This is a draft performance work statement for the procurement of a Payload Handling System. The Navy seeks to develop a system to deploy large payloads from submarine platforms. Key deliverables include a machined canister assembly consisting of lower and upper forgings, mid weldment, and foundation rails. Respondents must have the capability to fabricate forgings and welded assemblies from HY-80 steel to stringent Navy standards. Delivery is to the Puget Sound Naval Shipyard. Responses are due by March 26, 2020 and should demonstrate technical and production capabilities as well as administrative and quality control processes for a performance-based contract. The work will be set aside for small businesses or competitively awarded to multiple vendors.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A
PERFORMANCE WORK STATEMENT (PWS)
FOR MANUFACTURE OF THE
PAYLOAD HANDLING SYSTEM (PHS)
MACHINED CANISTER
PART 1
GENERAL INFORMATION
1. OVERVIEW
1.1. Summary: This is a non-personnel services contract to provide one complete Payload Handling System Machined Canister consisting of the manufacture and assembly of drawings listed in Part 3. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.2. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform engineering services to build the Payload Handling System Canister Assembly within the confines of specifications as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract.
1.3. Background: The development of Payload Handling System (PHS) Machined Canister is to satisfy the needs of the Navy to deploy large diameter payloads from submarine platforms. The PHS is a research and development effort to design build, and test a first article system. This is a risk reduction effort for the future of Virginia Class (VACL) Blocks V/VI with the VIRGINIA Payload Module (VPM). Initial installation shall be on an Ohio Class (SSGN). Basic functions of the PHS are to extend and retract vertically, pivot horizontally, and stow payloads. The PHS Machined Canister shall be a First Article, which is a major structural component of the system.
1.4. Objectives: Vendor to Provide fabrication services, to manufacture and deliver one each Payload Handling System (PHS) Machined Canister, including all non-destructive testing and inspection documentation.
1.5. Scope: The vendor shall provide services for fabrication and delivery of one each complete First Article Payload Handling System Machined Canister consisting of fabrication, and assembly of tube weldment, upper forging weldment, and lower forging weldment. Fabrication shall include weld cladding of surfaces, application of welded nonferrous inserts, and precision machining as identified per applicable references. The vendor shall invite Government representatives and allow access to witness all testing and inspection. The vendor shall provide first article testing on the upper and lower canister forgings. The vendor shall package and arrange shipping FOB PSNS Bremerton.
1.6. Period of Performance: The period of performance is 01 August 2020 to 01 May 2022. Base option estimates a total 30 weeks for delivery of forgings to support Option 1. Option 1 manufacture estimates 33 weeks for the execution of Option 1 for delivery of one each complete upper forging machined, and one each complete lower forging weldment machined to support Option 2. Option 2 manufacture estimates 32 weeks delivery of May 2022.
1.7. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.8. Recognized Holidays: Days are listed below and work is not required if the business is not normally open on the below holidays.
· New Year’s Day
· Martin Luther King Jr.’s Birthday
· President’s Day
· Memorial Day
· Independence Day
· Labor Day
· Columbus Day
· Veteran’s Day
· Thanksgiving Day
· Christmas Day
1.9. Place of Performance: The work to be performed under this contract will be performed at the awarded vendor’s place of business
1.10. Type of Contract: The government will award a (Type of contract to be determined by CCE and the customer).
1.11. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.12. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: 1) assure that the Contractor performs the technical requirements of the contract, 2) perform inspections necessary in connection with contract performance, 3) maintain written and oral communications with the Contractor concerning technical aspects of the contract, 4) issue written interpretations of technical requirements, including Government drawings, designs, specifications, 5) monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, 6) coordinate availability of government furnished property, and 7) provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.13. Key Personnel: The following are key personnel by the government:
James McCready (COR) James.McCready@navy.mil 360-627-5075
Jonathan Jordan (ACOR) Jonathan.d.Jordan@navy.mil 360-627-5077
Jeremy Lamb (Lead Engineer, NSWCPD) Jeremy.Lamb@navy.mil 215-897-7548
Isaac Swain (Project Engineer) Isaac.Swain@navy.mil 360-627-5203
Ryan Freke (Lead Development Engineer) Fyan.Freke@navy.mil 360-627-5106
James Blythe (Program Manager) James.Blythe@navy.mil 360-627-5141
1.14. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. At the end of the contract period, all materials, deliverables, and intellectual property rights procured or produced specific to the design, manufacture, and/or test of items under this contract shall become property of the Government and delivered to that effect. These items include, but are not limited to:
· Fabrication Plan
· Forging Sketch Upper Canister
· Forging Sketch Lower Canister
· Forging Sketch Upper Canister First Article
· Forging Sketch Lower Canister First Article
· Test Certifications
1.15. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.16. Contractor Point of Contact: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. HINDCAST. The mean value of span ± 2s, as well as the mean value.
2.1.7. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have private of contract with the subcontractor.
2.1.13. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.14. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
| ACOR | Alternate Contracting Officer's Representative |
| AFARS | Army Federal Acquisition Regulation Supplement |
| AR | Army Regulation |
| CCE | Contracting Center of Excellence |
| CDRL | Contract Data Requirements List |
| CFR | Code of Federal Regulations |
| COC | Certification of Compliance - Conformance |
| CONUS | Continental United States (excludes Alaska and Hawaii) |
| COR | Contracting Officer Representative |
| COTR | Contracting Officer's Technical Representative |
| COTS | Commercial-Off-the-Shelf |
| DA | Department of the Army |
| DD250 | Department of Defense Form 250 (Receiving Report) |
| DD254 | Department of Defense Contract Security Requirement List |
| DFARS | Defense Federal Acquisition Regulation Supplement |
| DMDC | Defense Manpower Data Center |
| DOD | Department of Defense |
| DWG | Drawing |
| FAR | Federal Acquisition Regulation |
| FAT | First Article Test Report |
| HIPAA | Health Insurance Portability and Accountability Act of 1996 |
| IAW | In Accordance With |
| KO | Contracting Officer |
| MT | Magnetic Particle Test Report |
| NDT | Non-Destructive Testing |
| OCI | Organizational Conflict of Interest |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) |
| ODC | Other Direct Costs |
| PIPO | Phase In/Phase Out |
| POC | Point of Contact |
| PRS | Performance Requirements Summary |
| PWS | Performance Work Statement |
| QA | Quality Assurance |
| QAP | Quality Assurance Program |
| QASP | Quality Assurance Surveillance Plan |
| QC | Quality Control |
| QCP | Quality Control Program |
| RT | Radiography Test Report |
| TE | Technical Exhibit |
| UT | Ultrasonic Test Report |
| VT | Visual Inspection Test |
| V&V | Verification and Validation |
PART 3
APPLICABLE REFERENCES
3. APPLICABLE REFERENCES:
| a) 8681502 REV- | CANISTER, MACHINED |
| b) 8681503 REV- | CANISTER, WELDMENT |
| c) 8681504 REV- | CANISTER, UPPER FORGING MACHINED |
| d) 8681505 REV- | CANISTER, MID WELDMENT |
| e) 8681506 REV- | CANISTER, LOWER WELDMENT MACHINED |
| f) 8681508 REV- | FOUNDATION RAIL |
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Materials. The Contractor shall provide all materials required to manufacture requested items.
4.3. Equipment. The Contractor shall provide all equipment necessary to manufacture requested items.
4.4. DELIVERABLE ITEMS
4.4.1. Base Deliverables:
4.4.1.1. One (1) each Fabrication Plan for one (1) each Complete Machined Canister IAW references (a), (b), (c), (d), (e), and (f) per part 3 of this PWS. (Pre-deliverable)
4.4.1.2. One (1) each Quality Dimensional Measurement Plan for one (1) each Complete Machined Canister IAW references (a), (b), (c), (d), (e), and (f) per part 3 of this PWS. (Pre-deliverable)
4.4.1.3. One (1) each Canister, Lower Forging sketch IAW DWG 8681506 (Pre-deliverable)
4.4.1.4. One (1) each Canister, Lower Forging, First Article Sketch IAW DWG 8681506 (Pre-deliverable)
4.4.1.5. One (1) each Canister, Lower Forging, First Article produced with V&V testing included and rough machined IAW DWG 8681506, and the Canister, Lower Forging, First Article Forging sketch, and the Quality Dimensional Measurement Plan.
