This is a Performance Work Statement (PWS) for habitat monitoring services at Howard Hanson Dam in King County, Washington, covering the period 2026–2030. The U.S. Army Corps of Engineers (Corps) seeks to evaluate the effectiveness of wood and gravel nourishment projects downstream of the dam by monitoring large wood debris distribution in the Green River, with particular emphasis on tagged wood placed by the Corps.
The contract spans a base year (2026) plus four option years (2027–2030), with all annual tasks to be completed by April 1 of the following year. The primary deliverables include large wood inventory surveys conducted in 2026, 2028, 2029, and 2030, with comprehensive habitat monitoring in 2027. Monitoring must occur during low-flow periods and follow established 2001 TFW protocols updated in 2022–2023. The contractor must survey the middle Green River between river mile 64.5 and 33 (excluding reach 1), inventory all tagged logs regardless of size, collect data on bankfull width, residual pool dimensions, canopy cover, riffle substrate, and habitat unit mapping, and develop geospatial data layers compatible with ArcGIS 10x and Federal Geographic Data Committee standards. Draft reports are due by February 1 and final reports by April 1 following each inventory year. All deliverables require submission in both hard copy (3 copies of final reports, double-sided on recycled paper) and electronic format (Microsoft Word 2024 and PDF). The Government will furnish aerial photos and previous monitoring reports; the contractor must provide all labor, materials, supplies, and equipment necessary to complete the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Announcement_ HHD Green River Habitat Monitor 20 Jan 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Howard Hanson Dam, Green River Habitat Monitoring 2026 - 2030 King County, Washington
Draft: 3 November, 2025
Prepared by Nathan Malmborg (CENWS-ODM)
1. General Information
1.1 - Purpose: The purpose of this performance work statement is to evaluate the effectiveness of the U.S. Army Corps of Engineers (Corps) wood and gravel nourishment projects downstream of Howard Hanson Dam. Specifically, the monitoring work would be to collect data to inventory large wood debris in the Green River with a focus on tagged wood placed into the river by the Corps.
1.2 - Background:
Wood nourishment: The Corps has augmented spawning gravels in the Green River since 2003 and large wood since 2004 as part of the operation and maintenance of Howard Hanson Dam. Additional wood nourishment is planned for the foreseeable future due to requirements outlined in Endangered Species Act consultation with NMFS. The effects of these projects have periodically been monitored over this timeframe. Large wood distribution has been inventoried annually since 2007 and additional habitat monitoring has occurred once every five years. These monitoring activities will be repeated staring in 2026 through 2030 using the previously used protocols.
1.3 - Period of Performance: The period of performance for each task is described below. The timing of the habitat monitoring is sensitive to environmental conditions and should be conducted during the low flow period consistent with previous iterations of the monitoring. All tasks for each year should be completed by 1 April of the following year. The Government reserves the right to extend the term of this contract in accordance with the terms and conditions contained in FAR clause 52.217-9 entitled, “Option to extend the Term of the Contract.” The period of performance reads as follows:
Base Year 2026 Option Year 1 2027 Option Year 2 2028 Option Year 3 2029 Option Year 4 2030
1.4 - Quality Assurance: The government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5 - Government Remedies: The contracting officer shall follow FAR 52.212-4, “Contract Terms and Conditions-Commercial Items” or 52.246-4, “Inspection of Services-Fixed Price” for Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
1.6 - Place of Performance: The services described in this PWS shall be performed in King County, WA. Habitat surveys begin within the Tacoma municipal watershed. Access to the watershed must be coordinated with the Corps and Tacoma. Adherence to all Tacoma requirements regarding vehicles, protection of drinking water, etc., must be adhered to.
1.7 - Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conferences convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The contracting officer (KO), Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor’s performance. At these meetings the contracting officer will apprise the Contractor of how the government views the Contractor’s performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8 - Contracting Officer’s Representative (COR): A COR will be assigned at award:
The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.9 - Government Technical Point of Contact (TPOC): The TPOC is identified below:
Nathan Malmborg Mud Mountain Dam 30525 SE Mud Mountain Road Enumclaw, WA 98022
(206) 316-3021 nathan.c.malmborg@usace.army.mil
1.10 - Identification of Contractor Employees: All contract personnel attending meetings and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.11 – Security Requirements:
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by District Security Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify ) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
2. Government and Other Agency Furnished Property, Equipment, and Services
The Corps shall provide materials and services listed below.
a. Aerial photos of the project area
b. Previous Years Monitoring Reports and Plans.
3. Contractor Furnished Items and Services
The contractor shall furnish to Seattle District all services, labor, materials, supplies, and equipment necessary to conduct the tasks (listed below) necessary to meet the stated objectives within the time frame provided. The contractor can make slight modifications to the methods described with approval by the Contracting Officer's Representative (COR).
4. Specific Tasks
4.1 – Middle Green River habitat surveys
4.1.1 Milestone 1: Conduct large wood inventory 2026, 2028, 2029, 2030
A monitoring protocol and study plan based on the TFW ambient monitoring program was developed in 2001 for the purpose of conducting baseline reach scale physical habitat monitoring in the middle Green River between RM 64.5 and 33 to monitor habitat restoration projects implemented under the AWSP. Methodology and protocols used for this 2001 monitoring shall be replicated in summer each year to evaluate the distribution of large wood and log jams. Any updates to methodology that is described in the 2023 LWD data report shall be included for all of the succeeding reports. This shall include photos of each jam. Specific emphasis shall be made on identifying LWD tagged and released by the Corps at the RM 60 nourishment location. All tagged logs shall be inventoried regardless of size, and location recorded for inclusion in the GIS database. Reach 1, from RM 64.5 to RM 61 shall not be included in the surveys. Data shall be analyzed and summarized consistent with the 2023 LWD data report including updates to all graphs and tables.
4.1.2 Milestone 2: Conduct large wood inventory & Habitat Monitoring 2027
This task repeats habitat monitoring of the middle Green River last conducted in 2022. A monitoring protocol and study plan based on the TFW ambient monitoring program was developed in 2001 for the purpose of conducting baseline reach scale physical habitat monitoring in the middle Green River between RM 64.5 and 33 to monitor habitat restoration projects implemented under the AWSP. Methodology and protocols used for this 2001 monitoring were replicated in 2007, 2012, 2017, and 2022 to evaluate trends in monitored endpoints. This task shall repeat the monitoring protocol developed in 2001 as updated in 2022 and as discussed below. Reach 1, from RM 64.5 to RM 61 shall not be included in the 2027 survey. Monitoring endpoints to be collected include:
• Bankfull width
• Residual pool dimensions, frequency, and formative factor
• Large woody debris counts and distribution including photos of each log jam
• Canopy cover
• Riffle substrate
• Habitat unit mapping Specific emphasis shall be made to identify LWD tagged and released by the Corps at the RM 60 nourishment location. All tagged logs shall be inventoried regardless of size and location recorded for inclusion in the GIS database. Side channels in the project reach surveyed during the 2017 work shall also be monitored. Side channel monitoring shall be consistent with the work in 2017. Large wood was inventoried in 2017. The effort resulted in several recommendations for side channel monitoring. These recommendations shall be adopted for the 2027 monitoring effort and be applied to the suite of monitoring variables as appropriate.
4.1.3 Milestone 3: Draft and Final Study Reports
Contractor shall produce draft and final reports summarizing the work. The 2022 data report should serve as model for the 2027 habitat monitoring task and the 2023 report should serve as a model for all other years under this contract. Comparisons to data collected from previous years shall be made. This shall include analysis of any changes in LWD, riffle particle size, and pool habitat area. All tables, graphs, and analysis presented in the 2022 and 2023 reports shall be updated for the succeeding reports. LWD tables and analysis shall be consistent with the analysis conducted in 2023. A GIS database shall be developed for the habitat data according to standards described below.
Electronic data layers shall be developed for each endpoint compatible with ArcGIS 10x. Data shall be referenced to North American Datum of 1983. Digital orthophotos provided by the Corps shall serve as a base map for the GIS and for data collection. Contractor shall provide metadata files for all geospatial data and products produced under this task order. Geospatial data are defined as information that identifies the geographic location and characteristics of natural or constructed features and boundaries on the earth. Geospatial data affected by these requirements are those generated in a Geographic Information System or other computer system that employs or references data using either absolute, relative, or assumed coordinates. The metadata file shall conform to the Federal Geographic Data Committee (FGDC) standards. Digital metadata files shall be provided to the Government along with each final product deliverable, unless otherwise approved by the Contracting Officer.
5. Deliverables
5.1 - General. All deliverables shall be sent to the COR. Final deliverables shall be submitted in hard copy on 8-1/2 by 11-inch paper, with 11 by 22-inch foldouts as necessary. They shall also be provided in electronic format by CD in Microsoft Word 2024 and PDF formats. The Corps will provide comments to the contractor on draft submittals.
All hard-copy submissions shall be printed double-sided, using recycled and unbleached paper to the maximum extent possible.
5.2 - Specific Submittals.
a. Draft and final reports for Middle Green River LWD [electronic copy (draft), 3 hard copies (final) plus electronic submittal].
6. Schedule
WORK ITEM
Date to be completed
Task 4.1.1. LWD inventory: 2026, 2028, 2029, 2030 (Milestone 1)
No later than 1 October of each year starting in 2026
Task 4.1.2. LWD inventory & Habitat Monitoring:
2027 (Milestone 2) No later than 1 October of 2027
Task 4.1.3. Draft monitoring reports (Milestone 3)
No later than 1 February following each annual LWD inventory, and 1 February 2028 for task 4.1.2
Task 4.1.4. Final monitoring reports (Milestone 3)
No later than 1 April following each annual LWD inventory, and 1 April 2028 for task 4.1.2
7. Performance Requirements Summary
Performance Objectives Performance Standard Monitoring Method
Milestone 4.1.1:
LWD inventory
USACE approval of communications
Contractor communication with Government; periodic inspection/participation in field work
Milestone 4.1.2:
LWD inventory & Habitat Monitoring
USACE approval of communications
Contractor communication with Government; periodic inspection/participation in field work
Milestone 4.1.3:
Draft and Final Reports
USACE approval of data reports
Review and comment of draft report.
Review of final report.
| Performance Work Statement |
| 1. General Information |
| 2. Government and Other Agency Furnished Property, Equipment, and Services |
| The Corps shall provide materials and services listed below. |
| 3. Contractor Furnished Items and Services |
| 4. Specific Tasks |
| 4.1.1 Milestone 1: Conduct large wood inventory 2026, 2028, 2029, 2030 |
| 4.1.2 Milestone 2: Conduct large wood inventory & Habitat Monitoring 2027 |
| 5. Deliverables |
| WORK ITEM |