:

1.1 Title: Transfer of Vessel and Trailer Custody; accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (One EA), 32 Foot Harbor Security (HS) Boat (HSB-9), Manufacturer: Metal Shark, Manufacturer Hull Identification Number:

GAJ32D58L919, APL Number: 72A180063, Hull Registry Number: 32HS1807

1.3.2 Quantity (One EA), HSB-9 Boat Trailer, Manufacturer: Evolution Trailer Technologies, Model Number: MSB-32-FPBM, Vehicle Identification Number (VIN): 1E9E1BT3XLF513994, License Plate Number: USN N97-53299BT

2. REFERENCES:

2.1 Attachment (A):, Boat and Trailer Custody Form

3. REQUIREMENTS:

3.1 The CONTRACTOR shall pick up and deliver the vessel via trailer to contractor's facility.

3.1.1 The GOVERNMENT will provide the trailer for vessel transport and the CONTRACTOR shall place the vessel on jack stands and keel blocks or vessel cradle.

3.1.1.1 The trailer shall not to be used as a “vessel stand”

during the accomplishment of repairs, for the vessel listed in 1.3.

3.1.2 The CONTRACTOR shall be responsible for the vessel and trailer listed in 1.3 from the time of delivery to the CONTRACTOR, to the return of the vessel and trailer to the GOVERNMENT.

3.2 Upon receiving custody of the vessel and trailer listed in 1.3 from the activity, complete Part A of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the vessel and trailer.

3.3 After returning custody of the vessel and trailer listed in 1.3 to the activity, complete Part B of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR, within 24 hours after redelivery of the vessel and trailer.

3.3.1 The CONTRACTOR shall be responsible for delivery to and from boat launch ramp for all necessary sea trails and operational tests to prove all work has been completed in accordance with the requirements of each Work Item within the availability.

4. NOTES:

SSP: HRMC-035-23 2 of 2 ITEM NO: 583-31-002

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 583-31-003

COAR: 28 PCN: HSB1-L039

CMP: NONE

PLANNER:

SSP: HRMC-035-23 1 of 2 ITEM NO: 583-31-003

1. SCOPE:

1.1 Title: Transfer of Vessel and Trailer Custody; accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (One EA), 32 Foot Harbor Security (HS) Boat (HSB-10), Manufacturer: Metal Shark., Manufacturer Hull Identification Number:

GAJ32013J414, APL Number: 72A180064, Hull Registry Number: 32HS1808

1.3.2 Quantity (One EA), HSB-10 Boat Trailer, Manufacturer:

Evolution Trailer Technologies, Model Number: MSB-32-FPBM, Vehicle Identification Number (VIN): 1E9E1BT31LF514032, License Plate Number: USN N97-52820BT

2. REFERENCES:

2.1 Attachment (A):, Boat and Trailer Custody Form

3. REQUIREMENTS:

3.1 The CONTRACTOR shall pick up and deliver the vessel via trailer to contractor's facility.

3.1.1 The GOVERNMENT will provide the trailer for vessel transport and the CONTRACTOR shall place the vessel on jack stands and keel blocks or vessel cradle.

3.1.1.1 The trailer shall not to be used as a “vessel stand”

during the accomplishment of repairs for the vessel listed in 1.3.1.

3.1.2 The CONTRACTOR shall be responsible for the vessel and trailer listed in 1.3 from the time of delivery to the CONTRACTOR, to the return of the vessel and trailer to the GOVERNMENT.

3.2 Upon receiving custody of the vessel and trailer listed in 1.3 from the activity, complete Part A of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the vessel and trailer.

3.3 After returning custody of the vessel and trailer listed in 1.3 to the activity, complete Part B of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR, within 24 hours after redelivery of the vessel and trailer.

3.3.1 The CONTRACTOR shall be responsible for delivery to and from boat launch ramp for all necessary sea trials and operational tests to prove all work has been completed in accordance with the requirements of each Work Item within the availability.

4. NOTES:

SSP: HRMC-035-23 2 of 2 ITEM NO: 583-31-003

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.