DRAFT PWS for Engine Test Cell 4 PLC Upgrade 2.pdf
PDF 276 KB Posted
- Attached to
- Engine test cell PLC upgrade
- Solicitation number
- Not on record
About this file
This is a Performance Work Statement for the upgrade of a Programmable Logic Controller (PLC) system in Engine Test Cell 4 at Corpus Christi Army Depot (CCAD), located at 308 Crecy Street, Corpus Christi, Texas.
The contract requires the removal of the obsolete GE Fanuc 90-30 PLC and its replacement with a new Allen-Bradley CompactLogix 1769 Series PLC system. Key deliverables include transposing existing PLC ladder logic into RSLogix5000/Studio 5000 programming to ensure operational functionality matches the current system, creating CAD drawings in both PDF and DWG formats showing all wiring from terminal strips to module edge connectors, removing the existing GE Fanuc system, installing the new Allen-Bradley system utilizing existing wiring where possible and adding materials as needed, and conducting operational checks to verify all PLC-related controls function correctly. The specified hardware components include one 1769-L33ER CPU, relay output modules, digital input/output modules, power supplies, expansion cables, and associated wiring, terminal blocks, breakers, fuses, and panel-building materials. The Period of Performance is 60 calendar days, with work conducted Monday through Friday, 0700–1700 hours, excluding recognized US federal holidays. The Contractor must furnish all labor, equipment, supplies, tools, and materials necessary to complete the project and develop and maintain an effective Quality Control Program. The Government will provide facility access, workspace, and utilities, with a COR/Project engineer available to coordinate and verify requirements. Security requirements include Installation Access Control compliance, base pass acquisition through Navy Pass & Tag, pass log documentation, and adherence to CCAD facility security policies, including anti-terrorism training, OPSEC training, iWATCH briefing, DoD Cyber Awareness training, and Controlled Unclassified Information (CUI) training completion within 30 calendar days. The Government retains unlimited data rights to all documents and materials produced, including source code, which become Government property and cannot be used or sold without written Contracting Officer permission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Request for Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Engine Test Cell 4 PLC Upgrade
PART 1
GENERAL INFORMATION
1.0 General: This is a non-personal service contract to Upgrade the GE Fanuc 90-30 PLC in Engine Test Cell 4 to a new Allen-Bradley CompactLogix 1769 Series PLC. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Scope: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, quality control, and other items and non-personal services necessary to complete the following project objectives. Project will include onsite integration of the new Allen-Bradley Compact Logix 1769 Series PLC system in Engine Test Cell 4. The contractor shall provide newly created drawings showing all wiring from terminal strip to module edge connectors in PDF and DWG format.
1.2 Background: The GE Fanuc 90-30 PLC is obsolete and unsupportable. If the PLC were to fail, Engine Test Cell 4 would be down indefinitely.
1.3 Description of Services: The Contractor shall provide the following project objectives:
1.3.1. Contractor shall transpose existing PLC ladder logic into RSLogix5000/Studio 5000 to ensure the upgraded control system mimics the current operational functionality. This program shall be provided to CCAD.
1.3.2. Contractor shall create CAD drawings reflecting Allen-Bradley CompactLogix installation including all wiring from the terminal strip to the module edge connectors. The drawings shall be provided in PDF and DWG formats.
1.3.3. The Contractor shall remove the existing GE Fanuc 90-30 PLC.
1.3.4. The contractor shall install the new Allen-Bradley CompactLogix 1769 Series PLC utilizing existing wiring where possible and adding additional wiring, terminals, breakers, fuses, labels, and panel building materials as needed.
1.3.5. The contractor shall conduct operational checks to verify functionality of all PLC-related controls.
1.4 Period of Performance (POP): The period of performance shall be for sixty (60) calendar days.
1.5 General Information:
1.5.1 Quality Control (QC): The Contractor shall develop and maintain an effective QC Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the Contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary.
1.5.2 Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary, See Part 7.1; attachment 1.
1.5.3 Recognized Holidays: The following are recognized US holidays. The Contractor shall not perform services on these days:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth National Independence Day Christmas Day Independence Day
1.5.4 Hours of Operation: The Contractor shall provide services between the hours of 0700 – 1700 hours Monday thru Friday, except on US Holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. For other than firm fixed price contracts, the Contractor shall not be reimbursed when the Government facility is closed for the above reasons. The Contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed. Extended hours may be worked when approved by the government and at no additional cost to the government.
1.5.5 Place of Performance: Performance for work under this contract shall be at Corpus Christi Army Depot, 308 Crecy Street, Corpus Christi, Texas.
1.5.6 Security Requirements: See Part 7.3; attachment 3.
1.6 Safety Requirements:
1.6.1 The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991).
1.6.2. The Contractor shall conduct all work in a safe manner and in compliance with Federal, State, Local, Department of Defense, Army, and Depot regulations and national consensus standards.
1.6.3 The Contractor shall provide a Site-Specific Safety and Occupational Health Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA).
1.6.3.1 Site-Specific Safety and Occupation Health Accident Prevention Plan (APP). The Contractor shall develop, promulgate, and enforce a written site-specific safety and occupational health accident prevention plan (Herein referred to as safety plan). The safety plan shall identify protocols and procedures to ensure a safe and healthful workplace. The safety plan shall be reviewed and deemed acceptable by the COR before beginning any on-site activities.
1.6.3.2 Activity Hazard Analysis (AHA). The Contractor shall identify in sequence the activities being performed, the specific anticipated hazard, equipment, materials, and the control measures to implemented to eliminate or minimize each hazard to an acceptable level of risk. The contractor shall use the more stringent standard when standards are different. The names of the competent and qualified person required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities as specified by OSHA) shall be identified and included in the activity hazard analysis, as well as proof of their competency and qualification. The analysis shall be reviewed and deemed acceptable by the COR before beginning any on-site activities.
1.6.4 Service Condition. No part of the services covered by the McNamara-O’Hara Service Contract Act of 1965 will be performed in buildings or surroundings or under working conditions, provided by or under the control or supervision of the Contractor or any Subcontractor, which are unsanitary or hazardous or dangerous to the health or safety of service employees engaged to furnish the services.
PART 2
DEFINITIONS & ACRONYMS
2.0 DEFINITIONS AND ACRONYMS:
2.1 Definitions:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3 CONTRACTING OFFICER’S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor Contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.3.1 TECHNICAL OFFICER’S REPRESENTATIVE (COTR). An employee of the U.S. Government assisting the COR in technical matters outside his expertise such as functional checks regarding water and air volume flows at various speeds, proper fill material installation and structural support, engineering drawings review, component shop submittals etc.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the
PWS.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured items such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to the acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
AR Army Regulation AQL Acceptable Quality Level CAD Computer Aided Design CCAD Corpus Christi Army Depot CFR Code of Federal Regulations COR Contracting Officer’s Representative DA Department of the Army DD250 Department of Defense Form 250 Receiving Report DD254 Department of Defense Form 254 Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMWR Depot Maintenance Work Requirement DOD Department of Defense FAR Federal Acquisition Regulation IAW In Accordance With JTR Joint Travel Regulation KO Contracting Officer NA Not Applicable NFPA National Fire Protection Association PDF Portable Document Format PIPO Phase In/Phase Out PLC Programable Logic Controller POC Point of Contact POP Period of Performance PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit TEEB Test Equipment Engineering Branch
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES
3.0 GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Facilities: The Government will provide access to and the necessary workspace to perform the tasks as outlined in the PWS.
3.2 Equipment: The Government will provide access to Engine Test Cell 4 as needed to complete PWS. As Engine Test Cell 4 is an active test cell, access will need to be coordinated with CCAD production.
3.3 Materials: Not Applicable.
3.4 Services: The Government will provide COR/Project engineer to be available during the project to coordinate, perform, verify, and accept the requirements of the PWS.
3.5 Utilities: The Government will provide all utilities available in the facility for the Contractor’s use in the performance of this contract. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: Except for those items specifically stated to be Government-Furnished in paragraph 3.0, the Contractor shall furnish everything required to perform project objectives as indicated in paragraph 1.1.
4.2 Secret Facility Clearance: Not Applicable.
4.3 Materials/Equipment: The contractor shall furnish all required materials, supplies, equipment, and tools of the trade to perform the project as defined in this PWS.
4.4 Standard Warranty: No warranty.
PART 5
SPECIFIC TASKS
5.0 REQUIREMENTS:
5.1 Basic Services: The Contractor shall furnish all labor, parts, material, and equipment to successfully upgrade the PLC in Engine Test Cell 4.
5.2 Task/Requirement:
5.2.1 Contractor shall remove GE Fanuc 90-30 PLC.
5.2.2 Contractor shall install new Allen-Bradley CompactLogix 1769 Series PLC system.
5.2.3 Contractor shall program the new Allen-Bradley CompactLogix 1769 Series PLC system to function like removed system.
5.2.4 Contractor shall verify functionality of all PLC related controls.
PART 6
APPLICABLE PUBLICATIONS
6.0 APPLICABLE PUBLICATIONS
6.1 The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures listed below:
1. Occupational Safety and Health Administration (OHSA) Part 1910 Occupational Safety and Health Standards
2. NFPA 70 National Electrical Code
3. EM 385-1-1, Safety and Health Requirements Manual, 2014 version
4. Occupational Safety and Health Administration (OHSA) Part 1926 Safety and Health
Regulations For Construction
5. NFPA 70E Standard for Electrical Safety in the Workplace
6. Unified Facilities Criteria (UFC) 3-561-01 Electrical Safety, O & M
7. Security Requirements
8. CCAD Reg. 385.30 CCAD Safety Program
PART 7
ATTACHMENTS/TECHNICAL EXHIBITS
7.0 Attachment/Technical Exhibit List: (List all attachments and technical exhibits that will be useful for the Contractor to submit an appropriate proposal).
7.1 Attachment 1 / Technical Exhibit 1: Performance Requirements Summary
7.2 Attachment 2 / Technical Exhibit 2: Deliverables Schedule
7.3 Attachment 3 / Technical Exhibit 3: Security Requirements
ATTACHMENT 1 / TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare contractor performance to the Acceptable Quality Level
(AQL).
PWS Paragraph 5.2. thru 5.2.3 Task Replacement Parts/Upgrade Performance Standard The Contractor shall receive parts, install, and troubleshoot if required and notify the government of cost of replacements/repairs.
Acceptable Quality Level No failure rate.
Surveillance Method 100% inspection by the COR
PWS Paragraph 5.2.4 Task Product Conformance Performance Standard Repaired, overhauled, or remanufactured products shall conform to the OEM engineering specifications for fit, form, and function.
Acceptable Quality Level No failure rate.
Surveillance Method 100% inspection by the COR
ATTACHMENT 2 / TECHNICAL EXHIBIT 2
Deliverables Schedule
The following Allen-Bradley CompactLogix 1769 Series components will be supplied and installed:
Main Rack Components
• (1) 1769-L33ER CPU
• (1) 1769-OW16 Relay Output Module (AC/DC)
• (4) 1769-IQ16 16pt 24VDC Input Modules
• (4) 1769-OB16 16pt 24VDC Output Modules
Expansion / Remote Rack Components
• (1) 1769-OA16 16pt 120VAC Output Module
• (1) 1769-IA16 16pt 120VAC Input Module
• (1) 1769-OW8 8pt Relay Output Module (AC/DC)
• (2) 1769-IQ16 16pt 24VDC Input Modules
• (2) 1769-PA4 Rack Power Supplies (one per rack)
• (1) 1769-CRL1 Bus Expansion Cable
• (1) 1769-ECR Right End Cap Terminator
Additional Materials
• All necessary wiring, wire labels, terminal blocks, breakers, fuses, and associated panel-building materials.
Part 7.3 ATTACHMENT 3: Security Requirements
7.1. Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or background investigations will be grounds for denying access to U.S. installations, buildings, and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control processing requirements.
The Contractor shall return installation and CCAD passes to the issuing Security office when the contract is completed or when a Contractor employee no longer requires access.
The Contractor shall obtain a Base Pass through Navy Pass & Tag not to exceed contract expiration. The government Contracting Officer Representative (COR) will coordinate badging and briefing with Security. CCAD personnel will escort Contractor at all times if building access is required unless approved in advanced by CCAD Security.
Contractors are not authorized to escort anyone on the installation or CCAD.
7.2. Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award. The log must at a minimum contain the following information Full Legal Name, type of access (e.g. DBIDS, base pass) and working hours. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.
7.3. Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) working days.
7.4. Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within three (3) working days.
7.5. Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
7.6. Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
7.7 Safeguarding Covered Defense Information: Contractors and subcontractors are required to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security requirements and reporting of cyber incidents in accordance with 48 CFR 204.73.
7.8 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
7.9 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
7.10 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
7.11 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
7.12 Required Training: The following provides information on training requirements.
7.8.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days as required on the AT/OPSEC Cover Sheet after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within five business days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil, (course JS-US007). Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within five business days after completion of the training.
7.8.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under this contract. Verification of the training shall be provided to the COR within five business days after completion of the training.
http://www.dimoc.mil/resources/limitations/ https://jkodirect.jten.mil/
OPSEC Level I training is available at https://securityawareness.usalearning.gov. Contractor personnel must complete refresher training every twelve months. Verification of the training shall be provided to the COR within five business days after completion of the training.
7.8.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after the contract is awarded and within five business days after new employees commence contract performance, with the results reported to the COR within five business days after the contract is awarded and within 30 calendar days} after new employees commence contract performance. Verification of the training shall be provided to the COR within five business days after completion of the training.
7.8.4 DoD Cyber Awareness Training All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Verification of the training can be provided to the COR upon request after completion of the training.
7.8.5 Controlled Unclassified Information (CUI): Contractor employees, including subcontractors, performing services under this contract with access to CUI shall complete DOD Mandatory Controlled Unclassified Information (CUI) Training within 30 calendar days of employment and annual refresher training in accordance with DoDI 5200.48.The Contractor shall provide the COR a copy of the training certificates for its employees no later than five
(5) days after completion. Training is available at https://securityawareness.usalearning.gov.
7.9 Omitted
7.10 APPLICABLE SECURITY PUBLICATIONS
7.10.1 Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
7.10.1.1 Executive Order 13556, Controlled Unclassified Information
7.10.1.2 National Institute of Standards and Technology Special Publication 800-171, Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations
7.10.1.3 32 Code of Federal Regulation (CFR) Part 2002, Controlled Unclassified Information
7.10.1.4 32 Code of Federal Regulation (CFR) Part 117 National Industrial Security Program Operating Manual
(NISPOM)
7.10.1.5 Federal Acquisition Regulation Subpart 24.1 CFR Part 24 and Part 39.105
7.10.1.6 Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
7.10.1.7 Defense Acquisition Regulation 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls
7.10.1.8 Defense Acquisition Regulation 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
7.10.1.9 DoDI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and other Eligible Individuals
7.10.1.10 DoDM 5200.02 Procedures for the DoD Personnel Security Program
7.10.1.11 DoDM 1000.13, Volume 1, DoD Identification (ID) Cards: ID Card Life-Cycle DoDI 5200.02 DoD Personnel Security Program
7.10.1.12 DoDI 5200.02 DoD Personnel Security Program
7.10.1.13 DoDI 5200.48, Controlled Unclassified Information
7.10.1.14 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS UNIFIED FACILITIES
CRITERIA (UFC)
7.10.1.15 DoDI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and other Eligible Individuals
7.10.1.16 DoD 5220.22-M National Industrial Security Program Operating Manual DoD Directives
7.10.1.17 DoDD 5230.25, Withholding of Unclassified Technical Data from Public Disclosure https://securityawareness.usalearning.gov/
7.10.1.18 DoDD 5240.06 Counterintelligence Awareness and Reporting (CAIR)
7.10.1.19 DoDD 5400.11, Department of Defense Privacy Program, October 29, 2014
7.10.1.20 DoD 5400.11-R, Department of Defense Privacy Program UFC 4-010-01 9 February 2012 Change 1, 1 October 2013
7.10.1.21 DoD 8570-M Information Assurance Workforce Improvement Program
7.10.1.22 AR 25-1 Army Information Technology
7.10.1.23 AR 25-2 Army Cybersecurity
7.10.1.24 AR 25-55, The Department of the Army Freedom of Information Act
7.10.1.25 AR 70-31, Standards for Technical Reporting
7.10.1.26 AR 190-13 The Army Physical Security Program
7.10.1.27 AR 360-1, The Army Public Affairs Program
7.10.1.28 AR 380-5, Army Information Security Program
7.10.1.29 AR 380-10, Foreign Disclosure and Contact with Foreign Representatives
7.10.1.30 AR 380-49, Industrial Security Program
7.10.1.31 AR 380-67, Personnel Security
7.10.1.32 AR 530-1, Operations Security
7.10.1.33 AR 735-5 Property Accountability Policies
7.10.1.34 EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
7.10.1.35 530-CCAD-001 CCAD Operations Security Plan (OPSEC)
7.10.1.36 CCAD Physical Security Plan
7.10.1.37 Army Directive 2014–05 (or its successor) Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
7.10.1.38 AMC-R 525-13, AMC Force Protection Program
7.10.1.39 5230.24, Distribution Statements on Technical Documents