This performance work statement outlines repair and fabrication services required for an aircraft firefighter training mockup located at Ellsworth Air Force Base in South Dakota. The contractor will remove, repair, fabricate, and reinstall metal sections for the large wing, small wing, tail wing, and nose cone. Responsibilities include using cranes and welding equipment to detach, transport, and install mockup components. The contractor must be experienced in metal fabrication, installation, and repair work. The solicitation will be open to small businesses only and have a period of performance from July 1st to 30th, 2022. The Air Force will provide site access, approvals, and safety/security services while work is performed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
REMOVE, REPAIR, FABRICATE, & RE-INSTALL METAL JET-FUEL AIRCRAFT
TRAINING PIT MOCK-UP
ELLSWORTH AFB, SD
16 MARCH 2022
SCOPE OF WORK: Provide labor, materials, and equipment to perform removal, repair, custom fabrication, installation, and disposal of metal aircraft mock-up sections used for aircraft firefighter training located in center of fire department jet-fuel training pit, Ellsworth AFB, SD, Bldg. 6907. Contractor will remove old, fabricate new, and install one complete large and one small wing. Contractor will repair repairable parts and fabricate new unrepairable pieces of tail wing and nose cone sections of aircraft mock-up. The repairs and materials used for fabrication need to withstand high heat from jet fuel training and hot/cold metal contraction, metal materials used must be similar in type, size, and thickness used on existing aircraft mock-up.
VENDOR RESPONSIBILITIES: Custom fabrication or repairs of mock-up sections can be accomplished off-site, vendor responsible for delivery back to job site.
CONTRACTOR QUALIFICATIONS: Contractor shall be experienced and trained in crane operations, welding, custom fabrication, installation, and repair of metal.
COMPLIANCE: Contractor shall comply with OSHA and applicable National Fire Protection Association Codes. Contractor(s) shall comply with the Base Fire Regulations as required under EAFBI 92-1. Contractor(s) shall not utilize explosives or fire in performing work. Contractor shall comply with Welding, Cutting and Brazing requirements in AFOSH Standard 91-5, 1 May 1997.
Following items will be performed by contractor personnel as part of this scope of work:
1. Large Wing Section Removal, Custom Fabrication, Installation, and Disposal:
• Remove existing large wing section with crane from the training pit:
o Detach from support footings and fuselage.
o Detach fuel line from large wing section
• Custom fabricate and weld new large wing with:
o I-beam frame o Individual wing plates o I-beam fascia plates o Support legs with mounting plates and mounting holes
• Install new large wing, weld or mount to fuselage and support footings.
o Re-attach fuel line to large wing section
• Dispose of old large wing section.
2. Small Wing Section Removal, Custom Fabrication, Installation, and Disposal:
• Remove existing small wing with crane from the training pit:
o Detach from support footings o Detach fuel line from small wing section
• Custom fabricate and weld new large wing with:
o I-beam frame o Individual wing plates o I-beam fascia plates o Support legs with mounting plates and mounting holes
• With crane, install new small wing, mount to support footings.
o Re-attach fuel line to small wing section
• Dispose of old small wing section.
3. Tail Wing Section Removal, Repair, Custom Fabrication, and Installation:
• Remove existing tail wing section with crane from the training pit.
• Repair tail wing:
o Remove loose or damaged sections o Remove existing skids o Remove vertical stabilizer o Remove damaged horizontal stabilizer o Weld or repair tail wing parts o Custom fabricate and replace tail wing parts and skids
• With crane, place tail wing section in training pit on skids.
• Dispose of old tail wing parts/pieces.
4. Nose Cone Section Removal, Repair, Custom Fabrication, and Installation:
• Remove existing nose cone section with crane from the training pit.
• Repair nose cone:
o Remove loose or damaged sections o Remove existing skids o Remove damaged cone belly pan and front plate o Remove damaged horizontal stabilizer o Weld or repair nose cone parts o Custom fabricate and replace damaged nose cone parts and skids
• With crane, place nose cone section in training pit on skids.
• Dispose of old nose cone parts/pieces.
GOVERNMENT RESPONSIBILITIES:
• Provide site and facility access for Vendor personnel performing installation and repair work.
• Vendor personnel will be allowed on site and be able to work without specific clearances or special access needs.
• If escorts are required to controlled areas then they shall be provided by the base.
• Provide the Vendor Project Manager with a single point of contact for the duration of the contract.
• Obtain and provide all necessary approvals, permits, and lease agreements for affected facilities.
5. WORKING HOURS: Normal duty hours at Ellsworth AFB are Monday through
Friday, except on Government holidays, 7:00 a.m. to 4:30 p.m. Inform Contracting Officer in writing 72 hours prior to working at times other than normal duty hours.
Facilities will be occupied and in full operation when the work is performed.
• Federal Holidays include:
i. New Year’s Day – 1 January
ii. Martin Luther King Day - 3rd Monday in January
iii. Washington’s Birthday - 3rd Monday in February
iv. Memorial Day - last Monday in May
v. Juneteenth Day – 19 Jun
vi. Independence Day - 4 July
vii. Labor Day - 1st Monday in September
viii. Columbus Day - 2nd Monday in October
ix. Veteran’s Day - 11 November
x. Thanksgiving Day - 4th Thursday in November
xi. Christmas Day - 25 December
6. BASE CLOSURE: Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.
7. CLEAN UP: After successful completion of all work and tests, and at the end of each workday, Contractor shall clean the area and dispose of debris and trash outside the limits of Government property. Work area and affected areas shall be left in a clean and orderly manner, acceptable to Contracting Officer's Representative. Any damages caused by the contractor to surfaces or structures due to accomplishment of the project shall be repaired to match existing at no cost to the Government. Any damages caused by the contractor to trees, shrubs or surrounding vegetation will be repaired / replaced at no cost to the Government.
8. COMPLIANCE WITH ENVIRONMENTAL LAWS: The contractor shall comply with all applicable federal, state, and local laws, regulations, ordinances, policies, codes and standards related to environmental matters. The contractor shall also comply, and assure that all subcontractors comply, with all applicable specific instructions, policies, or references contained herein. Copies of local policies and procedures can be reviewed at the Base
Environmental office, 605-385-2674. Contractor shall comply with
EAFB WATER SYSTEM O&M RELEASE MANAGEMENT PLAN.
9. ACCESS TO BASE: Contractor shall attain Contractor/Employee Base Passes to perform these services on Ellsworth AFB. The contractor shall coordinate with Contracting to complete this task.
• TRAFFIC LAWS: The Contractor and its employees shall comply with base traffic regulations. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on EAFB.
10. SECURITY, FIRE, AND MEDICAL SERVICES: The government will provide police, medical and fire protection while contract personnel are on base.
| ELLSWORTH AFB, SD |
| 16 MARCH 2022 |
File details come from the government source that posted it. Updated .