Draft Performance Work Statement.docx
DOCX document 152 KB Posted
- Solicitation number
- 36C10B24Q0597
About this file
This document is a Draft Performance Work Statement (PWS) for a Clinical Productivity and Experience Pilot for the Department of Veterans Affairs (VA) Electronic Health Record Modernization (EHRM) program. The key objectives are to provide a solution that improves provider satisfaction and reduces provider time interacting with the electronic health record system, through features such as contextual data display, personalized dashboards, streamlined navigation, data visualizations, and mobile/remote access.
The PWS outlines a 12-month pilot deployment at the Columbus, OH VA Medical Center, with potential expansion to other EHRM sites. The solution must closely integrate with the Oracle Health Millennium electronic health record system currently deployed at six VA facilities. The VA is seeking a contractor-owned, contractor-operated solution, potentially in a Software-as-a-Service model, but is open to other solution architectures. The PWS provides detailed requirements, deliverables, and general terms and conditions for the effort.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B24Q0597_1.docx | DOCX document | |
| 36C10B24Q0597.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clinical Productivity and Experience Pilot
VA-24-00085023
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Office of Information & Technology Electronic Health Record Modernization Integration Office
Clinical Productivity and Experience Pilot
Date: July 5, 2024
VA-24-00085023
PWS Version Number: 1.0
Contents
| 1.0 | BACKGROUND | 4 |
| 2.0 | APPLICABLE DOCUMENTS | 4 |
| 3.0 | SCOPE OF WORK | 7 |
| 4.0 | PERFORMANCE DETAILS | 7 |
| 4.1 | PERFORMANCE PERIOD | 7 |
| 4.2 | PLACE OF PERFORMANCE | 8 |
| 4.3 | TRAVEL | 8 |
| 5.0 | SPECIFIC TASKS AND DELIVERABLES | 8 |
| 5.1 | PROJECT MANAGEMENT | 8 |
| 5.1.1 | CONTRACTOR PROJECT MANAGEMENT PLAN | 8 |
| 5.1.2 | REPORTING REQUIREMENTS | 9 |
| 5.1.3 | PILOT KICKOFF MEETING | 9 |
| 5.2 | CLINICAL PRODUCTIVITY AND EXPERIENCE SOLUTION | 10 |
| 5.3 | CPE PRE-PILOT ACTIVITIES | 10 |
| 5.3.1 | PHASE 1: CPE PILOT PLANNING | 11 |
| 5.3.2 | PHASE 2: PRE-PILOT SOLUTION INTEGRATION, TESTING AND DEPLOYMENT READINESS | 12 |
| 5.3.2.1 | PRE-PILOT SOLUTION INTEGRATION | 12 |
| 5.3.2.2 | PRE-PILOT SOLUTION TESTING | 13 |
| 5.3.2.3 | PRE-PILOT SOLUTION DEPLOYMENT READINESS | 13 |
| 5.3.2.4 | PHASE 3: PILOT DEPLOYMENT AND EVALUATION | 14 |
| 6.0 | GENERAL REQUIREMENTS | 14 |
| 6.1 | ENTERPRISE AND IT FRAMEWORK | 14 |
| 6.1.1.1 | VA TECHNICAL REFERENCE MODEL | 14 |
| 6.1.2 | FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM) | 15 |
| 6.1.3 | INTERNET PROTOCOL VERSION 6 (IPV6) | 17 |
| 6.1.4 | TRUSTED INTERNET CONNECTION (TIC) | 17 |
| 6.1.5 | STANDARD COMPUTER CONFIGURATION | 17 |
| 6.1.6 | VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM) | 18 |
| 6.1.7 | PROCESS ASSET LIBRARY (PAL) | 18 |
| 6.1.8 | AUTHORITATIVE DATA SOURCES | 18 |
| 6.1.9 | SOCIAL SECURITY NUMBER (SSN) REDUCTION | 19 |
| 6.1.10 | SOFTWARE AND LICENSING REQUIREMENTS | 20 |
| 6.2 | SECURITY AND PRIVACY REQUIREMENTS | 20 |
| 6.2.1 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 20 |
| 6.2.2 | CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 20 |
| 6.3 | METHOD AND DISTRIBUTION OF DELIVERABLES | 22 |
| 6.4 | PERFORMANCE METRICS | 24 |
| 6.5 | FACILITY/RESOURCE PROVISIONS | 25 |
| 6.6 | GOVERNMENT FURNISHED PROPERTY | 26 |
| 7.0 | ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED | 26 |
| 8.0 | ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE | 31 |
BACKGROUND
The mission of the Department of Veterans Affairs (VA) is to provide benefits and services to Veterans of the United States. In meeting these goals, VA strives to provide high quality, effective, and efficient Information Technology (IT) services to those responsible for providing care to the Veterans at the point-of-care as well as throughout all the points of the Veterans’ health care in an effective, timely and compassionate manner. VA depends on Information Management/Information Technology (IM/IT) systems to meet mission goals.
On May 17, 2018, VA entered into a ten-year indefinite-delivery, indefinite-quantity (ID/IQ) sole-source contract with Cerner Government Services, Inc., now know as Oracle Health, (OH) to acquire the Electronic Health Record (EHR) system being deployed by the Department of Defense (DoD) and related services for deployment and transition across the VA enterprise in a manner that meets VA needs, and which will enable seamless healthcare to Veterans and qualified beneficiaries. Procurement of a single common system across VA and DoD shall achieve VA’s goal of seamless care for Veterans by facilitating the transition of active duty military members to VA and improving their timely access to the highest quality of care.
The OH EHR is now deployed at six VA Medical Centers (VAMC) and their associated outpatient centers. This has highlighted areas for improvement. Currently providers must review patient records in a variety of different application locations within Millenium to make clinical care decisions. The lack of a singular location where providers can review patient information leads to provide cognitive interruption and fatigue.
This action requires to provide a solution to improve clinical productivity and experience and deploy the solution as a pilot.
APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”
2. “Federal Information Security Modernization Act of 2014”
3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”
4. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004
5. FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006
6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013
7. 10 U.S.C. § 2224, "Defense Information Assurance Program"
8. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
9. Public Law 109-461, Veterans Benefits, Health Care, and Information Technology Act of 2006, Title IX, Information Security Matters
10. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
11. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
12. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
13. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019
14. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017
15. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016
16. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
17. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” October 2008
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021
21. VA Handbook 6500, “Risk Management Framework for VA Information Systems VA Information Security Program,” February 24, 2021
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” March 12, 2019
23. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle,” March 22, 2010
24. VA Handbook 6500.6, “Contract Security,” March 12, 2010
25. VA Handbook 6500.8, “Information System Contingency Planning,” April 6, 2011
26. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
27. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
28. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp
29. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
30. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014
31. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015
32. VA Handbook 6510, “VA Identity and Access Management,” January 15, 2016
33. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017
34. VA Directive 6300, “Records and Information Management,” September 21, 2018
35. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010
36. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018
37. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
38. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
39. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014
40. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005
41. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019
42. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
43. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with an updated Architecture (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)
44. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018
45. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
46. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
47. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile Devices (Draft),” October 2012
48. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014
49. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
50. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
51. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
52. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
53. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019
54. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008
55. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007
56. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
57. Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018
58. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
59. VA Directive 0058, “VA Green Purchasing Program,” July 19, 2013
60. VA Handbook 0058, “VA Green Purchasing Program,” July 19, 2013
61. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
62. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
63. “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
64. VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
65. “DevSecOps Product Line Management Playbook” version 2.0, May 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
66. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
67. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol Version 6 (IPv6),” November 19, 2020
68. Social Security Number (SSN) Fraud Prevention Act of 2017
69. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018
SCOPE OF WORK
The Contractor shall provide, configure, install, and deploy a pilot solution improve EHRM clinical productivity and experience, to include Project Management, Installation, Integration, Configuration, Testing, Change Management, Training and Support.
PERFORMANCE DETAILS
PERFORMANCE PERIOD
The PoP shall be a 12-month base period.
Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO).
There are eleven (11) Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, four are set by date:
| New Year's Day | January 1 | |
| Juneteenth | June 19 | |
| Independence Day | July 4 | |
| Veterans Day | November 11 | |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
| Martin Luther King's Birthday | Third Monday in January |
| Washington's Birthday | Third Monday in February |
| Memorial Day | Last Monday in May |
| Labor Day | First Monday in September |
| Columbus Day | Second Monday in October |
| Thanksgiving | Fourth Thursday in November |
PLACE OF PERFORMANCE
Tasks under this PWS shall be performed in VA facilities located in Columbus, OH and at Contractor facilities.
TRAVEL
Travel costs will not be separately reimbursed.
SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the following:
PROJECT MANAGEMENT
CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP.
Deliverable:
A. Contractor Project Management Plan
REPORTING REQUIREMENTS
The Contractor shall provide the COR and Project Manager with Monthly Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding Month.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor performance against the CPMP and report any deviations. It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.
Deliverable:
A. Monthly Progress Report
PILOT KICKOFF MEETING
The Contractor shall hold a pilot kickoff meeting within 10 days after TO award. The Contractor shall present, for review and approval by the Government, the details of the intended approach, work plan, and project schedule for each effort. The Contractor shall specify dates, locations (can be virtual), agenda (shall be provided to all attendees at least five calendar days prior to the meeting), and meeting minutes (shall be provided to all attendees within three calendar days after the meeting). The Contractor shall invite the Contracting Officer (CO), Contract Specialist (CS), COR, VA PM, VA CTO, and VA CMO, at a minimum.
CLINICAL PRODUCTIVITY AND EXPERIENCE SOLUTION
The Contractor shall provide a clinical productivity and experience (CPE) solution. The Solution shall:
1. Contextual information display: The ability to dynamically filter and present relevant data – both patient specific and non-patient specific - based on the patient’s condition, the clinician’s role, and the current task at hand, minimizing cognitive load and reducing information overload.
2. Personalized dashboards: Customizable user interfaces that present the contextual relevant and frequently used features, patient data (patient’s problems, allergies, vitals, histories, medications, procedures and lab, imaging and pathology results), and system notifications (reminders and alerts) based on the provider preferences.
3. Streamlined navigation: Intuitive menus, search functions, and quick links to reduce the number of clicks needed to access critical information, place orders, or document patient care.
4. Interactive visualizations: Graphical representations of data, such as trend charts, medication timelines, or anatomical diagrams, which help users quickly comprehend and analyze complex clinical information.
5. Mobile compatibility and remote access: Support for mobile devices and secure remote access, empowering clinicians to access patient data, place orders, and document care on-the-go or from remote locations.
6. Support for all specialties include behavior health in both inpatient and ambulatory settings.
7. Closely integrate with OH EHR so that application is available from within the EHR without additional authorization.
CPE PRE-PILOT ACTIVITIES
The Contractor shall plan, integrate, test, and deploy, and maintain a nine (9) month CPE Pilot at EHRM deployment site in Columbus (and other sites, if successful) covering all clinical functions and all end users for each site. There will also be three (3) months of preliminary planning and solution integration and testing before the pilot begins.
The CPE Pilot shall provide VA clinicians with a predictive clinical workflow platform to reduce the time spent in Millennium patient charts, increase patient throughput, and allow clinicians to redirect their time from system interaction to improving care quality. The pilot will be conducted in the following phases:
a) Phase 1: CPE Pilot Planning
b) Phase 2: Pre-Pilot Solution Integration and Testing
c) Phase 3: Pilot Deployment and Evaluation
i. Initiated at the Columbus VAMC. During this period, the Contractor shall perform deployment and evaluation activities including four (4) weeks of live use and evaluation followed by a decision point on expansion to other deployment sites. The Contractor shall provide all CPE users with training and help desk support.
ii. Upon a “Go” decision by VA as a result of a successful Columbus deployment, the Contractor shall conduct deployment to additional EHRM live sites, which may include Spokane, Walla Walla, White City, Roseburg, and North Chicago. The Contractor shall provide all CPE users with training and help desk support.
PHASE 1: CPE PILOT PLANNING
The Contractor shall:
a. Create a CPE Pilot Plan for VA review and approval, including:
1. Pilot structure and schedule
2. Scope for pilot site including:
a. functionality included and excluded for the pilot site.
b. inclusion/exclusion use cases for remote sites/services.
3. Approach to role-based access and authorization
4. Approach testing/validation
5. Training and help desk support for VA clinicians/other users participating in the pilot.
6. Feedback mechanisms to improve pilot functionality.
7. Proposed timelines for remediation of pilot errors
8. Strategy for measurement of success
9. Rollback strategy in case of pilot termination
10. Solution update and refresh strategy
b. Create a Pilot Assessment Plan for VA review and approval. The plan will have three main components:
1. Identify user experience metrics to be used in a post-pilot evaluation of the user experience. The metrics will include metrics applicable to all use cases as well as a metric for each user group to pinpoint differences in user experience depending on departmental differences. Metrics shall be agreed on between VA and the Contractor.
2. Identify user engagement, satisfaction and effectiveness feedback data that will be collected throughout the pilot and provided to VA after pilot completion.
3. Provide a post-pilot summary of lessons learned and documentation of potential improvements to the pilot solution, training, and execution prior to future potential deployments.
c. Develop/Provide training materials (Instructor Led training (ILT), Virtual Led training (ViLT), eCoach Videos, supplemental materials, etc.) for pilot participants on the features, functions and applicable workflow impacts related to the platform.
d. Develop a Cybersecurity Management plan. The plan shall address security activities to include reviewing, validating, and/or developing security requirements and authorizations consistent with the EHRM IDIQ Cybersecurity posture. The Contractor shall provide ongoing security management and oversight to ensure Security Plan, requirements and processes are adhered to. As part of the Cybersecurity management plan development and execution, Contractor shall complete a data categorization document based on NIST SP 800-60 Volume 1 and 2 in accordance with Risk Management Framework (RMF).
e. Refine and document any user requirements specific to individual VA clinical functions.
Deliverable:
A. CPE Pilot Plan and Schedule B. CPE Pilot Assessment Plan C. Cybersecurity Plan D. Department-specific Requirements
PHASE 2: PRE-PILOT SOLUTION INTEGRATION, TESTING AND DEPLOYMENT READINESS
The Contractor shall support:
PRE-PILOT SOLUTION INTEGRATION
The Contractor shall:
a. Install the CPE solution in Data Access Service (DAS) in the AWS cloud. Cloud credits will be provided by EHRM-IO as required.
b. Integrate CPE with the EHRM FHIR APIs in Build and Production.
c. Configure CPE as required for role-based access and authorization.
d. Configure CPE for department-specific requirements.
e. Support EHRM in updating the DAS Authority to Operate/Authority to Connect approvals and supporting documentation as required.
f. Develop and demonstrate filtering methodology to ensure only VA patient records are included in the pilot.
PRE-PILOT SOLUTION TESTING
The Contractor shall conduct CPE testing in Build. Testing shall include:
a. An approach tailored to the scope of this TO in compliance with the Joint EHRM Master Test Plan (JMTP) provided under TO46.
b. Developing Testing Artifacts such as test scenarios, test cases, test data, and test results to execute and report on testing activities. The Contractor Test Analysis Summary (TAS) report shall serve as the key test artifact for the formal deliverable process. Other test artifacts such as test cases, test results, etc. shall be entered and maintained in tools as outlined in the JMTP as the work is being executed. The Contractor shall coordinate with the EHRM-IO Integrated Test (IntT) team to define methodology to test the integrity of each development item.
c. Provide support for execution of IntT acceptance, data integrity, and validation testing including defect/issue process, assistance in troubleshooting/triaging, jointly troubleshooting issues, and responding to findings from test activities.
PRE-PILOT SOLUTION DEPLOYMENT READINESS
The Contractor shall:
a. Demonstrate the integrated CPE/EHRM solution to the VA team to obtain an approval for pilot initiation.
b. Conduct system performance monitoring to ensure scalability, reliability, and availability of the system.
c. Provision users for the production pilot program.
d. Provide a Technical, Requirements, and System Architecture Report for CPE. Report shall be in a format ingestible by VA architecture tools.
e. Document integration, testing, demonstration, training and approvals in a Pilot Readiness Document
Deliverable:
A. Technical, Requirements, and System Architecture Report B. Pilot Readiness Document
PHASE 3: PILOT DEPLOYMENT AND EVALUATION
Upon VA approval for pilot initiation, the Contractor shall:
a. Deploy approved CPE pilot from the Build to Production environment.
b. Execute the Pilot Assessment Plan:
i. Distribute pre-pilot questionnaire.
ii. Document baseline pre-pilot user metrics.
iii. Adoption/usage: number of users and patient chart opens.
iv. Time in chart
c. Conduct training for pilot participants on all applicable features, functions, and workflow impacts.
d. Conduct the pilot at Columbus for 4 weeks. At the conclusion of 4 weeks, meet with VA stakeholders to assess feasibility for pilot extension to remaining deployment sites. Identify any system/training changes required to initiating remaining pilot programs.
e. Document progress, feedback, risks, issues, and help desk ticket count for weekly review with VA PM and stakeholders.
f. Complete pilot. Distribute post-pilot questionnaire. Prepare a Pilot Metric Analysis comparing pre and post questionnaire responses and metrics.
g. Complete an After-Action Report. The report shall include analysis of post-pilot feedback from the pilot user group and product support team. The Report shall include any recommendations for modifications to the pilot deployment approach for additional sites, including considerations related to:
i. training (time required, complexity, refresher training required)
ii. technical onboarding: API complexity, integration timeline, IT support
iii. configuration, integration, enterprise operations support and infrastructure.
Deliverables:
A. Pilot Metric Analysis B. After Action Report
GENERAL REQUIREMENTS
ENTERPRISE AND IT FRAMEWORK
VA TECHNICAL REFERENCE MODEL
The Contractor shall support the VA enterprise management framework. In association with the framework. The Contractor shall comply with OIT Technical Reference Model (VA TRM) to the extent possible and in mutual cooperation with the VA in overall support of the VA enterprise management framework. The VA TRM is one component within the overall Enterprise Architecture (EA) that establishes a common vocabulary and structure for describing the information technology used to develop, operate, and maintain enterprise applications. Moreover, the VA TRM, which includes the Standards Profile and Product List, serves as a technology roadmap and tool for supporting OIT. Architecture & Engineering Services (AES) has overall responsibility for the VA TRM.
FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)
The Contractor shall ensure Commercial Off-The-Shelf (COTS) product(s), software configuration and customization, and/or new software are Personal Identity Verification (PIV) card-enabled by accepting HSPD-12 PIV credentials using VA Enterprise Technical Architecture (ETA), https://www.ea.oit.va.gov/EAOIT/VA_EA/Enterprise_Technical_Architecture.asp, and VA Identity and Access Management (IAM) approved enterprise design and integration patterns, https://www.oit.va.gov/library/recurring/edp/index.cfm. The Contractor shall ensure all Contractor delivered applications and systems comply with the VA Identity, Credential, and Access Management policies and guidelines set forth in VA Handbook 6510 VA Identity and Access Management, VA Handbook 0735 Homeland Security Presidential Directive 12 (HSPD-12) Program, and align with the Federal Identity, Credential, and Access Management Roadmap and Implementation Guidance v2.0.
The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63-3, VA Handbook 6500 Appendix F, “VA System Security Controls”, and VA IAM enterprise requirements for direct, assertion-based authentication, and/or trust-based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV card and/or Common Access Card (CAC), as determined by the business need.
The Contractor shall ensure all Contractor delivered applications and systems conform to the specific Identity and Access Management PIV requirements set forth in the Office of Management and Budget (OMB) Memoranda M-05-24, M-19-17, and NIST Federal Information Processing Standard (FIPS) 201-2. OMB Memoranda M-05-24 and M-19-17 can be found at: https://www.whitehouse.gov/sites/whitehouse.gov/files/omb/memoranda/2005/m05-24.pdf, and https://www.whitehouse.gov/wp-content/uploads/2019/05/M-19-17.pdf respectively. Contractor delivered applications and systems shall be on the FIPS 201-2 Approved Product List (APL). If the Contractor delivered application and system is not on the APL, the Contractor shall be responsible for taking the application and system through the FIPS 201 Evaluation Program.
The Contractor shall ensure all Contractor delivered applications and systems support:
The Contractor shall ensure all Contractor delivered applications and systems support:
1. Automated provisioning and are able to use enterprise provisioning service. (VA Responsibility)
2. Interfacing with VA’s Master Person Index (MPI) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data. (VA Responsibility)
3. The VA defined unique identity (Secure Identifier [SEC ID] / Integrated Control Number [ICN]). VA responsibility.
4. Multiple authenticators for a given identity and authenticators at every Authenticator Assurance Level (AAL) appropriate for the solution. Paceart Optima satisfies AAL1 (single factor authentication) which is appropriate for the solution.
5. Identity proofing for each Identity Assurance Level (IAL) appropriate for the solution. Paceart Optima satisfies IAL 1 (single factor authentication) which is appropriate for the solution.
6. Federation for each Federation Assurance Level (FAL) appropriate for the solution, if applicable. Federation Assurance Level does not apply as the Paceart Optima Product is not a hosted solution.
7. Two-factor authentication (2FA) through an applicable design pattern as outlined in VA Enterprise Design Patterns. Paceart Optima does not support two-factor authentication (2FA); we are investigating paths to support 2FA in future Paceart platforms.
8. A Security Assertion Markup Language (SAML) implementation if the solution relies on assertion-based authentication. Additional assertion implementations, besides the required SAML assertion, may be provided as long as they are compliant with NIST SP 800-63-3 guidelines. Paceart Optima does not rely on assertion-based authentication. This requirement does not apply.
9. Authentication/account binding based on trusted Hypertext Transfer Protocol (HTTP) headers if the solution relies on Trust based authentication. Paceart Optima does not rely on Trust based authentication. This requirement does not apply.
10. Role Based Access Control.
11. Auditing and reporting capabilities. Paceart Audit is all or nothing, if turned “on”, this will present a performance issue.
12. Compliance with VIEWS 00155984, PIV Logical Access Policy Clarification https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896. Paceart does not comply.
The required Assurance Levels for this specific effort are Identity Assurance Level 3, Authenticator Assurance Level 3, and Federation Assurance Level 3. Not applicable. Paceart Optima does not do 2-factor authentication and is not currently on the APL as noted in the comments above.
INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support Internet Protocol Version 6 (IPv6) based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf). IPv6 technology, in accordance with the USGv6 Program (https://www.nist.gov/programs-projects/usgv6-program/usgv6-revision-1), NIST Special Publication (SP) 500-267B Revision 1 “USGv6 Profile” (https://doi.org/10.6028/NIST.SP.500-267Br1), and NIST SP 800-119 “Guidelines for the Secure Deployment of IPv6” (https://doi.org/10.6028/NIST.SP.800-119), compliance shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices shall support native IPv6 and dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g. web, email, DNS, ISP services, etc.) shall support native IPv6 and dual stack (IPv6 / IPv4) users and all internal infrastructure and applications shall communicate using native IPv6 and dual stack (IPv6 / IPv4) operations. Paceart Optima relies on the Operating System to provide IPv6/IPv4 support. All standard Operating Systems Support IPv6/IPv4.
TRUSTED INTERNET CONNECTION (TIC)
The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative“ (https://www.whitehouse.gov/wp-content/uploads/2019/09/M-19-26.pdf), VA Directive 6513 “Secure External Connections”, and shall comply with the TIC 3.0 Core Guidance Documents, including all Volumes and TIC Use Cases, found at the Cybersecurity & Infrastructure Security Agency (CISA) (https://www.cisa.gov/publication/tic-30-core-guidance-documents). Any deviations must be approved by the VA TIC 3.0 Working Group at vaoisesatic30team@va.gov.
STANDARD COMPUTER CONFIGURATION
The Contractor IT end user solution that is developed for use on standard VA computers shall be compatible with and be supported on the standard VA operating system, currently Windows 10 (64bit), Edge (Chromium based), and 365 Apps for enterprise. Applications delivered to VA and intended to be deployed to Windows 10 workstations shall be delivered as a signed .msi package with switches for silent and unattended installation and updates shall be delivered in signed .msp file formats for easy deployment using Microsoft Endpoint Configuration Manager (CM) VA’s current desktop application deployment tool. Signing of the software code shall be through a vendor provided certificate that is trusted by VA using a code signing authority such as Verizon/Cybertrust or Symantec/VeriSign. The Contractor shall also ensure and certify that their solution functions as expected when used from a standard VA computer, with non-admin, standard user rights that have been configured using the United States Government Configuration Baseline (USGCB) and Defense Information Systems Agency (DISA) Secure Technical Implementation Guide (STIG) specific to the particular client operating system being used.
VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM)
The Contractor shall support VA efforts IAW the updated Veteran Focused Integration Process (VIP) and Product Line Management (PLM). The major focus of the new VIP is on Governance and Reporting and is less prescriptive, with a focus on outcomes and continuous delivery of value. Product Line Management (PLM) is a framework that focuses on delivering functional products that provide the highest priority work to customers while delivering simplified, reliable, and practical solutions to the business, medical staff, and our Veterans. The VIP Guide is a companion guide to the PLM Playbook and can be found at: https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 and the PLM Playbook can be found at https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946. The PLM Playbook pivots from project-centric to product-centric delivery and contains descriptive practices that focuses on outcomes. The PLM Playbook contains a set of “plays” that implement Development, Security, and Operations (DevSecOps) principles and processes such as automated development, continuous integration/continuous delivery, and release on demand. The PLM Playbook details how product lines implement Lean-Agile principles, methods, practices, and techniques through levels of maturity. VIP and PLM are the authoritative processes that IT projects must follow to ensure development and delivery of IT products.
PROCESS ASSET LIBRARY (PAL)
The Contractor shall perform their duties consistent with the processes defined in the OIT Process Asset Library (PAL). The PAL scope includes the full spectrum of OIT functions and activities, such as VIP project management, operations, service delivery, communications, acquisition, and resource management. PAL serves as an authoritative and informative repository of searchable processes, activities or tasks, roles, artifacts, tools and applicable standards and guides to assist the OIT workforce, Government and Contractor personnel. The Contractor shall follow the PAL processes to ensure compliance with policies and regulations and to meet VA quality standards. The PAL includes the contractor onboarding process consistent with Section 6.2.2 and can be found at https://www.va.gov/PROCESS/artifacts/maps/process_CONB_ext.pdf. The main PAL can be accessed at www.va.gov/process.
AUTHORITATIVE DATA SOURCES
The VA Enterprise Architecture Repository (VEAR) is one component within the overall EA that establishes the common framework for data taxonomy for describing the data architecture used to develop, operate, and maintain enterprise applications. The Contractor shall comply with the department’s Authoritative Data Source (ADS) requirement that VA systems, services, and processes throughout the enterprise shall access VA data solely through official VA ADSs where applicable, see below. The Information Classes which compose each ADS are located in the VEAR, in the Data & Information domain. The Contractor shall ensure that all delivered applications and system solutions support:
1. Interfacing with VA’s Master Person Index (MPI) (formerly the Master Veteran Index (MVI)) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data. The VA does not require MPI for the Paceart Optima application. MPI will integrate through ISI.
2. Interfacing with Capital Asset Inventory (CAI) to conduct real property record management actions if the solution relies on real property records data. CAI is the authoritative source for VA real property record management data.
3. Interfacing with electronic Contract Management System (eCMS) for access to contract, contract line item, purchase requisition, offering vendor and vendor, and solicitation information above the micro-purchase threshold, if the solution relies on procurement data. ECMS is the authoritative source for VA procurement actions data.
4. Interfacing with HRSmart Human Resources Information System to conduct personnel action processing, on-boarding, benefits management, and compensation management, if the solution relies on personnel data. HRSmart is the authoritative source for VA personnel information data.
5. Interfacing with Vet360 to access personal contact information, if the solution relies on VA Veteran personal contact information data. Vet360 is the authoritative source for VA Veteran Personal Contact Data. The VA does not require Vet360 for the Paceart Optima application. The reference Paceart ICD is developed in conjunction with Medtronic.
6. Interfacing with VA/Department of Defense (DoD) Identity Repository (VADIR) for determining eligibility for VA benefits under Title 38, if the solution relies on qualifying active-duty military service data. VADIR is the authoritative source for Qualifying Active-Duty military service in VA.
SOCIAL SECURITY NUMBER (SSN) REDUCTION
The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the ICN in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.
SOFTWARE AND LICENSING REQUIREMENTS
The Contractor shall be responsible for the provision of all software licenses and any associated licensing maintenance required for any development, delivery, integration, operation, and/or maintenance associated with its proposed application(s), software products, software solution, and/or system including, but not limited to, any and all application(s), software and/or software products that comprise, are a part of, or integrate with the Contractor’s proposed application(s), software products, software solution, and/or system for the life of any resulting contract.
SECURITY AND PRIVACY REQUIREMENTS
Not Applicable.
POSITION/TASK RISK DESIGNATION LEVEL(S)
In accordance with VA Handbook 0710, Personnel Security and Suitability Program, the position sensitivity, and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:
Position Sensitivity and Background Investigation Requirements by Task
| Task Number |
| Tier1 / Low Risk |
| Tier 2 / Moderate Risk |
| Tier 4 / High Risk |
| 5.1 |
| |X| |
| |_| |
| |_| |
| 5.2 |
| |X| |
| |_| |
| |_| |
| 5.3 |
| |X| |
| |_| |
| |_| |
| 5.4 |
| |X| |
| |_| |
| |_| |
| 5.5 |
| |X| |
| |_| |
| |_| |
The Tasks identified above, and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
Contractor Responsibilities as applicable for contractor employees accessing VA network systems independent of a VA employee:
a. The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak, and understand the English language.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the PAL template artifact. The Contractor Staff Roster shall contain the Contractor’s Full Name, Date of Birth, Place of Birth, individual background investigation level requirement (based upon Section 6.2 Tasks), etc. The Contractor shall submit full Social Security Numbers either within the Contractor Staff Roster or under separate cover to the COR. The Contractor Staff Roster shall be updated and provided to VA within 1 day of any changes in employee status, training certification completion status, Background Investigation level status, additions/removal of employees, etc. throughout the Period of Performance. The Contractor Staff Roster shall remain a historical document indicating all past information and the Contractor shall indicate in the Comment field, employees no longer supporting this contract. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.
b. The Contractor should coordinate with the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized. The Contractor shall bring their completed Security and Investigations Center (SIC) Fingerprint request form with them (see paragraph d.4. below) when getting fingerprints taken.
c. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:
1. Optional Form 306
2. Self-Certification of Continuous Service
3. VA Form 0710
4. Completed SIC Fingerprint Request Form
The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC).
The Contractor employee shall certify and release the e-QIP document, print, and sign the signature pages, and send them encrypted to the COR for electronic submission to the SIC. These documents shall be submitted to the COR within 3 business days of receipt of the e-QIP notification email. (Note: OPM is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via e-QIP).
d. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
e. A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC), completed training delineated in VA Handbook 6500.6 (Appendix C, Section 9), signed “Contractor Rules of Behavior”, and with a valid, operational PIV credential for PIV-only logical access to VA’s network. A PIV card credential can be issued once your SAC has been favorably adjudicated and your background investigation has been scheduled by OPM. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of OPM.
f. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to VA facilities and systems by Contractor and Subcontractor employees and/or termination of the contract for default.
Identity Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.
Deliverable:
Contractor Staff Roster
METHOD AND DISTRIBUTION OF DELIVERABLES
The Contractor shall deliver documentation in electronic format, unless otherwise directed in Section B of the solicitation/contract. Acceptable electronic media include Microsoft 365, MS Word 2000/2003/2007/2010/2019, MS Excel 2000/2003/2007/2010/2019, MS PowerPoint 2000/2003/2007/2010/2019, MS Project 2000/2003/2007/2010/2019, MS Access 2000/2003/2007/2010, MS Visio 2000/2002/2003/2007/2010/2019, AutoCAD 2002/2004/2007/2010, and Adobe Postscript Data Format (PDF).
PERFORMANCE METRICS
| Performance Objective |
| Performance Standard |
| Acceptable Levels of Performance |
| A. Technical / Quality of Product or Service |
| 1. Demonstrates understanding of requirements. |
2. Efficient and effective in meeting requirements
3. Meets technical needs and mission requirements.
4. Provides quality services/products.
5. Incorporates “ease of use” Human Centered Design principles in any software developed.
Satisfactory or higher
| B. Project Milestones and Schedule |
| 1. Established milestones and project dates are met. |
2. Products completed, reviewed, delivered in accordance with the established schedule.
3. Notifies customer in advance of potential problems Satisfactory or higher
| C. Cost & Staffing |
| 1. Currency of expertise and staffing levels appropriate to perform tasks required. |
2. Personnel possess necessary knowledge, skills, and abilities to perform tasks Satisfactory or higher
| D. Management |
| 1. Integration and coordination of all activities to execute effort |
| Satisfactory or higher |
The COR will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable level of performance. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion. A Performance Based Service Assessment will be used by the COR in accordance with the QASP to assess Contractor performance.
FACILITY/RESOURCE PROVISIONS
The Government will provide office space, telephone service and system access when authorized contract staff work at a Government location as required in order to accomplish the Tasks associated with this PWS. All procedural guides, reference materials, and program documentation for the project and other Government applications will also be provided on an as-needed basis.
The Contractor shall request other Government documentation deemed pertinent to the work accomplishment directly from the Government officials with whom the Contractor has contact. The Contractor shall consider the COR as the final source for needed Government documentation when the Contractor fails to secure the documents by other means.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .