This sources sought notice seeks capabilities statements for the placement and cleaning of portable chemical toilets and hand sanitizing stations at Fort Jackson, South Carolina. The requirement includes furnishing and maintaining 845 single-seat portable chemical toilets, 120 additional portable chemical toilets for temporary use, 20 portable hand sanitizing stations, and emptying three pit latrines. Interested parties must submit a capabilities statement no more than ten pages in length by 2 pm EST on October 19th describing their experience, technical skills, and ability to perform at least 50% of the work as a small business. The government will evaluate responses to determine if the requirement will be set aside fully or partially for small businesses or procured through full and open competition with potential for multiple awards. The anticipated contract is a firm-fixed price contract for a base year from December 1st, 2022 to November 29th, 2027 with four one-year option periods.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draf t
W9124C-22-R-0002
PERFORMANCE WORK STATEMENT
Portable Chemical Toilets
01 September 2022 – 31 August 2027
Directorate of Public Works Fort Jacksons, SC
W9124C-22-R-0002
Table of Contents
PART 1 – General Information
PART 2 – Definitions and Acronyms
PART 3 – Government Furnished Property, Equipment, and Services
PART 4 – Contractor Furnished Items and Services
PART 5 – Specific Tasks
PART 6 – Applicable Publications
PART 7 – Attachment/Technical Exhibit Listing
TECHNICAL EXHIBIT 1 Performance Requirements Summary
TECHNICAL EXHIBIT 2 Deliverables Schedule
TECHNICAL EXHIBIT 3
TECHNICAL EXHIBIT 4 Servicing Sign in Roster
TECHNICAL EXHIBIT 5 Fort Jackson Vetting Policy
Fort Jackson Contractor Vetting Policy Enclosure 1
Fort Jackson Contractor Vetting Policy Enclosure 2
Fort Jackson Contractor Vetting Policy Enclosure 3
Fort Jackson Contractor Vetting Policy Enclosure 4
PERFORMANCE WORK STATEMENT (PWS)
Portable Chemical Toilets Fort
Jackson, Columbia SC
Part 1
GENERALINFORMATION
1. GENERAL: This is a non-personal services contract to provide for the placement and cleaning of Portable Chemical Toilets and portable hand sanitizing stations on Fort Jackson in South Carolina.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the
Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the placement and cleaning of Portable Chemical Toilets on the installation, as defined in this Performance Work Statement (PWS) except for those items specified as
Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: Fort Jackson is the largest and most active Initial Entry Training Center in the
U.S. Army, training over 50 percent of all soldiers and nearly 60 percent of women entering the army each year. The Fort Jackson’s primary mission is providing the Army with highly trained, disciplined, motivated and physically fit warriors who espouse the Army’s core values and are focused on teamwork. During the course of training, soldiers are conducting field exercises at various ranges and remote locations around the installation. Often permanent utility connections are not available and/or permanent latrine facilities are not nearby. Surges in numbers of soldiers being trained require more facilities as well. Therefore, portable chemical toilets are used in the absence of available latrine facilities. Additionally, special events often generate a need for portable chemical toilets. Training and special events are often intermittent and unpredictable in nature. However, most chemical toilet requirements are recurring and predictable.
1.3 Objectives:
• Place chemical toilets per the direction of the Contracting Officer (KO) or the
Contracting Officer’s Representative (COR).
• Remove waste product from the chemical toilets as required.
• Clean toilets as required.
• Maintain all chemical toilets so that the end result is sanitary and functional portable latrines.
1.4 Scope: The Contractor shall furnish and maintain 845 single seat, portable chemical toilets (844 regular and 1 handicap toilets) to be placed at permanent locations throughout Fort Jackson. The
Contractor shall also make an additional 120 portable chemical toilets, 10 handicap toilets, and 20 portable hand sanitizing stations available that may be placed as required at temporary locations for short terms throughout the installation. Additionally, the contractor shall be required to empty 3 pit latrines. Each contractor furnished portable toilet, portable hand sanitizing station, and pit latrine shall be serviced (see definition) and maintained in strict accordance with the terms and conditions of this contract. Each contractor furnished chemical toilet placed at an established permanent site shall have an attached sign in roster enabling the means to record the date and time of service completed;
as well as signature of the servicing driver. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, and latch. Each chemical toilet when placed will seat level and the door will latch and close tightly. Permanent locations are listed in Technical Exhibit (TE)-3 and the sign in roster is listed in Technical Exhibit TE-4. Contractor shall submit an updated Technical
Exhibit as outlined in TE-3 or comparable to the COR on a quarterly basis or as requested by the
Contracting Officer. This updated TE shall capture all changes of location and/or quantity as directed by the COR. The Contractor shall place and service portable chemical toilets throughout the
Installation at locations and quantities as indicated in the TE-3.
