DRAFT SOW.pdf
PDF 799 KB Posted
- Solicitation number
- N64498-22-R-4002
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW-PWS Template 01 December 2020 version Page 1
Statement of Work (SOW) for Treadwell Corporation
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 416, which is responsible for Submarine Life Support and Ventilation Systems.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied
1.0.3 Government/Contractor Relationship
1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation.
This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or
SOW-PWS Template 01 December 2020 version Page 2 employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND The Submarine Life Support and Ventilation Systems Branch (Code 416) provides in-service engineering supports and services for submarine air revitalization, air monitoring, oxygen generations and ventilations. Current programs under Code 416’s responsibility include oxygen generators, carbon dioxide removal system, carbon monoxide and hydrogen removal system, central atmosphere monitoring system, and ventilation system.
Improvement, modernization, reconfiguration and upgrades for these systems remain critical for the essential atmosphere control systems aboard all classes of submarines.
1.2 SCOPE OF WORK The proposed acquisition will provide for furnishing of services in support of the Model 6L16 Electrolytic Oxygen Generator (EOG), Automated Electrolytic Oxygen Generator (AEOG), Low Pressure Electrolyzer (LPE) and their respective simulators used to support training installed aboard various classes of submarine and training facilities. The services to be furnished will consist of the removal, installation, inspection, troubleshooting, testing, repair, adjustment, disassembly, and assembly of EOG/AEOG/LPE and their respective simulators. The services also include overhaul of Government Furnished Material, providing specialized training for shipboard personnel to maintain and operate the units, the furnishing of technical documentation and incidental materials, and overhaul of government furnished material.
2.0 APPLICABLE DOCUMENTS
2.2 NAVSEA 0948-LP-045-7010, Volume I, Revision 3, Material Control Standard (Non-
Nuclear)
2.5 Quality Management Procedure (QMP) 4.2, Control of Records
2.6 DoD 8570.01-M Information Workforce Improvement Program
These documents can be referenced at www.website.gov
The Contractor shall reference and utilize the latest version available when performing tasks within this PWS.
SOW-PWS Template 01 December 2020 version Page 3
3.0. REQUIREMENTS
3.1 Required Services
3.1.1 FIELD SERVICES
The contractor shall investigate, troubleshoot, and repair operational problems and malfunctions of the EOG, AEOG, LPE on US Navy submarines and their respective simulators. Oxygen generators are located in the machinery spaces of US Navy submarines. Operating procedures are contained in Ship’s Systems Manuals which can be FOUO, NNPI, or NOFORN.
Incidental to furnishing the services described above, the contractor shall furnish consumable materials, such as nuts, bolts, SEMs, gaskets, sensor heads, or valves. If materials are not available, all unavailable consumable material shall be provided by the Government and shall be identified in individual DOs issued hereunder.
3.3 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components
3.3.1 The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
4.0 DATA REQUIREMENTS
4.1 Contract Status Report (CDRL A001)
4.1.1 This report shall reflect prime contractor data.
4.1.2 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor's format is acceptable the Government's approval must be received in writing from the COR within 5 business days before formal submission.
4.1.3 Labor Rate Tripwire Justification
4.1.3.1 The contractor shall advise the COR and the Contract Specialist, by email, if the pending addition of any individual (Key or non-Key) will be at fully burdened average labor rate (including pass-through and/or target fee) that exceeds the labor tripwire amount. The Contractor shall not proceed with the addition until the contractor is advised by the Contract Specialist that the request has been approved by the Contracting Officer.
4.1.3.2 The contractor’s request shall include, the proposed individual’s resume, labor hourly rate build-up, labor hours per work year, detailed justification for the addition of the particular individual based on his/her technical expertise and projected technical impact on the Task Order.
4.1.3.3 Currently, the fully burdened average labor rate of $156/hour or greater, regardless of the number of labor hours the proposed individual will work. The contractor will be advised of any changes to this tripwire level that occur during performance. All Fully Burdened Labor rates of $156/hour or greater shall require the COR and the PCO’s review and written approval.
