This sources sought notice is seeking information from potential vendors interested in providing snow shoveling services at the Tobyhanna Army Depot. The notice describes the required work to include shoveling snow and ice from sidewalks, steps, walkways and other areas totaling approximately 12,000 linear feet of sidewalks, 20,000 square feet of concrete and asphalt surfaces, and 120 doorways and steps. Responses are requested by September 30th, 2022 and should include company capabilities and any socio-economic certifications such as small or veteran owned business status. The applicable NAICS code is 561790 for other services to buildings and dwellings. If procured, the requirement may be set aside fully or partially for small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Historical data from the past 2 years.docx | DOCX document | |
| Projected Snow Shovel Map .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOBYHANNA ARMY DEPOT TOBYHANNA, PA
STATEMENT OF WORK
Snow Shoveling Depot Wide 06/09/2020
PART - GENERAL
1.1 PROJECT DESCRIPTION:
Furnish all supervision, labor, equipment, and materials in performing all operations in connection with the removal of snow, ice, etc., from various sites in the secure, unsecure and roof areas as designated by the Contracting Officer’s Representative (COR) this includes steps walkways, sidewalks and other concrete and asphalt surfaces. This contract will be limited to areas listed in the map unless specified by the COR. This includes approx. 12,000 LF of sidewalk, approx. 20,000 SF concrete/asphalt surface and approx. 120 doorways/steps areas are shown in Map and Schedule below. Work shall be performed on an on-call basis as required and will be performed in accordance with specifications and information provided. See below Schedule of Areas, and Attachment 2, Map.
| 1.2 | GENERAL SPECIFICATIONS: |
| a. | Workmanship shall be in accordance with the best standard practice for this type of work. The work shall be conducted under the general direction of the Chief Facilities Engineer and is subject to inspection by the COR to ensure strict compliance with the terms of the contract. |
| b. | Contractor shall commence work within one (1) day after date of receipt of award and shall complete all work within 360 calendar days. |
| c. | The Contractor shall respond within two (2) hours after receipt of notification by authorized personnel. The Contractor shall be on a 24-hour on-call basis, 7 Days a week including holidays and shall be notified by Security Personnel during off-duty hours. Rotating shifts may be required to provide 24-hour service during an event. |
| d. | The Government shall have the option of modifying the contract at the same hourly rate for other areas. Weekend and after hour work may be required. The contract will be issued for a base year plus two (2) option years, if exercised. |
| e. | Areas in Schedule and Attachment 2, Map, are to be cleared of snow and ice. The contractor shall clear by 6:00 AM all scheduled areas identified on the Scheduled Area Table below. These areas shall remain clear of snow and ice through the duration of the workday (typical work day is 6:00 AM to 5:30 PM Monday through Friday). The COR will notify the contractor of any “hot spots” on the Installation that requires immediate snow or ice removal. The contractor shall mobilize to the location of the “hot spot” within 30 minutes of notification from the COR. Weekend and after hour work may be required to cover other shifts. |
| f. | Contractor must report to the COR upon arrival and upon completion or work (VIA Phone or Email). Written daily log of time, hours/materials charged for all line items, call and response time, areas and locations of removal will be provided to the COR within 2 days of work completion. |
| g. | Payment shall be on an hourly basis and the Government shall be billed on a monthly basis. Please submit an hourly bid for foreman, laborer, materials, snow blowers and other equipment as per the solicitation Offeror’s Proposed Pricing Worksheet (Atch 3). |
| h. | (1) Ice Slicer |
Ice Slicer® - EnviroTech Services or Equal product shall be used by the contractor to melt ice in most icy areas (see h.(2) below for exception). The Contractor shall submit a Material Safety Data Sheet (MSDS) on any products with submission of proposal. These will then be forwarded to the subsequent Environmental Office for approval. Any change in MSDS product requirements after contract award will require review & approval by the COR before use of product is permitted.
Salient Characteristics: To be considered an equivalent product to the Ice Slicer material, the proposed ice melt shall be environmentally friendly and a granular deicing product. Ice Slicer® granular ice melt is homogenous (not blended) product containing naturally occurring minerals, such as: Complex Chlorides (magnesium, calcium, sodium, and potassium chloride), Sulfur, Iron, Iodine, Zinc, Copper, Manganese, Phosphorous, and 50+ trace minerals.
(2) The COR will identify areas to be serviced where newly poured concrete exists on the depot. For these areas and dependent on the surface accumulation the Contractor shall apply either: Polar Express Ice Melt Safety Max Formula ®www.Milazzoindustries.com or Equal Salient Characteristics: Contains Sodium Chloride (CAS #0007647-14-5). Calcium Chloride (CAS #007447-40-7)
OR
QUICKERITE ® https://www.quikrete.com/ or Equal; Salient Characteristics: All-Purpose Sand is a washed, properly graded, course sand with multiple uses , Meets ASTM C-33 specifications or Equal.
(3) The equipment used to spread the Ice Melt in the most even spread shall be a Broadcast Spreader.
PERFORMANCE STANDARDS - see Quality Assurance Surveillance Plan (QASP) (Atch 4)
i. REPORTING REQUIREMENTS: The office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor manpower (including subcontractor manpower) required for performance of this contract.
The contractor is required to completely fill in all the information in the format required using the following web address: https://cmra.army.mil/Login.aspx/ .
j. Contractor is required to provide a detailed map of routes for each team to COR after award. Any Route changes must have COR approval, other than hot spot calls. This includes a separate mapped route to cover overnight shift.
k. The number of labors will be determined by the amount and severity of conditions. 12 labors and one foreman are a an adequate number for work needed to be done.
L. Contractor may use standard industry snow equipment made for the use of clearing sidewalks seps and walkways.
M. Contractor shall clear approx. 12,000 LF of sidewalk, approx. 20,000 SF of concrete/asphalt surface described in map. And approx. 120 doorways/steps. Other doorways ramps, sidewalks may be included on an as needed basis.
N. contractors are to adjust work force if needed to address the most populated areas to ensure they have a clear passage in and out of facilities during before and during shift changes.
1.1 The Contractor shall be responsible for all damage caused by his work force and equipment. In cases of damage, occurring contractor shall contact security and COR. Any damages that to property or equipment shall be repaired at the contractor’s expense.
1.2 FACILITY SECURITY CLEARANCE:
a. Contractors and contractor personnel shall be required to wear identification badges while working in the restricted area of the depot. The Contractor shall complete a form 648c for all employees being utilized on this contract including all sub-contractors being utilized to complete project. The badges will be issued from the Security Dept. and must be returned to the Security Division upon completion of the Contract.
b. All vehicles operated on the depot must have a valid (state) registration and current proof of insurance. Vehicles used inside the restricted area must be registered with Security and will be issued a special placard which must be displayed while the vehicle is operating in the restricted area of the depot.
c. Vehicles entering and leaving the restricted area of the depot are subject to inspection by Security Personnel. Any movement or removal of Government property must be accompanied by Form DA 1818.
d. Weapons, cameras, electronic equipment and alcoholic beverages are not permitted on the depot. If cameras or electronic equipment is required for official use, they must be registered with the Security Division prior to entry into the restricted area.
1.3 CONTRACTORS USE OF PREMISES
a. General: During the period of performance, the contractor’s use of the premises is confined to those areas where work is to be performed.
b. Keep driveways and entrances serving the premises clear and available to the depot and depot's employees at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
c. Use of the existing building: Maintain the existing building in the condition it is in before and throughout the service. Repair any damage caused by snow removal operations.
d. Contractor will be supplied a lay down area designated by the COR for equipment and material. The area will be outdoors the contractor is responsible for housekeeping of area. Storage of material and equipment is solely up to the contractor. Any storage box or structure must be approved by COR prior to placement
1.4 OWNER OCCUPANCY: Full depot occupancy: The depot will occupy the area during the performance period. The contractor shall cooperate with the depot during operations to minimize conflicts and facilitate depot usage. Perform the work so as not to interfere with Tobyhanna Army Depot’s operations.
1.5 SAFETY:
The Contractor shall be responsible for furnishing and placing the necessary guards and signage for prevention of accidents. The Contractor shall provide and maintain any necessary equipment required to secure safety to life and property, such as life line harnesses, gloves, belts, and etc.
Contractors must comply with all Department of Labor and OSHA Rules and Regulations, 29 CFR-1910 (General Industries) or 1926 (Construction), whichever is applicable, and all applicable sections of the National Fire Protection Association (NFPA). Contractor must call 1-800-242-1776 Pennsylvania One Call System Inc. before installation of posts.
FALL PROTECTION - Particular attention is directed to the OSHA Fall Protection Requirements. Personnel performing any type of work on elevated surfaces, over 6 feet, must adhere strictly to Occupational and Health Standards, specifically 29 Code of Federal Regulations, Part 1926, Sections 500, 501 and 502. Currently there are no certified anchorage points, nor permanent guardrail systems in place on any of TYAD's roofs. Attention is drawn to the requirement for Warning Line Systems, described in CFR Part 1926.502-f, and a competent person to monitor the safety of other employees per CFR Part 1926.502-h, Safety Monitoring Systems. OSHA has informed TYAD the fall protection requirements will be fully enforced at TYAD with no exceptions.
STANDARDS FOR ELECTRICAL SAFETY - Particular attention is directed to NFPA 70E, Standard for Electrical Safety Requirements for Employee Workplaces. The Contractor shall fully comply with all sections of this standard, including but not limited to; PART I, Chapter 2-2.4.3 - Ground Fault Protection for Personnel on Construction Sites, PART I, Chapter 3-7.1 - Use of Flexible Cords and Cables, PART II, Chapter 2-3 - Working On or Near Electrical Conductors or Circuit Parts, PART II, Chapter 5 - Lockout/Tag-out Practices and Devices.
VOLUNTARY PROTECTION PROGRAM - In addition to compliance with standard OSHA Safety Requirements, Tobyhanna Army Depot participates in the OSHA Voluntary Protection Program (VPP). Contractor shall also comply with all aspects of this program.
JOB HAZARD ANALYSIS - Contractor shall, prior to start of work, prepare a Job Hazard Analysis (JHA) for each phase of work involved in the contract. Job Hazard Analysis requirements are defined in the OHSA VPP program. The JHA will list the sequence of job steps; the potential hazard associated with those steps; and the procedures, safeguards, and/or training necessary to eliminate the hazards or reduce the risk to an acceptable level. Tobyhanna Army Depot Form AMSEL-TY Form 180-R-E, 1 Sep 98, or an equivalent format may be used. JHA’s shall be available for review by the COR upon request.
SCHEDULED AREAS
1st Street
Meyer Street
B14 North sidewalk/entrances
All sidewalks and ramps
Gas Pumps
B20 Main entrance from Parking Lot
B15 all entrances
B11 all sidewalks/entrances
B16 all entrances/walkways
B2 Main Entrance/ramp/walkways
B17 all entrances/walkways
B1-B1 entrances
B18 all entrances
B1A all entrances/ramps
B41 all stairs
B1C all entrances/ramps
B45 all walkways
B4 entrance/ramp
Truck Scales
B5 all entrances/ramps
B56 & 57 all doors/walkways
2 K-Lot Turnstiles
Transformers
B72 entrance
B69 entrance
2nd Street
B3 all stairs/entrances/ramps
Squire Street
B2 all stairs/entrances/ramps
All sidewalks/ramps
B8 all stairs/entrances/ramps
All shelters and walkways to them
B7 all stairs/entrances/ramps
B18 entrances
B17 entrances
3rd Street
B2-B5 all entrances/ramps
B2 all stairs/entrances/ramps
B10 all entrances/sidewalks
1B all stairs/entrances/ramps
B30 all entrances/walkways
B10 all stairs/entrances/ramps
B1C-B6 all entrances/ramps
B90 all entrances
B9 all entrances/ramps
B91 all entrances
B4A all entrances/ramps
B92 all entrances
B4-B6 all entrances/ramps
B96 all entrances
B6 entrances/ramps
B95 all entrances
B5-B6 entrances/ramps
B85 all entrances
B3005
B79 all entrances
B12 all entrances/ramps
5th Street
Gibbs Street
B4 all stairs/entrances/ramps
B59 all entrances
B5 all stairs/entrances/ramps
B66 all entrances
B6 all stairs/entrances/ramps
B86 all entrances
B12 side entrance
B87 all entrances
B58 all stairs/entrances
B88 all entrances
Sprung Structure all entrances
6th Street
B98 all entrances
B5 all stairs/entrances/ramps
B97 all entrances
B72 all entrances
B57 all entrances
B73 all entrances
B23 all entrances
B13 all entrances/ramps
The "U" Area 1A
McDonough Loop
1B West Side -
B230 Barracks entrances/walkways all entrances/steps/ramps
B310 entrances/walkways
1A Back Ramp entrance
B1006 entrances/walkways
B1E - IOF all entrances/ramp/docks
B1008 entrances/walkways
B1C East Side entrances/ramps/steps
B1015 entrances/walkways
Various Locations
The Villas
All Security Gates Buildings
B1101 all entrances/walkways
B34 Mac Field House , B218, B33
B1102 all entrances/walkways all entrances
B1103 all entrances/walkways
B31 entrance
B1104 all entrances/walkways
B52 entrance
B1020 all entrances/walkways
B54 entrance
B1013 all entrances/walkways
B24, B242 Treatment Plant
B1014 all entrances/walkways
| Family Housing all sidewalks/driveways |
| Walking Trail |
RADM Maher Street
Oil Tanks
Bell Court
Transformers
Edison Court
Marconi Court
Morse Court
Col's Court
CPL Damato Street
B336 all entrances/sidewalks
B337 all entrances/sidewalks
B335 CDC all entrances/sidewalks
Gen Lemnitzer Street
B816 Commissary all entrances
B403 Offices entrance/walkway
B334 PX all entrances/walkways
B333 The Landing all entrances/walkways
Westover Drive
B103 all entrances/walkways
Hap Arnold BLVD
B220 all entrances/walkways
B221 all entrances/walkways