This is a Performance Work Statement (PWS) for Airport Rescue Firefighting Live Fire Training services at Buckley Space Force Base, Colorado, effective December 8, 2025. The contractor shall provide a Mobile Aircraft Fire Trainer (MAFT) with a minimum of one instructor and one operator to conduct semi-annual training for 42 Buckley SFB firefighters. Training shall consist of five consecutive days (8 hours per day), twice yearly between April/May and September/October, conducted during normal duty hours (7:00 a.m. to 4:00 p.m. Mountain Time, Monday through Friday). The contractor must deliver and set up the MAFT on Buckley's training pad no later than one day prior to training and provide five two-hour classroom instructional sessions and five practical hands-on training evolutions each training cycle. The training must include six LPG remote-controlled fire scenarios: cockpit fire, engine intake fire, wing fuel tank fire, nose landing gear fire, afterburner fire, and main wheel/brake fire. The MAFT must comply with NFPA 405 standards, Federal Aviation Administration requirements, and Department of Defense regulations, and must simulate realistic aircraft firefighting conditions for both small fixed-wing aircraft (F-16) and large commercial aircraft (747/C-17/C-5).

The Government will provide facilities (training room and training pad), electrical power, water, and propane at no cost to the contractor. The contractor must submit all materials, supplies, and equipment for Government approval on specified forms and provide Material Safety Data Sheets. Performance is evaluated through 100 percent Government surveillance against two primary objectives: classroom instruction delivery (rated on complaint basis from Excellent/0 complaints to Unsatisfactory/more than 3 complaints) and provision of the six required fire scenarios (same rating scale). The contractor shall develop and maintain a quality control program, respond to Contract Discrepancy Reports within ten calendar days, and participate in periodic progress meetings. Contractor personnel must maintain neat appearance, be easily identifiable on the installation, fluently speak/read/write English, and comply with Buckley SFB security requirements including DBIDS card access, vehicle inspections through the Large Vehicle Inspection Point, and base access through Mississippi Gate. All contractor labor hours must be reported via SAM.gov by October 31 annually. This is a base contract with four option years.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

for Airport Rescue Fire Fighting Live Fire Training (Base contract with 4 option years)

BUCKLEY SFB, COLORADO

08 DEC 2025

TABLE OF CONTENTS

PARA

1.

2.

3.

4.

DESCRIPTIONPAGE
Description of Service3
Service Summary4
Government Furnished Property and Services5
General Information6

PERFORMANCE WORK STATEMENT FOR

AIRPORT RESCUE FIREFIGHTING LIVE FIRE TRAINING

1. DESCRIPTION OF SERVICES

The contractor shall provide a Mobile Aircraft Fire Trainer (MAFT) with a minimum of one instructor and one MAFT operator to train 42 Buckley SFB firefighters semi-annually in aircraft live fire scenarios. The contractor will provide a minimum of six (6) LPG remote-controlled fires, a cockpit fire, engine intake fire, wing fuel tank fire, nose landing gear fire, afterburner fire, and a main wheel/brake fire. Included shall be delivery, prop setup and live fire instructions with the extinguishing infrastructure. The contractor will ensure all requirements of NFPA 405, Standard for the Recurring Proficiency of Airport Firefighters, are met and enable all firefighters to comply with all applicable federal guidelines.

The aircraft mobile live fire trainer must be constructed and maintained in accordance with the requirements of NFPA, Federal Aviation Administration, and the Department of Defense. The contractor will provide a mobile aircraft live fire simulator designed to be fully operational and transportable. The Mobile Aircraft Fire Trainer (MAFT) shall be delivered, set up and connected onto Buckley’s training pad. The contractor will ensure delivery no later than one (1) day prior to ensuring proper operation before training begins.

The contractor shall include at least an aircraft fire with an aircraft mock-up (MAFT), using enough fuel to provide a fire simulating realistic aircraft firefighting conditions. The conditions should simulate the type of fire that could be encountered on an aircraft at Buckley Space Force Base Airfield, ranging from small, fixed wing fighter jets (F-16) to large commercial aircraft (747/C-17/C-5). The trainer should provide an opportunity for the firefighting team to be familiarized with the use of all fire extinguishing equipment, enhancing their abilities with the equipment they will be utilizing in an actual accident/incident, and developing tactics, strategies, and procedures.

