STATEMENT OF WORK FOR

PRODUCTION OF C-130 PECULIAR SUPPORT EQUIPMENT

26 Feb 20

1.0 INTRODUCTION

This Statement of Work (SOW) addresses the requirements and tasks associated with the production and delivery of Peculiar Support Equipment (PSE) for the KC-130J PROGRAM.

PART NUMBER
NSN
NOMENCLATURE
QTY
RC2045G03
4920-01-566-1357
Electronic Turning Tool
3

2.0 APPLICABLE DOCUMENTS

a) MIL-STD-130N – Identification Marking of U.S. Military Property

b) GEIA-STD-0007- Logistics Product Data

c) GEIA-HB-0007- Logistics Product Data Handbook

3.0 REQUIREMENTS

3.1 General

The Contractor shall manufacture and deliver the part number (P/N) identified in Section 1.0 above in accordance with this SOW and the requirements of the contract.

3.2 Quality Assurance

The Contractor shall have in place a production quality assurance (QA) system. This QA system shall be able to ensure that manufactured configuration items are built to print, functional, and reliably made IAW controlling technical drawings, specifications and standards. Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250.

3.3 Government Inspection and Acceptance

Government Inspection and Acceptance of all production units shall be accomplished at origin by the Government.

3.4 PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION (PHS&T)

Packaging Requirements The contractor shall preserve and pack materiel IAW ASTM D3951-18 (excluding paragraphs 4.2-4.3) and require same by vendors and subcontractors (for materiel being shipped to the government).

Marking Requirements Marking shall be in accordance with MIL-STD-129R.

Transportation Transportability issues shall be identified and addressed to ensure all shipments can be transported with unrestricted movement via over-the-road transport. Transportability problem items shall be identified in accordance with MIL-STD-1366E criteria. Requirements for shipment of DOD materiel shall meet, at a minimum, the requirements of the following rules and regulations, as applicable to the mode of transportation in the Defense Transportation Regulation, DOD 4500.9-R, Part II, Uniform Freight Classification Rules, National Motor Freight Classification Rules and American Trucker's Association Rules.

Shipment shall be FOB Origin.

All shipments under this contract shall be addressed to: