DRAFT SOO Attachment 1 - Technical Requirements for Arc Heated Test Facility Exhaust System.pdf
PDF 77 KB Posted
- Attached to
- Arc Heated Test Facility Exhaust System
- Solicitation number
- FA910124RB015
About this file
The document is a DRAFT Statement of Objectives (SOO) Attachment 1, which outlines the technical requirements for an Arc Heated Test Facility Exhaust System. This is a pre-solicitation notice from the Department of the Air Force Materiel Command Test Center, seeking information on the availability and technical capability of small and large businesses to meet this requirement. The draft SOO Attachment 1 is marked as distribution limited to the Department of Defense and its contractors, and can only be accessed by companies certified in the Joint Certification Program (JCP). Interested contractors must provide their approved DD Form 2345 to the Contracting Officer to obtain the draft document. The government is looking to award a contract for the Arc Heated Test Facility Exhaust System, and this Sources Sought notice is the first step in the acquisition process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice.pdf | ||
| DRAFT Statement of Objectives.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The draft “SOO Attachment 1 – Technical Requirements for Arc Heated Test Facility Exhaust System” is marked Distro Statement D; distribution is only authorized to Department of Defense and U.S. DoD contractors only. Therefore, to obtain this attachment, your company must be a certified contractor in the Joint Certification Program (JCP). For more information about this program, please visit the following Defense Logistics Agency website:
https://www.dla.mil/Logistics-Operations/Services/JCP/#general-instructions
If your company is currently a JCP certified contractor: to request the draft “SOO Attachment 1 - Technical Requirements for Arc Heated Test Facility Exhaust System” provide the Contracting Officer with your company’s approved DD Form 2345 via email at haley.smith.10@us.af.mil.
Upon confirmation of your company’s JCP certification status, the Contracting Officer will release the document to your company’s authorized Data Custodian for further dissemination.
File details come from the government source that posted it. Updated .