4.4.1.6. One (1) each Canister, Lower Forging, produced and rough machined IAW DWG 8681506, and the Canister, Lower Forging sketch, and the Quality Dimensional Measurement Plan.
4.4.1.7. One (1) each Canister, Lower Forging, conformance inspection report IAW DWG 8681506, the Canister, Lower Forging sketch and the Quality Dimensional Measurement Plan.
4.4.1.8. One (1) each Canister, Lower Forging, first article inspection report IAW DWG 8681506, the Canister, Lower Forging, First Article Forging sketch and the Quality Dimensional Measurement Plan.
4.4.1.9. One (1) each Canister, Upper Forging, sketch IAW DWG 8681504 (Pre-deliverable)
4.4.1.10. One (1) each Canister, Upper Forging, First Article sketch IAW DWG 8681504 (Pre-deliverable)
4.4.1.11. One (1) each Canister, Upper Forging, First Article, produced with V&V testing included and rough machined IAW DWG 8681504, the Canister Upper Forging First Article Forging sketch, the Fabrication Plan and Quality Dimensional Measurement Plan.
4.4.1.12. One (1) each Canister, Upper Forging, produced and rough machined IAW DWG 8681504, the Canister Upper Forging sketch, the Fabrication Plan and Quality Dimensional Measurement Plan.
4.4.1.13. One (1) each Canister, Upper Forging, conformance inspection report IAW DWG 8681504, Canister, Upper Forging sketch and Quality Dimensional Measurement Plan.
4.4.1.14. One (1) each Canister, Upper Forging, first article inspection report IAW DWG 8681504, Canister, Upper Forging, First Article sketch and Quality Dimensional Measurement Plan.
4.4.1.15. Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for base option requirements.
4.4.2. Deliverables Option 1:
4.4.2.1. One (1) each Canister, Lower Weldment Machined, complete IAW DWG 8681506 and the Fabrication Plan and the Quality Dimensional Measurement Plan
4.4.2.2. One (1) each Canister, Lower Weldment Machined inspection report IAW DWG 8681506, Fabrication Plan, and Quality Dimensional Measurement Plan
4.4.2.3. One (1) each Canister, Upper Forging Machined, complete IAW DWG 8681504, Fabrication Plan, and Quality Dimensional Measurement Plan
4.4.2.4. One (1) each Canister, Upper Forging Machined conformance inspection report IAW DWG 8681504, the Fabrication Plan, and the Quality Dimensional Measurement Plan
4.4.2.5. Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for option 1 requirements.
4.4.3. Deliverables Option 2:
4.4.3.1. One (1) each Complete Machined Canister IAW DWG 8681502, 8681503 and 8681505, and 8681508. Utilizing Canister Lower Machined DWG 8681506, Canister Upper Machined DWG 8681504, the Fabrication Plan, and the Quality Dimensional Measurement Plan
4.4.3.2. One (1) each conformance inspection reports as defined IAW DWG 8681502, 8681503 and 8681505, the Fabrication Plan, and Quality Dimensional Measurement Plan
4.4.3.3. Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for option 2 requirements.
PART 5
QUALITY ASSURANCE SURVEILLANCE PLAN
5. QUALITY ASSURANCE SURVEILLANCE PLAN
5.1. Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the SOW. The QASP will be used primarily as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the PWS in a timely, accurate and complete fashion.
5.2. The Contractor as the OEM is solely responsible for the quality of services provided. PSNS may witness manufacture and testing at any time of PHS Canister.
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
| Provide One (1) each Fabrication Plan for one (1) each Complete Machined Canister IAW references (a), (b), (c), (d), (e), and (f) per part 3 of this PWS. (Pre-deliverable 4.4.1.1) |
| The Contractor will provide complete Fabrication Plan (Deliverable 4.4.1.1) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.1. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with fabrication plan requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Quality Dimensional Measurement Plan for one (1) each Complete Machined Canister IAW references (a), (b), (c), (d), (e), and (f) per part 3 of this PWS. (Pre-deliverable 4.4.1.2) |
| The Contractor will provide Dimensional Measurement Plan (Deliverable 4.4.1.2) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.2. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with Quality Dimensional Measurement Plan requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
| Provide One (1) each Canister, Lower Forging sketch IAW DWG 8681506 (Pre-deliverable 4.4.1.3) |
| The Contractor will provide Canister Lower Forging Sketch (Deliverable 4.4.1.3) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.3. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with Canister, Lower Forging Sketch requirements Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Canister, Lower Forging, First Article Sketch IAW DWG 8681506 (Pre-deliverable 4.4.1.4) |
| The Contractor will provide Canister Lower Forging First Article Sketch (Deliverable 4.4.1.4) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.4. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with Canister, Lower Forging, First Article Sketch requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
Provide One (1) each Canister, Lower Forging, First Article produced with V&V testing included and rough machined IAW DWG 8681506, and the Canister, Lower Forging, First Article Forging sketch, and the Quality Dimensional Measurement Plan.
(Deliverable 4.4.1.5.)
| The Contractor will provide One (1) each Canister, Lower Forging, First Article produced with V&V testing included and rough machined IAW the Canister, Lower Forging, First Article Forging sketch, and the Quality Dimensional Measurement Plan. (Deliverable 4.4.1.5.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case by case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.5. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with first article requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
Provide One (1) each Canister, Lower Forging, produced and rough machined IAW DWG 8681506, and the Canister, Lower Forging sketch, and the Quality Dimensional Measurement Plan (Deliverable 4.4.1.6.)
| The Contractor will provide One (1) each Canister, Lower Forging, produced and rough machined IAW the Canister, Lower Forging sketch, and the Quality Dimensional Measurement Plan (Deliverable 4.4.1.6.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case by case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.6. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681506, Forging sketch, and the Quality Dimensional Measurement Plan, Contractor Report requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement | |
| Performance Standards | |
| Allowable Deviation | |
| Surveillance Method | |
| Correction Procedures |
Provide One (1) each Canister, Lower Forging, conformance inspection report IAW DWG 8681506, the Canister, Lower Forging sketch and the Quality Dimensional Measurement Plan.
(Deliverable 4.4.1.7.)
| The Contractor will provide One (1) each Canister, Lower Forging, conformance inspection report IAW DWG 8681506, the Canister, Lower Forging sketch and the Quality Dimensional Measurement Plan. (Deliverable 4.4.1.7.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.7. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681506, forging sketch, and quality dimensional plan Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Canister, Lower Forging, first article inspection report IAW DWG 8681506, the Canister, Lower Forging, First Article Forging sketch and the Quality Dimensional Measurement Plan. (Deliverable 4.4.1.8.) |
| The Contractor will provide One (1) each Canister, Lower Forging, first article inspection report IAW DWG 8681506, the Canister, Lower Forging, First Article Forging sketch and the Quality Dimensional Measurement Plan. (Deliverable 4.4.1.8.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.8. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with first article requirements of DWG 8681506, forging sketch, and Quality dimension plan Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
Provide One (1) each Canister, Upper Forging, sketch IAW DWG 8681504 (Pre-deliverable 4.4.1.9.)
| The Contractor will provide One (1) each Canister, Upper Forging, sketch IAW DWG 8681504 (Pre Deliverable 4.4.1.9.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.9. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681504 forging sketch requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
Provide One (1) each Canister, Upper Forging, First Article sketch IAW DWG 8681504 (Pre-deliverable 4.4.1.10.)
| The Contractor will provide One (1) each Canister, Upper Forging, First Article sketch IAW DWG 8681504 (Pre Deliverable 4.4.1.10.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.10. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681504, forging first article sketch requirements Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
Provide One (1) each Canister, Upper Forging, First Article, produced with V&V testing included and rough machined IAW DWG 8681504, the Canister, Upper Forging, First Article Forging sketch, the Fabrication Plan and Quality Dimensional Measurement Plan.
(Deliverable 4.4.1.11.)
| The Contractor will provide One (1) each Canister, Upper Forging, First Article, produced with V&V testing included and rough machined IAW the Canister, Upper Forging, First Article Forging sketch, the Fabrication Plan and Quality Dimensional Measurement Plan. (Deliverable 4.4.1.11.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.11. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with first article requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Canister, Upper Forging, produced and rough machined IAW DWG 8681504, the Canister, Upper Forging sketch, the Fabrication Plan and Quality Dimensional Measurement Plan. (Deliverable 4.4.1.12.) |
| The Contractor will provide One (1) each Canister, Lower Forging, produced and rough machined IAW the Canister, Lower Forging sketch, and the Quality Dimensional Measurement Plan (Deliverable 4.4.1.12.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.12. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681504, the Canister, Upper Forging sketch, the Fabrication Plan and Quality Dimensional Measurement Plan, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
Provide One (1) each Canister, Upper Forging, conformance inspection report IAW DWG 8681504, Canister, Upper Forging sketch and Quality Dimensional Measurement Plan.
(Deliverable 4.4.1.13.)
| The Contractor will provide One (1) each Canister, Upper Forging, conformance inspection report IAW DWG 8681504, Canister, Upper Forging sketch and Quality Dimensional Measurement Plan. (Deliverable 4.4.1.7.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.13. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681504, Canister, Upper Forging sketch and Quality Dimensional Measurement Plan. Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Canister, Upper Forging, first article inspection report IAW DWG 8681504, Canister, Upper Forging, First Article sketch and Quality Dimensional Measurement Plan. (Deliverable 4.4.1.14.) |
| The Contractor will provide One (1) each Canister, Upper Forging, first article inspection report IAW DWG 8681504, Canister, Upper Forging, First Article sketch and Quality Dimensional Measurement Plan. (Deliverable 4.4.1.14.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.14. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance first article inspection report IAW DWG 8681504, Canister, Upper Forging, First Article sketch and Quality Dimensional Measurement Plan requirements, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
| Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for base option requirements. (Deliverable 4.4.1.15.) |
| The Contractor will provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for base option requirements. (Deliverable 4.4.1.15.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.15. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with monthly Contractor's Progress, Status and Management Report, Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Canister; Lower Weldment Machined, complete IAW DWG 8681506, the Fabrication Plan, and the Quality Dimensional Measurement Plan (Deliverable 4.4.2.1.) |
| The Contractor will provide One (1) each Canister, Lower Weldment Machined, complete IAW DWG 8681506 and the Fabrication Plan and the Quality Dimensional Measurement Plan (Deliverable 4.4.2.1.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.1. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681506, the Fabrication Plan, and the Quality Dimensional Measurement Plan Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
Provide One (1) each Canister, Lower Weldment Machined inspection report IAW DWG 8681506, Fabrication Plan, and Quality Dimensional Measurement Plan (Deliverable 4.4.2.2.)
| The Contractor will provide One (1) each Canister, Lower Weldment Machined inspection report IAW DWG 8681506, Fabrication Plan, and Quality Dimensional Measurement Plan (Deliverable 4.4.2.2.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.2. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681506, Fabrication Plan, and Quality Dimensional Measurement Plan Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide One (1) each Canister, Upper Forging Machined, complete IAW DWG 8681504, Fabrication Plan, and Quality Dimensional Measurement Plan (Deliverable 4.4.2.3.) |
| The Contractor will provide One (1) each Canister, Upper Forging Machined, complete IAW DWG 8681504, Fabrication Plan, and Quality Dimensional Measurement Plan. (Deliverable 4.4.2.3.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.3. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681504, Fabrication Plan, and Quality Dimensional Measurement Plan Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Requirement |
| Performance Standards |
| Allowable Deviation |
| Surveillance Method |
| Correction Procedures |
Provide One (1) each Canister, Upper Forging Machined conformance inspection report IAW DWG 8681504, the Fabrication Plan, and the Quality Dimensional Measurement Plan (Deliverable 4.4.2.4.)
| The Contractor will provide One (1) each Canister, Upper Forging Machined conformance inspection report IAW DWG 8681504, the Fabrication Plan, and the Quality Dimensional Measurement Plan (Deliverable 4.4.2.4.) following the delivery instructions, and include all required submittals with each delivery. |
| The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance. |
| Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.4. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable. |
| Upon discovery of non-conformance with DWG 8681504, the Fabrication Plan, and the Quality Dimensional Measurement Plan Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements. |
| Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for option 1 requirements. (Deliverable 4.4.2.5.) |
This is the start of the file's text. The full file is on GovTribe.