4.2 Travel Report (CDRL A002)
4.2.1 This report shall reflect prime contractor data.
4.2.2 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
SOW-PWS Template 01 December 2020 version Page 4
4.2.3 The CDRL shall be delivered electronically 10 business days after the conclusion of each required trip, unless otherwise stated, the contractor shall submit Travel Reports in accordance with DI-MISC-81943, and while contractor’s format is acceptable, Government’s approval is required from the COR.
4.1.4 The contractor may be required to travel in performance of this task order. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the COR. All travel shall be conducted in accordance with FAR 31.205-46 Travel Costs and the Federal Travel Regulations (FTR) and shall be pre-approved by the COR.
4.3 Contractor’s Personnel Roster (CDRL A003)
4.3.1 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.4 Other Direct Costs Report (CDRL A004)
4.4.1 The CDRL shall be delivered electronically, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.5 Engineering, Technical, and Field Services Accomplishment Report (CDRL A005)
4.5.1 Development or Field Services Accomplishment Report.
4.5.2 The contractor shall submit the Development or Field Services Accomplishment Report in accordance with DI-MGMT-80061A (see CDRL A005 for specific instructions), and while contractor’s format is acceptable, Government’s approval is required from the COR. The CDRL shall be delivered electronically on an ‘as-required’ basis as delineated in the attached DD Form 1423-1 (to be specified on individual Delivery Orders), unless otherwise stated.
4.6 Engineering Drawings (CDRL A006)
4.6.1 If a prototype is developed in conjunction with the design services, a complete set of technical drawings shall be submitted.
4.6.2 The contractor shall submit the Engineering Drawings in accordance with DI-DRPR- 80651, and while contractor’s format is acceptable, Government’s approval is required from the COR. The CDRL shall be delivered electronically on an ‘as-required’ basis as delineated in the attached DD Form 1423-1 (to be specified on individual Delivery Orders), unless otherwise stated.
4.7 Test Procedure (CDRL A007)
4.7.1 If a prototype is developed in conjunction with the design services, a test procedure and plan shall be submitted prior to the start of testing for review.
4.7.2 The contractor shall submit the Test Procedure in accordance with DI-NDTI-80603A, and while contractor’s format is acceptable, Government’s approval is required from the COR. The CDRL shall be delivered electronically on an ‘as-required’ basis as delineated in the attached DD Form 1423-1 (to be specified on individual Delivery Orders), unless otherwise stated.
4.8 Test/Inspection Report (CDRL A008)
SOW-PWS Template 01 December 2020 version Page 5
4.8.1 All test procedures performed in accordance with SOW 4.8 (CDRL A008) require the submission of a Test/Inspection Report (test summary and test results) after completion of testing.
4.8.2 The contractor shall submit the Test/Inspection Report in accordance with DI-NDTI- 80809B, and while contractor’s format is acceptable, Government’s approval is required from the COR. The CDRL shall be delivered electronically on an ‘as-required’ basis as delineated in the attached DD Form 1423-1 (to be specified on individual Delivery Orders), unless otherwise stated.
5.0 SECURITY REQUIREMENTS
5.1 The Contractor is responsible for completing all required government mandated training to maintain security and network access to government sites and IT systems.
5.2 An Active CONFIDENTIAL Facility Clearance (FCL) is required for performance on this contract. The contractor must have a Safeguarding Level of CONFIDENTIAL.
5.3 DD254 REQUIREMENT. This effort may require access to classified information up to the SECRET level. No classified data will be generated or stored by the Contractor. The Contractor is required to have and maintain a SECRET clearance. The requirements of the attached DD Form 254 apply.
5.3.1 The contractor is required to maintain a Facility Security Clearance (FCL) in accordance with the DD254 to perform certain work under the contract. Although it is not required at time of award, it shall be obtained within 90 DAYS after award. Otherwise the government will have no obligation to continue ordering work under the contract and may not exercise any of the available options.
5.3.2 The Contractor shall appoint a Facility Security Officer (FSO), who shall (1) be responsible for all security aspects of the work performed under this contract, (2) assure compliance with the National Industrial Security Program Operating Manual (NISPOM) (DOD 5220.22-M), and (3) assure compliance with any written instructions from the NSWCPD, Security Office_______________.
5.3.3 The contractor shall forward signed copies of DD254s provided to subcontractors to the Naval Surface Warfare Center Philadelphia Division (NSWCPD), ATTN: Security.
5.3.4 The contractor shall direct the subcontractor to obtain approval, through the prime Contractor, for the public release of information received or generated by the sub through the prime Contractor.
5.3.5 The contractor shall submit the subcontractor request for public release through the technical point of contact identified on the DD 254.
*Note to Requestor to be deleted upon SOW/PWS submission*: Please ensure that any relevant DD254 Statements found in block 13 of the DD 254 are placed here in the PWS/SOW. For example: 5.2 “An Active SECRET Facility Clearance (FCL) is required for performance on this contract. There are no safeguarding requirements required.”
While applicable to all requirements where a FCL is these statements are required by the Seaport CONOPS, please do not remove for Seaport SOWs containing a FCL requirement:
SOW-PWS Template 01 December 2020 version Page 6
Additional information related to the facility clearance process can be obtained by visiting www.dss.mil or http://www.dss.mil/isec/pcl_index.htm.
5.3.6 The planned utilization of non-U.S. Citizens in the performance of this contract effort must be identified by name and country of citizenship in the proposal. Foreign Nationals shall not be allowed access to classified or critical program information unless approved on a case by case basis by DSS.
5.4 OPERATIONS SECURITY (OPSEC)
5.4.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted.
Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI).
5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
5.4.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.
5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or;
incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105.1). Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NSWC PD Security Division (Code 105.1).
5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED
INFORMATION (CUI) All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance
SOW-PWS Template 01 December 2020 version Page 7 with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition;
pulverizing, disintegration; or methods approved for classified destruction.
5.6 PLANNING, PROGRAMMING, BUDGETING AND EXECUTION (PPBE) DATA.
When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non-Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.
5.7 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER
INCIDENT REPORTING – N/A
5.8 U-NNPI SECURITY REQUIREMENTS
5.8.1 Security Classification Guidance is as follows of portions of the tasking on this contract when invoked in the task order statement of work: CONFIDENTIAL
5.8.1.1 Contractor requires access to information and equipment classified at the Confidential National Security Information (NSI) level in order to provide industrial support services within facilities that actively supports the Navy Nuclear Propulsion Program
(NNPP).
5.8.1.2 All contractor personnel accessing classified information or classified material associated with the performance work relative to the resultant contract must be United States citizens no foreign nationals and shall have and maintain at a minimum Confidential security clearance.
5.8.1.3 The Contractor is responsible for completing all required government mandated training to maintain security and network access to government sites and IT systems, as necessary to support.
5.8.1.4 Contractor will have access to FOUO and NNPI in spaces on US Navy submarines. Oxygen generators operate in accordance with Operating Instruction (OI) which are
FOUO.
5.9 U-NNPI
5.9.1 Purpose The Contractor hereby agrees that when provided documents (specifications, drawings, etc.) that are marked as containing NOFORN sensitive information that must be controlled pursuant to Federal law, the information contained therein and generated as part of the inquiry shall be used only for the purpose stated in the contract and shall in no case be transmitted outside the company (unless such transmittals comply with the detailed guidance of
SOW-PWS Template 01 December 2020 version Page 8 the contract) or to any foreign national within the company. While in use, the documents shall be protected from unauthorized observation and shall be kept secure so as to preclude access by anyone not having a legitimate need to view them. The documents shall not be copied unless done in conformance with the detailed guidance of the contract. All the documents shall be promptly returned in their entirety, unless authorized for proper disposal or retention, following completion of the contract.
5.9.2 Specific Requirements for Protecting U-NNPI
a) Only U.S. citizens who have an NTK required to execute the contract shall be allowed access to U-NNPI.
b) When not in direct control of an authorized individual, U-NNPI must be secured in a locked container (e.g., file cabinet, desk, safe). Access to the container must be such that only authorized persons can access it, and compromise of the container would be obvious at sight.
Containers should have no labels that indicate the contents. If removed from the site, U- NNPI must remain in the personal possession of the individual. At no time should U-NNPI be left unsecured (e.g., in a home or automobile, or unattended in a motel room or sent with baggage).
c) U-NNPI documents will have the word NOFORN at the top and bottom of each page. The cover sheet will have the warning statement shown below. Documents originated in the course of work that reproduce, expand or modify marked information shall be marked and controlled in the same way as the original. Media such as video tapes, disks, etc., must be marked and controlled similar to the markings on the original information.
d) U-NNPI may not be processed on networked computers with outside access unless approved by CNO (N00N). If desired, the company may submit a proposal for processing NNPI on company computer systems. Personally owned computing systems, such as personal computers, laptops, personal digital assistants, and other portable electronic devices are not authorized for processing NNPI. Exceptions require the specific approval of the cognizant DAA and CNO (N00N).
e) U-NNPI may be faxed within the continental United States and Hawaii provided there is an authorized individual waiting to receive the document and properly control it. U-NNPI may not be faxed to facilities outside the continental United States, including military installations, unless encrypted by means approved by CNO (N00N).
f) U-NNPI may be sent within the continental United States and Hawaii via first class mail in a single opaque envelope that has no markings indicating the nature of the contents.
g) Documents containing U-NNPI shall be disposed of as classified material.
h) Report any attempts to elicit U-NNPI by unauthorized persons to the appropriate security personnel.
i) Report any compromises of U-NNPI to the appropriate security personnel. This includes intentional or unintentional public release via such methods as theft, improper disposal (e.g., material not shredded, disks lost), placement on Web site, transmission via email, or violation of the information system containing U-NNPI.
j) The only approved storage for U-NNPI is CDMS NOFORN.
6.0 PLACE OF PERFORMANCE
6.1 Performance may be on site at various locations worldwide, including New London, CT;
Philadelphia, PA; Norfolk, VA; San Diego, CA; Bremerton, WA; Guam; Diego Garcia; and
SOW-PWS Template 01 December 2020 version Page 9
Pearl Harbor, HI. The actual services to be performed and the specific location shall be identified in delivery orders issued under the resulting contract. The contractor shall furnish consumable materials (dependent upon inventory availability at contractor’s facility e.g., nuts, bolts, o-rings; all unavailable consumable material will be provided as GFE) as may be required in performance of services specified in individual orders. Government-furnished material shall be identified in individual delivery orders.
7.0 TRAVEL
7.1 The Contractor may be required to travel from the primary performance location when supporting this requirement. Travel to support training and field support services is to be specified in individual task orders. Travel to installation sites may include New London, CT;
Philadelphia, PA; Norfolk, VA; San Diego, CA; Bremerton, WA; Guam; Diego Garcia; and Pearl Harbor, HI.
Site visits cost is estimated at $729,498 over the life of the contract. The estimated travel cost was calculated based on the travel requirements in the previous Treadwell Corporation service contract N65540-02-D-0004, N65540-06-D-0020, N65540-09-D-0019, N65540-11-D-0028, and N65540-15-D-0002. Refer to the Independent Government Cost Estimate (IGCE) for travel costs breakdown.
7.2 The number of times the Contractor may be required to travel to each location cited above may vary as program requirements dictate, provided that the total estimated travel cost is not exceeded. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements. All travel shall be approved before travel occurs.
Approval may be via email by the Contracting Officer (PCO) or the fully executed Technical Instruction (TI) signed by the Contracting Officer.
7.2.1 In accordance with the TI instructions, before initiating any travel the Contractor(s) shall submit a detailed and fully-burdened estimate that includes the number of employees traveling, their expected travel costs for airfare, lodging, per diem, rental car, taxi/mileage and any other costs or actions requiring approval. The travel estimate shall be submitted to the Contracting Officer's Representative (COR) and Contract Specialist. Actuals cost, resulting from the performance of travel requirements, shall be reported as part of the Contractor's monthly status report. The reportable cost shall also be traceable to the Contractor's invoice
7.3 All travel shall be conducted in accordance with FAR 31.205-46, Travel Costs, and B-231- H001 Travel Cost (NAVSEA) and shall be pre-approved by the COR. The Contractor shall submit travel reports in accordance with DI-MGMT-81943 (CDRL A002).
7.4 Travel Costs
7.4.1 The current “maximum per diem” rates are set forth in the (i) Federal Travel Regulations for travel in the Continental United States; (ii) Joint Travel Regulations for Overseas Non- Foreign areas (e.g., Alaska, Hawaii, Guam, Puerto Rico, etc.); and (ii) Department of State (DOS) prescribed rates for foreign overseas locations.
7.5 OCONUS Contractor Personnel Travel During COVID-19
In consideration of personnel movement during the COVID-19 pandemic, Force Health Protection (FHP) guidance has been issued for contractor personnel who travel OCONUS for deployment and for conducting official travel OCONUS as well. Entry requirements are
SOW-PWS Template 01 December 2020 version Page 10 communicated to traveling personnel, including contractor personnel, through the Electronic Foreign Clearance Guide (EFCG). Contractor personnel must adhere to current country entry requirements of the respective geographic combatant command (GCC) (which may include screening, ROM, and testing) and all applicable host nation procedures. All contracts including performance outside the United States require DoD contractor personnel to complete a risk assessment of health status.
8.0 GOVERNMENT FURNISHED PROPERTY - N/A
9.0 GOVERNMENT FURNISHED INFORMATION - N/A
10.0 PURCHASES
10.1 Only items directly used and incidental to the services for this Contract and for work within the scope of the Statement of Work, shall be purchased under the Other Direct Cost (ODC) line items. Purchases of an individual item that is valued above $10,000 shall be approved by the Contracting Officer prior to purchase by the Contractor. (NOTE: This amount is editable based on the procurement, a selection of $3,500, $10,000, or even $250,000 might be an appropriate threshold dependent upon the scope of work and the scale of the individual effort. Consideration shall also be given to whether the contractor has an approved purchasing system.) The purchase request and supporting documentation shall be submitted via email to the Contracting Officer and the Contracting Officer's Representative (COR) it shall be itemized and contain the cost or price analysis performed by the Contractor to determine the reasonableness of the pricing.
10.2 Information Technology (IT) equipment, or services must be approved by the proper approval authority. All IT requirements, regardless of dollar amount, submitted under this Contractor shall be submitted to the PCO for review and approval prior to purchase. The definition of information technology is identical to that of the Clinger-Cohen Act, that is, any equipment or interconnected system or subsystem of equipment that is used in the automatic acquisition, storage, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information. Information technology includes computers, ancillary equipment, software, firmware and similar procedures, services (including support services), and related resources.
11.0 COUNTERFEIT MATERIAL PREVENTION - N/A
12.0 PERSONNEL
12.1 Personnel Requirements. All persons proposed in key and non-key labor categories shall, at the time of proposal submission, be U.S. citizens holding at least a current SECRET clearance, or possess a favorable DCSA adjudication as outlined in section 5.3.
12.2 Clause 52.222-2 "Payment for Overtime Premiums" will provide for the total approved dollar amount of overtime premium or will state “zero” if not approved. If overtime premium has not been approved under this contract in accordance with Clause 52.222-2, overtime effort to
SOW-PWS Template 01 December 2020 version Page 11 be performed shall be requested from the Contracting Officer prior to performance of premium overtime. For overtime premium costs to be allowable costs; the Contracting Officer is required to approve the performance of overtime prior to the actual performance of overtime. The dollar amount in FAR 52.222-2 shall equal overtime premium negotiated between the Government and the prime contractor. This overtime premium amount shall equal the prime contractor's unburdened premium OT labor costs plus the subcontractors' fully-burdened premium OT labor costs.
12.3 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING
(ECRAFT) SYSTEM (REMOVE IF CONTRACT DOES NOT INCLUDE COST TYPE
CLINS)
13.1 In addition to the requirements of Clause C-237-W001 “Electronic Cost Reporting and Financial Tracking (eCRAFT) System Reporting (NAVSEA)”, the contractor is required to provide supporting accounting system reports, at the Contracting Officer’s request, based on the review of the invoice documentation submitted to eCRAFT. This documentation will include reports such as the Job Summary Report (or equivalent), Labor Distribution Report (or equivalent), and General Ledger Detail Report (or equivalent). Supporting labor data provided must include unburdened direct labor rates for each employee and labor category. Cost breakdowns for ODCs, Materials, travel and other non-labor costs must be at the transactional level in sufficient detail so the Government can review allocability to the contract/task order.
Indirect costs allocated to direct costs must be shown at the lowest level of detail sufficient to reconcile each indirect rate to the appropriate allocation base.
13.2 On invoices containing subcontractor costs, the prime contractor agrees, at the Contracting Officer’s request, to attach as supporting documentation all invoices received from subcontractors, unless the subcontractor submits invoices directly to the CO and COR. This requirement applies to all subcontract types (Cost, FFP, etc.).
14.0 SPECIAL REQUIREMENTS (REMOVE IF NOT APPICABLE)
14.1 Quality Management System
14.1.1 The contractor shall maintain a Quality Management System (QMS) in accordance with ASQ/ANSI/ISO 9001:2015 standards per Naval Sea Systems Command (NAVSEA) QMS Acceptance Authority or appropriate directorate requirements. All QMS packages are required to adhere to applicable NAVSEA Technical Specification 9090-310 and NAVSEA Standard Item 009-04 requirements.
14.1.2 The contractor shall notify NSWCPD’s Quality Department in writing when any changes are made to the QMS that may affect work defined in accordance with NAVSEA Technical Specification 9090-310.
SOW-PWS Template 01 December 2020 version Page 12
14.1.3 The contractor shall ensure its QMS Level 3 specific work procedures relevant to the requirements of the Solicitation, including the SOW at the Task Order level (i.e. welding, etc.).
14.2 Risk Management
14.2.1 The contractor shall develop an internal risk management program and work jointly with NSWCPD Code 416 to develop an overall risk management program.
14.2.2 Assign responsibility for risk mitigation activities, and monitor progress through a formal tracking system.
14.2.3 Conduct risk identification and analysis during all phases of the program, including proposal development. Develop appropriate risk mitigation strategies and plans.
14.2.4 Use projected consequences of high probability risks to help establish the level of management reserve and schedule reserve.
14.2.5 Assess impact of identified performance, schedule and costs risks to estimate at completion, and include in the estimate as appropriate. Develop a range of estimates (best case, most likely, worst case).
14.2.6 The Contractor shall capture risks and associated mitigation plans in a risk database and provide status updates to the Government for all documented risks upon request.
14.3 Minimum Standard Quality Contract Requirements for Material Procurement, Modification, Repair, or Overhaul of Material – Deep Submergence Systems – Scope of Certification MCD-A SMICs D5 & D6 – N/A
14.4 OCONUS Contractor Personnel Travel During COVID-19
In consideration of personnel movement during the COVID-19 pandemic, Force Health Protection (FHP) guidance has been issued for contractor personnel who travel OCONUS for deployment and for conducting official travel OCONUS as well. Entry requirements are communicated to traveling personnel, including contractor personnel, through the Electronic Foreign Clearance Guide (EFCG). Contractor personnel must adhere to current country entry requirements of the respective geographic combatant command (GCC) (which may include screening, ROM, and testing) and all applicable host nation procedures. All contracts including performance outside the United States require DoD contractor personnel to complete a risk assessment of health status.
14.5 Software Development Plan (SDP) N/A
File details come from the government source that posted it. Updated .