DRAFT PWS.pdf
PDF 426 KB Posted
- Attached to
- Scanning electron microscope maintenance
- Solicitation number
- Not on record
About this file
This document is a draft Performance Work Statement (PWS) for a non-personal services contract to perform preventative maintenance and repair on a Scanning Electron Microscope (SEM) and Energy Dispersive Spectrometer (EDS) at the Corpus Christi Army Depot.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, quality control, and other items and services necessary to perform the required maintenance and repair services in accordance with original equipment manufacturer standards. The government will provide the necessary workspace, refurbishing and repair equipment, and technical manuals and procedures. The contract period of performance is not specified. Key requirements include performing preventative maintenance, conducting repairs, submitting invoices and service reports, and adhering to quality control, security, and other defined standards. The government will evaluate contractor performance using a Quality Assurance Surveillance Plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIRequestforInformation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Scanning Electron Microscope (SEM) Energy Dispersive Spectrometer (EDS)
Corpus Christi Army Depot
1.0 GENERAL: This is a non-personal services contract to perform Preventative Maintenance (PM) and Repair Scanning Electron Microscope (SEM) Energy Dispersive Spectrometer (EDS). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in tum is responsible to the Government.
1.1 Scope: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, quality control, and other items and nonpersonal services necessary to perform services as defined in this PWS, except for those items specified as government furnished. The Contractor shall perform to the standards of this contract.
1.2 Backqround: Material Engineering Branch (MER) use the scanning electron microscope (SEM) / energy dispersive spectrometer (EDS) instrument: to support the Accident Investigation Branch (AIB) forensic failure analysis program for rotary wing aircraft; perform chemical analysis to determine alloy composition for finite particle analysis for chip-lights, screens and filters; and provide critical production support for engine test cells, flight test and incoming field samples.
1.3 Description of Services: See paragraph 5.
1.4 Period of Performance (POP): N/A
1.5 General Information:
1.5.1 Quality Control (QC): The Contractor shall develop and maintain an effective QC Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent and ensure nonrecurrence of defective services. The Contractor's QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the Contractor shall develop QC procedures that address the areas identified in the Performance Requirements Summary.
1.5.2 Quality Assurance (QA): The Government will evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP).
1.5.3 Recoqnized Holidays: The following are recognized US holidays. The Contractor shall not perform services on these days:
New Year's Day Labor Day Martin Luther King Jr.'s Birthday Columbus Day President's Day Veteran's Day Memorial Day Thanksgiving Day Independence Day Juneteenth
Christmas Day
1.5.4 Hours of Operation: The Contractor shall provide services based on a 40 hour week, except on US Holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government directed facility/installation closings. Normal hours of operation are 40 hours per week. The hours of required support shall parallel with those hours that the regular CCAD maintenance teams are available to provide assistance. The exact hours and days may change in instances of government furloughs or shift changes. No overtime is authorized without prior approval from the COR. For other than firm fixed price contracts, the Contractor shall not be reimbursed when the Government facility is closed for the above reasons. The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed.
1.5.5 Place of Performance: Performance for work under this PWS shall be at Corpus Christi Army Depot.
1.5.6 Contractor Travel: Contractor shall travel to Corpus Christi Army Depot, Corpus Christi, Texas during the performance of this requirement. The Contractor shall be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and authorization by the KO prior to travel arrangements being made.
DEFINITIONS & ACRONYMS
2.0 DEFINITIONS AND ACRONYMS:
2.1 Definitions:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government.
Note: The only individual who can legally bind the Government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government designated by the KO to monitor Contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the PWS.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes nonmanufactured items such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to the acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CARC Chemical Agent Resistant Coating CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer's Representative COTS Commercial-Off-the-SheIf DA Department of the Army DD250 Department of Defense Form 250 Receiving Report DD254 Department of Defense Form 254 Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation
IAW In Accordance With KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PPE Personal Protective Equipment PIPO Phase In/Phase Out POC Point of Contact
Performance Requirements Summary
PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SOP Standard Operating Procedure Technical
Exhibit TM Technical Manual UFC Unified Facility Criteria WAWF Wide Area Workflow
PART
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES
3.0 GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Facilities: The Government will provide the necessary workplace for the Contractor to provide the service outlined in this PWS to include desk space and telephones.
