PERFORMANCE WORK STATEMENT (PWS)

FOR

Install Communication LAN and Phone Lines 4200 Randolph Ave. Building 1015, Kirtland AFB NM 87117 08 August 2022

KIRTLAND AIR FORCE BASE, NEW MEXICO

TABLE OF CONTENTS

1. Scope

2. Applicable Documents

3. Requirements

4. Schedule and Delivery

5. Facility Requirements

6. Environmental Compliance

7. Parking

8. Availability of Site

9. Site Protection and Cleanup Fig. 1: Building 1015 Supply Warehouse Layout

Install Industrial Communication LAN and Phone Lines, Building 1015

1. SCOPE. Provide and Install communication LAN and Phone lines for four modular offices located in building 1015.

2. APPLICALBLE DOCUMENTS

2.1. Floor plan. (Fig. 1)

3. REQUIREMENTS

3.1 The Contractor shall provide all manpower, labor, equipment, materials, services, means and methods required to complete installation of this project.

3.2 Contractor shall provide/install in each of the four modular offices:

· Install 20 Category 6 drops used for 10ea. LAN lines and 10ea. Phone lines. Run LAN/Phone lines to connection points as shown in Fig 1 below.

· Install 10 surface mounted raceways to network drop by each one of the electrical outlets.

· Install 2 inch conduit from building structure to ceiling space of modular.

· Install 20ea. LEVITON 2 Port White Plates.

· Install 30ea J-Hook Support

· Provide and install wall mounted terminations adjacent to the existing wall cabinet.

· Provide and install 2 Telephone Tie Cable Patch Panel for Patch Cord cross-connect.

4. SCHEDULE and DELIVERY

4.1 Shall provide a period of performance (60/90/120 days after contract award).

5. FACILITY ENTRY REQUIREMENTS. Building 1015 is considered a restricted area.

5.1.1 The contractor is responsible for obtaining access to Kirtland AFB, through the contractor’s gate.

5.1.2 The contractor employees will be escorted and issued badges to worn when working in building 1015 and must be visible while performing work.

6. ENVIRONMENTAL COMPLIANCE. The contractor shall comply with all Air Force, State, Local, and Federal environmental regulations.

7. PARKING. Contractor shall only park in designated parking locations on east/north side of building.

8. AVAILABILITY OF SITE. Workdays are from 7:00 AM to 4:00PM, Monday through Friday, excluding Federal Holidays. Below is a list of recognized Federal holidays:

· New Year’s Day

· Martin Luther King, Jr.’s Birthday

· Presidents’ Day

· Memorial Day

· Juneteenth Day

· Independence Day

· Labor Day

· Columbus Day

· Veterans’ Day

· Thanksgiving

· Christmas

9. SITE PROTECTION AND CLEANUP. The contractor shall dispose of trash and debris on a regular basis at the end of every day prior to leaving the site.

Fig. 1: Building 1015 Supply Warehouse Layout

“First Bay (01A) where three modular offices are located:

· Location #6: LAN LINES will be run from modular to the projected COMM Room at location #6 located on the NE wall. This is the main distribution for LAN to include a rack (connection point for new Lines).

· Location #5: Phone LINES will be run to the small COMM closet on the west wall at location #5, just to the right of the office and just left of the roll-up door.

“Second Bay (01B) where one modular office is located.

· Location #4: LAN & PHONE LINES will be run to east wall at location #4.

image1.png