1.5 Period of Performance: The period of performance shall consist of a 30-day phase- in period, one (1) Base Year of 11 months and four (4) 12-month options years. Period of Performance reads as follows:
Phase-in
Base Year
Option Year I
Option Year II
Option Year III
Option Year IV
Six month Option to extend services in accordance with 52.217-8
1.6 General Information:
1.6.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. The Contractor’s Quality Control Program (QCP) is the means by which it assures all performed work complies with the requirement of the contract. Within 30 days after contract award, three copies of a comprehensive written QCP shall be submitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to the QCP system.
1.6.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day
Memorial Day
Juneteenth Day
Independence Day
Veteran’s Day
Thanksgiving Day
Christmas Day
1.6.4 Hours of Operation: The Contractor is responsible for conducting business between the hours of 0730 and 1615 Monday thru Saturday, (emergencies exempt) and on Federal holidays. The contractor will not be required to work when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Any deviation from this schedule shall be submitted for approval to the KO and COR, then coordinated with the Directorate of Public Works (DPW) Contract Management Branch, Building 2562 prior to any out of scope work being initiated. The Contractor shall correct any defective work at no cost to the Government. The Contractor shall perform all work required to complete service requests covered by this contract within times allowed after receipt of the service request. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at various locations on Fort Jackson.
1.6.6 Type of Contract: The Government will award a firm fixed price Indefinite Delivery
Indefinite Quantity contract.
1.6.7 Security Requirements:
1.6.7.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.6.7.2 Key Control: The Contractor shall establish and implement methods of ensuring all key(s)/ key cards issued to the Contractor by the Government are not lost or misplaced, and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the
Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to secured areas. The
Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the
Contracting Officer. In the event a key is lost, the total cost for the replacement key is subject for recoupment from the Government.
In the event keys other than master keys are lost or duplicated, the Contractor shall upon the direction of the Contracting Officer, re-key or replace the affected lock(s); however, the Government at its option may replace the affected lock(s) or perform re- keying. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost for the replacement key is subject for recoupment from the Government.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by
Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting
Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know the combinations. These procedures shall be included in the Contractor’s Quality Control
Plan.
1.6.8 AT/OPSEC Requirements:
1.6.8.1 Annual Antiterrorism (AT) Level 1 training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within five (5) calendar days after completion of training by all employees and subcontractor personnel. Antiterrorism Level I Training now resides on Joint Knowledge Online
(JKO), and can be reached via the following site: https://jkodirect.jten.mil/.
1.6.8.2 Access and General Protection/Security Policy and Procedures: The Contractor and all associated sub-Contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by
Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation
Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by Department of
Defense (DOD), Head Quarters Department of Army (HQDA) and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection
Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
1.6.8.3 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within fifteen (15) calendar days of contract award and within fifteen (15) calendar days of new employees commencing performance with the results reported to the COR NLT fifteen (15) calendar days after contract award.
1.6.8.4 OPSEC Training: Per AR 530-1, Operations Security, contractor employees must complete Level I OPSEC training within 30 calendar days after start of contract; new contractor employees will complete training within 30 days after reporting for duty. This is an annual requirement – all contractor employees must complete annual OPSEC awareness training.
Training can be accessed on line the following link; https://jkodirect.jten.mil/ you will need to enroll in course number EUC-ECJ6-110-N-LB; You may use your CAC card if you have one to sign in or you will need to register and create a password.
1.6.8.5 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting
Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the
Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.9 Safety: The contractor shall safeguard and maintain all Government and contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The contractor shall comply with AR 385-10, The Army Safety Program.
1.6.9.1 Safety Plan: The contractor shall develop and implement a safety program for its employees. The plan shall include an analysis of the significant hazards to life, limb and property inherent in contract work performance and a plan for controlling these hazards. Plan shall comply with pertinent provisions of U.S. Army Corps of Engineers (USACE) Safety and Health
Requirements Manual, EM 385-1-1 requirements and FAR 52-236-13. The safety plan shall be forwarded to the Contracting Office for review/approval by the Installation Safety Office within 10 calendar days of commencement of contract. The contractor shall provide and maintain work environments and procedures which will comply with the standards issued by the Secretary of
Labor at 29 CFR Part 1926 and 29 CFR Part 1910. The contractor shall also submit a Job Hazard
Analysis (JHA) to the Contracting Office for review and acceptance within 10 calendar days of commencement of contract.
1.6.9.2 Occupational Safety and Health (OSHA): The contractor shall comply the OSHA standards and all pertinent provisions of 29 CFR Part 1910, Part 1917.152, Part 1915.501-509 and part 1926; Federal and State environmental regulation; DoD and DA regulations and instruction, AR 385-10; and the USACE Safety and Health Requirements Manual (EM 385-1-1). The contractor shall establish Medical surveillance, industrial hygiene, and individual protective equipment programs sufficient to meet requirements delineated in OSHA standards.
1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter.
The COR monitors all technical aspects of the contract and assists in contract administration The
COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the
Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the
COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The
COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Key Personnel: The contractor shall provide a Program Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The
Program Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Program Manager or alternate shall be available between 7:30 a.m. to 4:15 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. List of Program Manager and Alternate shall be provided within 10 days of contract award. Qualifications for all key personnel are listed below:
Must be able to read, speak and understand English.
Must be able to fully understand the recurring and technical requirements of the work.
1.6.12 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.6.13 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government.
These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.14 Organizational Conflict of Interest: Contractor and sub-contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The
Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the
Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.15 Phase In/Phase Out Period: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board during the 30 day phase in period. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. The contractor will be responsible for ensuring they implement Phase In in accordance with the attached schedule to ensure minimal interruption to the customer. The contractor will be responsible for establishing and maintaining communication with both the incumbent and the Government to ensure a smooth transition. A Phase in report (submittal
XXXX) will be required to be submitted to the Contracting Officer Representative (COR) 15 days into the Phase In to keep the Government informed of what actions have been taken in the initial
15 days. During the last 30 days of the contract, the management personnel of an incoming contractor may observe operations of the incumbent contractor. The incumbent contractor shall not defer any needed services for the purpose of avoiding responsibility, or of transferring such responsibility to the successor contractor. The incumbent contractor shall fully cooperate with the successor contractor and the government, so as not to interfere with on-going operations. The contractor will fully cooperate with the succeeding contractor at conclusion of this contract in order to ensure a smooth transition.
1.6.16. Standards of Conduct. The Contractor shall maintain satisfactory standards of employee competency and conduct, and for taking disciplinary actions against Contractor personnel as necessary. The Contractor shall remove from the job site any Contractor employee found under the influence of alcohol, illegal drugs, or any other incapacitating agent during the tour of duty. The
Contractor shall remove any employee whose conduct or appearance debases or discredits Fort
Jackson or the United States Government. The Government reserves the right to require removal from the job site of any Contractor employee who endangers persons or property, whose continued employment is inconsistent with the interests of military security, or whose presence deters the accomplishment of required services. In such cases, the COR will advise the Contractor of the reason for requesting an employee's removal, or withdrawal of his authorization to enter the installation. The
Government’s exercise of its right to grant and revoke access by particular individual(s) to its facilities will not constitute a breach or change to this PWS; regardless of whether said individual(s) is employed by the Contractor, and regardless of whether said individual(s) is thereby precluded from performing work under the PWS.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITION AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2. Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. Permanent chemical toilets. Chemical toilet to be placed at certain designated locations throughout the installation and will remain there for the duration of this contract.
2.1.8. Physical Security. Actions that prevent the loss or damage of Government property.
2.1.9. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.11. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12. Serviced. The complete removal of ALL waste matter and foreign material; cleaning the inside of the waste tank; cleaning and applying a commercial grade cleaner and disinfectant to the toilet seat and all other interior surfaces; recharging the waste tank with a biodegradable chemical biocide and deodorant; replacing toilet paper in sufficient quantity to maintain a continuous supply for user personnel, and recording the date/time of service on the attached sign in roster on all chemical toilets located at the established permanent sites. Portable hand sanitizing stations will be refilled as needed by the request of the COR. The contractor shall remove all contents within the pit latrines during each servicing.
2.1.13. Sub-contractor. One that enters into a contract with a prime Contractor. The
Government does not have privet of contract with the sub-contractor.
2.1.14. Temporary Chemical Toilet and Portable Hand Sanitizing Stations. A Chemical toilet or hand sanitizing station that is not to be left in the field training exercise area indefinitely, and are required for special events like training surges, concerts, Torch Light Tattoo, etc.
2.1.15. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.16. Work Week. Monday through Saturday, unless specified otherwise.
2.2. Acronyms:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CMB Contract Management Branch
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
DPW Directorate of Public Works
FAR Federal Acquisition Regulation
FPCON Force Protection Condition
HIPAA Health Insurance Portability and Accountability Act of 1996
HQDA Head Quarters Department of the Army
IAT Information Assurance Technician
IAW In Accordance With
KO Contracting Officer
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
OPSEC Operational Security
OSHA Occupational Safety and Health Administration
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PSUS Palmetto States Utilities Services
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
SC DHEC South Carolina Department of Health and Environmental Control
SC DOT South Carolina Department of Transportation
SOP Standard Operating Procedures
TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services: Not Applicable
3.2 Facilities: The Government will provide the real property for the Contractor to locate a facility for its base of operation. This facility may not be permanent in nature and will be removed upon conclusion of this contract. Prior to placement, the facility will be approved by the KO. The
Contractor facility area is referred to as the Contractor’s Yard and is located on Ivey Road.
3.3 Utilities: The Government has made utilities available in the general area of the Contractor’s
Yard on Ivey Road. However, all utilities consumed will be at the expense of the Contractor.
Utilities use will be metered. All connections to utilities will be made at the Contractor’s expense.
3.4 Waste Management and Disposal: The Contractor may not dispose of waste generated from the portable chemical toilets listed in the Technical Exhibit 3 in the sanitary sewer collection system on
Fort Jackson. The Contractor must dispose of chemical toilet waste at an off post location in accordance with all local, state and Federal regulations. The Contractor may not bring waste from offsite (outside Fort Jackson) for disposal. All handling of waste shall be in accordance with all state and Federal requirements including the South Carolina Department of Health and Environmental
Control (SC DHEC) and/or City of Columbia requirements.
3.5 Security and Fire Protection: The Directorate of Emergency Services is the POC for these services on Fort Jackson. These services will be provided for the Contractor at the Contractor’s Yard on Ivey Road
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall provide vehicles in sufficient quantity and type to accomplish all services at locations specified in the contract. Each Contractor vehicle shall have the name of the
Contractor neatly and clearly exhibited on each side of the vehicle. All vehicles shall be maintained in satisfactory mechanical condition and shall present a clean and neat appearance. All vehicles shall be registered and licensed IAW SCDOT. The Contractor shall provide equipment and perform all operations IAW SCDHEC approved methods and procedures. The Contractor shall furnish the make, model, year, description and number of vehicles proposed to accomplish the work stated in the contract. The Contracting Officer may request inspection and verification of operator or vehicle license and registration at any time during the tenure of the contract. The Contractor shall submit a
Technical Exhibit to the COR on a quarterly basis or as requested by the Contracting Officer.
4.2 Equipment: The Contractor shall provide the type and quality of equipment necessary for the services required by this contract. All equipment shall be properly maintained according to the manufacturer’s recommendations and applicable safety regulations. The Contractor shall submit a complete list of equipment proposed for use in this contract, including size and quantity as part of the proposal. Contractor needs to be aware that a vast majority of the chemical toilets are located in the wooded training areas down small secondary roads. 4X4 Truck (s) for services and deliveries over rough and muddy terrain is required. Advertising displayed on the Contractor's vehicles is permitted provided that the advertising conforms to good taste and public morality and is so worded as not to imply Army or United States Government approval or sanction of the advertised service and which is not embarrassing or detrimental to the military. The Contracting Officer will determine when advertising is inappropriate
4.3 Communication Equipment: The Contractor shall provide communication equipment as necessary to perform the services of this contract. This includes mobile phones or radios for communication with employees, and telephone answering machine, if Contractor chooses (recording devices are prohibited). Vehicle mounted radio equipment shall conform to all applicable Federal regulations and standards.
4.4 Administrative Supplies: The Contractor shall provide all needed supplies, equipment and furnishings. The reproduction of forms shall be accomplished at the Contractor’s expense.
4.5 Fuels: The Contractor shall provide all fuels, flares, and safety equipment required for the operation of equipment and vehicles in conformance with installation fire regulations, South Carolina Department of Transportation (SCDOT) and Occupation Safety and Health Administration (OSHA).
All vehicles shall be equipped with fire extinguishers that are maintained in good working order.
4.6 Material/Components: The Contractor shall provide all materials and components to facilitate repairs. Materials shall be of the design, size, and type as approved.
4.7 Contractor’s Base of Operation: The Contractor shall have the option of providing structure(s) for the management operations and storage of flammable material. Contracting Officer Approval of these structures shall be obtained prior to delivery to the site. These structures shall be equipped with locking devices and the storage building for flammable material shall be located a minimum of fifty feet from any other structure. Flammable storage buildings will be inspected and approved by the Post Fire
Department. The Contractor is responsible for the clearing of site work area, grading, permits, utility connections, and all other work required for erecting of buildings located on-site.
4.8 Utility Meters: The Contractor shall provide and install utility meters for consumption readings for gas, water, sewer and electrical utilities at base of operations as necessary. All work shall comply with the International Building Code, dated 2003. Upon completion or termination of the contract all utility lines shall become the property of the Government.
4.9 Space Appearance: The Contractor shall maintain the assigned site and Contractor facilities in a manner consistent with the appearance of the Installation. The Contractor shall maintain an orderly clean area both inside and outside of its facilities, to include frequent grass mowing. The Contractor shall have all property and equipment removed from the site within five (5) days after completion or termination of contract.
4.10 Security: The Contractor is responsible for the protection of its property, equipment, and vehicles. In the event of a break-ins, theft, or disturbance, the Contractor shall immediately notify the
Provost Marshall, assist in the investigation. The COR and KO will also be notified.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services: The Contractor shall provide services for all necessary general and specialized equipment and clothing required to place and service all permanent and temporary chemical toilets as designated by this contract. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, and latch. Each chemical toilet when placed will seat level and the door will latch and close tightly.
5.1.2 Description: Portable chemical toilets will be separated into two categories: permanent and temporary. Permanent chemical toilets will be placed at certain designated locations throughout the installation and will remain there for the duration of this contract. Temporary chemical toilets will not be left in the field training exercise area indefinitely, and are required for special events like training surges, concerts, etc. Temporary chemical toilets will be managed as required per event.
Portable hand sanitizing stations will not be left in the field training exercise area indefinitely, and are required for special events such as training surges, concerts, etc. and will also be managed as required per event. Pit latrines are located at sites listed on TE-3 and will remain in place for the duration of this contract. In the event that a pit latrine is closed the contractor will place a sufficient number of chemical toilets that is agreed upon with the COR.
5.2. General: The Contractor shall furnish and maintain 845 single seat, portable chemical toilets
(844 regular and 1 handicap toilets) to be placed at permanent locations throughout Fort Jackson. The
Contractor shall also make an additional 120 portable chemical toilets available that may be placed as required at temporary locations for short terms throughout the installation.
Each Contractor furnished portable toilet shall be serviced (see definition) and maintained in strict accordance with the terms and conditions of this contract. Contractor shall place toilets at designated areas within twenty (20) calendar days from date of award. Staging of 200 portable toilets at the Fort
Jackson Landfill will be permitted during the initial placement of the toilets.
The Contractor shall submit a listing of all employees working under this contract within 5 working days of contract award to the COR and Contracting Officer. This list shall be submitted annually or within 5 working days of changes to the listing.
5.2.1 Servicing: The Contractor shall service all permanent portable chemical toilets three days per week and five a days for Range 1 through Range 13 as indicated in Technical Exhibit 3. Pit Latrines will be serviced at a minimum of once a month. Additional servicing as requested by the COR. Each
Contractor furnished portable toilet shall be serviced (see definition) and maintained in strict accordance with the terms and conditions of this contract. Each portable chemical toilet shall be completely closed, well ventilated, contain a single seat chemical toilet and storage tank, toilet tissue, toilet tissue holder, toilet seat, urinal, door, and latch. Servicing shall include: the complete removal of ALL waste matter and foreign material; cleaning the inside of the waste tank; cleaning and applying a commercial grade cleaner and disinfectant to the toilet seat and all other interior surfaces; recharging the waste tank with a biodegradable chemical biocide and deodorant; and replacing toilet paper in sufficient quantity to maintain a continuous supply for user personnel. Material that cannot be pumped shall be removed, placed in plastic bags and disposed as approved by SCDHEC. The contractor shall record the date and time of service completion on the sign in roster attached to each chemical toilet located at the established permanent sites; along with the signature of servicing employee. Portable hand sanitizing stations will be refilled as needed by the request of the COR. The contractor shall remove all contents within the pit latrines during each servicing.
5.2.2 Waste Disposal: Waste material that is pumped from the portable chemical toilets shall be not be discharged into sewage manholes on Fort Jackson. This practice is no longer accepted by the City of
Columbia per a consent agreement with the Environmental Protection Agency (EPA). All wastes from chemical toilets must be disposed of off post in accordance with all local, state and Federal regulations.
Drinking water and wastewater utility services, on Fort Jackson, have been privatized. Palmetto States
Utility Service (PSUS) maintains and operates the wet utility systems.
5.2.3 Chemical Toilet Maintenance: The Contractor shall perform maintenance as required, including: repairing, painting and replacing chemical toilets (if necessary). All portable chemical toilets shall remain water tight, vector-tight, sanitized, and shall remained in a presentable state at all times.
Chemical toilets that cannot be repaired will be replaced with another chemical toilet. The Contractor shall clean the exterior surfaces of all chemical toilets annually/as required or as directed by the
Contracting Officer or COR. The Contractor shall replace any toilet(s) determined by the Post Medical
Officer to be a health hazard under criteria outlined in AR 40 Chapter 5 Paragraph. The Contractor will submit a monthly log of all repairs or replacement of chemical toilets by the 5th of the following month.
5.2.4 Relocation and Placement of Chemical Toilets: Permanent toilets shall be placed throughout the installation as specified in Technical Exhibit 3. The Contractor shall relocate permanent toilets to new locations as directed by the COR or as indicated on delivery orders. The Contractor shall install and service temporary chemical toilets and portable hand sanitizing stations in quantities at locations during the time frames specified on the delivery orders issued by the COR or Ordering Officer. The
Contractor shall install chemical toilets and hand sanitizing stations within 72 hours after notification under normal conditions. Emergency situations such as water outages may require response times within three (3) hours after notification. Service frequency required shall be one service on the second day for chemical toilets that are in place for a three day period, and three days per week for chemical toilets that are in place for a weekly period (7 days). Portable hand sanitizing stations will be refilled as needed upon the request of the COR. No more than a total of 120 temporary chemical toilets will be required in place at any one time; however, a single order up to the maximum of 120 units may be placed. Payment for this requirement is based on the line item used in the Unit Bid Price Schedule.
The Contractor shall have 120 temporary chemical toilets and 20 portable hand sanitizing stations on hand at all times for temporary requirements. The Contractor shall service and remove temporarily placed portable chemical toilets and portable hand sanitizing stations within 24 hours following the removal date indicated on the delivery order, at no additional cost to the Government for any time period beyond the removal date indicated on the delivery order.
Contractor shall submit an updated Technical Exhibit as outlined in TE-3 or comparable to the COR on a quarterly basis or as requested by the COR or Contracting Officer. This updated TE shall capture all changes of location and/or quantity as directed by the COR.
5.3. Environmental and Hazardous Materials Handling.
5.3.1 Ft. Jackson is subject to EPCRA reporting requirements. Therefore, any hazardous substance brought on the post must be identified and properly characterized to ensure they are tracked for reporting purposes.
5.3.2 The contractor shall provide a means to supply and transport hazardous materials (HAZMAT) in support of HAZMART operations. The contractor shall store, control, maintain, transport, and sustain HAZMAT operations IAW regulatory requirements.
5.3.3 Any hazardous materials furnished under this contract shall comply with applicable OSHA laws and regulations. (See Clause 52.223-3- Hazardous Material Identification and Material Safety Data and 252.223-7001 - Hazard Warning Labels elsewhere in this solicitation.)
5.3.3.1 The Contractor shall provide copies of MSDS data sheets for all products to the COR.
5.3.4 The Contractor and Contractor representative shall handle, transport, store, and dispose of all waste materials generated by any work performed under this contract in accordance with all applicable
Federal, State, Local, or Installation laws, ordinances, regulations, court orders, or other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October
1978; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air
Act as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15
U.S.C. Sec 2601, ET SEQ); the Solid Waste Disposal Act, as amended (16 U.S.C. Sec 469, ET SEQ);
Emergency Planning and Community Right-to-Know Act (42 U.S.C. 11011, ET.SEC.). In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. Any
Hazardous Wastes requiring a manifest must be turned in to the DPW-Classification Unit for proper disposition. Should the Government be held liable for any noncompliance, neglect or improper actions resulting from the Contractor or the Contractor’s representative removal or disposal of hazardous waste, the Contractor shall reimburse the Government for all such liability. The Contractor is absolved of any liability for prior contamination of the site should it be identified.
5.3.5 The U.S. Environmental Protection Agency website
(http://www.epa.gov/wastes/conserve/tools/cpg/about.htm) has the latest product list and specific recycled content requirements for each product. For additional information contact Tameria Warren, ENV, at (803) 751-9505.
5.3.6 The contractor must be compliant with the Fort Jackson Spill Prevention Control and
Countermeasures Plan (SPCCP).
5.3.7 The Contractor is responsible for hazardous substance spill prevention, training, clean up, and reporting, and must comply with the Fort Jackson Spill Response Plan (page l5 of the HSMP). The Fort
Jackson Hazardous Substance Management Plan (HSMP), dated January 2011, may be used for guidance. The HSMP is located at http://wwwjackson.army.miVsites/garrisorVdocs/442. For additional information contact Environmental Office at 803-75l-4231.
http://www.epa.g/ http://www.epa.g/ http://www.epa.g/ http://wwwjackson.army.mivsites/garrisorVdocs/442
5.3.8 In the event of fuel or potentially hazardous material spillage by the Contractor and/or the
Contractor’s representative, the Contractor shall be responsible for its containment, clean up, and related disposal costs. The Contractor shall immediately notify the Fire/Emergency services dispatcher and take appropriate actions to correct and prevent future occurrences. The Contractor shall have sufficient spill supplies available on-site to contain any spillage. If any federal, state, or local agency assesses any monetary fines, penalties, or assessments related to the Contractor and/or the Contractor’s representative handling, release, storage, generation, or disposal of hazardous materials, toxic substances or any other regulated substance the Contractor shall indemnify and hold harmless the Government its agents, and employees from every claim or liability, including attorney fees and court costs.
5.3.8 Fort Jackson has implemented a Sustainability Management System (SMS) to proactively deal with environmental impacts of its processes, activities, and services while supporting mission requirements and building community relationships. All persons working on, for, or on behalf of Fort
Jackson must be aware of the SMS policy (acronym 'PALMS), which is to promote continual improvement, always be in compliance, look to prevent pollution, manage sustainable programs, and sustain natural and cultural resources. Contractors and their sub-contractors must receive SMS
General Awareness Training and ensure that all goods and services do not deviate from the installation's SMS Policy, objectives, and targets. For SMS training or additional information contact the SMS Coordinator at (803) 751-9505.
5.4. Occupational Safety and Health: The Contractor shall comply with the Occupational
Safety and Health Act (OSHA). The Contractor shall be responsible for ensuring adherence to all applicable installation, State of Texas, and federal rules and regulations.
5.4.1 The Contractor shall carry general liability and workers compensation as indicated by the FAR
52.228-5 (Insurance Work on a Government Installation) and hereby agrees to provide and maintain insurance during the entire contract period for the below stated minimum types and amounts specified elsewhere in the contract.
5.5 Work on a Government Installation: The work site is on a military installation, therefore, the Contractor shall comply with all applicable rules and regulations including, but not limited to those specified in the contract. See Technical Exhibit 4 for the Fort Jackson Vetting Policy
5.6 National Environmental Policy Act: The Contractor is advised that the National
Environmental Policy Act (NEPA) requires the consideration of the environmental impact before any federal action may be taken. The Army's procedure for complying with NEPA is set forth in Army
Regulation 200-2. The Contractor agrees that it has or will review the applicable environmental documentation required before performance of this contract, and it has or will notify the Contracting
Officer in writing prior to proceeding with performance if it is not satisfied with the sufficiency of the documentation.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .