DRAFT Prep School Basketball Coach PWS 30 Apr 2020.docx

DOCX document 77 KB Posted

Attached to
U. S. Air Force Academy Preparatory School Assistant Men's Basketball Coach
Solicitation number
FA700020R0022
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Performance Work Statement Assistant Men’s Basketball Coach – USAFA Prep School

United States Air Force Academy Prep School

DRAFT

Men’s Basketball Assistant Coach Performance Work Statement (PWS)

Revision Date: 30 April 2020

X Signature of Prep School Athletic Director (PSA/AD), (Lt Col Sean Tiernan), USAFA/PS signifies concurrence with the PWS.

1. Background Information

1.1. This position requires pre-season/on season coaching support of men’s basketball at the United States Air Force Academy Preparatory School. Coaching formats include one on one, small group and team group settings. The assistant coach will have opportunities to travel with the Prep School men’s basketball team. This is a part-time contracted coaching position for 2020-21 basketball season with four option years.

2. General Information 2.1

1.1. General: This is a non-personnel services contract to provide assistant basketball coach. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Comment by WRIGHT, SUSAN R NH-03 USAF USAFA 10 CONS/PK: Please make sure numbering is correct

1.2. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform assistant basketball coach duties as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract.

1.3. The Contractor shall provide all supervision, personnel, equipment, tools, materials, and vehicles necessary to perform all tasks and functions as defined in this Performance Work Statement (PWS).

1.4. Contractor Identification. All Contractor personnel shall wear a Government issued badge at all times to identify themselves as a Contractor employee. Contractor employees shall identify themselves as being a Contractor when attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties (e.g., clients, vendors, customers, public contacts, etc.) to avoid creating an impression that they are Government officials.

1.5. Dress code. Contractor personnel shall be professional in appearance and suitable for the occasion and environment. In support of some work orders contractor may be required to dress business professional (i.e. funerals, formal USAFA events). Work orders which require business professional dress will be annotated on the individual work order.

1.6. Threats to General Well Being. The Government reserves the right to direct the removal of Contractor personnel for misconduct or security reasons. This action does not relieve the Contractor from total performance of the program tasks specified herein.

1.7. Hiring of U.S. Government Employees. The Contractor shall not employ any person who is an employee of the US Government if employing that person would create a conflict of interest, or the appearance of a conflict of interest. The Contractor shall comply with the Joint Ethics Regulation (JER) in regard to the employment of current and/or former Government employees. The Contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives proper approval. The Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies in AFI 64-106 Air Force Industrial Labor Relations Activities paragraph 3. The Contractor is prohibited from employing off-duty Government COR(s) who are managing any contracts or subcontracts awarded to the Contractor. The abrupt absence of any Contractor personnel does not at any time constitute an excuse for nonperformance under this contract.

1.8. *Per 10 U.S.C. §2330a 10 U.S.C. §2330(a) Data collection required. “purchase of services by a military department or Defense Agency in excess of $3,000,000, regardless of whether such a purchase is made in the form of a contract, task order, delivery order, military interdepartmental purchase request, or any other form of interagency agreement, for services in the following service acquisition portfolio groups: (1) Logistics management services; (2) Equipment related services; (3) Knowledge-based services; and (4) Electronics and communications services.

1.1.1.1. Go to www.sam.gov and log in.

1.1.1.2. Select Entity Registrations and then select Service Contract Reporting.

1.1.1.3. SAM displays your entities which have service contracts and meet the reporting criteria. Select View by entity to see the service contracts for each entity.

1.1.1.4. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.

1.1.1.5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:

1.1.1.1.1. Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).

1.1.1.1.2. Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.

1.1.1.1. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.

1.1.1.2. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.

1.1. Service contracts over (dollar threshold) must be reported in ECMRA except those covering Construction labor and costs. Contractor Manpower Reporting. The Contractor shall report ALL contract labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the U.S. Air Force. The Contractor shall fill in all required data fields at https://ecmra.mil.

1.1.1. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting Application (CMRA) help desk.

1.1.2. Uses and Safeguarding of Information. Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data. User manuals for Government personnel and Contractors are available at the CMRA link at http://www.ecmra.mil.

1.2.*Adverse Weather Conditions. The Contractor shall coordinate with the COR concerning performance of PWS requirements during adverse weather conditions. Delayed reporting or early release (for Government employees) does not relieve the Contractor of PWS performance.
1.3.Work Environment. Missions are frequently interrupted by base exercises or actual ongoing base security events. The Contractor is required to participate in all exercises.
1.4.*Federal Holidays. The following Federal Holidays are observed by USAFA, but may not always be observed by the Contractor due to mission needs.

· New Year’s Day, January 1st or the Friday preceding or Monday following

· Martin Luther King’s Birthday, 3rd Monday in January

· President’s Day, 3rd Monday in February

· Memorial Day, Last Monday in May

· Independence Day, July 4th or the Friday preceding or Monday following

· Labor Day, 1st Monday in September

· Columbus Day, 2nd Monday in October

· Veteran’s Day, November 11th or the Friday preceding or Monday following

· Thanksgiving Day, 4th Thursday in November

· Christmas Day, 25th December

1.5.Mission Essential Personnel. When the contractor is performing services which meet the requirements of DFARS 237.76 a paragraph needs to be included to address PERFORMANCE OF SERVICES DURING CRISIS and DFARS clause 252.237-7023 needs to be included. Language substantially similar to the following should be added to the PWS:
1.5.1. PERFORMANCE OF SERVICES DURING CRISIS. In accordance with DFARS 237.76 it is determined that services identified in the PWS and implemented via DFARS 252.237-7023 are essential for performance under this contract. The following language may be helpful, as well, depending upon the circumstances: DECLARATION BY INSTALLATION COMMANDERS REGARDING MISSION ESSENTIAL REPORTING. Each Installation Commander follows their own protocol related to inclement weather reporting and other conditions that might result in decisions for reduced staffing or closure of the installation. Announcements related to these decisions are broadcast through various media to convey work expectations of military and civilian personnel employed by DoD based on their designation by DoD as falling into the category of "mission essential" or "non-mission essential." Contractor employees are governed by the employment agreements with their employers and are not impacted by how the DoD manages its military and civilian workforce. Contractors are required to meet the performance expectations in the contract regarding hours of operation and service support. It is the contractor’s responsibility to determine how to manage the workforce and meet contract expectations including dealing with inclement weather conditions.Comment by WRIGHT, SUSAN R NH-03 USAF USAFA 10 CONS/PK: This is not a mission essential (ME) position. ME does not need to be addressed in the PWS.

Alternatively, when DFARS clause 252.237-7023 Continuation of Essential Contractor Services is included in a contract, the government formally identifies all or a portion of the contractor services as “mission essential functions.” This is significantly different than the above definition for “mission essential personnel” for inclement weather reporting. The “mission essential functions” designation relates to continuation of services in events of crisis as they affect DoD’s ability to provide vital services or exercise authority, direction and control. As directed by DFARS 252.237-7023(c)(2), the contractor is required to maintain a Mission-Essential Contractor Services Plan detailing provisions for the acquisition of essential personnel and resources to maintain continuity of operations for up to 30 days in a crisis.

Although functions may be identified by the government as "mission essential" for inclement weather reporting or contractual by use of DFARS clause 252.237-7023, the government does not render a designation of "non-mission essential" for all other contracted functions and the contractor is expected to meet the operating hours and performance requirements and develop appropriate contingency plans to meet the terms of the contractor.

1.6.*Incident/Mishap Reporting. In the event of a safety incident/mishap, the Contractor shall take reasonable and prudent action to establish control of the scene, prevent further damage to persons or property and preserve evidence until released by the investigative authority. Immediately report the incident to the COR and the USAFA Safety Office. If the Government elects to conduct an investigation, the Contractor shall cooperate fully and assist Government personnel until completed.
1.7.*Emergency. Police, Medical and Fire can be reached by calling 911. Caller will reach El Paso County dispatcher and needs to identify that they are located on USAF Academy.
1.8.Fire Prevention and Protection. Base fire prevention personnel will make periodic Government provided facility inspections for regulation compliance.
1.9.Custodial Services. The Government will provide custodial services for occupied Government-provided facilities at the same level provided to Government employees. All other services shall be the responsibility of the Contractor.
1.10.Refuse Collection. The Government will make available refuse collection and disposal services for the Contractor at Government expense in direct support of the PWS. Emptying of individual trash receptacles into Government-provided dumpsters is the responsibility of Contractor employees. Dumpsters are available for Contractor use for the disposal of items. The Contractor shall follow guidelines established by the base regarding proper disposal of refuse. The Contractor shall not dump prohibited items in dumpsters. The Contractor shall comply with all base-recycling programs. (Verify procedures with 10 CES.)
1.11.Network Access. The Government will provide “Official Use Only” network Internet/intranet access through the Government network for approved systems and workstations required for accomplishment of work in support of this PWS. Network access for Contractor employees requires a common access card (CAC) provided by the Government.
1.12.Contractor Software and Hardware. The Contractor shall obtain approval from the Designated Approval Authority (DAA) prior to purchasing software and computer hardware for use on the USAFA network. The contractor shall maintain all licenses for contractor software connected to the USAFA network IAW AFI 33-114, Software Management, Section B, paragraph 8.2. When software use is no longer required, the contractor shall remove the software from both Government and contractor computer systems connected to the USAFA network.
1.13.Government Provided Site Licensed Software. The Contractor shall install and upgrade software that the Government has acquired site licenses for. The Government will keep current and pay any annual licensing fees for site-licensed software. When Government provided software is no longer maintained under site license use the Contractor shall remove the Government provided software from all computer systems under its control.
1.14.For Official Use Only (FOUO) Material. If the Contractor determines that unauthorized personnel have access to FOUO material, the contract manager shall immediately notify the COR and fully cooperate with any investigation. Contractor shall comply with DoD Manual 5400.07 Freedom of Information Act (FOIA) Program, 4.1. This regulation establishes policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
1.15.Data Rights, Copyrights, Patent Rights, and Royalties. Consider these applications are discussed for both the Government and contractor. Associated clauses FAR Part 27 and DFARS 227 form the legal determination of rights of parties and the PWS may refer to the clauses but is not appropriate location to convey rights and responsibilities.
1.16.Maintaining Clean Work Areas. The Contractor shall ensure that all work areas assigned under the PWS are neat, clean and maintained at all times and immediately report any facility and safety discrepancies to the Government.
1.17.Telephone Services. The Government will provide local and Defense Switched Network (DSN) telephone service. The Government will provide all maintenance service on Government-provided phone lines and instruments and will relocate subject service when the relocation is approved by the Government. Government provided telephone service shall be used for official calls necessary in the performance of the PWS. The COR may grant the Contractor access to Government long distance service. Otherwise, the Contractor shall provide his or her own non-Government telephone service through off-base switching equipment for personal or unofficial business.
1.18.Contractor/Personal Furnished Vehicles. The Contractor shall furnish all vehicles required to perform the services identified in this PWS.
1.19.Government Furnished Facilities. Contractor shall utilize Government furnished facilities in the performance of this requirement.
1.20.Information Resources. The Government will provide access to Government staff and pertinent information for this contract. The Government will provide the Contractor copies of, or access to, all required directives, publications and documents. All documentation provided to the Contractor shall remain the property of the Government and shall be returned upon completion of this contract.
1.21.Ancillary Training. The Contractor shall be required to accomplish initial and annual Government provided Computer Based Training (CBT) to include; Information Protection, Information Assurance, Anti- terrorism, OPSEC, COMSEC, FPCON, Records Management, and other training as identified and provided by the Government.

3. Description of Services

1.22. Non-Game Day (Practice and Strength Training) Tasks

1.22.1. Daily Instruction Expectation

i. Demonstrate, instruct, correct, teach offensive and defensive skills

1.22.2. Daily Schedule and Requirements

1500 Meet with Head Coach

1515 Lead Skill Development workout

i. Ball handling/Dribbling

ii. Passing

iii. Shooting

iv. Footwork

1530 Assist with Stretching

i. Active Warm-Up

ii. Static Stretch

iii. Rollout

1540 Assist with Fundamental Work

i. Team Dribbling Drills

ii. Team Passing Drills

iii. Team Shooting Drills

iv. Team Rebounding

1610 Assist with teaching team defense concepts

v. Closeouts and Slides

vi. On Ball Stance and Positioning

vii. Off Ball Stance and Positioning

viii. Defeating Screens – Off Ball and On Ball

ix. Blocking Out and Rebounding

x. Transition Defense

xi. Defending out of bounds plays

1640 Assist with Teaching Team Offensive Concepts

iv. Transition Offense

v. Screen/Cutting

vi. Player Movement/Ball Movement

vii. Reading the Defense/Decision Making

viii. Running Sets/Plays/Concepts

ix. Out of Bounds Plays

1720 Assist with Teaching Game Situations

i. Guarding Specific Actions

ii. Time and Score Situations – Offense and Defense

iii. Out of Bounds plays based on time and score

1730 Assist with individual shooting/offensive moves

i. Catching/Footwork

ii. Shooting Fundamentals (feet, hand position, follow through, speed)

iii. Direct Drive/Crossover

1.22.3. Strength Training Expectation

i. Three Days a Week After Practice

ii. 60 Minute Sessions

iii. Expectations

a. Demonstrate, instruct, correct, teach and re-teach

1.23. Game Day Tasks

1.23.1. Home Games

i. Arrive one hour prior to tip off

ii. Assist with stretching – 45 minutes prior to tip-off

iii. Assist with pre-game warmup – 35 minutes prior to tip off

iv. Assist with pre-game talk in locker room – 24 minutes prior to tip off

v. Assist with coaching during game

a. Track fouls

b. Track timeouts

c. Track substitutions

d. Provide game management and strategy

1.23.2. Away Games

i. Arrive on time for transportation to game

ii. Assist with stretching – 45 minutes prior to tip-off

iii. Assist with pre-game warmup – 35 minutes prior to tip off

iv. Assist with pre-game talk in locker room – 24 minutes prior to tip off

v. Assist with coaching during game

a. Track fouls

b. Track timeouts

c. Track substitutions

d. Provide game management and strategy

vi. If the away travel is at a tournament – scout future opponents in tournament

2. Services Summary

Practice Performance Objectives
Threshold
PWS Paragraph
Demonstrate Practice Drills
100% Performance

1.22.1 (i)

Lead Skill Development workout
100% Performance
1.22.2 (1515)
Assist with stretching and fundamental work
100% Performance

1.22.2 (1530/1540)

Assist with Teaching Team Offensive and Defensive Concepts

100% Performance

1.22.2 (1610/1640)

Assist with Teaching Game Situations

100% Performance
1.22.2 (1720)

Assist with individual shooting/offensive moves

100% Performance

1.22.2 (1730)

Lead Skill Development workout
100% Performance
1.22.2 (1515)
Strength Training Performance Objectives
Threshold
PWS Paragraph
Demonstrate, instruct, correct, and teach strength training movements
100% Performance

1.22.3 (iii) (a)

Game Day Performance Objectives
Threshold
PWS Paragraph
Assist with stretching, pre-game warmup, pre-game talk, and in game coaching
100% Performance

1.23.1 (ii)(iii)(iv)(v)

1.23.2 (ii)(iii)(iv)(v)

The contracting coach will be evaluated monthly against the above services table. Coach will be evaluated monthly by the COR (Head Men’s Basketball Coach) on each above task. Coach will be assessed on a pass/fail (100%/0%) basis.

If contracted coach receives more than two failures per month, contractor will be provided written documentation of such failures by the COR. If contractor receives two months of two or more failures, steps will be taken with the contracting office to being termination of contract (termination by default).

3. GOVERNMENT FURNISHED PROPERTY (GFP)

Not Applicable

4. Quality Control Program:

4.1 Quality Control (QC). The Contractor shall develop and maintain a Quality Control inspection system to ensure contracted services are performed IAW this PWS and within generally accepted commercial and industry practices. The Contractor shall develop and implement procedures to identify and ensure non-recurrence of defective services. The Contractor shall cooperate with the Government Quality Assurance Specialist, Quality Assurance Evaluators, technical representatives, investigative teams, inspectors, CO, and other Government-authorized individuals in the course of daily operations.

4.2 The Contractor’s Quality Control Plan shall be submitted to the CO with the RFQ response. An updated copy shall be provided to the CO on the contract start date, annually, and thereafter or as changes occur. The objective of the Quality Control Plan is to show the Contractor’s philosophy, methods, and techniques in place to ensure quality and consistency of effort in the performance of the PWS requirements.

4.3 The Contractor shall maintain adequate records of all audits and inspections. The records shall indicate the nature and number of observations made, the number and type of deficiencies found, and the nature of corrective action taken as appropriate. The Contractor shall keep, and provide to the Government, records of inspections throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.

4.4 The Contractor shall provide corrective action for Government-noted deficiencies. The Contractor shall reply to Government inspections rated “marginal” or “unsatisfactory” and to evaluations, inspections, and AFFM 27 Customer Comment Cards, as requested. The CO or Quality Assurance Evaluator/Quality Assurance Specialist will notify the Contractor of deficiencies noted during Government inspections or surveys. This notification of deficiencies shall be given to the Contractor immediately after the surveillance. The Contractor’s response to deficiencies shall include the Contractor’s management actions taken to correct the problem(s) and procedures implemented to prevent future occurrences.

image1.jpeg

File details come from the government source that posted it. Updated .