Buckley Fire Emergency Services (BFES) firefighters are required to participate in two (2) aircraft life fire training exercises per year. The Code of Federal Regulations (14 CFR 139.319 Aircraft Rescue and Firefighting: Operation requirements), states all rescue and firefighting personnel must participate in at least one (1) live-fire drill prior to initial performance of rescue and firefighting duties and every twelve consecutive calendar months thereafter. The Air Force Fire Emergency Services Training Program (CAO 2018 ATP) exceeds these requirements and mandates all firefighters to participate in two (2) live aircraft fire training exercises per year. The MAFT quote shall include semi-annual, 5-day classroom instruction and practical hands-on training evolutions

1.1. BASIC SERVICES.

1.1.1. TRAINING SCHEDULE. Training shall be provided to Buckley SFB Fire Dept. (Bldg. 806) and fire training area. Training shall be scheduled through the Assistant Chief (A/C) of Training. The contractor shall provide five (5) two-hour classroom instructional sessions and five (5) practical/hands on training evolutions semiannually to accommodate firefighting shifts.

1.1.2. SCHEDULING WORK. The contractor shall notify Buckley’s FES A/C of Training (847-9997) at least five (5) workdays prior to the 1st day of scheduled semiannual training to ensure coordination of MAFT delivery and setup. If scheduled training sessions are missed for any reason, the contractor shall notify the A/C of Training to re-schedule the missed training.

1.1.3. TRAINING FREQUENCIES. Training frequency will consist of 5 consecutive days, 8 hours per day twice a year between April/May and again between September/October.

1.1.4. SPECIFIC TASKS. The training will consist of course work, classroom instruction in Buckley's Fire Departments training room, practical/hands-on evolutions, instruction for two (2) individual training events each day and will be five (5) consecutive days (Monday through Friday).

1.1.5. CONTROLLED MATERIALS, SUPPLIES, AND EQUIPMENT. The Government reserves the right to prohibit the use of any materials, supplies, or equipment, and the contractor shall not use any materials, supplies, or equipment without prior Government approval. The contractor shall submit to the Government a list of all supplies, materials, and equipment for approval on AF-EMIS Form 3000 (for Equipment, Materials, and Supplies), AF-EMIS Form 3952 (for Cleaning Products) and attach the Material Safety Data Sheets (MSDS) for each item.

1.1.8. COMPLIANCE WITH LAWS AND REGULATIONS. The contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations, and requirements governing the work required under this contract. In the event applicable laws, regulations, or requirements change during the term of this contract, the contractor shall be required to comply with such changes when they come into effect. Upon agreement between the parties, this Performance Work Statement (PWS) will be revised to incorporate changes in laws, regulations.

2. SERVICE SUMMARY

The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of Government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.

SERVICE SUMMARY (SS) AND METHOD OF ASSESSMENT

Performance Objective

PWS Section
Performance Threshold

Method of Surveillance

PO-1 – Provide classroom instruction 5 consecutive days to all Buckley Firefighters
1.

1.1.1

Excellent: 0 complaints
Customer Complaint; 100% Inspection semi annual

Very Good: 1 compliant

Satisfactory: 2 complaints

Marginal: 3 complaints

Unsatisfactory: More than 3 complaints

PO-2 – Provide Six (6) LPG fires to all Buckley Firefighters to include:

a. Cockpit fire

b. Engine intake fire

c. Wing fuel fire

d. Nose landing gear fire

e. Afterburner fire

f. Main wheel/brake fire

1.1.3
Excellent: 0 complaints
Customer Complaint; 100% Inspection semi annual

Very Good: 1 complaint

Satisfactory : 2 complaints

Marginal: 3 complaints

Unsatisfactory: More than 3 complaints

Very Good: 1 complaint

Satisfactory: 2 complaints

Marginal: 3 complaints

Unsatisfactory: More than 3 complaints

2.1. QUALITY CONTROL

2.1.1. The contractor shall develop and maintain a quality program to ensure all training is performed in accordance with commonly accepted teaching practices for Aircraft Live Fire Training requirements.

2.2 QUALITY ASSURANCE

2.2.1. The Government shall evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS. The contractor shall provide work schedules to the A/C of Training in accordance with paragraph 1.1.2. of this PWS. The A/C may evaluate by validating actual training performance, investigating student complaints, or otherwise evaluating the task or its results to determine whether or not performance meets the standards contained in this PWS. When a performance threshold has not been met or contractor performance has not been accomplished, the A/C will initiate and provide the contracting officer (CO) a Contract Discrepancy Report (CDR) for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the CO within ten (10) calendar days of receipt.

2.3. PERFORMANCE ASSESSMENT

2.3.1. METHOD OF GOVERNMENT SURVEILLANCE. The Government will conduct surveillance of the contractor's performance through 100 percent surveillance. The Government shall be given ample notice and access by the contractor via coordination with the A/C and/or CO during operations associated with the requirements in this contract to satisfy compliance with those requirements.

2.4. PERIODIC PROGRESS MEETINGS

2.4.1. MEETINGS. If necessary, the CO, A/C, and other Government personnel as appropriate, and the contractor shall periodically meet to discuss the contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the contractor to prevent unsatisfactory occurrences in the future. The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. The Government shall provide, without cost:

3.1.1. FACILITIES. Buckley FES shall provide an adequate training room and equipment to deliver instructional material. Buckley FES shall provide an adequate training pad to set up MAFT and deliver hands on training.

3.1.2. UTILITIES. The Government shall furnish electrical power, water, and propane from existing sources at no cost to the contractor during performance of this contract.

3.1.3. CONTRACTOR FURNISHED ITEMS AND SERVICES. Except for those items or services specifically stated to be Government furnished, the contractor shall furnish everything required to accomplish work in accordance with this PWS.

3.2. EMERGENCY MEDICAL SERVICES. For Emergency services at BSFB, dial 911 from a landline phone.

*NOTE – In case of an emergency on BSFB, DIAL 720-847-9117, if using a cellular phone!

3.3. SECURITY FORCES AND FIRE PROTECTION. The Government will provide security forces and fire protection to the extent necessary to ensure a secure and safe installation. In case of an emergency, the Security Forces telephone number at BSFB is 720-847-9930 and the Fire Department telephone number is 720-847-9924.

*NOTE – In case of an emergency on BSFB, DIAL 720-847-9117, if using a cellular phone!

4. GENERAL INFORMATION

4.1. RESERVED

4.2. HOURS OF OPERATION

4.2.1. DAILY SCHEDULE. Perform all training sessions during normal duty hours (7:00 a.m. to 4:00 p.m. Mountain Time, Monday through Friday). This excludes federal holidays, unless otherwise required in the contract or approved by the CO. When the contractor’s work schedule conflicts with an Air Force mission requirement, advise the A/C and reschedule the work to minimize disruption.

4.3. HOLIDAYS & CLOSURES

4.3.1. Recognized Federal Holidays. There may be federal holidays when the contractor is not required to perform service, except in emergencies or to support specific mission needs. The holidays are:

Memorial Day - last Monday in May Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October

If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the contractor will be responsible for rescheduling services for the first day after the holiday observance.

4.3.2. OTHER BASE CLOSURES. Work scheduled but not accomplished because of base closure due to exercises or real-world events will be accomplished as soon as possible after base reopening. Contractor personnel are required to participate in contingency or "real world" exercises (e.g., fire drills, random anti-terrorism measures (RAMs), or active shooter exercises), if they are working in an area where such an exercise is implemented. Contractor personnel shall follow instructions given to them by the A/C of Training or CO pertaining to the exercise. Costs should not be incurred due to delays at entry control points or due to real world or exercise events.

4.4. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY

4.4.1. The services under this contract are not essential for performance during crisis or FPCON DELTA. The CO will determine circumstances, which constitute a crisis based on direction from Security Forces and base leadership.

4.5. CONTRACTOR WORK SCHEDULE

4.5.1. SCHEDULE SUBMISSION AND APPROVAL. The contractor shall submit a schedule for all services described in this PWS and Appendices to the A/C of Training for approval following award of the subject requirement. The schedule shall include hours of operation, times, and days the training will occur. The contractor shall not deviate from the approved schedule without prior approval from the A/C of Training or CO. The schedule must be submitted electronically using a file format compatible with Government software.

4.5.2. SCHEDULE CHANGES. Occurrence-based (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the A/C and do not require CO approval.

4.6. CONTRACT PERSONNEL

4.6.1. PERSONNEL. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, hats, or badges that identifies personnel easily and quickly for reasons of safety and personal protection.

4.6.2. EMPLOYEE RESTRICTIONS. The Government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. The Government retains the right to request the removal of any employee performing work under this contract. At the request of the CO, the employee shall be removed within 24 hours.

4.7. CONTRACTOR MANPOWER REPORTING

4.7.1. The Contractor shall report all contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for “U.S. Air Force” via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address https://beta.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the beta.SAM.gov help desk.

4.8 OPSEC

4.8.1. The contractor (including subcontractors) executing Aircraft Live Fire Training will not have access to any form of critical information or activities in performance of the contract.

4.9. SECURITY REQUIREMENTS

4.9.1. Contractor employees shall comply with BSFB security requirements imposed by the Space Based Delta 2 Commander at all times while on BSFB premises. The contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at BSFB. The contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment for the contractor. The contractor shall comply with all BSFB policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized entry to the installation for the purpose of work under this contract only and are not authorized in other facilities or areas without prior Government authorization. Due to safety/security requirements, contractor personnel shall be required to fluently speak, comprehend, read, and write English.

4.9.1. BASE ACCESS. The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the Defense Biometric Identification System (DBIDS) for base access. To gain unescorted access to BSFB, the contractor will obtain a DBIDS card. The DBIDS paperwork must be submitted to the CO for Security Forces approval before the card can be issued to the contractor. The Government will assist the contractor to coordinate security matters with the 460th Security Forces Squadron (SFS) and other base agencies, as needed.

4.9.2. MAIN BASE ACCESS. Current security access restrictions at Mississippi Gate require all contractor vehicles to enter through the Mississippi Gate. MAFT must process through the Large Vehicle Inspection Point (LVIP) located on 6th Ave. Contractor vehicles may be subject to search prior to gaining base entry. The contractor should plan and allow for delays as a result of increased and ever- changing security procedures.

4.9.3. SECURITY MANAGER. Upon contract award, the contractor shall designate, in writing to the CO, a Security Manager who shall be the contractor’s point of contact for all security matters. Within five (5) working days of contract award, the contractor’s Security Manager shall contact the Civil Engineer Squadron (CES) Security Manager for assistance on accomplishing contractor personnel security requirements.

4.9.3.1. RESERVED

4.9.3.2. SECURITY AUTHORITY. The contractor shall brief all employees that they shall immediately leave any area upon notification by the CO, A/C of Training, constituted authority, Security Forces, or when directed as occasional operational requirements, real world activities, or emergencies dictate.

4.9.3.3. CONTRACTOR VEHICLES. Contractor vehicles must be always maintained in a safe and operational condition while on BSFB. All contractor trucks will be searched prior to gaining access to BSFB. All contractor vehicles/drivers must process through the Large Vehicle Inspection Point (LVIP) located on 6th Ave.

4.10. PHYSICAL SECURITY

The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

4.11. SECURITY REQUIREMENT COSTS

4.11.1. All costs incurred by the contractor associated with security requirements including submission of necessary security investigation paperwork, routine entry/exit delays, and operational delays due to contingencies or exercises, are to be anticipated by the contractor and shall be included in the price of the contract. Exercises are estimated to occur approximately 30 workdays per year.

4.12. SAFETY REQUIREMENTS AND REPORTS

4.12.1. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five (5) calendar days of each occurrence.

4.13. CONTRACTOR REGISTRATION

4.13.1. Contractor shall be required to invoice through the Wide Area Work Flow (WAWF) System, which may be reached through Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil. More information regarding WAWF will be provided upon contract award. The contractor must have current registration though System for Award Management at https://beta.sam.gov.