Draft Performance Work Statment - MFSD Equipment Purchase and Maintenance Services.pdf
PDF 484 KB Posted
- Solicitation number
- N0018923Q0306
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Information (RFI) - MFSD Equipment Purchase and Repair Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR KING HALL/MIDSHIPMEN FOOD SERVICE DIVISION (MFSD)
EQUIPMENT ACQUISITION AND MAINTENANCE/REPAIR SERVICES
1.0 Objectives
The objective of this Performance Work Statement (PWS) is to acquire on-site maintenance, purchase of equipment, warranty and support of Government owned kitchen, food service, and materiel handling equipment located at the King Hall (KH) Galley/MFSD at the United States
Naval Academy (USNA) in Annapolis, MD. The contractor shall possess significant preventive and corrective maintenance experience for a variety of manufacturers as illustrated in Appendix
#1 (Equipment Inventory and Manufacturer). Additionally, at a minimum the contractor shall be an Authorized Service Agency for Cleveland, Angelo and other food service equipment manufacturers. Additionally, the contractor shall be knowledgeable contractual procedures and purchase equipment when equipment has reached its life expectancy or is no longer economical repairable.
The minimum period of performance is one year beginning TBD. The maximum period of performance is not to exceed five years with one base year beginning on TBD, and four option years to be exercised at the Government's discretion subject to Federal Acquisition Regulations provisions and the availability of funds
2.0 Description of Services
The contractor shall provide all management, tools, supplies, equipment and labor necessary to maintain and repair Government owned kitchen, food service, and materials handling equipment at the USNA, Annapolis, MD. Services will be provided at the KH Dining Facility where approximately 13,000 meals are prepared daily.
3.0 Requirements
The requirement is for full-service, on-site preventive and corrective maintenance support to be provided by an experienced, responsive contractor primarily Monday through Friday (except for
Federal holidays and base closures) and encompasses eight hours per day including the core hours of 0700 through 1530. The work will be performed onsite in Annapolis, MD at the KH
Dining Facility or other locations as required, i.e contractors repair shop and agreed upon with the Contracting Officer’s Representative (COR).
3.1 Specific Tasks
The contractor shall provide personnel to perform the following specific tasks.
3.1.1 Basic Equipment Maintenance/Repair Services. The contractor shall be an Authorized
Service Agency for Cleveland, Angelo PO and other equipment manufacturers, and possess significant preventive and corrective maintenance experience with a variety of other manufacturers. The contractor shall maintain all equipment in accordance with manufacturer’s recommendations (reference PWS paragraph 10.3) and standard commercial practices. Service shall be performed on equipment listed in Appendix #1. As replacement to existing and addition of new equipment is accomplished by the contractor, the contractor shall maintain the replacement and additional equipment to include warranty work as part of this contract. Total quantity of all equipment may vary plus or minus (+/-) 5% during the life of this contract.
3.1.1.1 Performance Objectives
A. The contractor shall maintain a “bench stock” of parts to perform on-the-spot repairs and preventive maintenance. Such parts may consist of regularly used items such as thermostats, valves, electrical plugs, knobs and dials, belts and chains, hoses, nozzles and wheels.
B. The contractor shall be responsible for any consumable items used in the performance of work. Such items may include, but not be limited to, nuts, bolts, screws, small electrical fittings such as wire nuts and connectors, solder and/or flux, oil, grease, refrigerant gases, cleaning and shop supplies. Consumable items shall also be maintained as “bench stock” items.
C. The contractor shall purchase any part for repairs under $1,500.00. Payment for individual parts over $1,500.00 shall be the Government’s responsibility. The contractor will be responsible for gathering three quotes and submitting a purchase worksheet demonstrating adequate competition. The contractor shall not combine individual parts under $1,500 in order to exceed this threshold. If such part is needed after normal duty hours for emergency repair, the contractor shall notify the COR. All replacement parts shall be new and meet manufacturer specifications.
D. The contractor shall communicate, on a daily basis to the COR, the status of any equipment in need of repair or if a part is not readily available.
E. The contractor shall conduct high temp testing of the three (3) deep fat fryers annually, and shall remove/add refrigerant as necessary. Refrigerant shall be removed from any equipment that will be turned in to base supply for transport to Defense Logistics Agency
Disposition Services. Refrigerant shall be disposed of properly (see section 8.3.2, Special
Qualifications). The contractor shall be required to obtain, from the base fire department, an annual welding permit to perform minor welding services required as part of equipment repair and maintenance.
F. The contractor’s responsibility for kitchen and food service equipment begins at the point where such equipment connects to facility utilities.
G. All repairs shall be completed within eight (8) hours (1 working day) of contractor notification by the Government. If repairs cannot be completed in this time frame, the contractor shall notify the COR of expected completion date and provide justification for non-completion of repair.
H. The contractor shall keep a daily log of all items repaired/replaced in a format agreed upon by the contractor and the COR, i.e. replaced 2 wheels on a spider rack; replaced frayed cord on a hot cart heating unit, etc. This log, listing daily workload, will serve as a tool for tracking possible equipment replacement or abuse to certain equipment items.
Within five (5) working days after the end of each month, the contractor shall make available, to the COR, a log showing all work accomplished during the month.
I. The contractor shall be required to disconnect utilities to old kitchen and food service equipment and connect utilities to new or replacement equipment.
J. The contractor shall be required to assist the facility manager or his/her designated representative in moving an existing piece of kitchen and food service equipment from one location to another location or removing an existing piece of kitchen and food service equipment and installing new.
K. The contractor shall locate, identify and tag all Government owned equipment identified in Appendix #1 with a contractor serial/information plate within 30 days after the period of performance commences. The contractor shall update serial/information plates as required due to purchase of new equipment, equipment replacement, damaged plates, etc.
3.1.1.2 Deliverables
A. Repair Parts. Repair parts shall be provided for maintenance actions as described in
3.1.1.1.3 above.
B. Equipment Status. Daily equipment status shall be communicated to the COR as described in 3.1.1.4 above.
C. Repairs. Equipment repairs shall be completed as described in 3.1.1.1.7 above.
D. Logs. Monthly work logs shall be provided to the COR as described in 3.1.1.1.8 above.
E. Equipment Inventory and Identification. Government owned equipment shall be inventoried and tagged in accordance with 3.1.1.1.11
3.1.2 Emergency Call Response. The contractor shall repair and maintain all equipment in accordance with manufacturer’s recommendations (reference PWS paragraph 10.3) and standard commercial practices in the event of an emergency. Emergency repair service shall be performed on equipment listed in Appendix #1, when required.
3.1.2.1 Performance Objectives
A. The contractor shall respond to any emergency repair, as determined by the COR, during non-duty hours within two (2) hours of notification. Non-duty hours are defined as any time outside the normal duty hours of Monday-Friday, 0700 to 1530.
B. During normal duty hours, the contractor shall respond within 30 minutes to an emergency call as determined by the COR. Such an emergency repair call will take precedence over normal preventive maintenance and routine repair calls.
C. In addition to preventive maintenance, the contractor shall respond to any non-emergency repairs when notified by the COR.
3.1.2.2 Deliverables
A. Repair Parts. Repair parts shall be provided for maintenance actions as described in
3.1.1.1.3 above.
B. Repairs. Equipment repairs shall be completed as described in 3.1.1.1.7 above.
C. Logs. Monthly work logs shall be provided to the COR as described in 3.1.1.1.8 above.
3.1.3 Preventive Maintenance. The contractor shall perform preventive maintenance (PM) on all equipment in accordance with manufacturer’s recommendations (reference PWS paragraph
10.3) and standard commercial practices. PM shall be performed on equipment listed in
Appendix #1.
3.1.3.1 Performance Objectives
A. The contractor shall submit and obtain Government approval of an on-going preventive maintenance (PM) program schedule. The PM program shall be submitted to the
Technical Point of Contact (TPOC) for Government approval within 90 days from commencement of the contract period of performance. The PM program shall capture all manufacturer required maintenance periodicities to include daily, weekly, monthly, quarterly, semi-annual, annual, as required and life-cycle maintenance checks. The PM program shall ensure all equipment is maintained according to the manufacturer’s recommendations (see PWS paragraph 10.3). The contractor shall minimize disruptions and inconveniences to users.
B. The contractor shall perform preventive maintenance in accordance with the approved plan identified above in 3.1.3.1.1.
3.1.3.2 Deliverables
A. Monthly PM schedule. In a format agreed upon by the COR and the contractor, the contractor shall provide to the COR a monthly PM schedule broken down by week and listing any/all discrepancies found as a result of completed maintenance from 3.1.3.1.2.
Repairs made during the preventive maintenance shall be listed and tracked.
B. PM report. Within five (5) working days after the end of each month, the contractor shall provide a report of all PM accomplished in a format agreed upon by the COR and the contractor. Any discrepancies between scheduled and actual performed maintenance will be noted and justifications provided to the COR.
3.1.4 SIGNS. The contractor shall place an “Out of Order” or “Do Not Use” sign on any piece of equipment for which parts are on order. Working in conjunction with USNA facilities, the contractor shall tag any electrical or gas disconnect that has been secured, noting the date and technician’s name. Signs shall contain pertinent information such as date of service, technician’s names, and expected date for parts arrival and/or unit placed back into service. Signs shall be legible and placed in an easy to see area. The contractor shall follow proper procedures for Lock
Out/Tag Out program.
4.0 Performance Standards
4.1 Timeliness. The contractor shall deliver products within times specified.
4.2 Accuracy. Products shall be factually accurate, complete, and in accordance with USNA standards and policies, as well as other standards and deliverables as mutually agreed to by both the COR and contractor.
4.3 Quality. Repair parts shall be genuine OEM or equivalent substitutes, and written products shall be free of spelling and grammatical errors, formatted appropriately, and fully coordinated with stakeholders.
4.4 Compatibility. All computer generated written products must be fully compatible with the format for Microsoft Word, Excel, PowerPoint, Access, MS Project and other application programs used to capture information. No product will be incompatible with USNA’s standard applications.
5.0 Monitoring Methods
5.1. Upon receipt of a deliverable or product by the Government, the COR will review and assess each deliverable to ensure its timeliness, accuracy, completeness, and whether it is in accordance with deadlines and guidance given.
5.2. Monthly reports will be delivered by the contractor to the Government COR. Due dates will be as specified within this PWS or otherwise mutually determined and agreed upon between the
COR and the contractor.
6.0 Property Control. The contractor shall obtain approval of the COR or the contracting officer before removing any item from its existing location.
7.0 Orientation Meeting. The COR shall host an orientation meeting immediately after award of contract. The meeting shall be attended by the contractor and all relevant key personnel to discuss the implementation of the contractor’s proposal and to ensure understanding of the PWS.
The COR and the contractor shall collaborate on the planning of the overall project to include approach, methodology, and prior work performed relevant to this contract. The project initiation includes on boarding of support contractor personnel, review and update of project management plans and schedules for the effort.
Key activities include, but are not limited to:
a. On board contractor personnel (i.e. initiation of background investigation process, signing disclosure statements, assignment of ITSD escorts, review of the performance plan, etc.).
b. The contractor shall provide a Contractor Quality Control Plan (CQCP) based on the performance standards in the PWS, which focuses on the quality, quantity, timeliness, etc. of the performance outputs to be delivered by the contractor but not on the steps required or procedures used to provide the services.
c. Contractor shall collaborate with COR on the process for drafting, reviewing, finalizing and delivering reports and meeting notes.
d. Contractor shall prepare and submit a plan to the COR that enables the smooth assumption of duties. Additionally, the transition plan shall include milestones, risk analysis, mitigation strategies and any other factor needed to ensure the work is properly transitioned from one offeror to the next.
8.0 General Information
8.1 Quality Assurance and Quality Control. Within 90 days of the commencement of the contract period of performance, the contractor shall establish and maintain a complete Quality
Control Plan to assure the requirements of the contract are provided as specified. A copy of the
CQCP shall be made available upon request by the Contracting Officer. The plan shall include, at a minimum, the following:
8.1.1. The methods of identifying and preventing defects in the quality of service performed before the level of performance becomes unacceptable. For example, the PM program.
8.1.2. Records of all inspections conducted by the contractor and the necessary corrective action taken. This documentation shall be made available to the Government during the term of the contract.
8.2 Hours of Operation. The KH Dining Facility serves three (3) meals per day, seven (7) days per week. The contractor shall provide on-site service at KH during normal duty hours which are Monday-Friday, 0700-1530; however, during special scheduled events the Government reserves the right to establish work requirements outside the normal duty hours. Hours are not altered by conditions which impact Government employees such as phased departure or delayed reporting.
8.2.1. The contractor shall also make available an additional technician to perform maintenance and repair duties in the absence of the regularly scheduled technician or to assist the regularly scheduled technician on such tasks that may require more than one (1) person to safely accomplish. The standby technician shall be familiar with the requirements of the KH Dining
Facility and be fully capable of replacing the regularly scheduled technician.
8.2.2. The contractor shall provide emergency service after normal duty hours and on weekends and holidays. The contractor shall provide the COR a schedule of on-call personnel. The contractor shall also notify the COR as to any changes to the standby schedule.
8.2.3. The contractor shall provide a cell phone as a means of technician contact both during and after normal duty hours. Cell phone shall have a local dialing area number, not a long distance number.
8.2.4. The contractor shall NOT be required to work on the following 10 recognized Federal holidays.
New Year’s Day Martin Luther King Day
President’s Day Memorial Day
Independence Day Labor Day
Columbus Day Veteran’s Day
Thanksgiving Day Christmas Day
8.3 Special Qualifications.
8.3.1 Contractor employee shall be a certified journeyman electrician.
8.3.2 Contractor employees shall be certified as Type I technicians under the EPA Certification for Federal Clean Air Act, Section 608, which requires all persons who maintain, service, repair, or dispose of appliances that contain regulated refrigerants be certified in proper refrigerant handling techniques. A copy of all employees’ training certificate will be presented to the COR prior to the contractor beginning work.
8.3.3 Contractor employees shall be an Authorized Service Agency for Cleveland and Lang food service equipment.
9.0 Service Summary
Performance Objective PWS Paragraph Performance Threshold
Equipment Repair
Repairs are made within specified time limits.
3.1.1.1.7
3.1.1.1.4
85% of equipment is repaired within 8 hours, remaining 15% within timeframe agreed upon between contractor and COR.
COR is notified of delays due to parts.
Reports and Logs
Call and Maintenance Log provided to COR.
Monthly PM Schedule provided and discrepancies noted and explained.
3.1.1.1.8
3.1.3 and sub paragraphs
90% of the time, monthly Call
Maintenance Log provided to COR within 5 working days after the end of the month, remaining 10% within 7 working days.
90% of the time, PM log provided to COR within 5 working days after the end of the month, remaining
10% within 7 working days.
Service Call Response
Service is provided within specified time.
3.1.1.1.7 and 3.1.2.1(1-
3)
95% of all service calls are satisfactorily completed within required time, remaining 5% within the timeframe agreed upon between contractor and COR.
10.0 Government Furnished Property and Services
10.1. Office/Work Shop area to include desk, chair, bookshelf, work bench, parts storage.
10.2. Telephone, fax line, computer with CPU and monitor. Access to USNA network including internet access.
10.3. The Government has gathered all available printed manuals and placed them in three-ring binders within the contractor office. Currently printed manuals are available for the majority of equipment; all others are available through internet access provided.
11.0 Employee Background Check. All contractor employees must obtain a favorable suitability determination based on a Tier 1 investigation by the Office of Personnel Management
(OPM). All contractors must obtain a DoD issued Common Access Card (CAC). Employment will be contingent on the receipt and evaluation of the background check report. Additional reports may be requested during the course of employment as well.
Approximately ninety (90) days is the standard service time for completion of a Tier 1 investigation by OPM. Contractor employees shall have a current Tier 1 Investigation with
OPM, or Tier 1 investigation submitted and favorable FBI fingerprint results, and be in possession of a CAC prior to starting work at USNA.
12.0 Appendices. Appendix 1, Equipment Inventory and Manufacturer. Immediately upon Post-
Award a survey will be conducted with the COR and the contractor. All of the Government owned equipment listed at Appendix 1 will be located, identified and tagged with contractor serial/information plates. See Appendix 1, Equipment Inventory and Manufacturer below:
APPENDIX 1
EQUIPMENT
INVENTORY
AND
MANUFACTURER
Nbr Description Location Manufacturer
1 COMBI - OVEN N1 GALLEY ANGELO PO
2 COMBI - OVEN N2 GALLEY ANGELO PO
3 COMBI- OVEN N3 GALLEY ANGELO PO
4 COMBI-OVEN N4 GALLEY ANGELO PO
5 COMBI - OVEN N5 GALLEY ANGELO PO
6 COMBI- OVEN N6 GALLEY ANGELO PO
7 COMBI-OVEN S1 GALLEY ANGELO PO
8 COMBI- OVEN S2 GALLEY ANGELO PO
9 COMBI - OVEN S3 GALLEY ANGELO PO
10 COMBI - OVEN S4 GALLEY ANGELO PO
11 COMBI - OVEN S5 GALLEY ANGELO PO
12 COMBI - OVEN S6 GALLEY ANGELO PO
13 COPPER 1 GALLEY CLEVELAND
14 COPPER 2 GALLEY CLEVELAND
15 COPPER 3 GALLEY CLEVELAND
16 COPPER 4 GALLEY CLEVELAND
72" FlatTop Griddle
1-4
GALLEY CPG
18 MIXER GALLEY HOBART
ICE MACHINE COOLING
UNIT
GALLEY PREP AREA FOLLETT
RIGHT SIDE COMPRESSOR
MOTOR
GALLEY PREP AREA FOLLETT
LEFT SIDE COMPRESSOR
MOTOR
GALLEY PREP AREA FOLLETT
22 ICE STORAGE BIN GALLEY PREP AREA FOLLETT
23 OPENER GALLEY PREP AREA EDLUND
24 PASTA KETTLE COOK CHILL CLEVELAND
25 ROUTER KETTLE COOK CHILL CLEVELAND
26 ROUTER KETTLE #1 COOK CHILL CLEVELAND
27 ROUTER KETTLE #2 COOK CHILL CLEVELAND
28 CHILLER #1 COOK CHILL CLEVELAND
29 CHILLER #2 COOK CHILL CLEVELAND
30 CONVEYOR COOK CHILL CLEVELAND
31 COOK CHILL TANK #3 COOK CHILL CLEVELAND
32 COOK CHILL TANK #1 COOK CHILL CLEVELAND
33 COOK CHILL TANK #2 COOK CHILL CLEVELAND
34 OVENS BAKE SHOP V42
35 OVENS BAKE SHOP V42
36 OVENS BAKE SHOP V42
37 OVENS BAKE SHOP V42
38 MIXER BAKE SHOP HOBART
39 DISHWASHER BAKE SHOP MEIKO
40 WASHING STATION BAKE SHOP POWER SOAK/ SOMAT
41 OPENER BAKE SHOP EDLUND
ICE CREAM TOPPING
HOLDER
BAKE SHOP TURBO-AIR
ICE CREAM TOPPING
HOLDER
BAKE SHOP TURBO-AIR
44 CONVEYOR TOASTER BAKE SHOP AVANTCO
45 (HOT) UPRIGHT CART WF-51 SERVERY
ALTO SHAM/ HALO
HEAT
46 HEATING LAMP SERVERY HATCO CORP
47 HEATING LAMP SERVERY HATCO CORP
48 FRY HOLDING STATION SERVERY HATCO GLO-RAY
49 (HOT) UPRIGHT CART DK46 SERVERY
ALTO SHAM/ HALO
HEAT
FRIDGE/ FREEZER BOX WF-
SERVERY TRUE
51 (HOT) UPRIGHT CART SERVERY
ALTO SHAM/ HALO
HEAT
52 REFER BOX SERVERY TRUE
53 FRIDGE/ FREEZER BOX SERVERY TRUE
54 (HOT) UPRIGHT CART
SERVERY
DH-100-2
ALTO SHAM/ HALO
HEAT
55 (HOT) UPRIGHT CART
SERVERY
BG-70
ALTO SHAM/ HALO
HEAT
56 (HOT) UPRIGHT CART
SERVERY
DH-100-63
ALTO SHAM/ HALO
HEAT
57 FRIDGE/ FREEZER BOX #7 SERVERY TRUE
58 FRYER DEEP FAT (NAT) SERVERY
VULCAN HART
COMPANY
59 COMBI- OVEN SERVERY ANGELO PO
60 COMBI- OVEN SERVERY ANGELO PO
61 COMBI- OVEN SERVERY ANGELO PO
62 COMBI- OVEN SERVERY ANGELO PO
63 GRILL FLAT TOP (NAT) SERVERY IMPERIAL
64 FRYER DEEP FAT (NAT) SERVERY
VULCAN HART
COMPANY
65 SKILLET,TILT SERVERY CLEVELAND
66 FRYER DEEP FAT (NAT) SERVERY
VULCAN HART
COMPANY
67 CHARBOILER SERVERY
VULCAN HART
COMPANY
68 WAFFLE IRON SERVERY
WARING
COMMERCIAL
69 WAFFLE IRON SERVERY
WARING
COMMERCIAL
70 WAFFLE IRON SERVERY
WARING
COMMERCIAL
71 WAFFLE IRON SERVERY
WARING
COMMERCIAL
72 WAFFLE IRON SERVERY
WARING
COMMERCIAL
73 72" GRIDDLE SERVERY CPG
74 72" GRIDDLE SERVERY CPG
SALAD BAR
REFRIGERATOR (MOBILE)
SERVERY TRUE
76 BLAST CHILLER C BLAST CHILLER/ C115 AMERICAN PANEL
77 BLAST CHILLER D BLAST CHILLER/ C115 AMERICAN PANEL
78 BLAST CHILLER J BLAST CHILLER/ C115 AMERICAN PANEL
79 BLAST CHILLER K BLAST CHILLER/ C115 AMERICAN PANEL
80 HOT CART 45 PWAY CARTAR HOFFMANN
81 HOT CART 29
GALLEY STORAGE
ROOM
CARTAR HOFFMANN
82 HOT CART 41 SERVERY CARTAR HOFFMANN
83 HOT CART 9 PWAY CARTAR HOFFMANN
84 HOT CART 49
CHESAPEAKE
GALLEY
CARTAR HOFFMANN
85 HOT CART 56 PWAY CARTAR HOFFMANN
86 HOT CART 13 PANTRY CARTAR HOFFMANN
87 HOT CART 34 JUNKYARD CARTAR HOFFMANN
88 HOT CART 11 PWAY CARTAR HOFFMANN
89 (HOT) UPRIGHT CART JUNKYARD
ALTO SHAM/ HALO
HEAT
90 (HOT) UPRIGHT CART JUNKYARD
ALTO SHAM/ HALO
HEAT
91 SALAD BAR JUNKYARD DELFIELD
92 SALAD BAR JUNKYARD DELFIELD
BUFFET GRILL WEIGH
ACTIVE
CHESAPEAKE GALLEY LAKESIDE
BUFFET GRILL WEIGH
ACTIVE
CHESAPEAKE GALLEY LAKESIDE
95 BUFFALO CHOPPER CHESAPEAKE GALLEY HOBART
96 TILT SKILLET CHESAPEAKE GALLEY CLEVELAND
97 COPPER/ KETTLE CHESAPEAKE GALLEY CLEVELAND
98 8 BURNER GRILL CHESAPEAKE GALLEY SOUTHBEND
99 OVEN #1 CHESAPEAKE GALLEY HOBART
100 OVEN #2 CHESAPEAKE GALLEY HOBART
101 6 BURNER GRILL CHESAPEAKE GALLEY SOUTHBEND
102 FLAT TOP CHESAPEAKE GALLEY SOUTHBEND
103 COMBI OVEN CHESAPEAKE GALLEY CLEVELAND
104 ICE STORAGE BIN CHESAPEAKE GALLEY FOLLET
105 COMPRESSOR #1 CHESAPEAKE GALLEY FOLLET
106 COMPRESSOR #2 CHESAPEAKE GALLEY FOLLET
107 WASHING STATION CHESAPEAKE GALLEY
POWER SOAK /
SOMAT
108 DISHWASHER
CHESAPEAKE
SCULLERY
MEIKO
BREAKFAST / SALAD BAR
#13
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#12
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#5
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#9
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#1
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#11
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#14
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#4
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
#8
KING HALL
ATLAS METAL
INDUSTRIES
BREAKFAST / SALAD BAR
KING HALL
ATLAS METAL
INDUSTRIES
SALAD BAR
REFRIGERATOR (MOBILE)
SERVERY TRUE
120 PUSH DOWN TOASTER SERVERY HATCO
121 YOGURT BOX KING HALL / EAST WING TRUE
122 YOGURT BOX KING HALL / EAST WING TRUE
123 CONVEYOR TOASTER KING HALL / EAST WING BELLECO
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
BREAKFAST
W/GLASS
VARIOUS DUKE
134 YOGURT BOX
KING HALL / SOUTH
WING
TRUE
135 YOGURT BOX
KING HALL / SOUTH
WING
TRUE
ICE CREAM TOPPING
HOLDER
KING HALL / SOUTH
WING
TURBO-AIR
137 CONVEYOR TOASTER KING HALL / EAST WING HOLMAN
138 PUSH DOWN TOASTER JUNKYARD HATCO
139 PUSH DOWN TOASTER
KING HALL / SOUTH
WING
HATCO
140 CONVEYOR TOASTER
KING HALL / SOUTH
WING
BELLECO
141 YOGURT BOX
KING HALL / WEST
WING
TRUE
142 YOGURT BOX
KING HALL / WEST
WING
TRUE
ICE CREAM TOPPING
HOLDER
KING HALL / WEST
WING
TURBO-AIR
144 PUSH DOWN TOASTER
KING HALL / WEST
WING
WARING
145 PUSH DOWN TOASTER KING HALL / EASTWING HATCO
146 MIXING MACHINE MEAT SLICER ROOM HOLLYMATIC
VACCUM CLIPPER AIR
POWERED
MEAT SLICER ROOM KOCH EQUIPMENT
FOOD/BAG FILLER
MACHINE
MEAT SLICER ROOM KAP-ALL PACKAGING
149 BUFFALO MACHINE MEAT SLICER ROOM HOBART
150 BUFFALO MACHINE MEAT SLICER ROOM HOBART
151 MEAT SLICER MEAT SLICER ROOM TREIF
152 HOT CART #15
GALLEY STORAGE
ROOM
CARTER HOFFMANN
153 HOT CART #26 PANTRY CARTER HOFFMANN
BREAKFAST / SALAD BAR
#2
GALLEY STORAGE
ROOM
DUKE
BREAKFAST / SALAD BAR
#3
GALLEY STORAGE
ROOM
DUKE
BREAKFAST / SALAD BAR
#7
GALLEY STORAGE
ROOM
DUKE
157 HOT CART #33 PANTRY CARTER HOFFMANN
158 HOT CART #38 PANTRY CARTER HOFFMANN
159 HOT CART #60 PANTRY CARTER HOFFMANN
160 HOT CART #16
GALLEY STORAGE
ROOM
CARTER HOFFMANN
161 HOT CART #35 PANTRY CARTER HOFFMANN
162 HOT CART #43
GALLEY STORAGE
ROOM
CARTER HOFFMANN
163 HOT CART #17 PANTRY CARTER HOFFMANN
164 HOT CART #2 PWAY CARTER HOFFMANN
165 HOT CART #37 PANTRY CARTER HOFFMANN
166 HOT CART #12 PWAY CARTER HOFFMANN
167 HOT CART #61 PWAY CARTER HOFFMANN
168 HOT CART #18 PANTRY CARTER HOFFMANN
169 HOT CART #30 PWAY CARTER HOFFMANN
170 HOT CART #54 PANTRY CARTER HOFFMANN
171 HOT CART #20 PANTRY CARTER HOFFMANN
172 HOT CART #22 PANTRY CARTER HOFFMANN
173 HOT CART #23
GALLEY STORAGE
ROOM
CARTER HOFFMANN
174 HOT CART #25
GALLEY STORAGE
ROOM
CARTER HOFFMANN
175 HOT CART #19 PANTRY CARTER HOFFMANN
176 HOT CART #57 PWAY CARTER HOFFMANN
177 HOT CART #24 SERVERY FLOOR CARTER HOFFMANN
178 HOT CART #47 PANTRY CARTER HOFFMANN
179 HOT CART #31 PANTRY CARTER HOFFMANN
180 HOT CART #59 PWAY CARTER HOFFMANN
181 HOT CART #46 PWAY CARTER HOFFMANN
182 HOT CART #51 PWAY CARTER HOFFMANN
183 HOT CART #10 PANTRY CARTER HOFFMANN
184 HOT CART #8 PANTRY CARTER HOFFMANN
185 HOT CART #32 PWAY CARTER HOFFMANN
186 HOT CART 14
OUTSIDE CHESAPEAKE
SCULLERY
CARTER HOFFMANN
187 HOT CART 50 SHOP AREA CARTER HOFFMANN
188 HOT CART 5 PANTRY CARTER HOFFMANN
189 HOT CART 53
GALLEY STORAGE
ROOM
CARTER HOFFMANN
190 HOT CART 55 PWAY CARTER HOFFMANN
191 HOT CART 3
GALLEY STORAGE
ROOM
CARTER HOFFMANN
192 HOT CART 42 GALLEY CARTER HOFFMANN
193 HOT CART 1 PWAY CARTER HOFFMANN
194 HOT CART 21 PANTRY CARTER HOFFMANN
195 REFER BOX
OUTSIDE CHESAPEAKE
SCULLERY
CARTER HOFFMANN
196 DISHWASHER POT AND PANS MIEKO
197 POWER SOAK POT AND PANS POWER SOAK/ SOMAT
198 UPRIGHT CART SERVERY
ALTO SHAM/ HALO
HEAT
199 REFER BOX
P-WAY LEADING TO
CHESAPEAKE
TRUE
200 HOT CART 28 PANTRY CARTAR HOFFMANN
201 HOT CART 44 PWAY CARTAR HOFFMANN
202 HOT CART 40 PANTRY CARTAR HOFFMANN
203 HOT CART 39
P-WAY LEADING TO
CHESAPEAKE
CARTAR HOFFMANN
204 HOT CART 7
P-WAY LEADING TO
CHESAPEAKE
CARTAR HOFFMANN
205 HOT CART 52 PANTRY CARTAR HOFFMANN
206 HOT CART 58 GALLEY CARTAR HOFFMANN
207 HOT CART 36 PWAY CARTAR HOFFMANN
208 HOT CART 4 PANTRY CARTAR HOFFMANN
209 BLENDER RIBBON SALAD PREP AREA
TUCS EQUIPMENT
INC.
210 DICER SALAD PREP AREA
URSCHEL
LABORATORIES
211 VEGETABLE PEELER SALAD PREP AREA HOBART
212 CAN OPENER GALLEY PREP AREA EDLUND
FOOD PROCESSOR
MACHINE
SALAD PREP AREA HOBART
214 HOT CART 48 PWAY CARTAR HOFFMANN
215 HOT CART 27 PWAY CARTAR HOFFMANN
216 TOASTER WRAPZ CAFÉ HATCO
217 BLENDER WRAPZ CAFÉ VITA MIX
218 REFRIG #4 WRAPZ CAFÉ TRUE
219 UPRIGHT BOX WRAPZ CAFÉ HALO HEAT
220 OVEN WRAPZ CAFÉ CLEVELAND
221 STOVE WRAPZ CAFÉ SOUTHBEND
222 FREEZER #3 WRAPZ CAFÉ EVEREST
223 REFRIG #1 WRAPZ CAFÉ EVEREST
224 REFRIG #2 WRAPZ CAFÉ EVEREST
225 HEATING LAMP BAKE SHOP HATCO CORP
226 HEATING LAMP SERVERY HATCO CORP
227 MICROWAVE WRAPZ CAFÉ PANASONIC
File details come from the government source that posted it. Updated .