DRAFT SOW.docx

DOCX document 70 KB Posted

Attached to
Sources Sought for Article 520 Radiological Release of the AS-41 Ex-Mckee
Solicitation number
N4215820JM002
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Section
Title
Page
1
Scope
2
2
Period of Performance
2
3
Place of Performance
2
4
Security Requirements
2
5
References
2
6
Quality Management and Assurance
4
7
Requirements
4
7.1
NNSY Requirements
4
7.2
General Requirements
5
7.3
General Radiological Requirements
8
7.4
Waste Contents/Form
9
7.5
Requirements for the Acceptance of Radioactive Waste
10
7.6
Requirements for the Generation and Acceptance of Mixed Waste
12
7.7
Radiological Reporting Requirements
15
7.8
Packaging of Materials by the Contractor
15
7.9
Radiological Release Requirements
15
7.10
Radiological Work Requirements
16
7.11
Ship Stability
19
7.12
Personnel Qualifications
19
7.13
Required Standard of Workmanship
21
7.14
Prior Written Permission Required for All Subcontracts
21
7.15
Points of Contact
21
7.16
Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
22

1 SCOPE:

1.1 Contractor shall remove all radioactively contaminated (or potentially radioactively contaminated) equipment and systems on board the Ex-MCKEE (AS-41). Contractor shall perform a space release (Article 520 Release) on all nuclear spaces aboard the Ex-McKee per NAVSEA 389-0288. This includes removal and proper disposal of material that would be an interference to performing the radiological release of the ship, removal and radwaste of internal RLW tank, providing sampling services, all temporary services, rigging and crane services. Also, in accordance with (IAW) NAVSEA 389-0288 prepare an Article 520 release letter/report to NAVSEA 08 for approval and final disposal of the Ex-McKee.

2 Period of Performance:

2.1 The contractor shall accomplish all work beginning by June 1, 2021 and completing no later than July 1, 2023.

3 Place of Performance:

3.1 The contractor shall bring all required tooling and equipment to accomplish all work at Norfolk Naval Shipyard (NNSY), pierside, within the Controlled Industrial Area (CIA) with the exception of non-nuclear structural item fabrication.

4 Security Requirements:

4.1 The Contractor shall ensure all applicable personnel have the proper security clearances for work performance under this contract, as specified in DD Form 254. The Contractor shall prepare and submit a complete list of all personnel, with security clearance, who will perform work under this contract. (CDRL A001)

4.2 The engineering and planning personnel will be required to hold CONFIDENTIAL security clearance in order to accomplish the planning and technical work documents for performing work. All contractor personnel working inside NNSY shall be a United States citizen. Include this information in the DD254.

5 References:

The following documents and their references shall be used in the technical requirements for performing work under this contract. The most current reference revision will be in effect at the time of award, unless otherwise specified. All work shall be performed in accordance with the drawings, documents and procedures cited below. The revision/change levels of any NAVSEA drawings or document utilized will be dictated by the most current revision/change unless directed otherwise via NAVSEA approved document for performing work under this Statement of Work (SOW). If the Contractor desires to use any drawing or technical instruction outside of these guidelines, cognizant Technical Authority concurrence must be given in writing prior to using any other reference, via a Contractor deficiency reporting process to include resolution. Any document not available to the Contractor can be obtained by request via the NNSY Contracting Officer.

5.1 Code of Federal Regulations (CFR), Title 49

5.2 CFR, Title 10

5.3 Radiological Controls for Shipyards (NAVSEA 389-0288)

5.4 International Standards Organization - ISO 9001; Quality Management Systems-Requirements

5.5 Naval Ship’s Technical Manual S9086-CH-STM-030/CH 074, Volume 3; Gas Free Engineering

5.6 Code of Federal Regulations - 29 CFR 1915, Title 29; Occupational Safety and Health Standards for Shipyard Employment

