DRAFT SOW Bent Creek Mowing Statement of Work.pdf
PDF 265 KB Posted
- Attached to
- Bent Creek Grounds Maintenance Federal contract opportunity
- Solicitation number
- REQ1095630
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT SOI 1 Bent Creek Mowing Pricing Exhibit.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SRS Bent Creek, Asheville, NC Lawn Maintenance
Attachment 02
STATEMENT OF WORK
LAWN CARE MAINTENANCE SERVICES
FOR
USDA FOREST SERVICE, BENT CREEK EXPERIMENTAL FOREST, ASHEVILLE, NC
1.0 SCOPE
The service in this contract will consist of all jobs necessary to maintain and meet the technical specifications. This needs to be consistent with what normally is expected around commercial buildings.
The Contractor shall provide all labor, supplies, supervision, tools, materials, equipment, and transportation necessary to provide grounds maintenance.
The Contractor is responsible for and will replace within 24 hours, any damage caused by mowing or trimming or by flying rocks or debris. This includes but not limited to HVAC & blower units, sewer caps/lines, in ground lighting, meter or valve boxes or other structures.
Special caution is needed around the historical buildings and rock walls, scientific instruments and weather station. Damage to plants/hedges/trees caused by Contractor will be replaced within 24 hours. All areas shall be kept clean, neat, free of fire and safety hazards, and unsanitary conditions.
2.0 MANAGEMENT
The Contractor must manage the total work effort associated with the ground’s maintenance services required herein to assure fully adequate and timely completion of these services.
Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, report preparation, and quality control. The Contractor must provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices.
3.0 WORK CONTROL
The Contractor must implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor must plan and schedule work to assure labor, equipment, and material are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Written schedules and status reports must be provided when requested by the Contracting Officer’s Representative (COR).
4.0 PLACE OF PERFORMANCE
Grounds maintenance services are required for the USDA Forest Service, Southern Research Station, Bent Creek Experimental Forest campus site, 1577 Brevard Road, Asheville, NC 28806. The area to be maintained is highlighted in the map provided. The Bent Creek Campus is on the National Register of Historic Places.
5.0 TECHNICAL SPECIFICATIONS
5.1 GROUNDS MAINTENANCE AS NEEDED (APRIL THROUGH NOVEMBER) BUT
NOT MORE THAN EVERY 10note that this DAYS.
5.2 Prior to mowing, the Contractor shall remove all rubbish, debris, and trash. (This includes but not limited to fallen limbs, rocks, paper or other objects.) Historical rock paths cannot be altered or removed.
5.3 The Contractor will mow the grass in a manner to continually maintain a height range of a minimum of 3.5 inches and maximum of 4.5 inches. Clippings on lawn areas shall be removed when there is such a concentration of clippings the life of the plants are in danger (no clumping). Grass cutting shall be accomplished in a manner such that it is free of scalping, rutting, bruising, uneven, and rough cutting. Contractor mower blades are to be sharp to provide a high-quality cut.
5.4 Mowing equipment for all areas shall utilize mulching blades.
5.5 Edging and trimming shall be accomplished concurrently with grass cutting operations.
Edging of sidewalks and other paved surfaces, and around other cultivated areas is to be accomplished to match the height and appearance of surrounding vegetation. Edging is to be accomplished in a manner such that it is free of scalping, rutting, bruising, uneven and rough cutting. Edging shall include removal of vegetation from cracks in sidewalks, driveways, parking areas, and curbs. Trees, plants, and shrubs shall not be damaged by any trimming operations. If damaged the Contractor will replace or repair within 24 hours at no additional cost to the customer.
5.6 Mowing around the weather stations, scientific instruments, raised plant beds in fenced area behind Training Center, and historic buildings MUST NOT have any blown materials thrown towards the basement windows and instrument panels. In addition, do not mow or weed eat flowerbeds.
5.7 Weed eat weeds coming through juniper groundcover to same level with junipers at training center and resistance screening center in front of greenhouses and hill side.
5.8 Herbicides No herbicides or pesticides will be applied without COR approval. The Contractor should manage invasive and noxious weeds via mechanical or hand removal.
The Contractor must also use USDA Certified Biobased Weed Control Products listed in Attachment 2. Herbicide controls must be formulated to target specific plants and must be implemented only when pests have reached aesthetic or health thresholds verified by the CO. The Contractor must not perform regularly scheduled, periodic herbicide
Commented [FKFN1]: Note this this cold mean services performed only one per month or 3 times per month.
Commented [FKFN2]: I've had issues in the past with interpretation of edging/trimming. For example, is this by string trimmer or mechanical edging tool.
Commented [FKFN3R2]: True Edging: "3.4.3 Edging All sidewalks, driveways, street edges, curbs, other paved areas, and shrubbery areas located must be edged each time mowing occurs. Edging must create a l/2 inch wide and l inch deep clear zone immediately adjacent to the paved surface. All edging must be by mechanical means.
The edging operation must include removal of grass and other vegetation which has encroached onto street and other paved surfaces from adjoining grassed areas. Where driveway or street pavement edge is not discernable due to grass encroachment, a straight and even line approximating the edge of pavement must be established and maintained.
The edging operation must produce neat, clean lines along the sides of sidewalks and other areas edged, and must be accomplished free of scalping, rutting, bruising, uneven and rough cutting. All vegetation growing in the following areas must be removed during the edging operation:
1. Sidewalk and driveway expansion joints and cracks.
2. Street/driveway curbing expansion joints.
3. Cracks between curbing and street/driveway pavement.
For continued maintenance of vegetation growing in cracks and expansion joints, herbicide treatment may be utilized to reduce the amount of mechanical work. The use of herbicides must not be allowed for the purpose of eliminating or reducing normal mechanical edging along straight paved edges (sidewalks, etc.). Debris generated by edging operations, which falls on or is thrown on sidewalks, on curbs, in gutters, streets, or is thrown on nearby sod, causing an unsightly appearance, must be removed from the site the day of the edging operation and disposed offsite.
applications except in situations where no other approach or technology is available to protect personnel or property of high value. If herbicides are to be used, the application must occur during unoccupied hours and the Contractor must be licensed by the applicable State agency to provide pesticide application in the categories specified in this contract. All work must be under the superintendence of a certified, responsible individual, and in accordance with Federal, State, local laws and requirements. The Contractor must submit Material Safety Data Sheets meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313 for all hazardous chemicals to be used.
5.9 Control Methods. The Contractor must utilize only herbicides registered by the Environmental Protection Agency. Use must be in strict compliance with label directions for the control of the target weeds. Herbicides selected, application rates, and application techniques must have the prior approval of the COR. Additionally, the Contractor must control pests using integrated pest management principles (http://www.epa.gov/pesticides/factsheets/ipm.htm).Contractor is responsible for any damaged to HVAC units, coils or blower units caused by trimming or blowers and shall be replace or repair within 24 hours at no additional cost to the customer.
5.10 Contractor shall blow all clippings from sidewalks, parking areas, curbs, and all entrances to buildings following any mowing, trimming, and edging. Contractor shall never blow clippings into the raised plant beds in fenced area behind the Training Center, towards historical buildings, scientific instruments, and weather station. Blow all debris and insects off porch area at training center
6.0 SAFETY
The Contractor will be responsible for conducting appropriate safety measures. No one under the age of 18 allowed on the worksite due to safety reasons.
7.0 CONTRACTOR FURNISHED ITEMS
All equipment and supplies necessary to perform the statement of work.
8.0 PERIOD OF PERFORMANCE
The base period for this contract is from May 15, 2023 to March 31, 2024. Four potential option year periods are also included in this requirement.
Option 1 Lawn Care Maintenance at Bent Creek Experimental Forest campus site Period of Performance: April 1, 2024 to March 31, 2025
Option 2 Lawn Care Maintenance at Bent Creek Experimental Forest campus site Period of Performance: April 1, 2025 to March 31, 2026
Option 3 Lawn Care Maintenance at Bent Creek Experimental Forest campus site Period of Performance: April 1, 2026 to March 31, 2027
Option 4 Lawn Care Maintenance at Bent Creek Experimental Forest campus site Period of Performance: April 1, 2027 to March 31, 2028
9.0 INSPECTION AND ACCEPTANCE
9.1 Additional Inspection Requirements. The Government will make periodic random inspections to determine that Contractor complies with the specifications of this contract.
The Contractor is encouraged to observe these inspections.
9.2 Acceptance of the work will be made only after the Government has determined the work complies with the contract.
10.0 DELIVERIES AND PERFORMANCE
Hours of Performance. Grounds maintenance services shall be performed Monday through Friday with the exception of U.S. Government holidays. Hours of services to be performed shall be coordinated with the COR.
11.0 INVOICING AND PAYMENTS:
All payments are processed using the Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website:
https://www.ipp.gov/index.htm . Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
The IPP Customer Support Desk is available to assist users Monday through Friday (excluding Federal holidays) from 8:00 AM to 6:00 PM ET, to answer questions related to accessing IPP or completing the registration process. Their toll free number is 1-866-973-3131 or they can be reached at IPPCustomerSupport@fms.treas.gov . If you have additional questions or concerns, please contact the Controller Operations Division Help Desk at 1-877-243-3072 or cod.help@usda.gov
12.0 BIOBASED PRODUCT:
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management," and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use' or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards.
All supplies and materials to be used in the performance of work described herein are subject to the approval of the CO.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm mailto:IPPCustomerSupport@fms.treas.gov mailto:cod.help@usda.gov
The following are examples of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Herbicides Mulch and Compost Gardening Supplies and Accessories
Biobased products that are designated for preferred procurement under USDA's Bio-Preferred program must meet the required minimum biobased content as stated at www.biopreferred.gov The Contractor shall provide data for their biobased products such as biobased content. ·
In addition to the biobased products designated by the U.S. Department of Agriculture in the Bio- Preferred Program, the Contractor is encouraged to use other biobased products.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
7.0 Deliverables
Deliverable Objective Due Deliver -To Biobased Report (copy)
Report purchases of Biobased products in the System for Award Management (SAM)
By Oct 30 for prior fiscal year (Oct. 1 - Sep. 30) ending the performance period of the contract base period and for each option year, if exercised
Contracting Officer http://www.biopreferred.gov/
TASK FREQUENCY SCHEDULE
TASK/SERVICE FREQUENCY
Mow/cut grass maintain a height range of a minimum of
3.5 inches and maximum of 4.5 inches
Edging and Trimming Same day as mowing as needed to maintain a manicured look
Weed eat weeds in junipers groundcover down level with junipers at training center and greenhouse area.
Same day as mowing as needed to maintain a manicured look
Blowing of grass clippings. Contractor shall blow all clippings from sidewalks, parking areas, curbs, and away from all entrances of buildings and under porch at the training center
Same day as mowing, following any mowing, trimming, edging
Removal of all rubbish, debris and trash
Same day as mowing
Weed free sidewalks, driveways, parking areas. Control weed growth in cracks in parking areas and sidewalks. As needed to maintain a manicured look
| The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management," and the Federal Acquisition Regulatio... |
| The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use' or detracting from the o... |
| The following are examples of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting t... |
| Biobased products that are designated for preferred procurement under USDA's Bio-Preferred program must meet the required minimum biobased content as stated at www.biopreferred.gov The Contractor shall provide data for their biobased products such as... |
| In addition to the biobased products designated by the U.S. Department of Agriculture in the Bio-Preferred Program, the Contractor is encouraged to use other biobased products. |
| The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification. |
| The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts. |
| A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category. |
| 7.0 Deliverables |
File details come from the government source that posted it. Updated .