This is a Performance Work Statement (PWS) for grounds maintenance services at Martin Army Community Hospital (MACH) at Fort Moore, GA. The PWS covers maintenance of an 868,958 square foot landscape area including the hospital/clinic building complex, central utility plant, hazardous material storage, ambulance garage, storm water management structure, staff and visitor parking garages, sidewalks, fencing, and directory signs.
The contractor must provide all personnel, equipment, and materials to perform services including: litter/debris removal, grass cutting every 14 days during growing season and 28 days in non-growing season, edging, trimming, lawn fertilizer treatment (April, June, August, September), landscaping and weed control, plant/tree replacement, pruning (2x per year), turf repair, soil aeration, and natural disaster cleanup. The landscaping includes native/naturalized plants suited to the Georgia southern piedmont environment and three vegetative roof gardens. Key personnel required include a Program/Contract Manager, Quality Control Manager, and On-Site Project Manager/Lead. The contractor must follow specific environmental compliance requirements regarding pesticide use and hazardous materials handling. Historical workload data indicates needs for 1 FTE Project Manager (1,992 hours/year), 2 FTE Mowers (600 hours each/year), and 6 FTE Tree/Special Projects workers (200 hours each/year).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Grounds Maintenance_Attachment_4 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCT 2024
PERFORMANCE WORK STATEMENT (PWS)
Grounds Maintenance Martin Army Community Hospital Fort Moore, GA 11 September, 2024
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide Grounds Maintenance services to the Facilities Management Branch within Martin Army Community Hospital (MACH) on Fort Moore, GA.
1.2 Background: Martin Army Hospital (MACH) is a complex of buildings facilitating the medical care of not only our Soldiers and their families, but our Retired personnel and their families in the surrounding area. The complex includes the Hospital/Clinic Building 9250, Central Utility Plant Building 9251, Hazardous Material Storage Building 9252, Ambulance Garage Building 9253, Storm Water Management Structure 9254, Staff Parking Garage M9250 and Visitor Parking Garage M9251, Sidewalks and Fencing surrounding the complex, Directory signs and cooling towers on Fort Moore, GA.
The landscape and site development of the Fort Moore Martin Army Community Hospital (MACH) has seamlessly blended architecture and hardscape into the existing landscape of the site, disturbing as small a footprint on the land as possible. Regional materials were be used throughout the landscape and hardscape to retain the positive benefits of established landscape and site drainage. Grading was minimized to save as much of the existing woodland as possible to provide a sustainable, inviting and attractive healing environment. The existing vegetation was augmented with new plantings intended to create a stylized southern Piedmont landscape giving shade, bursts of seasonal color, and varied textures to the project.
Bio-swales and other sustainable solutions were used to minimize storm water basin requirements, create unique plant and animal habitats, and provide innovation in design to enhance associated LEED credits.
Landscape materials are all native or naturalized to the Georgian southern piedmont landscape to ensure minimum LEED requirements are met and to bolster the existing woodland wherever possible. Use of these native and naturalized plants emphasizes the current character of the area, provides wildlife habitat vital to the local eco- system, and encourages sustainability by minimizing maintenance in the landscape. Once established, native or naturalized plants require very few resources such as water, fertilizer, or labor, and are more likely to withstand regional temperature and moisture extremes, reducing the need to replace unhealthy specimen. Utilizing a palette of native and naturalized species helps to foster an appreciation for the beauty of our indigenous landscapes and natural heritage.
Throughout the site, plant material has been chosen for its appropriateness to building scale, orientation, and use and maintenance requirements. Plants are grouped in masses and incorporate evergreen and deciduous species for year-round interest and color. A variety of sizes, colors, textures, and scents are employed across the project to create vast swaths of drifting plant masses, or detailed niches of finely detailed garden arrangements. The siting of plant material function to define spaces, create visual barriers, frame vistas, accentuate dramatic architectural features, announce entries, soften edges, promote therapy, and most importantly enhance the experience of those people working, visiting, or receiving treatment at the facility.
There are three vegetative roof gardens to help alleviate the heat island effect from the roofs as well as provide a visual aesthetic for patients, employees, and guests.
1.3 Scope: The Contractor shall provide non-personal service(s) contract to provide Grounds Maintenance for Martin Army Community Hospital (MACH) with a total landscape area 868,958 sqft.
1.4 Objectives: The objective of this contract is to provide Martin Army Community Hospital a way to keep the grounds of the complex an inviting, and professional environment for our community to not only have a health complex that is comforting to ovserve, but to preserve the area and land on which the complex is located.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within (10) Ten days after date of contract award; {Deliverable # A.001}.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within (10) Ten days. If the Government has provided comments, the Contractor shall then have (10) Ten days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than (20) Twenty days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items
(Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided
Equipment / Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 Reserved.
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within (2) Two hours of identifying those issues. Verbal reports shall be followed up by written reports within (3) Business days. {Deliverable # A.002}.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Reserved.