3.2 Equipment: The Government will provide necessary refurbishing and repair equipment and tooling to the Contractor to provide the service outlined in this PWS.
3.3 Materials: The Government will provide the TMs and SOPs for the Contractor to provide the service outlined in this PWS, listed in Part 6.
3.4 Services: N/A.
3.5 Utilities: The Government will provide all utilities available in the facility for the Contractor's use in the performance of this contract. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 CONTRACTOR FURNISHED ITEMS AND RESPONSBILITIES:
4.1 General: Except for those items specifically stated to be Government-Furnished in Part 3, the Contractor shall furnish everything required to perform these services as indicated in paragraph 1.1.
4.2 Secret Facility Clearance: N/A.
4.3 Materials/Equipment: See para 1.1.
SPECIFIC TASKS
5.0 REQUIREMENTS: The Contractor shall accomplish:
5.1 The Contractor shall preform PM of the scanning electron microscope (SEM) / energy dispersive spectrometer (EDS) instrument in accordance with OEM standards.
5.2 The Contractor shall preform Repair of the scanning electron microscope (SEM) / energy dispersive spectrometer (EDS) instrument in accordance with OEM standards.
5.3 The Contractor shall submit invoice via WAWF upon completion of PM and/or Repair.
5.4 The Contractor shall submit service report to COR via email upon completion of pm and/or Repair.
APPLICABLE PUBLICATIONS
6.0 APPLICABLE PUBLICATIONS: NONE
ATTACHMENTS
7.0 Attachment List:
7.1 Attachment 1: Performance Requirements Summary
ATTACHMENT 1 / TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Acceptable Quality Levels AQL
Surveillance Method /
Whom
1.5 All
Adherence to scheduled arrival and departure dates and times.
The Contractor shall perform technical support within 98% of the scheduled time.
2% failure to perform technical support within the scheduled time.
COR inspectio and custome feedback
1 .3, 5.0 Job performance The Contractor shall perform 100% completion of each task.
0% failure of each task performed.
COR inspectio and custome feedback
1.5 All, 1.6
All Adherence to
CCAD regulations (Safety, security and environmental).
The Contractor shall perform within of the scheduled time.
0% failure to the scheduled time.
COR inspectio and custome feedback
Invoice / Billing
5.3 100% of completed on each service call. Error return rate 0%.
Project Officer
(QA/COR)
inspection & customer in ut
Invoice / Billing
Services / 5.0 100% of completed on each service call. Error return rate 0%.
Project Officer
(QA/COR)
Services / Materials Support onse
Materials Support res onse inspection & customer in ut
7.2 Attachment 2: ATTACHMENT 2 / TECHNICAL EXHIBIT 2
Deliverables Schedule
Frequency
Number of Co ies
Medium/Format Submit To
Paragraph 5.1 Proposal/Estimate
Prior to emergency repair visit
Email iulius.c.wilsonl .civ@armv.mil
Paragraph 5.3 Pricing/lnvoices with itemized pricing for all parts and labor
Due by completion of preventive maintenance visit and each emergency re air/re lacement
1 Hard copy invoice/work order iulius.c.wilsonl .civ@army.mil
7.3 Attachment 2: N/A
CAO: April 2019
SECURITY REQUIREMENTS FOR ALL CONTRACTS PERFORMED AT CORPUS
CHRISTI ARMY DEPOT Place these security requirements in all Statement of Works (SOW's) and Performance Work Statements (PWS's) for contracts performed at Corpus Christi Army Depot (CCAD).