5.7 OPNAVINST 5100.19; Navy Occupational Safety and Health Program for Forces Afloat

5.8 NAVSEA INSTRUCTION 4700.17; Preparation and Submission of Trouble Reports

5.9 NAVSEA INSTRUCTION 5400.95; Waterfront and Technical Authority Policy

5.10 Code of Federal Regulations 40; Protection of Environment

5.11 Code of Federal Regulation 49; Transportation

5.12 Code of Federal Regulations 19; 1910; Occupational Safety and Health Standards

5.13 NAVSEA Standard Item (SI) 009-32; Cleaning and Painting Requirements

5.14 NAVSEA Standard Item (SI) 009-01; General Criteria; accomplish

5.15 NAVSEA Standard Item (SI) 009-02; Environmental Compliance Report for Material Usage; accomplish

5.16 NAVSEA Standard Item (SI) 009-03; Toxic and Hazardous Substance; control

5.17 NAVSEA Standard Item (SI) 009-04; Quality Management System; provide

5.18 NAVSEA Standard Item (SI) 009-05 Temporary Access; accomplish

5.19 NAVSEA Standard Item (SI) 009-07; Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

5.20 NAVSEA Standard Item (SI) 009-08; Shipboard Fire Protection and Fire Prevention; accomplish

5.21 NAVSEA Standard Item (SI) 009-09 Process Control Procedure (PCP); provide and accomplish

5.22 NAVSEA Standard Item (SI) 009-10; Asbestos-Containing Material (ACM); control

5.23 NAVSEA Standard Item (SI) 009-12; Weld, Fabricate, and Inspect; accomplish

5.24 NAVSEA Standard Item (SI) 009-40; Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

5.25 NAVSEA Standard Item (SI) 009-60; Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

5.26 NAVSEA Standard Item (SI) 009-65; Polychlorinated Biphenyls (PCBs); control

5.27 NAVSEA Standard Item (SI) 009-70; Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish

5.28 NAVSEA Standard Item (SI) 009-74; Occupational, Safety and Health Plan; accomplish

5.29 NAVSEA Standard Item (SI) 009-100; Ship's Stability; maintain

5.30 NAVSEA Standard Item (SI) 009-103; Weight and Moment Change Data; provide

5.31 NAVSEA Standard Item (SI) 009-120; Fact Finding and Critique of Unplanned Event; manage

5.32 NAVSEA Standard Item (SI) 009-122; Temporary Padeye; install and remove

5.33 Local Standard Item 042-26-001 Security Requirements for Work Within Norfolk Naval Shipyard (NNSY); accomplish

5.34 Local Standard Item 042-11-001 General Occupational Safety, Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard; accomplish (PCP)

5.35 OSHECM Chapter 250 'Hazardous Energy Control'

5.36 COMNAVREG MIDLANT INSTRUCTION 11262.1A Contractor Crane/Weight Handling Equipment Oversight.

5.37 Norfolk Naval Shipyard (NNSY) Asset Authorization Submittal Requirements

5.38 NAVFAC P-307; Weight Handling Program Management

5.39 NAVSEA Instruction 9210.47 Requirements For Mixed Waste And Radioactive Polychlorinated Biphenyl (Pcb) Waste Control

5.40 Local Standard Item 042-22-001 General Requirements for Work Within Norfolk Naval Shipyard (NNSY); accomplish

6 Quality Management and Assurance:

6.1 The Contractor shall develop and maintain a Quality Management System, compliant with reference (5.4), which provide assurances that all contracted work submitted to the Government for acceptance conforms to contract requirements. The Contractor's Quality Management System shall be documented and shall be submitted as part of the contract award process. The Contractor’s Quality Management System shall be developed and approved by NNSY prior to start of performance and shall be subject to periodic audits by NNSY throughout the contract Period of Performance. The Contractor shall provide a copy of the Quality Management System, to include any applicable quality manuals, process instructions, and weld/braze procedures via electronic media to the Contracting Officer Representative (COR). The Contractor shall notify NNSY Contracting Officer (KO) in writing of any change to the Quality Management System, to include any updates, within one (1) week of change.

7 REQUIREMENTS:

7.1 NNSY Requirements:

7.1.1 NNSY will provide water, 90 psi tool air, and power to the pierside. 75kVA transformer provides power.

7.1.2 NNSY will provide berthing drawing of the AS-41 Ex-McKee per Attachment 3.

7.1.3 NNSY will provide initial radiological and waste characterization information to the Contractor. The information, which may (but NNSY is not required to) include waste characterization profiles, and radiological surveys, will be provided in a format acceptable to reference (5.3). This is provided for information purposes only and must be verified by the contractor. Refer to section 7.5.6.

7.1.4 NNSY will support Contractor work on 1st and 2nd shift Monday through Saturday, excluding government holidays. Due to overtime considerations, notification to the COR is required to support work outside of normal business hours. Notification must be received by the close of business on Tuesday of the week prior the week additional support is needed. Support outside of normal business hours will be evaluated on a case-by-case basis.

7.1.5 NNSY will maintain a custodian work force on the AS-41 to include inspections and small work items outside of the contractors work areas.

7.1.5.1 Maintain the fire and flood alarms and alarm system.

7.1.5.2 Monitoring shipyard workers access control.

7.1.5.3 Contractor is required to maintain contractor work force access control, including logging personnel on and off the ship. Contractor is required to know which employees are on the ship at all times.

7.1.6 NNSY will maintain ship security including securing the ship when it is unoccupied.

7.1.7 NNSY will provide a technical representative points of contact for interface. See 7.15.

7.2 General Requirements: In the performance of the resulting contract, the Contractor shall:

7.2.1 The Contractor shall perform all work in accordance with all applicable references identified in section 5. The Contractor shall comply with references as cited within this Statement of Work and the current contract modification, unless otherwise authorized by the Government. The effective issue of Government approved documents referenced in the ship specifications or otherwise invoked in this contract, including revisions or amendments, shall be the latest document date prior to contract award that has been accepted by the Contractor. The Contractor shall promptly notify the government of all revisions identified to the documents referenced in section 5 and identify all cost and schedule impacts. If required, the contractor shall submit an equitable adjustment request based upon revision as authorized through a contract modification. Individual process, system, and component specification upgrades will be addressed as identified in the Final Work Package. These requests will be evaluated prior to implementation based on their economy, feasibility and practicality. Implementation shall be in accordance with standard shipyard procedures identified in the Quality Assurance Program Requirements.

7.2.2 Senior Contractor personnel shall personally notify at least one senior Naval Nuclear Propulsion Program (NNPP) representative, the COR, and the Contracting Officer of any issue related to licenses, permits, agreements, consents, or other legal authorization required to perform work specified herein that would adversely affect the Contractor’s ability to perform the functions defined in the contract. This notification is required whether or not such documents are identified in this specification. This notification shall be via teleconference within one (1) business day of identification of the issue and shall be followed up in writing within five (5) calendar days. Additionally, senior Contractor personnel shall personally inform at least one senior NNPP representative and the COR prior to initiating any discussion, oral or written, with State, Federal, or local regulators concerning the handling, packaging of NNPP waste. This notification shall occur under all circumstances even if the Contractor does not specifically identify that the NNPP is the waste generator. This notification is in addition to, and not in lieu of, the Contractor's responsibility to promptly notify the Contracting Officer of any issues that could adversely affect schedule, impact performance or result in non-compliance with the contract. The senior Contractor Personnel and senior NNPP representative(s) for this contract will be designated at time of contract award (and updated as necessary).

7.2.3 Contractor shall follow all security requirements of reference (5.33) and Safety, Health, and Environment requirements of reference (5.34).

7.2.4 The Contractor shall provide to the COR an updated Plan of Action and Milestones (POA&M) and schedule for all associated work.

7.2.5 The Contractor shall submit Contract Funds Status Reports (CFSR) and the status of work reports. CFSRs and status of work reports shall be provided to the Government for all cost- reimbursement subcontracts. Should any subcontractors in a fixed price arrangement be willing to provide similar data, it should be integrated in the Contractor’s data as a part of the completion report. (CDRL A008 for CFSR)

7.2.6 The Contractor shall provide Project Management to participate in the following meetings and conferences:

7.2.6.1 The Cost Report meeting. Every 2 weeks beginning at one month before beginning work through completion of contracted work.

7.2.6.2 Weekly Progress meeting. One meeting per week beginning at one month before beginning work through completion of contracted work.

7.2.6.3 Periodic availability review conferences at 25%, 50%, 75% accomplishment of work.

7.2.6.4 Daily Production meetings with C400/COR.

7.2.6.5 Other meetings as required to cover any emergent needs that may develop over the availability.

7.2.7 The Contractor shall furnish the material, services, and work space/trailers, unless furnished by the Government under express provisions of this contract, necessary for the execution of work.

7.2.8 Contractor will be responsible for removal and preparation for disposal of all radioactively contaminated and potentially radioactively contaminated equipment or systems on board the AS-41 IAW documents in section 5.

7.2.9 Contractor will be responsible for removal of all equipment, furnishings and structural interference items including tanks, lead shielded piping and shielded decks. Some of this material is considered radioactive material.

7.2.10 All material removed from the AS-41 shall have the classification of waste to be determined by the contractor per this SOW and reference (5.3).

7.2.11 Contractor shall maintain ship structural integrity and stability as necessary. See Section 7.11.

7.2.12 Contractor shall remove and properly prepare for disposal of all lead shielded piping, lead shielded bulk heads and decks from the ship.

7.2.13 Contractor shall perform all planning for work to remove and properly disposal of all items (including radiological and hazardous waste) as necessary on the AS-41 to include:

Engineering Services
Structural Engineering Services
Radiological Services
Project management and Production Services

Lifting and Handling Services

7.2.14 Work Items, specifications and other work products shall be completely and thoroughly checked and reviewed by the Contractor for technical accuracy and compliance with provisions of technical instructions, specifications and assignments. The Government is the ultimate approval authority for work item specifications provided by the Contractor. Data and other work products developed by the Contractor for Contractor’s accomplished work shall be submitted to the COR for review by NNSY for approval before beginning work on the work item submitted. NNSY requires 10 working days for review and approval. The Contractor shall report any corrections necessary due to error or omission. No work may proceed without written approval of NNSY.

7.2.14.1 All work performed by the contractor must be in accordance with written and approved (by NNSY) work packages.

7.2.15 The Contractor shall submit reports as specified in this Statement of Work to the COR.

7.2.16 The Contractor shall comply with all laws, ordinances, and regulations of Federal, State, and Local authorities regarding licenses, permits and consents that may be necessary. For any supplies or services provided pursuant to this contract, the Contractor shall comply with all applicable laws and regulations, including, but not limited to, the Nuclear Regulatory Commission (NRC), the Environmental Protection Agency (EPA), the Occupational Safety and Health Act (OSHA) and associated regulations, the Department of Transportation (DOT), the Toxic Substances Control Act (TSCA) and associated regulations, radioactive waste compact, and the appropriate Agreement State (as applicable).

7.2.17 The Contractor shall allow inspections on the AS-41 by (NNPP) Representatives at all reasonable times. Inspections will include radiological control, safety, and adherence to approved work procedures. All deficiencies documented by this inspections will be provided to the COR. Inspections may be random.

7.2.18 The Contractor, will not take possession, custody, or control of the AS-41, but will, to the extent legally permissible, assume all risk, risk of loss, and all other incidents of ownership to the AS-41. The Contractor shall be liable and responsible to the extent allowed by applicable laws and regulations in any action that may claim damages or compensation in any connection with the AS-41 after the Contractor has started work on the AS-41.

7.2.18.1 In the event of a catastrophic accident (such as hull puncture below the waterline) NNSY will provide emergency response and emergency repair of the ship to maintain seaworthiness. Contractor would be liable for ship damage.

7.2.19 The contractor shall prepare for disposal all wastes generated from the AS-41 disposal including (but not limited to) radioactive waste, Heavy Metal Bearing Equipment (HMBE) waste (HMBE mainly consists of equipment with lead components inside), and mixed waste. Storage, treatment, and/or packaging of these wastes shall be in accordance with applicable federal, state and local regulations.

7.2.19.1 Hazardous waste, including lead waste and Asbestos waste (radiological and non-radiological), PCB waste (radiological and non-radiological), and non-hazardous regulated waste (any non-radioactive waste generated from a ship that is no longer usable and, due to its hazardous or pollutant properties, requires controlled treatment/disposal), shall be handled, packaged in accordance with references (5.16, 5.22, 5.26, and 5.34).

7.2.20 Contractor shall submit a safety plan to NNSY for review and approval.

7.2.21 Contractor shall provide crane and rigging services for removal of items from ship and for opening and closing of the nuclear trunk hatch as needed during execution. Contractor must submit crane plans to and have cranes be inspected by Code 700 for approval per reference 5.36.

7.2.22 All cuts or modifications to the ships hull or structure must be per SI 009-05 (IAW) 7.2.11.

7.2.23 Welding is per SI 009-12. All weld procedures and welder qualifications must be approved by NNSY C138.

7.2.24 Contractor shall obtain authorization for all electronic devices from NNSY per reference (5.33).

7.2.24.1 Contractors are authorized to bring the following privately owned personal electronic devices (PEDs) onto the Shipyard, but not within the CIA or secured spaces: cell phones, cell phones with PDAs embedded (including web access), PDAs (including web access), and Blackberry - type devices and Bluetooth for these devices including hands-free (ear pieces). It is required to leave these devices outside of the CIA and secured spaces.

7.2.24.2 Cameras and PEDs (including laptops) with camera, video, remote activation, and/or audio recording capabilities are prohibited on the Shipyard. Camera cell phones are permitted on the shipyard; however they cannot be brought into the CIA or into spaces where NAVSEA business is conducted.

7.2.24.3 PEDs brought within Shipyard worksites are subject to random audits. Devices found to contain government information shall be sanitized. The device will be examined to determine if government information can be removed without destruction. If it is determined that physical destruction is the only method for sanitizing, the device will be destroyed and the owner will not be reimbursed for the device.

7.3 General Radiological Requirements

7.3.1 Perform all work (IAW) reference (5.3). In all disputes in the interpretation of reference (5.3) NNSY is the final authority.

7.3.1.1 Per reference (5.3) the following conditions are considered radiological incidents. If an incident occurs the contractor must immediately suspend all work and submit a recovery plan to the COR for approval. For convenience, section numbers of reference (5.3) are listed after each incident.

7.3.1.2 External radiation exposure in excess of NAVSEA limits. (238.3 and 238.4)

7.3.1.3 Internally deposited radioactivity. (406.4)

7.3.1.4 Skin Contamination. (517.2)

7.3.1.5 Personnel exposed to airborne radioactivity. (404)

7.3.1.6 Unauthorized radioactive liquid discharge to the environment. (308.2 and 310.3)

7.3.1.7 Loss of radioactive material. (704.3)

7.3.1.8 Spread of radioactive contamination. (517.3 and 517.4)

7.3.1.9 Unmonitored exposure. (234.1.f)

7.3.1.10 Improper control of high radiation areas or exclusion areas. (226.1.g and 226.4.c)

7.3.1.11 Unauthorized disposal of radioactive waste. (including mixed waste and PCB waste). (324.2)

7.3.1.12 Improperly controlled radioactive material. (703.8.b)

7.3.1.13 Dosimetry discrepancy. (231.4.b and 233.3.g)

7.3.1.14 Any instance in which personnel radiation exposure exceeded the control levels. (106.1.a, 106.8.b or 240.8.c)

7.3.2 The Contractor shall provide radiological coverage for all Contractor radiological work. This includes providing Radiological Control Technicians and supervisors to ensure work is performed in a radiologically safe manner and per all requirements.

7.3.3 Contractor personnel shall be trained to perform radiological work and wear dosimetry per reference (5.3). Training is performed by NNSY.

7.3.4 Contractor personnel will be entered into NNSYs dosimetry program and subject to the rules and regulations of the program. Personnel will be required to complete training, pass exams and have a medical examination.

7.3.5 The Contractor shall provide the COR a Point of Contact (POC) listing citing all contractor personnel for Radiological Manager’s notification to NNSY RADCON, to include the following: Radiological Control Department, Radiological Waste Management, Radiation Worker Training, and Radioactive Material Control Office. (CDRL A002)

7.3.6 The Contractor shall provide copies of approved technical work documents containing radiological controls to NNSY upon request.

7.3.7 Contractor is subject to radiological oversight by NNSY at all times per the Quality Assurance Plan (QASP).

7.3.8 Services are to be performed in a manner that minimizes the generation of radioactive waste and mixed waste. All radioactive waste, and mixed waste shall be handled according to federal, state, and local regulations and shall be prepped for disposal appropriately.

7.3.9 If the contractor encounters water in radiological system the water shall be controlled as follows:

7.3.9.1 If less than 1 pint then use absorbents in the containment and Radwaste. If more than a pint is encountered or expected drain water into a polybottle, provided by NNSY, and turn over to NNSY.

7.3.10 When a problem occurs that has violated or has the potential to violate the limits listed in 7.3.1 the contractor must stop work and perform a Team Learning Session (TLS). This TLS includes a discussion (and written report) of what happened, what should have happened, what the team learned, and what actions are going to be taken to ensure that the problem will not happen again. TLS must include the COR and any technical representatives that the COR deems necessary.

7.3.10.1 For problems that occur but the COR does not deem significant enough to have violated the limits of 7.3.1 then the COR may only require a written report and not a full meeting.

7.4 Waste Contents/Form:

7.4.1 The contractor shall survey and sample all material for radiological and hazardous constituents prior to removal and preparation for disposal.

7.4.2 Waste material for disposal will contain individual radionuclides or combinations of radionuclides listed in Part 61 of reference (5.2). Waste material will meet the limits of Class A waste as defined by Part 61.55 of reference (5.2).

7.4.3 The Contractor shall provide services for removal and packaging of components having unique design characteristics and for large components. All waste shall be handled according to Federal. State, and local regulations at NNSY and shall be packaged (IAW) reference (5.3) and NNSY’s provided training.

7.5 Requirements for the Acceptance of Radioactive Waste:

7.5.1 In the event of a violation concerning any waste previously accepted at the final disposal site, the Contractor may be held liable to the extent that its actions or inactions caused the violation, at the discretion of the NNPP, for costs incurred to ensure the proper disposal at the final disposal facility.

7.5.2 NNSY will only accept the following waste with prior approval and special considerations. (Mixed waste and PCB/radioactive waste will be handled under the Mixed Waste and PCB/radioactive waste section).

1. Heavy metal bearing equipment (HMBE) and elemental lead

2. Radiological waste with blood.

3. Polybottles (See 7.3.9)

4. Aqueous filters.

5. Biological Radwaste

7.5.3 The Contractor shall perform handling, segregating and packing of radioactive solid waste (hazardous and non-hazardous). Waste is to be segregated (packed separately) based on waste streams. Mixed waste, hazardous waste, PCB waste and ORW (see 7.5.12 and 7.6.9.5) are to be packaged separately from other types of waste.

7.5.4 The Contractor shall perform blocking and bracing for items that cannot be packed by hand and provide associated inspections IAW Part 393, reference (5.1). This includes building wooden decks with fire retardant wood for shipping radwaste items.

7.5.5 The Contractor shall provide disposal information via technical working document or by completing a Waste Evaluation Form prior to generating any waste. Specific characterization information on the contents of each waste item must be provided to NNSY to support later communications and disposal of the radioactive waste. (CDRL A003)

7.5.6 The Contractor shall provide Objective Quality Evidence (OQE) such as radiological surveys of containers, item on-contact levels, determination that radioactive waste is not mixed waste, for radioactive waste items to verify characterization of the waste. This characterization data may be based on either appropriate process knowledge or sample analysis. This data (analysis sheets, surveys, etc.) is to be attached to the container associated with the waste items. Characterization information should be provided prior to turning over custody to NNSY. The following are required to be turned over to NNSY:

a. Information used to serialize the container (e.g. serial numbers, tracking, etc.).

b. Container weight (recorded in lbs).

c. All applicable surveys (recorded in mR/hr).

d. Inventory List for each container turned over to NNSY.

e. If required, proof item(s) are blocked and braced satisfactory per reference 5.11.

f. All applicable NNSY documentation (Appendix Ns for ORW waste, TWDs, etc.).

g. Proof of satisfactory closure per manufacturer’s closure instructions.

(CDRL A003)

h. Percentage full (Only for NNSY provided Sealands, estimated to the nearest ± 5 percent).

7.5.7 The Contractor shall perform packaging of all radioactive waste to be transferred to NNSY. However, some types of waste need to be segregated (bagged separately). These waste streams include Mixed waste, hazardous waste, PCB waste and ORW (see 7.5.3, 7.5.12 and 7.6.9.5). For uniform radioactive debris of same characterization, debris are to be bagged prior to being packed into container. Debris with potential cut hazards, such as glass, protective bags or sharp edge protection shall be utilized prior to turning over to NNSY.

7.5.8 The Contractor shall provide the necessary support to permit NNSY to visually inspect any radioactive waste prior to transfer to NNSY. This inspection will, in some instances, require an open-container inspection of the waste to verify first-hand that no unacceptable materials are included with the radioactive waste and to ensure waste is properly identified and inventoried per work document.

7.5.9 Contractor shall provide new or like new containers and/or drums for packing waste. Containers/drums will not be used as a shipping container; instead, these containers will be packed into Sealands for shipment. NNSY may provide Sealands to the contractor to pack radioactive waste directly into if the Contractor request a Sealand container from NNSY. Shipping containers and conveyances supplied to the NNPP sites shall be either new or refurbished and appear in a like new condition on all interior and exterior sides, including the top and bottom sides. All seals on access panels (i.e., doors and removable tops) shall be new or refurbished to be in a like new condition. Latches, door handles, chains and binders located on or attached to the container shall be in proper working order and be new or in a like new condition. The Sealand will remain under NNSY custody during all work evolutions. The Sealand will be used as a shipping container and must meet the requirements of reference (5.1). The Contractor shall not move, lift, or alter the NNSY provided Sealand container. The Contractor shall return the Sealand to NNSY in the same state as received once packing is complete.

7.5.10 Each container of waste turned over to NNSY shall have a detailed inventory list provided. This inventory shall be a breakdown of the waste in the bag as annotated on the Technical Work Document (TWD) or Waste Evaluation Form. Be specific. Do not use general terms such as “debris” to describe several waste forms, such as rubber gloves, stainless steel, etc. For debris, package together, ensure it is uniform under the same waste characterization. (CDRL A003)

7.5.11 For certain pieces of equipment (i.e. vacuum canisters, chip collectors), the bagging requirements of this section are not applicable. However, an inventory shall still be provided. For heavy or large items where hand packing is not practical, block and brace as necessary.

7.5.12 Information on NNSY radiological waste streams are as follows:

a. Common Consumable Material (CCM): Waste destined for incineration at the Vendor. Common Non-Hazardous Trade Waste.

b. Standard Radioactive Waste (SRW): Radioactive waste stream for non-hazardous materials or recyclable metals.

c. Other Radioactive Waste (ORW): Radioactive waste stream that consists of items that do not fit into SRW and are not mixed waste or PCB/Radioactive waste. Metal items and other special characterized items that do not fit into the SRM waste stream, Out Of Waste Acceptance Guideline (OOWAG) material which may require pre-approval from Energy Solutions or special curie content evalution. Examples of ORW are: tanks, elemental lead, aqueous filter, asbestos, etc.

7.6 Requirements for the Generation and Acceptance of Mixed Waste:

7.6.1 Mixed Waste is Waste which is radioactive and which has been determined to be hazardous under RCRA. This includes radiological waste with PCBs.

7.6.2 The Contractor shall minimize generation of mixed and/or PCB/radioactive wastes in accordance with reference 5.39.

7.6.3 The Contractor shall notify NNSY Code 2380.6 and Code 308 24 hours (during normal NNSY working hours) or 56 hours (during the weekend or holidays) after generation of any mixed and/or PCB/radioactive waste generated requiring transfer to NNSY Central Accumulation Area (CAA).

7.6.4 The Contractor shall submit characterization information (see step 7.5.5), the date or expected date of generation, and volume or anticipated volume of waste. (CDRL A003)

7.6.5 The Contractor shall provide disposal information via technical work document or completing Waste Evaluation Form and forwarding the form to NNSY Code 2380.6, for review and approval prior to transfer of any mixed and/or PCB/radioactive wastes to NNSY CAA. Specific characterization information on the contents of each waste item must be provided to NNSY to support later treatment and disposal of the mixed and/or PCB/radioactive waste. (CDRL A003)

7.6.6 The Contractor shall provide PCB analysis sheets, chemical analysis sheets, etc. for individual mixed and/or PCB/radioactive waste items to verify characterization of the waste. This characterization data may be based on either appropriate process knowledge or sample analysis. This data (analysis sheets, surveys, etc.) is to be attached to the Appendix A associated with the waste items. Characterization information should be provided prior to the date of generation. (CDRL A003)

7.6.7 The Contractor shall package all mixed and/or PCB/radioactive waste to be transferred to NNSY.

7.6.8 The Contractor shall provide the necessary support to permit NNSY to visually inspect any mixed and/or PCB/radioactive waste prior to transfer to NNSY. This inspection will, in some instances, require an open-bag inspection of the waste to verify first-hand that no unacceptable materials are included with the mixed or PCB/radioactive waste and to ensure waste is properly identified and inventoried per TWD or Appendix A. NNSY cannot accept mixed and/or PCB/radioactive waste until an on-site waste inspection has been satisfactorily performed.

7.6.9 Mixed Waste Acceptance Criteria

7.6.9.1 The following items shall not be packaged with mixed and/or PCB/radioactive waste item:

7.6.9.1.1 Free standing liquids

7.6.9.1.2 Pressurized containers

7.6.9.2 Waste items generated by contractor shall be bagged in non-PVC clear plastic bag. Examples of non-PVC plastics are polyurethane, polyethylene, and polypropylene. The use of other types of packaging materials requires NNSY approval. The weight for bagged mixed and/or PCB/radioactive waste should be kept to a maximum of 35 lbs per bag unless otherwise approved by NNSY Code 2380.6. This does not apply to vacuums or chip collectors.

7.6.9.3 Each package of waste turned over to NNSY shall have a detailed inventory list provided. This inventory shall be a breakdown of the weight percent of each component of the waste in the bag as annotated on the TWD or Waste Evaluation Form. Be specific. Do not use general terms such as “debris” to describe several waste forms, such as rubber gloves, absorbents, paint chips, etc. An example of a breakdown would be a bag containing 85% delicate task tissue wipes, 15% cloth diapers. (CDRL A003)

7.6.9.4 For large components and pieces of equipment (i.e. vacuum canisters, chip collectors), the bagging requirements of this section are not applicable. However, an inventory shall still be provided.

7.6.9.5 Approved Waste Streams for Mixed Waste

7.6.9.5.1 Only those mixed waste streams listed below are allowed for storage by NNSY. Each mixed waste stream is identified and the applicable EPA Waste Codes are provided.

7.6.9.5.2 Mixed Waste Requiring Organic/Characteristic Treatment (MW1) EPA Waste Codes: D001, D002, D003, D004, D005, D006, D007, D008, D009, D010, D011, D027, F002, F003, F005.

7.6.9.5.3 Mixed Waste for Macroencapsulation Treatment (MW2)

EPA Waste Codes: D004, D005, D006, D007, D008, D009, D010, D011 This waste stream consists primarily of lead, leaded alloys, brass and bronze items, cadmium plated equipment and other debris type waste.

Debris means solid material exceeding a 60mm particle size that is intended for disposal and that is: a manufactured object; or plant animal matter; or natural geologic material.

Radioactive Lead Solids (RLS) are another type of hazardous waste that requires treatment via macroencapsulation. Radioactive Lead Solids include, but are not limited to, all forms of lead shielding and other elemental forms of lead. There are no size criteria for RLS unlike the 60 mm particle size requirement for hazardous debris. As such, smaller forms of RLS such as lead shot or fines require macroencapsulation prior to disposal.

This waste stream may contain asbestos and/or regulated PCBs that are amenable for direct disposal. No free paint chips is authorized for direct disposal.

7.6.9.5.4 Mixed Waste Containing PCBs (MW3)

EPA Waste Codes: D001, D002, D003, D004, D005, D006, D007, D008, D009, D010, D011, F002, F003 and F005 This waste stream consists primarily of PCB contaminated debris, items, particulates, and sediments that may contain asbestos. This waste stream shall contain greater than or equal to 50 ppm PCBs.

7.6.9.5.5 Process knowledge and/or a representative sample analysis of the waste streams identified above shall be based on the minimum sample analyses as identified below. Any sample analysis performed shall meet the requirements of EPA Test Methods for Evaluating Solid Waste (SW-846) and analyzed for the following constituents per the stated (SW-846) test method. The number of samples for each analysis shall be determined by a contracted organization sampling analysis plan.

a. Toxicity characteristic leaching procedure (TCLP) (Metals): Test Method

b. Volatile Organic Compound (VOCs): Test Method 8260

c. Semi-Volatile Organic Compound (SVOCs): Test Method 8270

d. PCBs: Test Method 8082

7.6.9.5.6 PCB Bulk Product Waste (PCB1)

PCB bulk product waste is defined in 40 CFR Part 761.3. Examples of PCB bulk product waste may include certain types of cable insulation, thermal insulation, floor tiles, rubber parts, items coated with PCB-containing paint, and PCB-containing paint chips.

Only radioactive waste with PCB contamination levels greater than or equal to 50 ppm or greater than or equal to 10 ug/100cm2 (for loose surface PCB contamination) are acceptable for storage to NNSY as PCB/radioactive waste.

7.7 Radiological Reporting Requirements:

7.7.1 The Contractor shall provide radiological survey results in a format acceptable per reference (5.3). (CDRL A004)

7.7.2 Asbestos waste and any asbestos containing daughter waste products originating from asbestos waste generated shall be tracked until the waste is turned over to NNSY.

7.7.3 The Contractor shall provide a copy of all associated certified TWDs, Work Permits and other work documents upon completion of all work as Objective Quality Evidence (OQE) to the COR.

7.7.4 Contractor shall develop radiological release reports in accordance with reference (5.3) and acceptable to the NNSY Radiological Controls Department. (CDRL A005)

7.8 Packaging of Materials by the Contractor:

7.8.1 Material must be properly packaged, blocked and braced per local, state, federal and DOT regulations.

7.9 Radiological Release Requirements:

7.9.1 In addition to the requirements of federal, state and local regulatory authorities and those specific requirements stipulated in applicable licenses, permits, and authorizations, the below stated radiological requirements apply, as indicated.

7.9.1.1 The following radiation measuring methods shall be used to determine the various radiation and/or contamination levels. All release levels and limits are per reference (5.3).

7.9.1.1.1 Gamma Scintillation surveys shall be performed with IM253 or equivalent. This is a single point survey within a ½” of the surface.

7.9.1.1.2 Frisk surveys shall be performed with a DT-304/PDR equipped ratemeter or instrument of equal sensitivity, with the probe held within ½” of the surface being scanned.

7.9.1.1.3 Solid Samples will be analyzed by isotopic analysis using a shielded well and a High Purity Germanium (HPGe) semiconductor detector for quantitative analysis. The peaks are identified by software and compared against a standard library to determine which radionuclides are present.

7.9.1.2 The Contractor shall provide copies of radiological surveys to the COR and/or NNPP site, as requested. (CDRL A004)

7.10 Radiological Work Requirements:

7.10.1 Attachment 1 lists the status of the radiological grouping of the spaces aboard the AS-41.

7.10.2 Attachment 2 lists potential specific tasks that should be evaluated when executing the contract.

7.10.3 Exhaust ventilation ducting upstream of HEPA filters will not be released and will be removed and disposed of as radioactive waste.

7.10.4 Spaces may contain signs indicating “No Bunking – Radiation Areas Nearby”. These signs were covered over with tape All radiological signs shall be removed and disposed of appropriately. Signs are not to be released to the public.

7.10.5 A waterborne release of the hull for unrestricted use was performed in 2017. This was documented via memo 105/0091 dated 31 May 2017.

7.10.6 The contractor shall remove the internal Radioactive Liquid Waste Tank (RLWT) while waterborne Tank is located seven (7) decks below the weather deck.

7.10.7 The contractor shall remove all non-asbestos/asbestos insulation on piping in radiological and support areas. Insulation may contain asbestos, sample and test as required for proper removal and disposal of insulation.

7.10.8 The contractor shall remove the contaminated laundry equipment. This may require making a hull cut as the equipment may be removed through the hull.

7.10.9 The contractor shall remove a long section of lead shielded piping. Pipe is encased in several inches of lead and travels through several decks and spaces. Rigging and crane services will be required.

7.10.10 The contractor shall open and close tanks/voids as required to remove the RLWT module, which consists of several RLW tanks that will be removed and properly disposed of.

7.10.11 The contractor shall perform radiological release which must be performed in accordance with Reference 5.3. This includes performing surveys, sampling, taking photographs and developing the final release report. (CDRL A005) For Camera permitting see reference (5.33).

7.10.12 The handling of each radiological space (per Attachment 1) is detailed below.

7.10.12.1 For spaces identified as Group 4 per Attachment 1 the following must be performed:

7.10.12.1.1 All furnishing, equipment, piping, conduit, cladding, insulation and interferences must be removed from each space in preparation for release. To the maximum extent possible each space should be cleared until only the walls, floor, and ceiling remain.

7.10.12.1.2 Release is performed per the following surveys:

7.10.12.1.3 The floor shall be gridded in 4’x4’ grids. The walls above 12’ in 6’x6’ grids and 4’x4’ grids below 12’. The ceiling above 12’ in 6’x6’ grids and 4’x4’ grids below 12’.

7.10.12.1.4 On 100% of all grids perform Direct Frisks which must verify surface contamination levels are less than 450 ꝓCi/probe for Beta-Gamma.

7.10.12.1.5 At the center point of each 4’x4’ and 6’x6’ grid perform Gama Scintillation (HV1/PHA Mode).

7.10.12.1.6 At the center point of a random 25% of the 4’x4’ grids perform Gamma Scintillation (HV2/Gross Mode).

7.10.12.1.7 Sampling must be performed in all grids. Minimum of 1 sample per grid . Samples taken from areas of highest potential and differing materials (if present).

7.10.12.1.8 Contractor must take photograph of every grid.

7.10.12.2 Spaces identified as Group 3 the following must be performed.

7.10.12.2.1 All furnishing, equipment, piping, conduit, cladding, insulation and interferences must be removed from each space in preparation for release. To the maximum extent possible each space should be cleared until only the walls, floor, and ceiling remain.

7.10.12.2.2 Release is performed per the following surveys:

7.10.12.2.3 The floor shall be gridded in 6’x6’ grids with one row of 6’x6’ grids measured from the floor on all walls.

7.10.12.2.4 Direct Frisks must verify surface contamination levels are less than 450 ꝓCi/probe for Beta-Gamma.

7.10.12.2.5 At the center point of each 6’x6’ grid perform Gamma Scintillation (HV1/PHA Mode). Gamma Scintillation must have no discernible counts above background levels.

7.10.12.2.6 At the center point of a random 25% of the 6’x6’ grids perform Gamma Scintillation (HV2/Gross Mode). Gamma Scintillation must have no discernible counts above background levels.

7.10.12.2.7 Sampling must be performed in all grids. Minimum of 1 sample per grid . Samples taken from areas of highest potential and differing materials (if present).

7.10.12.2.8 Contractor must take photograph of every grid.

7.10.12.3 Spaces identified as Group 2 the following must be performed.

7.10.12.3.1 All furnishings and equipment that is not part of the ships structure must be removed. All radiological systems must be removed.

7.10.12.3.2 For every 10 foot by 10 foot section of floor space (or partial) choose two square areas that measure 3’x3’, squares should be located in areas with the highest potential for accumulation of NNPP. These two areas must be 100% surveyed for Surface Contamination (Beta-Gamma), and Gamma Scintillation (HV1/PHA Mode).

7.10.12.3.3 Direct Frisks must verify surface contamination levels are less than 450 ꝓCi/probe for Beta-Gamma. Gamma Scintillation must have no discernible counts above background levels.

7.10.12.3.4 Contractor must take photograph of every grid.

7.10.12.3.5 Radiological systems (ventilation and piping) that run through these spaces must first be removed and disposed of before attempting release.

7.11 Ship Stability

7.11.1 In order to execute the removal of material from the ship, a Ship’s Stability Plan shall be developed in order to maintain an adequate margin of stability and reserve buoyancy. Plan should evaluate stability condition at start and conclusion of overall work effort as well as during key intermediate times in-between so as to ensure ship’s stability, list and trim are not adversely impacted. Evaluation of ship’s changing condition during work execution should also consider impact on such items as brows, mooring lines, and temporary services. Care should be taken to compensate for weight removed from the ship by adding compensating weight or ballasting of tank(s) taking into consideration impact on ship’s overall stability, list and trim. All weight changes (removals, additions, modifications) that impact the final physical condition of the ship shall be documented in a weight report that provides the following for each item: description; weight in pounds; location in feet relative to distance above baseline (VCG), distance off centerline (TCG), and distance from midship (LCG).

7.11.2 This tasking shall be supported by an experienced Naval Architect that has been involved in the design and working plan development for construction, conversion or modernization of U.S. Naval Ships (does not include maritime ship design). The Naval Architect should have the following engineering and related skills:

7.11.2.1 An in-depth understanding of ship’s hydrostatic characteristics such as longitudinal center of flotation, moment to trim, longitudinal center of buoyancy, and the effects of these characteristics on drafts, displacement and trim.

7.11.2.2 A thorough understanding of ship’s stability and the relationship between the transverse metacenter, metacentric height, cross curves of stability, moment to heel and list.

7.11.2.3 The ability to read tank capacity curve characteristics including centers of gravity and vertical moment of free surface.

7.11.2.4 Proficient in ship terminology and structural characteristics such as camber, sheer, baseline, and general ship construction.

7.11.2.5 Ability to develop weight and moment reports based on weights & centers of gravity and to analyze data to determine ship drafts, displacement, and stability.

7.12 Personnel Qualifications:

7.12.1 General:

7.12.1.1 All work under the terms of this contract will be performed in an efficient and workmanlike manner by personnel who are thoroughly familiar with the type of work being performed. The Contractor warrants that employees used on the work will, on the average, be as efficient as the average employees performing similar duties in the Contractor’s own organization and will in all cases meet or exceed the minimum requirements set forth for the respective labor categories.

7.12.1.2 The Contractor shall be responsible for employing appropriate professionally and technically qualified personnel to perform the tasks outlined herein. The Contractor must have the qualified personnel, organization and administrative control necessary to ensure that the finished products shall conform to each task order. If the Contracting Officer questions the qualifications or competence of any person(s) performing the contract, the burden of proof to sustain the person(s) is (are) qualified as prescribed herein shall be upon the Contractor.

7.12.1.3 The level of skill, education, and experience of the personnel required to perform this effort shall meet the minimums specified below. Personnel assigned for performance of a task to be ordered under this contract shall meet the minimum qualifications for the respective labor category under which they are charged.

7.12.2 Minimum Qualifications:

7.12.2.1 Personnel assigned to or utilized by the Contractor in the performance of this contract shall, as a minimum, meet the experience, educational, or other background requirements set form in Section 7.12.3 and be fully capable of performing the contemplated functions of the respective labor categories in an efficient, reliable, and professional manner.

7.12.2.2 The Government reserves the right to request the qualifications or competence of any person performing under this contract and the burden of proof to sustain that person is qualified as prescribed herein shall be upon the Contractor.

7.12.2.3 The Contractor shall be responsible for employing trained management, technical, and other personnel to perform work outlined.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .