This is a draft Performance Work Statement (PWS) for pavement markings and signage services at Little Rock Air Force Base (LRAFB) in Arkansas. The contractor must provide all personnel, equipment, materials, and services for LED one-for-one fixture replacement with photometrics, completing work within 60 days of material arrival per delivery order. Key requirements include minimum 5 years of experience in pavement markings and signage, compliance with Manual for Uniform Traffic Control Devices (MUTCD), and knowledge of federal/state/local regulations.
The PWS outlines specific operational requirements including traffic control coordination, waste disposal responsibility, and potential crane installation requiring FAA approval (60-day minimum process). The contractor must provide 12-month warranty on all work and materials. The associated Sources Sought notice indicates this will be a competitive acquisition under NAICS 237310 (Highway, Street, and Bridge Construction) with a $45.0M size standard. Responses are due by February 5, 2025, with submissions to be sent to Contract Specialist Saraetta Alexander and Contracting Officer Camille Drackette at the Department of the Air Force Air Mobility Command.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
DRAFT
PERFORMANCE WORK STATEMENT (PWS)
PAVEMENT MARKINGS AND SIGNAGE
at LITTLE ROCK AFB, AR 72099
1. DISCRIPTION OF SERVICES
1.1. The contractor shall provide all qualified personnel, transportation, lifts, tools, equipment, materials and services required to accomplish LED One-For-One Fixture Replacement w/Photometrics on Little Rock AFB, AR 72099. The contractor shall accomplish all below to meet the requirements of this Performance Work Statement (PWS). Work shall be in compliance with all Federal, State and local regulations, codes and contractor must have a minimum of 5-years of experience in pavement markings and signage. Work shall be accomplished within 60 days of material arrival per delivery order. Estimated delivery date of material is required to be sent to the CO and Contracting Officer Representative (COR) within 15 days of delivery order award.
1.2. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the Contracting Officer (CO) immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.
2. SAFETY AND REGULATORY REQUIREMENTS
2.1. This contract is for multiple year/multiple locations on LRAFB.
2.2. Pre-Install Requirements: Before services are commenced, the contractor shall inspect the work site and ascertain all information for the diligent performance of the service(s). The contractor shall notify the ordering agency of any conditions that prevent the suitable completion of these services to include operations that could endanger Government personnel or property and require appropriate abatement action. If the contractor discovers problems associated with the work after starting, he or she shall immediately notify the Contracting Officer (CO) for their approval if the work is to continue. Coordinate with the Government designated representative to have utilities/fire alarms etc…turned on or off during the competition of the task.
2.3. Disposal of waste: All waste disposals are the responsibility of the contractor to include any fees or permits. Recycling containers will be provided for the operation. Coordinate through your government representative or Contracting Officer Representative (COR).
2.4. Experience shall show that the Contractor has a good working knowledge of Manual for Uniform Traffic Control Devices (MUTCD) requirements related to all pavement markings and signage for streets and parking lots.
2.5. If a crane is required for any of the installation of the equipment by Federal Law an airfield waiver must be accomplished and signed off by the FAA. This takes a minimum of 60 days to complete and will delay work till completed.
3. WORK REQUIREMENTS
3.1. The contractor shall provide all pavement markings and signage as specified in each work order. Work in each line item shall include traffic control, equipment, labor and materials required to accomplish the task order requirements. Traffic control will not be paid for separately. Traffic control, road closures and sequence of work shall be coordinated with LRAFB and approved prior to start of work. Specifications for each line item is provided in Appendix A.
4. GOVERNMENT FURNISHED EQUIPMENT
4.1. The Government will provide drawings as required to delineate all work locations and requirements.
5. GENERAL REQUIREMENTS
5.1. Contractor personnel and vehicles shall possess appropriate passes. These shall be obtained from Installation Security Forces Pass and ID at the Vehicle Inspection Center.
5.2. The Contractor is subject to all installation fire, safety, security, and traffic regulations.
5.3. The Government contracts on the understanding that the Contractor is complying with applicable laws concerning workplace safety.
5.4. The Contractor is subject to all citations and penalties for violation of applicable workplace safety laws. The burden of compliance rests with the Contractor. Enforcement of workplace safety laws is the responsibility of the agency specified in the applicable law.
5.5. The Contracting Officer may notify the Contractor of hazards in Contractor operations that endanger Government personnel or property and require appropriate action. This provision does not constitute assumption of liability for Occupational Safety and Health compliance on the part of the Government or negate other agency responsibility for enforcement of applicable laws.
5.6. Accident prevention principles must be thoroughly integrated into all operations. Unsafe conditions and practices, as identified by the designated representative, must be corrected immediately.
5.7. Contractor Employees: While on the installation, the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the organization or by wearing appropriate badges containing the organization's name and the employee's name. Contractor personnel must wear issued base identification cards at all times while on the installation.
5.8. Service contracts shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
6.0. WARRANTY
6.1. Contractor shall guarantee all material, workmanship and labor from defects for a period of 12 months from the date of acceptance of the work. A warranty letter detailing the work accomplished per facility is required to be furnished to the government representative upon acceptance of the work.
7.0. APPENDIXES
APPENDIX A: SPECIFICATIONS FOR EACH LINE ITEM.