Draft PWS for W91QVN26RA007.docx

DOCX document 89 KB Posted

Attached to
Maintenance Service of Parts Washers Solvent Tank and Exchange Solvent and Rag for EUSA Wide
Solicitation number
W91QVN26RA007
Issued by

About this file

This is a Draft Performance Work Statement (PWS) for a non-personnel services contract for maintenance of parts washers solvent tanks across U.S. Army installations in South Korea. The contract (W91QVN26RA007) requires the contractor to provide monthly maintenance services for 127 solvent tanks (10 @ 120-gallon and 127 @ 48-gallon) at various military locations, including Camp Carroll, Camp Humphreys, Camp Casey, and other bases. Key services include filling tanks with 100% pure flash point cleaning solvent, disposing of used solvent, and providing 40 pounds of clean rags monthly.

The contract is structured as a firm fixed-price agreement with a base year from January 1, 2026 to December 31, 2026, and four optional 12-month extension periods through 2030. The contractor must meet specific qualifications, including having Korean government certifications for hazardous waste transportation, providing a contract manager with at least one year of relevant experience, and employing a mechanic with a 1st Class Driver's License. The contractor will be responsible for safety compliance, environmental management, and providing detailed documentation, including monthly equipment inspection worksheets and safety plans.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK

STATEMENT (PWS) MAINTENANCE SERVICE OF PARTS WASHERS

SOLVENT TANK ANDEX CHANGE SOLVENT AND RAG FOR EUSA WIDE

1. GENERAL: This is a non-personnel services contract to provide maintenance service of solvent tank and exchange solvent and supply rag for EUSA wide. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, Transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Monthly Maintenance service of the solvent tank inspect and replace solvent and clean rags bundle as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background: The contract shall provide inspect and replace solvent and solvent tank cleaner and clean rag bundle every month for EUSA Wide.

1.3. Objectives: The contractor shall maintain inoperable Solvent Tank and Solvent in good working condition.

1.4. Scope of Work: The Contractor shall provide an exchange solvent service for the U.S. Government owned 120-gallon (Qty 10), and 48-gallon (Qty 127) solvent tanks. The Contractor shall provide monthly 40 LBs of clean rags and pick up and dispose of used and soiled rags. The Contractor shall provide all necessary skilled personnel, supervision, tools, materials, transportation and other items and services necessary to perform monthly maintenance service on U.S. Government owned parts washers in the 8th Army units.

1.5. Period of Performance:

Base Year (12 Mos):1 Jan 2026 – 31 Dec 2026
1st Option Period (12 Mos):1 Jan 2027 – 31 Dec 2027
2nd Option Period (12 Mos):1 Jan 2028 – 31 Dec 2028
3rd Option Period (12 Mos):1 Jan 2029 – 31 Dec 2029
4th Option Period (12 Mos):1 Jan 2030 – 31 Dec 2030

1.6. General Information:

1.6.1. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with (IAW) this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The contractor shall provide a written Quality Control Plan (QCP) within ten (10) working days after contract award to the KO and COR. Additionally, changes to the QCP shall be submitted to the KO and COR within five (5) working days when changes are made thereafter. After acceptance of the QCP the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2. The contractor shall keep records of inspections and make them available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract. The contractor shall collect data, perform self-evaluation, and document performance against standards associated with each specific requirement. The contractor shall address all tasks in PWS based on the example below:

Objective (contract requirement)
PERFORMANCE STANDARD

What level of performance is required to meet the Performance Objective or Task?

Acceptable Quality Level (AQL) or Performance Threshold

WHAT/DATA SOURCE

What is the Contractor going to inspect?

CALCULATION

How will The Contractor determine if the AQL and Standard are being achieved?

This information comes from the PWS.
This information comes from the PWS.
This information comes from the PWS.
Contractor shall submit
Contractor shall submit.

1.6.3. Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.4. Recognized Holidays: The contractor is not required to provide service on US Government legal holidays and Korean National holidays except in emergency situations.

US Government legal holidays are as follows:

1 January (New Year's Day) 3rd Monday, January (Dr. King’s Birthday) 3rd Monday, February (President's Day) 19 June (Juneteenth National Day) Last Monday, May (Memorial Day) 4 July (Independence Day) 1st Monday, September (Labor Day) 2nd Monday, October (Columbus Day) 11 November (Veterans' Day) 4th Thursday, November (Thanksgiving Day) 25 December (Christmas Day)

Korean Holidays are as follows:

1 and 2 January (New Year) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar) 1 March (Independence Movement Day) 1 May (Labor Day) 5 May (Children's Day) Buddha's Birthday (8 April on the Lunar Calendar) 6 June (Memorial Day) 15 August (Liberation Day) Chu-Suk (14, l5 and 16 August on the Lunar Calendar) 3 October (National Foundation Day) 25 December (Christmas Day)

1.6.5. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730 to 1630, Monday through Friday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor should keep in mind that the stability and continuity of the workforce are essential.

1.6.6. Place of Performance: All services required under the basic award shall be performed at the U.S. Government-Furnished Facilities listed in the below Paragraph 6.3.

1.6.7. Type of Contract: The Government will award a Firm Fixed Price type contract.

1.6.8. Security Requirements: Due to the nature of working on military installation, the contractor is required to observe and practice Operation Security (OPSEC) and Physical Security while engaged in this contract operation. The contractor shall not photograph the vehicles, equipment, materials, and facilities without an explicit written approval by the COR.

1.6.8.1. Antiterrorism Training (AT Level I Training): All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract award. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee to the COR and KO within 7 calendar days after completion of training by all employees and subcontractor personnel. New employees shall take this training within 14 days after starting work under the contract.

1.6.8.2. Access and General Protection/Security Policy and Procedures: Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all the information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.8.3. iWatch Training: The Contractor and all associated sub-contractors shall brief all employees on the local iWatch program (training standards provided by the requiring activity Antiterrorism and Operations (ATO). This local developed training will be used to inform employees of the types of behavior to watch and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance. The contractor shall submit iWatch training record to the COR within 5 calendar days after completion of the training.

1.6.8.4. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.8.5. Key Control: The contractor shall receive all keys from the service COR, and shall sign for keys on DA Form 5513-R (Key Control Register and Inventory). The contractor shall not duplicate the issued keys without an explicit written approval of COR or KO and shall report the loss of issued keys to the servicing COR within 24 hours of discovering the loss. The contractor is responsible for the replacement cost of lost keys to include the replacement of locks. The contractor shall inventory all issued keys in accordance with AR190-11 (Physical Security) and return all keys to COR upon termination of the contract.

1.6.9. Contractor Qualification:

Prime Contractor’s Prior Experience: The prime contractor shall have a minimum of one (1) year experience within the last eight (8) years from the solicitation issue in performing the same or similar type of services for Solvent Tank maintenance services.

1.6.9.1. The Contractor shall meet qualification requirements stated in (a) and (b) or

(c) below in order to deliver and dispose of fresh solvent, used solvent, clean rags, and used rags by appropriate vehicles. In addition, the Contractor shall meet all safety and regulatory requirements to transport and dispose such material by Korean Environmental Governing Standards (KEGS), Waste Control Law, 26-3. The contractor shall provide current and valid certifications.

(a) Business Registration (사업자등록증),

(b) The contractor or sub-contractor shall have both a Business of Designated Waste Interim Treatment Permission Certificate (지정폐기물 중간처리업 허가증),

(C) The contractor or sub-contractor shall have both a Business of Designated Waste Interim Treatment Permission Certificate (지정폐기물 중간처리업 허가증) and a Business of Designated Waste Collect and Transport Permission Certificate (지정폐기물 수집 및 운반업 허가증).

1.6.10. Personnel Qualification:

1.6.10.1. Contract Manager (CM): The contractor shall provide a CM with a minimum of one (1) year experience within the last eight (8) years as the CM in the same or similar type of services to this requirement. The CM shall manage the workforces in daily operation, coordinate with the Government representatives, and maintain a close liaison with the Government. The CM shall be competent in English, fully understand the requirements of this contract, and address all contract related issues to assigned COR.

1.6.10.2. Mechanic: The contractor shall provide a mechanic who shall have license for 1st Class Driver License (1급 자동차 운전면허증) in accordance with PWS, Paragraph 6 issued by Republic of Korea (ROK) Government.

1.6.11. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will appraise the contractor of how the government views the contractor's performance and the contractor should apprise the Government of problems, if any, being experienced. Appropriate action should be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.12. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.13. Key Personnel: The follow personnel are considered key personnel by the government:

1.6.13.1. Contract Manager (CM) and Mechanic: Before removing, replacing, or diverting the CM and Mechanic, the Contractor shall:

(1) Submit notification to the Administrative Contracting Officer (ACO) 14 calendar days.

(2) Submit justification (including proposed substitutions with resumes of equal or greater qualifications stated in this PWS, Paragraph 1.6.10.1 and 1.6.10.2 in sufficient detail to permit evaluation of the impact on this contract; and

(3) Obtain the Contracting Officer's written approval. Notwithstanding the foregoing, if the Contractor deems immediate removal or suspension of any member of its management team is necessary to fulfill its obligation to maintain satisfactory standards of employee competency, conduct, and integrity under the clause at 48 CFR 970.5203–3, Contractor's Organization, the Contractor may remove or suspend such person at once, although the Contractor shall notify the Contracting Officer prior to or concurrently with such action.

(4) The list of key personnel may, with the consent of the contracting parties, be amended from time to time while the contract to add or delete personnel so long as the aforementioned items are addressed.

1.6.14. Contractor Personnel:

1.6.14.1 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the services. The names of the contract manager and alternate(s) shall be provided to the KO in writing prior to the beginning of the first performance period. The contract manager and alternate(s) must be able to read, write, speak, and understand English.

1.6.14.2. The contract manager shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract.

1.6.14.3. The contract manager shall be available during normal duty hours within two (2) hours to meet on the installation with government personnel (designated by the KO) to discuss problems. After normal duty hours the manager or alternate shall be available within four (4) hours.

1.6.14.4. Contractor Employees: The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the KO as a potential threat to health, safety, security, general well- being or operational mission of the installation and its population.

1.6.14.5. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English

1.6.15. Conduct of Contractor Personnel: The contractor personnel shall observe and obey all U.S., U.S. Army, and U. S. Army installation laws and regulations while working on U.S. Army installations. The contractor personnel shall not wear any military uniforms (U.S. or ROK) and shall not wear any clothing that has or depicts derogatory messages to other personnel, U.S. Government, and U.S. Army. The contractor personnel shall not engage in any type of altercation or violent activities with U.S and other personnel. Any personnel in violation of this paragraph shall be promptly removed from the installation under the Military Police escort if applicable and shall not be permitted to access the U.S. Army installations until the matter is resolved and re-entrance is permitted by the Garrison Commander.

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such an appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of amend product or service shall meet contract requirements.

2.1.11. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.2. DEFINITIONS: Acronyms List.

PWS
Performance Work Statement
ESC
Expeditionary Sustainment Command
DMC
Distribution Management Center
CMR
Contractor Manpower Report
MSDS
Material Safety Data Sheet
COR
Contracting Officer Representative
COTR
Contracting Officer’s Technical Representative
CM
Contract Manager
KEGS
Korean Environmental Government Standard
NFPA
National Fire Protection Association
EPA
Environmental Protection Agency
SOP
Standing Operating Procedure
POL
Petroleum Oil and Lubricant
EMS
Environmental Management System
AQL
Acceptable Quality Level
CCR
Central Contractor Registration
FSC
Federal Service Code
UIC
Unit Identification Code
RA
Requiring Activity
CLIN
Contract Line Item Number
DA
Department Army
ISO
International Organization Standardization

3. GOVERNMENT-FURNISHED EQUIPMENT AND MATERIAL (GFE/GFM): N/A

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: The Contractor shall supply, equipment, and services required to perform this contract that are not listed under Paragraph 3 of this PWS. Equipment and materials used in the performance of this contract shall be that which is recognized as standard in the trade, and in accordance with manufacturer’s specifications and condition of equipment. Replacement items shall be standard products from manufactures regularly engaged in the production of such supplies, parts, or materials. Items without technical specifications shall be of acceptable industrial grade and quality and require COR’s approval prior to replacement or repair.

5. SPECIFIC TASKS:

5.1. The contractor shall fill 120 gallons, and 48 gallons of parts washer solvent tanks with 100% of pure (Environmental mark Certified Products, not recycled) type I cleaning solvent monthly. The contractor shall dispose of the used solvent in the 120 gallons and 48 gallons of parts washer solvent tanks. Clean Rag base on 100% cotton and at least 2 square feet size.

5.2. Type of Solvent: The contractor shall provide Flash Point cleaning solvent with a minimum of 60.0C degrees.

5.3. The contract manager shall meet with the COR to discuss maintenance issues and scheduling of maintenance/service as required.

5.4. COR will coordinate with the contract manager for training by the Garrison Environment Office. The Garrison Environmental Office will train Contractor’s safety and environmental representatives to ensure that the contractor is in compliance with applicable safety standards and environmental requirements. The training records shall be provided to the environmental office.

5.5. The contract manager shall be available to resolve any delivery or maintenance problems within 3 working days after notification from COR/Area ACOR(Area I&II, III, IV&V).

5.6. The contractor shall provide a Material Safety Data Sheet (MSDS) reports written in English based on Korean Environmental Government Standard (KEGS) or US Government National Fire Protection Association (NFPA) – Hazard Identification Regulation and using the manufacture’s manual after award contract. The contractor must have authorized license by Korean government to haul and dispose of waste solvent.

5.7. Contractor shall prepare and provide completed copies DA Form 2404’s (Equipment Inspection and Maintenance Worksheet) verified by the COR by the 10-calendar day of each month to the COR.

5.8. The contractor shall conform to unit Standing Operating Procedure (SOP) and MSDS for the handling of hazardous materials. Hazardous material and waste shall be turned into the Petroleum, Oil and Lubricant (POL) unit waste collection point only.

5.9. Environmental Management System (EMS)

5.9.1. The Contractor shall perform work consistent with the relevant policy and objectives identified in the Installation’s Environmental Management System (EMS). A copy of the EMS can be found in…or A copy of the EMS is provided in attachment…The Contractor shall perform work in a manner that conforms to Environmental Management Programs and Operational Controls identified by the Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection outlined in the USAG Daegu EMS manual Document 10.1.1, Environmental Policy.

5.9.2. In the event of noncompliance with Korean local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective action(s) and notifying the COR and the EMS Manager.

5.9.3. Upon a contract award, the COR will notify the EMS Manager to arrange EMS training for Contractor employees if necessary.

5.9.4. Additionally, when ordering supplies for use on Installation, all Contractor personnel shall purchase energy- efficient, recycled, or reclaimed material whenever practicable.

5.9.5. Any questions regarding EMS may be directed to the COR.

5.9.6. Safety Plan: The Contractor shall develop and maintain a safety plan that describes all safety requirements for every phase of activities under this contract. A complete analysis for unforeseen safety hazards and unfavorable working conditions shall be made. The contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government, the property of the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the contractor’s actions to maintain minimal accidents/incident, zero loss of life and minimal damage to property. The contractor shall provide a written safety plan with policies, procedures, and safety checklist within 15 calendar days after contract award. Any revisions, 5 calendar days after receiving the Government revision. The program shall comply with the Korean Occupational Safety and Health Act (KOSHA). The Contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program will be coordinated and reviewed by the COR, or his/her duly authorized representative.

5.9.6.1. Risk Management Process. The safety plan shall include detailed job-related hazards and controls for each work activity. The plan shall include an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools, or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.

5.9.6.2. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 4 hours of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) calendar days following the accident. Implement corrective actions as soon as reasonably possible. Re-submit the corrected report within 3 working days. The accident investigation reporting format shall include at a minimum:

(1) Contract number and contract name/description.
(2) Name of contractor

(3) Date/time of accident

(4) Date report was completed

(5) Detail description of events that lead to the accident

(6) Root cause of accident

(7) Contributing factors

(8) Corrective action(s) to prevent recurrence

5.9.6.3. The following require immediate accident notification and written accident report:

(1) A fatality.
(2) A permanent total or permanent partial disability.
(3) The hospitalization of three or more people resulting from a single occurrence.
(4) Property damage of $200 or more.
(5) Accidents/injuries resulting in one or more loss workday(s).

5.9.6.4. The Contractor shall provide on a monthly basis 40 LBs of clean rags, pick up and dispose of used and soiled rags.

5.10. Final Inspection: The Contractor shall be responsible for completing a DA Form 2404, Equipment Inspection and Maintenance Worksheet in accordance with DA PAM 750-8 when performing monthly maintenance/service. Any discrepancies noted shall be corrected prior to the final inspection.

6. SPECIAL REQUIREMENTS: In order to transport and dispose of solvent the Contractor shall be submitted license issued by Korean government in hazardous waste and transporting vehicle shall be an appropriate vehicle. This is necessary to protect the U.S. Government in case the material is disposed of improperly. Period of performance records are subject to review by the Contracting Officer and COR upon request.

6.1. `The Contractor shall meet qualification requirements stated in either (a) or (b) below in order to deliver and dispose of fresh solvent, used solvent, clean rags, and used rags by appropriate vehicles. In addition, the Contractor shall meet all safety and regulatory requirements to transport and dispose such material by Korean Environmental Governing Standards (KEGS), Waste Control Law, 26-Contractor shall provide current and valid certifications.

(a) The contractor or sub-contractor shall have both a Business of Designated Waste Interim Treatment Permission Certificate (지정폐기물 중간처리업 허가증), and the registered vehicles (지정폐기물 수집 및 운반허가증 소지차량)

OR

(b) The contractor or sub-contractor shall have both a Business of Designated Waste Interim Treatment Permission Certificate (지정폐기물 중간처리업 허가증) and a Business of Designated Waste Collect and Transport Permission Certificate (지정폐기물 수집 및 운반업 허가증).

6.2. Transportation: The Contractor shall be responsible for delivery and pick-up of cleaning solvent and clean rags covered in this contract. The Contractor vehicles shall be appropriate for delivery of supplies and waste shall meet all safety and regulatory requirements by Korean Environmental Government Standards, Waste Control Law, 26- 3.

6.3. Estimated Workload Data: The estimated workload data are shown below table. All services required under the basic award shall be performed at the U.S. Government-Furnished Facilities listed below:

List of Solvent & Rag Monthly Service

#
MSC
Location
Unit
Bldg

No Ga Ga

POC(Name)
Phone No
RAG
1
19th ESC
Cp Carroll
HED, MSC-K
665
10
Mr. Yu, Yongsok
010-5736-0011
10
2
19th ESC
Cp Carroll
MAD, MSC-K
327
5
Mr. Yi, Kye Man
010-2531-3340
5
3
19th ESC
Cp Carroll
MAD, MSC-K
326
5
Mr. Yi, Kye Man
010-2531-3340
5
4
19th ESC
Cp Carroll
FMSD, MSC-K
405
2
Mr. Chong, Song Hyo
010-2847-9412
4
5
19th ESC
Cp Carroll
FMSD, MSC-K
407
1
Kim, Uchang
763-2878
6
19th ESC
Cp Carroll
FMSD, MSC-K
408
1
Kim, Uchang
763-2878
7
19th ESC
Cp Carroll
HHC 168TH/ 563 Med
712
1
SGT Galaang, Pedro R
737-4462
1
8
19th ESC
CP Walker
HHC 168TH
393
1
CW2 Calderon, Joselyn
010-2690-1248
1
9
19th ESC
Cp Carroll
35th ADA, 2-1 ADA
970
3
CPL Lee, Sae
010-4393-2813
8
10
19th ESC
Cp Carroll
35th ADA, HHB
403
1
SFC Rashawn I. Baker
010-7210-1454
1
11
19th ESC
Cp Carroll
94MP, 188MP
430
1
SGT Brandon T. Rose
010-8205-6925
1
12
19th ESC
Cp Carroll
403rd AFSB, TMP
915
1
Mr. Yi, Kyong Sik
010-4315-2126
1
13
19th ESC
Cp Carroll
498th CSSB, 95 Trans
201
1
CPL Ian Brewer
010-8110-2546
1
14
19th ESC
Cp Carroll
498th CSSB, 551st
396
2
PFC Logan W. Martinez
010-7517-6826
2
15
19th ESC
Cp Carroll
AFS Bn
817
1
Mr. Alexander M. Hung

010-5742-8259

16
19th ESC
Cp Henry
403rd AFSB, TMP
1521
1
Mr. Hong, Song Hon
010-4931-1673
1
17
65th Med

Bde

Cp Humphreys
568 MED
713
1
SSG Reyes
315-737-5918
1
18
2ID
Cp Humphreys
2 CAB, 3-2 GSAB
2110
1
SFC WYACO, ANTHONY
315-755-1453
1
19
2ID
Cp Humphreys
3 CAB, 3-2 GSAB
809
1
SFC WYACO, ANTHONY
315-755-1453
1
20
2ID
Cp Humphreys
2CAB, 4-2 CAB
2110
2
SSG IRVING, GORDON
315-755-1453
2
21
2ID
Cp Humphreys
2CAB, 602nd

ASB/4-6 CAV, E Trp

4
SFC WYACO, ANTHONY
315-755-1453
4
22
1st Sig Bde
Cp Humphreys
41st SIGN
2150
3
CW3 Nicholas Stauffer
315-756-1702
3
23
1st Sig Bde
Cp Humphreys
304th ESB
2130
2
CW3 Nicholas Stauffer
315-756-1702
2
24
Tenants
Cp Humphreys
403 AFSBn-Korea
7000
1
SFC McGuffey, Andrew T.
757-1220
1
25
Tenants
Cp Humphreys
403 AFSBn-Korea
7010
1
SFC McGuffey, Andrew T.
757-1220
1
26
HHBN, 8A
Cp Humphreys
HHC 8A
7110
2
SFC Godbolt, Derek
315-756-8258
2
27
19th ESC
Cp Humphreys
94MP
7120
1
SFC Deleon, Zander
315-756-1584
1
28
19th ESC
Cp Humphreys
4-58AOB,339QM
7130
2
SFC Sarmiento, Manuel
315-756-2310
2
29
2ID
Cp Humphreys
194th CSSB
7210
2
SSG GALVAN
315-756-6028
2
30
2ID
Cp Humphreys
194th CSSB
7240
1
SSG GALVAN
315-756-6028
1
31
2ID
Cp Humphreys
HHC, 2ID DSTB, DIV
7325
1
No Solvent Tanks from unit
N/A
1
32
2ID
Cp Humphreys
814th MRSC
7506
2
SSG Elza, Cody
315-756-3585
2
33
2ID
Cp Humphreys
814th MRSC
7520
2
SSG Elza, Cody
315-756-3585
2
34
2ID SBDE
Cp Humphreys
23rd CHEM
7230
4
SFC Beak, Hyung
315-757-1502
4
35
2ABCT, 1 AD
Cp Humphreys
215 BSB
P8310
2
SGT NINE, RANDY
315-757-3055
2
36
2ID
Cp Humphreys
HHBN, 2ID
P8300
1
CW2 Hicks, Dominick
315-756-7830
1
37
2ID
Cp Humphreys
HHBN, 2ID
7309
1
CW2 Hicks, Dominick
315-756-7830
1
38
2ID
Cp Humphreys
3-8 CAV
7440
4
SSG DELOSANGELES
315-756-1210
4
39
2ID
Cp Humphreys
2-7 CAV, 1ABCT, 1AD
7410
2
1LT HANNAH, THOMAS
315-756-2080/
40
501st MI BDE
Cp Humphreys
3rd, MI BN
12055
2
SFC Crawford, Easton
755-8515
2
41
19th ESC
Osan AB
35th ADA
2473
3
CW2 Lopez / SSG Hayward
010-6820-8142
3
42
19th ESC
Osan AB
35th ADA
7132
1
CW2 Lopez / SSG Hayward
010-6820-8142
1
43
19th ESC
Suwon AB
35th ADA
2533
2
CW2 Lopez
010-6820-8142
2
44
19th ESC
Yongsan
403rd AFSB
5714
1
Ms. Son, Un Suk
010-6807-2546
1
45
2ID
K-16
2-2 ASLT
S-523
4
2LT PARKER, AIYANA/

SGT THATER, JOHN

315-722-3996
4
46
2ID
K-16
2-2 ASLT
S261
1
2LT PARKER, AIYANA/

SGT THATER, JOHN

315-722-3996
1
47
2ID
JSA (BONIFAS)
JSA
1075
1
1LT Spiegl, Jarrett
010-5155-5785
1
48
19th ESC
Cp Casey
7th KSC
2285
1
Mr. Pak, Chae Su
010-3704-5125
1
49
19th ESC
Cp Casey
403rd AFSB
2399
1
Ms. Son, Un Suk
010-6807-2546
1
50
2ID
Cp Casey
6-37 FA, 2ID
480
4
1LT White, Logan
010-7426-6099
4
51
2ID
Cp Casey
6-37 FA Bn, 579th FSC
1904
1
1LT White, Logan
010-7426-6099
1
52
2ID
Cp Casey
DPW, Heavy Shop
610
1
SSG Henley
010-5733-6947
1
53
2ID
Cp Casey
954th CBRN
1024
1
2LT Weege, Bret
010-2231-9558
1
54
19th ESC
Cp Casey
94 MP
S2528
1
SFC Deleon, Zander
315-756-1584
1
55
2ID
Cp Hovey
5-20 IN
4322
4
SFC Vargas, Julio
56
2ID
Cp Hovey
1-37FA
4108
2
SGT Riveranegron, Joseh
57
2ID
Cp Hovey
1-41 FA, F FSC
4367
2
SGT Riveranegron, Joseh
58
2ID
Cp Hovey
1-41 FA, F FSC
4125
1
CW2 DARNALL
59
2ID
Cp Hovey
A&B Co. 23 BEB
3478
60
2ID
Cp Hovey
14th BEB
3461
1
2LT Sardon, Justin
61
2ID
Cp Casey
1-38 FA BN
S105
2
2LT Smitsdorff, Lindsey
010-4276-7103
2
62
2ID
Cp Casey
1
2LT Smitsdorff, Lindsey
010-4276-7103
1
63
2ID
Cp Casey
1-23 IN 1-77 AR, 2ID
1064
2
SSG Reyes, Lorenzo
010-3406-1974
2
64
65th MED
Cp Casey
629th Medical Co
1171
1
2lT Snoonian, Else
010-8190-5169
1
65
2ID
Cp Casey
70th BSB
627
2
1LT Strippoli, Jaida
010-2406-1132
2
66
2ID
Cp Casey
70th BSB, HSC
1753
2
1LT Strippoli, Jaida
010-2406-1132
2
67
2ID
Cp Casey
C-CTC/ C CO,

194TH 46th Trans Co

2
SGT Hernandez, Matos
010-7641-3974
2
68
2ID
Cp Casey
61st Maint Co
793
2
SSG Carter, Raymond
010-7582-5960
2
69
2ID
Cp Casey
61st Maint Co
746
1
SSG Carter, Raymond
010-7582-5960
1
70
2ID
Cp Casey
C.CO. 194TH
778
1
Mr. Kwon Su Yong
010-8652-7250
1
71
19th ESC
RLFC
TSAK(포천)
1255
1
Mr. Yi, Tu Sin
010-9055-0414
1
72
20th ESC
RLFC
TSAK(포천)
1381
1
Mr. So, Chae Ku
010-4330-3123
1
73
19th ESC
SLFC
TSAK(문산)
283
1
Mr. Kim, Si Hyong
010-3350-9675
1
74
35ADA
Kunsan
2-1 ADA
802
1
SGT MOORE
010-2409-0299
1
75
35ADA
Kunsan
2-1 ADA
1310
1
SGT LEE
7829981
1
10
127

7. APPLICABLE DOCUMENT: N/A

8 PERFORMANCE REQUIREMENTS SUMMARY: The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective / PWS Para
Performance Standard
Performance Threshold THIS IS THE

MAXIMUM ERROR RATE. IT COULD POSSIBLY BE “ZERO DEVIATION FROM

STANDARD”

Method of Surveillance
Remedy

Fill and dispose of 120 gallon and 48-gallon parts washer cleaning solvent tanks with 100% of pure (not recycled) Flash Point up to 60.0 C. (PWS Para 5.1 & 5.2)

Monthly, Contractor shall ensure tanks are filled with 100% pure Flash point cleaning solvent up to 60.0 C IAW set schedule.
100%
100% of the technical inspection by COR/Area ACOR (I&II, III, IV&V)
Re-performance within 3 working days of notification

The contract manager shall be available to resolve any delivery or maintenance problems within 3 working days after notification from COR. (PWS Para 5.5)

The contractor shall ensure resolving and completed
95%
100% of the technical inspection by COR/Area ACOR (I&II, III, IV&V)
Re-performance within 3 working days of notification

The contractor shall provide a Material Safety Data Sheet (MSDS) reports written in English based on Korean Environmental Government Standard (KEGS) or US Government National Fire Protection Association (NFPA) – Hazard Identification Regulation and using the manufacture’s manual after to award contract. The contractor must have an authorized license by the Korean government to haul and dispose of waste solvent (PWS Para 5.6)

The contractor shall ensure that they provide after contact award.
95%
100% of the technical verify by COR/Area ACOR
Re Re-performance within 5 working days of notification

9. CONTRACTOR DATA REQUIREMENT LISTS (CDRL): The contractor shall prepare DA Form 2407 (Maintenance Request), DD Form 250 (Material Inspection and Receiving Report), and EANC Form 750-R (Contract Production Report). The contractor shall furnish to the COR, Administrative Contracts Officer (ACO) a copy of all completed forms by monthly, with copy furnished to the Cdr, 19th ESC DMC, EANC-DMC -OC, Unit #15015, APO AP 96218-5015. All the submission required data lists are shown on DD Form 1423-1 (Contract Data Requirements List).

No
Deliverable / PWS Paragraph
Frequency
# of Copies
Medium / Format
Submit To
1
Safety Plan (PWS Para 5.9.6)
First submission within 15 calendar days after contract award. Revisions, 5 calendar days after receiving the government

revision.

One copy
Hard Copy / Contractor Format
KO, COR &

RA 19th ESC

2
Accident Investigations Report (PWS Para 5.9.6.2)
Within 5 calendar days of accident. Re-submit the corrected report within 3 working days.
One copy
Hard Copy / Contractor Format
KO, COR &

RA 19th ESC

3
DA Form 2404, Equipment Inspection and Maintenance Worksheet (PWS Para 5.7)
10th calendar day of each month after maintenance/service or after unscheduled maintenance. Re- performance within 5 working days of notification.
One copy
Hard Copy / DA Form 2404
COR

&RA 19th ESC

4
DA Form 2407 Maintenance Request (PWS Para 9)
10th calendar day of each month. Re-submit the corrected report within 3 working days
One copy
Hard Copy / DA Form 2407
COR

&RA 19th ESC

5
DD Form 250 Material Inspection and Receiving Report (PWS Para 9)
10th calendar day of each month. Re-submit the corrected report within 3 working days.
One copy
Hard Copy / DD form 250
COR

RA 19th ESC

6
EANC Form 750-R Contract Production Report (PWS Para 9)
10th calendar day of each month. Re-submit the corrected report within 3 working days.
One Copy
Hard Copy / EANC Form 150R
COR

RA 19th ESC

10. CONTRACT MANPOWER REQUIREMENT (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) requires for performance of services provided under this contract for maintenance service of solvent tank and exchange solvent and supply rag for EUSA wide. The contractor is required to completely fill in all required data fields using the following web address: http://www.sam.gov.

The Contractor shall reference FAR clause 52.204-14: Service Contract Reporting Requirements. And follow reporting instruction in accordance with paragraphs (c) and (d) of the clause annually by October 31 for services performed under this contract during the preceding Government fiscal year (October 1- September 30).

(c) The Contractor shall report the following information:

(1) Contract number and, as applicable, order number.

(2) The total dollar amount invoiced for services performed during the previous Government fiscal year under the contract.

(3) The number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year.

(4) Data reported by subcontractors under paragraph (f) of this clause.

(d) The information required in paragraph (c) of this clause shall be submitted via the internet at www.sam.gov. (See SAM User Guide). If the Contractor fails to submit the report in a timely manner, the contracting officer will exercise appropriate contractual remedies. In addition, the Contracting Officer will make the Contractor’s failure to comply with the reporting requirements a part of the Contractor’s performance information under FAR subpart 42.15.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2026. Contractor may direct questions to the help desk at: https://www.sam.gov

File details come from the government source that posted it. Updated .