This document is a brief overview of rules and regulations of Naval Air Station Corpus Christi (NASCC) and Corpus Christi Army Depot (CCAD). It is not intended to be all-inclusive or cover all contingencies.
Direct specific security requirements questions to the following numbers: CCAD: (361) 961-3313 NASCC: (361) 961-2480 Regulations:
Army Directive 2014—05 (or its successor) Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors AR 25-1 , Army Knowledge Management and Information Technology AR 25-2, Information Assurance AR 25-55, The Department of the Army Freedom of Information Act AR 70-31 , Standards for Technical Reporting AR 190-13, Department of the Army Physical Security Program AR 360-1 , The Army Public Affairs Program AR 380-5, Department of the Army Information Security Program AR 380-10, Foreign Disclosure and Contact with Foreign Representatives AR 380-49, Industrial Security Program AR 380-67, Personnel Security (PERSEC); AR 530-1 , Operations Security (OPSEC) AR 530-1 , AMC supp Operations Security (OPSEC) AR 530-1 , CCAD Plan Operations Security (OPSEC) AMC-R 525-13, AMC Force Protection Program
Deliverable
DOD 5220.22-M National Industrial Security Program Operating Manual DOD Directives 5230.24, Distribution Statements on Technical Documents DOD Directives 5230.25, Withholding of Unclassified Technical Data from Public Disclosure DOD Regulation 5200.2 Personnel Security Program DOD 5400.11 -R, Department of Defense Privacy Program UFC 4-010-01 9 February 2012 Change 1, 1 October 2013 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS UNIFIED FACILITIES
CRITERIA (UFC)
DODI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and other Eligible Individuals DoDD 5400.11 , Department of Defense Privacy Program, October 29, 2014 DoDM 1000.13, Volume 1, DoD Identification (ID) Cards: ID Card Life-cycle DoDl 5200.02 DoD Personnel Security Program 2
DoDM 5200.02 Procedures for the DOD Personnel Security Program Federal Acquisition Regulation Subpart 24.1 CFR Part 24 and Part 39.105 U.S. Office of Personnel Management Memorandum, "Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12," July 31, 2008Federal Acquisition Regulation (FAR), March 2005
1 .Conduct and Behavior: IAW DOD Directive 5200.8, "Security of DOD Installations and Resources", the NAScommander has broad authority to remove or exclude any person or persons from the military installation toprotect personnel and property, to maintain good order and discipline, and to ensure the uninterrupted andsuccessful performance of the installations mission. In the exercise of this authority, the commander mayrefuse to grant entry or may bar Contractor employees. Refusal of entry or barment of any employee does notrelieve the Contractor of the responsibility to continue performance under this contract.
1.1 . All personnel entering and working at CCAD are subject to all rules, regulations and applicable laws. All personnel and their effects are subject to search, to include vehicles and company belongings.
1.2 No person shall willfully fail or refuse to comply with lawful orders or direction of any civilian or military security police officer.
1.3 The Contractor shall not employ persons for work on this contract if such employees are identified to the Contractor by the Government as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Disrespectful behavior, failure to obey orders or regulations, fighting, horseplay, stealing, illegal use of drugs (using/transporting/selling), consuming or being under the influence of alcohol, or being in the possession of illegal weapons are prohibited and subject to appropriate penalties. This may include being detained, banned from entering the Government facility, or remanded to civilian authorities.
1.4 All Contractor personnel will limit their travel on the installation only to specific areas required for performance of the contract, specified break and meal areas, or in travel directly to and from these locations. Employees found on the installation away from officially identified areas may be detained and/or debarred from the installation.
1.5 Subcontracts; if the Contractor enters into a Subcontractor arrangement with another Contractor, the prime Contractor is responsible for Subcontractor performance and compliance.
The prime Contractor must provide a copy of the security requirements to the subcontractor. The contracting officer must ensure any questions of adequacy of the Subcontractor are resolved to the mutual satisfaction of the prime Contractor, Subcontractor, security, and CCAD commander.
1.6 All prospective government and contractor employees are subject to a check of their criminal history prior to being granted access to CCAD. Adverse or derogatory information revealed by these checks, or failure to provide full disclosure, may result in denial of access.
2.Support:
2.1 Security support provided by CCAD to the Contractor includes (if applicable) storage containers for classified information/material, use of base destruction facilities, classified reproduction facilities, use of base classified mail services, security badging, investigation of security incidents, base traffic regulations, use of security forms, and conducting inspections required by DOD 5220.22-M "Industrial Security Regulation", AR 380-49 "Industrial Security
Program", AR 380-5 "Department of Army Information Security Program", and AR25-2 "Information Assurance" and others as required or deemed necessary by the Government. 3
2.2 Security support requiring joint Army and Contractor coordination includes packaging classified information, mailing and receiving classified materials, implementing emergency procedures for protection of classified information, security checks, and internal security controls for protection of classified material, sensitive material, and high value pilfer able property.
3.Security Investigation Requirements:
3.1 . Investigation requirements including IT level and CAC requirements should be clearly indicated in the contract and Performance Work Statement (PWS) as prescribed in paragraph 4.1303, of the FAR:
Personal Identity Verification of Contractor Personnel (a)The Contractor shall comply with agency personal identity verification procedures identified in thecontract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management andBudget (OMB) guidance M-05-24 and Federal Information Processing Standards Publication (FIPS PUB)Number 201.
(b)The Contractor shall account for all forms of Government-provided identification issued to theContractor employees in connection with performance under this contract. The Contractor shall return suchidentification to the issuing agency at the earliest of any of the following, unless otherwise determined bythe Government:
(1 )When no longer needed for contract performance.
(2)Upon completion of the Contractor employee's employment.
(3)Upon contract completion or termination.
(c)The Contracting Officer may delay final payment under a contract if the Contractor fails to comply withthese requirements.
(d)The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontractswhen the subcontractor's employees are required to have routine physical access to a Federally-controlledfacility and/or routine access to a Federally-controlled information system. It shall be the responsibility of theprime Contractor to return such identification to the issuing agency in accordance with the terms set forth inparagraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.
3.2. Subcontracts; if the Contractor enters into a Subcontractor arrangement with another Contractor, subcontractors must be clearly identified in the contract agreement.
3.3. Contractors must maintain the same level investigation or higher as their civilian counterparts. In the absence of a civilian counterpart, CCAD Security will determine the level of investigation based on a position sensitivity review. Close coordination with the COR and company are required. All documentation required for access to CCAD for classified contracts or IT Level I & Il shall be processed through the CCAD Security Personnel Security Office prior to entering CCAD facilities.
3.4. Classified Contracts: An interim clearance must be in place prior to entering CCAD facilities. All documentation (i.e. SF 86, etc.) required for security clearance shall be processed through the Contractor Facility Security Office (FSO).
3.4.1 . For all contracts involving employees who require a security clearance for performance of their duties or access to classified material, the Contractor must possess or obtain a facility security clearance prior to performing contract work. If the Contractor does not possess a facility clearance, the Government (Contracting Office) may request one from the Defense Security Service (DSS). 3.4.2. Contractor employees without a clearance level or background check properly indicated in the Joint Personnel Adjudication System (JPAS) or its successor, will not be assigned to this task directly or indirectly. Contractor employee(s) will not be authorized access, regardless of personal clearance, without the facility first being cleared to the appropriate level by Defense Security Service (DSS). 3.4.3. The Contractor shall request security clearances for personnel requiring access to classified information or IT Level I or Il within 15 days after receiving a facility clearance. If the Contractor is already cleared, they shall request security clearances for the personnel within 15 days after contract award. Due to costs involved with security investigations, requests for Contractor employee security clearances shall be kept to an absolute minimum necessary to perform contract requirements. 3.4.4. IT Level I positions;
Contractor employees shall have one of the following prior to commencing work: A current, valid Tier 5 investigation or equivalent or "Interim" Top Secret eligibility by Defense Industrial Security Clearance Office (DISCO) indicated in JPAS. 3.4.5. IT Level Il positions; Contractor employees shall have one of the following prior to commencing work: A favorably completed Tier 3 investigation or equivalent or "Interim" Secret eligibility by DISCO indicated in JPAS.
3.4.6. IT Level Ill positions: Contractor employees shall have one of the following prior to commencing work: A favorably completed Tier 3 investigation or equivalent or "Interim" Secret eligibility by DISCO indicated in JPAS. 3.5. Unclassified Contracts requiring IT access: All documentation (i.e. SF 85*, etc.) required for their initial security appointment for unclassified contracts to IT Level Ill shall be processed through the CCAD Security Personnel Security Office prior to entering CCADfacilities. 3.6. IT Level Ill positions; Contractor employees requiring access to CCAD Local Area Network (LAN) shall have background investigation processed through CCAD Personnel Security Office. If the Contractor employee does not possess the proper investigation, the Government (Contracting Officer Representative) will request one. The Government assumes costs and initiates non-clearance investigation by submitting the appropriate Personnel Security Investigation request to the Army Center of Excellence.
Minimum requirements for CAC issuance and access to the LAN is an initiated investigation with favorable FBI fingerprint check. Due to costs and the inherent delays involved with security investigations, requests for Contractor LAN access shall be kept to an absolute minimum necessary to perform contract requirements. 3.6.1. Fitness Issues: CCAD Security will be notify the Contracting Officer Representative (COR) when discovery of adverse information indicates potentially actionable issues that may disqualify the Contractor employee from access. 3.6.2.
OPM Memorandum, Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12 provides governmentwide credentialing standards to be used by all Federal departments and agencies in determining whether to issue or revoke personal identity verification (PIV) cards to employees and contractor personnel.
3.6.3. Whether or not to grant access is the sole discretion of the Government. The decision not to grant access will not be grounds for contract modification and shall not constitute an excuse for Contractor performance failure.
3.7. System Authorization Access Request (SAAR): Prior to system access, a SAAR, DD Form 2875, shall be completed by the Contractor employee. The Contractor employee shall complete Part l, the COR shall complete Part Il, and CCAD Personnel Security shall complete Part Ill.
3.8. Unclassified Contracts NOT requiring IT access: Contracts not requiring access to CCAD LAN shall be subject to installation access requirements that include the Defense Biometric Identification System (DBIDS) and/or guest sponsorship. The COR shall provide the appropriate details and contact information.
4.1T/lA Requirements:
4.1 . All contract employees with access to the CCAD network must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services. Contractors and associated subcontractor employees must also complete DOD IA Awareness Training before they can be granted access to the CCAD network and complete the training annually thereafter.
4.2. All contractors working INIT functions must comply with DOD and Army training requirements in DoDD 8570.01 , DOD 8570.01 -M, and AR 25-2 within 6 months of employment.
4.3. Per DoD 8570.01 -M, DEARS 252.239.7001 , and AR 25-2, the contractor employees' supporting WIT functions shall be appropriately certified upon contract award. The baseline certification, as stipulated in DOD 8570.01 -M, must be completed upon contract award.
5.Acquisition: All contracts will include acquisition related documents in accordance with the
Federal Acquisition Regulation Subpart 24.1 CFR Part 24 and Part 39.105.
6.Foreign Nationals:
6.1 . Official Visits: All official foreign visits (visits sponsored by a foreign government) must be based on a legitimate need, be sanctioned by the appropriate foreign attaché or embassy, and approved through Department of Army channels. Access will be coordinated through the CCAD Foreign Disclosure Officer (FDO), COR, and respective NASCC/CCAD security offices.
6.2. Unofficial Visits: These are visits by foreign nationals that are not endorsed by a foreign government. The Contractor will submit a request for employee access, based on a legitimate need, to the appropriate COR. The COR will in turn notify the FDO of the request. Due to security considerations, requests for these types of visits should be kept to a minimum. Foreign nationals will require a government escort at all times while on CCAD property. The COR will ensure the foreign contractor employee provides a copy of their passport to NASCC and CCAD security offices, to ensure the appropriate background checks are completed. NOTE: Properly validated permanent resident alien registration card holders are exempt from this requirement.
7.Notifications: The following information will be submitted to the COR and the CCAD Security Manager oncompany letterhead, signed by the Contractor Facility Security Officer (FSO) within 15 days of awarding thecontract. An updated listing shall be provided quarterly or when the company or an employee's status orinformation changes. Electronic equivalents are acceptable. The notification shall include:
a.Name, address, and telephone number of company representatives.
b.Employee's name, last four of social security number, shift.
c.The contract number and contracting agency.
d.The highest level of classified information to which Contractor employees require access.
e.The location(s) of contract performance.
f.The date contract performance begins and terminates.
8.Security Point of Contact: At no cost to the Government, the Contractor shall appoint a seniorContractor employee to serve as an on-site point of contact for any security concems at the CCADlocation. This may be a full time position or an additional duty position.
9.Security Training:
9.1 . All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://atlevell.dtic.mil/at. 9.2. US-based contractor and subcontractor employees who are required to travel overseas in performance of their duties must receive government provided AT awareness training that is specific to the area of responsibility (AOR), as directed by AR 525-13.
Specific AOR training content will be directed by the combatant commander and the unit ATO will ensure an applicable AT foreign travel briefing is provided to the contractor. 9.3. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program. This is a locally developed training is provided by CCAD security and will be used to inform employees of the types of suspicious behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees' commencing performance, with the results reported to the COR no later than 30 days after training completion. 9.3.1 Contracts with a scope of work that call for the use of CCAD specific information or equipment at off base locations and facilities must develop an OPSEC Standard Operating Procedure (SOP)/Plan within 90 days of contract award which will be reviewed by the CCAD OPSEC Officer for approval IAW AR 530-1, Operations Security. The SOP/Plan must identify CCAD's critical information, why it needs to be protected, where it is located, who is responsible, and how the contractor intends to protect it. This plan is "For Official Use Only" and must contain appropriate document controls in accordance with AR 25-55, Chapter 4. The plan must be stored in a secure location such as a lockable container and must be properly destroyed when no longer needed in accordance with local CCAD policy CCADR 25-92,Chapter 1, Section 1-60). 9.4. IAW AR 530-1, new contractors and associated subcontractors who require a CAC Card and access to the CCAD network must complete Level I OPSEC training within 30 calendar days of reporting for duty and annual OPSEC contractor refresher training, thereafter.
9.5. Threat Awareness Reporting Program Training: Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training presented by a Counterintelligence Special Agent. 10. Pass and Identification Items: The Contractor shall obtain the pass and identification items for employees and Contractor owned vehicles required for contract performance.
1 1 .Retrieving Identification Media: The Contractor shall retrieve all identification media, including vehiclepasses from employees who depart for any reason before the contract expires;
e.g. terminated for cause,retirement, etc. and surrender to CCAD security through the COR.
12.Weapons, Firearms, and Ammunition: Contractor employees are prohibited from possessing weapons,firearms, or ammunition, on themselves or within their Contractor-owned vehicle or privately- owned vehiclewhile on CCAD.
13.Safeguarding Classified or Sensitive Information: Any material marked as Top Secret, Secret, Confidential,For Official Use Only (FOUO) Freedom of Information Act (FOIA), Privacy Act Information, or any otherrestrictively marked material discovered by the Contractor or Contractor employees will be surrendered at theearliest opportunity to any military or DOD employee of the installation. Under no circumstances will theContractor retain such material. The Contractor and all Contractor employees will execute a SF 312, Classifiedlnformation Non-Disclosure Agreement or equivalent CCAD Non-Disclosure Agreement as directed orrequired.
13.1 . Classified: Visitor Groups will safeguard classified information IAW DOD 5200.1 -R, DOD Information Security Program, AR 380-5, Department of the Army Information Security Program, AR 380- 49, Industrial Security Program, and other directives deemed necessary by the Servicing Security Activity (SSA). The contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential," "Secret," or "Top Secret" and requires contractors to comply with—(l ) The Security Agreement (DD Form 441 ), including the National Industrial Security Program Operating Manual (DOD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.
13.2. Information Systems (IS): All Contractor personnel will protect and restrict access to all documentation (i.e. maps, test and evaluation results, vulnerability assessments, audits, results, or findings) describing operational IS architectures, designs, configurations, vulnerabilities, address listings, or user information.
13.3. FOR OFFICIAL USE ONLY (FOUO): The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements and AR 25-55, Chapter Ill and Chapter IV, The Department of the Army Freedom of Information Act Program. These regulations set forth policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
13.4. Privacy Act: All data associated with this task is covered by the Privacy Act of 1974, Title 5 of the
U.S. Code, Section 552a, DoDD 5400.11, Department of Defense Privacy Program, and applicable CCAD rules and regulations. Violation of the Act may involve the imposition of criminal penalties.
Therefore, all Contractor personnel assigned shall take appropriate actions to prevent unauthorized disclosure of Privacy Act information.
13.5. Operations Security (OPSEC): Contractor personnel must protect information that has been designated as critical to the CCAD mission from disclosure. Critical information will only be disseminated on a "need-toknow" basis and not be discussed in public areas such as hallways, bathrooms, eateries, smoke shacks, or any off-base gathering locations. Contractor employees will not pass critical information over unsecured telephones, facsimiles, and/or e-mail outside of the CCAD firewall. All critical/sensitive information being electronically transmitted will be encrypted. Contractor employees will not post critical information on the web, personal "blogs," or where it is visible to visitors or the public. All information, to include photos, web posts, and captions, must be reviewed by the CCAD Public Affairs Officer (PAO) and the CCAD Operations Security Officer prior to public dissemination.
13.6. Proprietary Information: Information and materials developed at CCAD are considered business sensitive and must be protected from unauthorized disclosure. This information is the sole property of CCAD and must not be revealed or used except in contract performance, Distribution is limited to authorized US Government agencies and identified Contractors.
Contractor personnel must receive prior authorization from the CCAD Public Affairs Officer (PAO) and the CCAD Operations Security Officer to disseminate CCAD information.
14.Reporting Requirements: Contractor personnel shall report to an appropriate authority any informationor circumstances of which they are aware may pose a threat to the security of personnel, resources, andclassified or unclassified defense information. Contractor employees shall be briefed by their immediatesupervisor upon initial on-base assignment.
15.Physical Security: The Contractor shall be responsible for safeguarding all Government property andcontrolled forms provided for Contractor use. At the end of each work period, all Government facilities,equipment, and materials shall be secured.
16.Key Control: The Contractor shall establish and implement methods of making sure all keys issued to theContractor by the Government are not lost or misplaced and are not used by unauthorized persons. TheContractor shall not duplicate any keys issued by the Government.
16.1 . The Contractor shall coordinate with security for the receiving of keys needed to access necessary work spaces.
16.2. The Contractor shall immediately report to security, the Quality Assurance Evaluator (QAE), and Program Manager any occurrences of lost or duplicated keys.
16.3. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required, upon written direction of the contracting officer, to re-key or replace the affected lock or locks at no cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform rekeying and deduct the cost of such assistance from payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from payment due the Contractor.
16.4. The contractor shall prohibit the use of any door obstruction and/or the removal of hardware that would prevent a door from securing properly.
16.5. The Contractor shall prohibit the use of keys, issued by the Government, by any persons other than the Contractor's employees and the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in performance of contract work requirements in those areas.
17.Lock Combinations: The Contractor shall control access to all Government provided lock combinationsto preclude unauthorized entry. The Contractor is not authorized to change lock combinations without writtenapproval by the Government Program Manager. Records with written combinations to authorized securestorage containers, secure storage rooms, or certified vaults, shall be marked and safeguarded at the highestclassification level as the classified or sensitive material maintained inside the approved containers or room.
18.0ther Responsibilities:
18.1. Traffic Rules and Regulations: All personnel will abide by all traffic and parking rules and regulations. Failure to abide may result in issuance of Government citations. 18.1.2. Permission to park company support vehicles within the perimeters of the job must be approved in advance by the COR and Security. Company support vehicles must have company identification. 10
18.2. Identification: CCAD requires Contractor personnel wear a Government issued identification badge provided by CCAD, NAS, or their representatives. Safety restrictions may require the pass to be removed while working, but it must be worn in plain view, above the waist, when away from the job site. Failure to do so is a violation of security regulations and may result in disciplinary action. 18.3. Visitors: Contractor personnel must clear all visitors in advance through the COR. This includes Contractor personnel and personal guests. All foreign national visitors will be identified to the appropriate authorities, be based on a legitimate need, and are only allowed at the discretion of the installation commander. 18.4. Photography: All photographic or video equipment must be acquired through the COR who will notify PAO prior to purchase for recommendations and acquisition guidelines. The Property Book Officer will be notified upon receipt of the equipment for inventory and bar tagging. Government purchased photographic and video equipment are accountable items and must be added to a property book account. Under no circumstance will contractors, to include subcontractors, use their own electronic devices to take photographic or video images while at CCAD without prior approval from CCAD's Security Department and/or Public Affairs Office. 18.4.1. Photographs, video, drawings, blueprints, or any other type of rendering or measurements unrelated to contract performance of sensitive areas, such as critical resources, controlled or restricted areas, or other areas deemed sensitive by the Government is strictly prohibited. The Government reserves the right to seize equipment used for unauthorized purposes and the employee and/or Contractor may be debarred from the base, detained, reported and/or remanded to civilian authorities, or have other sanctions placed against them. 18.4.2. Transfer of digitized or electronic photographs, video, drawings, blueprints, or any other type of rendering or measurements must be coordinated/requested through the CCAD information assurance office. 18.5. Weekends [After Duty Hours: Notice of weekend/after duty hours scheduled work must be submitted to Security through the COR. Personnel working weekend or after duty hours must check in and out with Security Building access support to job sites must be arranged with the COR. Keys to areas are obtained by the COR. Requesting areas to be unlocked by personnel other than contract representatives is not authorized. 18.6. Barricades/Construction Areas: 18.6.1. Designating construction areas is Contractor's responsibility and must be coordinated in advance through the COR, Safety, CCAD Fire Marshall, and CCAD Security. Work (construction) areas will be secured at the end of each day. All doors and windows must be closed and locked, and lights and electrical equipment turned off. 18.6.2. All Contractor property locks and keys must be properly secured. The Government is not responsible for personal property left unattended or unsecured.
18.6.3. CCAD Security is to be notified of all emergencies, accidents, disturbances, etc. (as soon after the event as is reasonably possible) or requests for Security related assistance. CCAD Security will make the appropriate calls for proper authorities. 18.6.4. All personnel will abide by all applicable safety procedures and responsibilities. Smoking in areas other than authorized areas located throughout the Depot is prohibited. 18.6.5. Opening or blocking doors, entering non-job related areas without permission or clearance, or removing tools or other Government equipment without proper permission is not permitted. Government buildings and property will not be left unattended and unsecured.
SPECIFIC TASKS
File details come from the government source that posted it. Updated .