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0700 to 15:30, after then, a second shift is on duty until 23:00 (11P.M.), but no alternate COR will be present. These hours are monday through Friday except U.S. Holidays identified in paragraph
1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours is normally 24/7 365 days of the year due to the Emergency Room. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above.
The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: There are no defined work hours for the upkeep of the Complex Grounds due to the 24/7 operations of the Hospital. The COR requests that in the event you will be working after hours defined in paragraph 1.5.4.1 above, the contractor give at least 48-hour notice prior to working after hours or on weekends or holidays as defined in pragarph 1.5.3.1. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. The contractor shall maintain a project manager / lead on site. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan.
The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within (10) days after date of contract award {Deliverable # A.003}.The Government will review and either accept or return their comments to the Contractor within (10) days. The Contractor shall then have (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.
1.5.5 Training Holidays: Reserved.
1.5.6 Place of Performance: The work to be performed under this contract will be performed on Areas surrounding the Government Facilities group of Martin Army Community Hospital;
Hospital/Clinic Building 9250, Central Utility Plant Building 9251, Hazardous Material Storage Building 9252, Ambulance Garage Building 9253, Storm Water Management Structure 9254, Staff Parking Garage M9250 and Visitor Parking Garage M9251, Fort Moore, GA.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Reserved.
1.6.2 Personnel Security Clearance Requirements: Reserved.
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.3.1 Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within (3) Three days after contract award {Deliverable # A.004}.The log must at a minimum contain the following information (Names, Dates, Time of entry, Time of exit.). The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log {Deliverable # A.005}.
1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within (1) One business day after receiving the installation access badge from the individual. {Deliverable # A.006}.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes/badges and return them to the issuing office within (1) One business day of collecting access passes/badges from the individuals. {Deliverable # A.007}.
1.6.3.4 Common Access Cards (CAC) and CAC Log: Contractor shall provide the following information: Last, First and Middle Names, government issued personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) and any other necessary information required to obtain an installation access card, to the COR with (10) days after award {Deliverable # A.008}. The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements under 1.22.5.
Since a CAC card will not be issued, a CAC Log will not be needed.
1.6.4 Background Checks:
1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within (10) days of receipt by the Contractor, identifying such with the appropriate contract number {Deliverable # A.009}.The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within (10) days of receipt by the Contractor, identifying such with the appropriate contract number {Deliverable # A.010}.When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals. Reserved.
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.)
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
1.7 Key Control: Reserved.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: { Program/Contract Manager/Alternate Program/Contract Manager, Quality
Control Manager, On-Site Manager.} The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than no later than
(10) ten days after contract award {Deliverable # A.011}.The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0700 and 15:30 Hours during official business weeks.
Qualifications for all key personnel are listed below:
a. Contract Manager and Alternate Contract Manager: Must demonstrate a minimum of
(2) years’ experience within the past (5), working as a Program Manager.
b. Quality Control Manager: The Quality Control Manager must demonstrate a minimum of (2) years’ experience, within the past (5), working as a Quality Control Manager.
c. On-site Project Manager/ Lead: The On-site Project Manager / Lead must demonstrate a minimum of (2) years’ experience, within the past (5), working as a Lead or a Project Manager.
d. Special Qualifications: Reserved.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Contractor Work Space: Reserved.
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) “The Contractor (to include subcontractors) are required to obtain and display a MACH access badge. To obtain a MACH access badge, all personnel must go through a safety video and pass a quiz given by the Facilities Management Division (FMD) on the first day of work. The COR will be the primary contact for all access requirements and can be reached at (762) 408-1123 / 1160. {Deliverable # A.012}.Government issued CACs, badges, identification shall be removed and/or concealed from plain sight when off station and shall not be left in vehicles or unprotected. Badges and Passes may not be duplicated or copied. Lost or stolen identification badges, vehicle passes etc. will be immediately reported to the COR and/or installation Security Office.
1.13 Contractor Travel: Reserved.
1.14 Other Direct Costs (ODCs): Reserved.
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than (3) days {Deliverable # A.013}.prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI {Deliverable # A.014}, on the same day of awareness. The Contractor’s OCI Mitigation Plan will be http://www.dimoc.mil/resources/limitations/ determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: To minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the (14) day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)). The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel {Deliverable # A.015}. (5) Business days prior to the commencement of work specified under the contract. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, Activity Hazard Analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting
Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen
(15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) Personal Protective Equipment (PPE). While operating on Fort Moore, the contractor must http://www.usace.army.mil/ comply with all State and Federal regulations regarding the provisioning of personnel with personal safety equipment. In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short/Long sleeve shirt; Shirts shall display company name and logo.
(ii) Long trousers; Pants shall be properly worn at hip level. Short pants are not allowed.
(iii) Steel-toed safety boots.
(iv) Hard hat.
(v) Hearing Protection.
(vi) Eye Protection.
(f) All personnel are required to maintain a professional appearance while working at
Martin Army Community Hospital. All contractor personnel working construction, maintenance or service contracts, associated with any MEDCOM/DHA facility at Fort Moore, shall observe the following dress code in addition to all PPE safety requirements:
(i) All attire shall be clean, in good repair and not excessively stained.
(ii) Any attire that displays objectionable logos or verbiage is not allowed.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate their plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than (5) days {Deliverable # A.016} that such notifications were made.
1.21.1.3 Reserved.
1.22 Environmental Compliance: Per MCOE Environmental Control. The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program:
The Contractor shall ensure that all of its operations and activities conform Fort Moore’s environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities Fort Moore are conducted in accordance with the Spill Prevention and Response Plan, Solid Waste Policy, and applicable environmental laws/standards.
If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and amount of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements; Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material; {Deliverable A.017}. The KO/COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all Hazardous Waste (HW) generated in accordance with Fort Moore environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the Department of Public Works (DPW) Environmental Division, and to the Contracting Officer via the COR. {Deliverable #A.018} 2 weeks prior to contract completion.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at 911.
1.23 Required Training: The following provides information on training requirements.
1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within (5) days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or (5) days after employment of new personnel {Deliverable # A.019}.AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every (12) twelve months except AOR specific AT Level I training which shall be completed as required by local AT policies {Deliverable # A.020}.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within (5) days after completion of the training {Deliverable # A.021}.
1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within (5) days of employment under this contract, verification of the training shall be provided to the COR within (5) days after completion of the training https://jkodirect.jten.mil/
{Deliverable # A.022}. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months, verification of the training shall be provided to the COR within (5) days after completion of the training {Deliverable # A.023}.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within (5) days after completion of the training {Deliverable # A.024}.
1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within (10) days after the contract is awarded and within (5) days after new employees commence contract performance, with the results reported to the COR within (10) days after the contract is awarded and within (5) days after new employees commence contract performance {Deliverable # A.025}.Verification of the training shall be provided to the COR within (10) days after completion of the training {Deliverable # A.026}.Training slides can be found on the Army OneSource we site:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
1.23.4 Information Assurance (IA) Training: Reserved.
1.23.4.1 Government Information Systems: Reserved.
1.23.4.2 Information Technology (IT)/IA functions: Reserved.
1.23.4.3 Army Training Certification Tracking System (ATCTS): Reserved.
1.23.5 Personally Identifiable Information (PII Reserved.
1.24 Authorization to Perform Services in Germany: Reserved.
1.24.1 Federal Republic of Germany (FRG): Reserved.
1.24.2 Work and Residence Permits: Reserved.
1.24.3 Compliance with German law: Reserved.
1.25 Notice to Proceed: The notice to proceed will be provided as indicated below.
(Contracting Office must identify one)
☐The effective date of contract will constitute the date of notice to proceed ☐A notice to proceed letter will be issued http://www.cdse.edu/catalog/elearning/GS130.html http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
☐The date of the letter transmitting the contract will constitute the date of the notice to proceed
1.26 Electromagnetic Compatibility Directive: Reserved.
1.27 Government Property and Services: Contractors are allowed to use the restrooms, merchant services, and dinning facilities.
1.28 Conventional Forces Europe (CFE) Treaty Verification Inspection: Reserved.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Acceptable Quality Level (AQL) – The AQL is the maximum precent odefective that, for purposes of sampling inspections can be considered satisfactory.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government.Government property includes both Government-furnishedand Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance (QA) – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Random Sampling – A sampling method in which each service output in a lot has an equal chance of being selected for inspection.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AQL Acceptable Quality Level AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense DoDI Department of Defense Instruction DPW Directorate of Publis Works
EMD Environmental Management Division FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 HW Hazardous Waste IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IPMC Integrated Pest Management Coordinator IPMD Integrated Pest Management Plan ISCP Installation Spill Contingency Plan IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer MACH Martin Army Community Hospital MS4 Municipal Separate Storm Sewer System NEPA National Environmental Policy Act OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PGP Georgia Pesticide General Permit PII Personally Identifiable Information PIPO Phase In/Phase Out PMC Pest Management Consultant PMQAE Pest Management Quality Assurance Evaluator POC Point of Contact POL Petroleum and OiL-based materials PPE Personal Protective Equipment PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office REC Record of Environmental Consideration SIGE Safety and Health Protection Plan
SOP Standard Operating Procedure SqFt Square Feet SSO Sanitary Sewer Overflows TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services
3.1 Services: Reserved.
3.2 Facilities: The Government will not provide an office, a spot for a trailer, or any office functions required for work. The contractor is allowed use of the restrooms in their area of operations, the dining facility, and stores located on the first floor. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
3.3 Utilities: The Government will provide use of utilities in their area of operation only. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.
3.4 Equipment: The Government will not provide and equipment nor transportation. All equipment and means of transportation will be provided by the contractor. The contractor must transport all equipment and material needed by their vehicle daily, then remove them from the property at close of business.
3.5 Special Tooling and Test Equipment: Reserved.
3.6 Materials: Reserved.
3.7 Training: The Government will provide the following training: AT Level 1 Awareness, OPSEC, TARP (THREAT Awareness Reporting Program), iWATCH, etc.).
3.8 Common Access Cards (CAC): Reserved.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .