This is a Performance Work Statement (PWS) for native grassland restoration seeding at Lake Berryessa following wildfire recovery. The Bureau of Reclamation seeks a contractor to conduct no-till seeding of approximately 383.8 acres across five paddocks along the East Side Road using 100% native grass and wildflower seed mix containing a minimum of five species from the government-approved list, which includes perennial and annual grasses such as California Barley, Purple Needlegrass, Blue Wildrye, and Small Fescue. The contractor must provide all labor, supervision, native seed, equipment, tools, and materials; submit and obtain government approval of a detailed Work Plan and Quality Control Plan before commencing work; and conduct seeding only during October-November unless otherwise authorized in writing. Seeding must achieve within 3% of the government-identified acreage with even distribution consistent with native grassland restoration standards and industry best practices.
The base year period of performance runs from October 1, 2026 through November 30, 2026 (Monday-Friday, excluding federal holidays), with an option year from October 1, 2027 through November 30, 2027. The contract will be firm-fixed price and may include separate option year CLINs for individual paddocks based on government monitoring results following base year seeding. The contractor must conduct pre-construction biological surveys for California Red-legged Frog and Keck's checker-mallow within 14 days prior to work commencement, implement Worker Environmental Awareness Training for all personnel, enforce a 10 mile-per-hour speed limit, prohibit work during or within 24 hours following rain events of 0.5 inches or more, and fully decontaminate all equipment and vehicles prior to site arrival. The place of performance is Lake Berryessa Field Office near Napa, California, with staging capability at the Eticuera Day Use Area. Deliverables include biological survey reports, seed procurement documentation, work plan, quality control plan, daily logs as requested, and a final seeding completion report due within 30 days after annual seeding completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOURCES_SOUGHT_NOTICE_6_9_2026_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Lake Berryessa East Side Road Seeding
1.0 Purpose
The purpose of this Performance Work Statement (PWS) is to define required performance outcomes for restoration seeding across fire‑impacted lands along East Side Road at Lake Berryessa. The Lake Berryessa Field Office has successfully applied for BIL-BAR 5-10 Year Post Fire Recovery Funding in FY 25 and would like to use this funding to re-seed the area and implementing recommendations from a July 2008 Lake Berryessa East Side Grazing Management Plan.
2.0 Background
The Bureau of Reclamation created the reservoir of Lake Berryessa in the 1950’s as part of the Solano Project, authorized by the Reclamation Project Act of 1939 (53 Stat. 1187). Solano Irrigation District operates the Solano Project under an agreement with Reclamation, although the reservoir and surrounding land are federal lands managed by Reclamation. At capacity, Lake Berryessa stores 1.6 million acre-feet (af) of water and is one of the largest bodies of fresh water in California. The lake is 23 miles long by 3 miles wide and has 165 miles of shoreline.
In August of 2020, a series of spot fires ignited and converged to form the LNU Lightning Complex Fire, which burned the northern-most 400 acres of the former Lake Berryessa Wildlife Area as well as 60% of the Solano Project Lands around Lake Berryessa. The recovery resulted in several time-consuming employee and public safety projects. This workload, when combined with a sharp decline in field office staff post-pandemic and post-fire, meant that a project to address the rise in invasive plants, including black mustard, along the eastern shore of Lake Berryessa could not be addressed until now.
3.0 Scope of Work
The Contractor shall provide all labor, supervision, native seed, equipment, tools, and materials needed to conduct no‑till seeding of approximately 383.8 acres across five paddocks. The Contractor is responsible for achieving the performance outcomes defined in this PWS.
Prior to the start of work the contractor must submit and receive approval of a detailed Work Plan and Quality Control Plan.
Acreage by paddock:
| Paddock |
| Acreage |
| 1A & B |
| 71.3 |
| 2 |
| 71.4 |
| 3 |
| 118.6 |
| 4A & B |
| 95 |
| 5 |
| 27.5 |
| TOTALS |
| 383.8 |
4.0 Performance Requirements
4.1 Seed Mix Procurement
The Contractor shall:
Provide a 100% native grass and wildflower seed mix.
Include no fewer than five (5) species from the Government‑provided species list.
Ensure seed purity, viability, and labeling in accordance with state and federal law.
Provide seed documentation with the work plan and again prior to application.
Approved Species List:
| Common Name |
| Scientific Name |
| Plant Type |
| Meadow or California Barley |
| Hordeum brachyantherum |
| Perennial Grass |
| California Brome |
| Bromus carinatus |
| Perennial Grass |
| California melic |
| Melica californica |
| Perennial Grass |
| Purple Needlegrass |
| Nasella pulchra |
| Perennial Grass |
| Nodding Needlegrass |
| Nasella cernua |
| Perennial Grass |
| Small-Flower Melicgrass |
| Melica imperfecta |
| Perennial Grass |
| Small Fescue |
| Vulpia microstachys |
| Annual Grass |
| Blue Wildrye |
| Elymus glaugus |
| Perennial Grass |
| Creeping Wildrye |
| Leymus triticoides |
| Perennial Grass |
Existing Vegetation Monitoring Summary:
The tenth year of annual monitoring was conducted on April 9, 2024, utilizing three linear monitoring transects established in 2015. Transect M-1 measures 90 meters in length while M-2 and M-3 each measure 50 meters in length. The three transects include a total of 35 monitoring plots, each measuring 1x1 meter square and positioned 5 meters apart (= 0.014% of 60 acres). Cover is visually estimated and assigned to a cover class: A, < 2%; B, 2-10%; C, 10-25%; D, 25-50%; and E, > 50%. Total cover is estimated to a precise percent in each plot. Cover of individual species is also estimated to absolute percent cover to permit determination of Relative Native Cover. (No fractional cover values are applied; the minimum value assigned is 1%).
Desired Monitoring:
Vendor will establish linear transects in each of the 5 parcels. Each transect will be 2-meters in width and 50 meters in length starting from the permanent fenceline adjacent to East Side Road and extending towards the shoreline. The transects will be laid out using a measuring tape before seeding, after seeding, and 6 months after seeding using the same fixed endpoints such as a fence, shrub, or stake. Utilizing the centerline of the tape as the axis of the transect, plants rooted up to one meter away from the measuring tape will tabulated.
4.2 Seeding Application
The Contractor shall:
· Apply seed using a no‑till drill.
· Seed the entirety of the designated paddocks, achieving total treated acreage within 3% of the Government‑identified acreage.
· Ensure even seed distribution consistent with native grassland restoration standards, and industry best practices.
· Conduct seeding only during the months of October - November unless otherwise approved in writing by the Government.
· Comply with all environmental and biological protection measures contained in Section 7.0.
5.0 Work Plan Requirement
Before beginning work, the Contractor shall submit a Work Plan to the Government for approval.
The plan shall include:
· The final seed mix (species and quantities).
· Equipment to be used (including decontamination procedures).
· The contractor’s planned seeding approach and sequencing.
· Estimated daily production rates.
· Environmental compliance methods.
No work may begin until the Government issues written approval of the work plan.
5.1 Re‑Performance Requirement
If the Contractor varies from the approved work plan without written Government authorization, the Contractor shall, at no additional cost to the Government:
· Re‑perform any portion of the work that does not meet PWS performance outcomes;
· Replace or reapply seed in areas where improper application occurred;
· Remedy non‑conforming work as directed by the Government.
The Government reserves the right to reject any work not performed in accordance with the approved plan or this PWS.
6.0 Quality Control Plan (QCP)
Within 15 days after award, the Contractor shall submit a Contractor Quality Control Plan that describes inspection procedures, personnel roles, monitoring frequency, and corrective action processes. The plan must be approved by the Contracting Officer prior to commencing work.
7.0 Environmental Protection Requirements
7.1 Worker Environmental Awareness Training (WEAT)
Worker Environmental Awareness Training: Prior to the commencement of Project work, all Project personnel will attend an environmental awareness training. It will include; species descriptions and habitat needs, species status and protection under the Endangered Species Act, definition of take, reporting requirements, conservation measures to reduce project impacts, and instructions for encountering California Red-legged Frog (CRLF) and Keck’s checker-mallow in areas where take could occur. Employees will sign a form stating that they received and understand the training. Reclamation will maintain a list of personnel receiving the training.
7.2 Pre‑Construction Biological Surveys
Prior to any ground disturbing activities, pre-construction biological surveys will be conducted in the action area for CRLF and Keck’s checker-mallow. Surveys will be conducted by a qualified biologist within 14 days prior to commencement of the work.
7.3 Wildlife Protection During Work
To reduce the potential for Project vehicles striking CRLF, a 10-mile-per-hour speed limit will be enforced at the site.
No work will occur during or 24-hours following a rain event. A rain event is to be considered precipitation of ¼-inch or more within a 24-hour period.
All Project personnel will be informed of the Action Area boundaries for Project activities. If necessary, flagging and/or staking may be used to define the Project area limits.
7.4 Vehicle and Equipment Decontamination
To prevent spread of invasive species, disease, or contaminants:
All equipment and vehicles shall be fully decontaminated prior to arriving on site.
Decontamination steps must be described in the Work Plan.
7.5 Ground Preparation
The Government will perform required ground preparation (e.g., controlled burns). The Contractor shall coordinate timing and shall not enter the site until the Government confirms it is safe and ready.
8.0 Government-Furnished Property / Access
The Government will provide access keys for gates along East Side Road and the Eticuera Day Use Area.
All other equipment, seed, and supplies shall be provided by the Contractor.
9.0 Period of Performance
Base Year: 10/01/2026 – 11/30/2026 Option Year 1: 10/01/2027 – 11/30/2027 Workdays: Monday–Friday, excluding federal holidays.
9.1 Paddock Option Year
Native grassland establishment can be impacted by environmental conditions, soil moisture, post‑fire succession, precipitation timing, and other natural factors outside the Contractor’s control.
Based on Government monitoring following the base‑year seeding, some paddocks may require additional reseeding the following year, while others may not.
To accommodate this, the Government intends to include separate option‑year CLINs for each paddock. The Government will exercise only the CLINs associated with those paddocks that the Government determines require reseeding.
If an option‑year CLIN is exercised, the Contractor shall perform reseeding in accordance with the requirements of this PWS and the approved Work Plan for that performance period.
10.0 Place of Performance
Lake Berryessa Field Office 5520 Berryessa Knoxville Road Napa, CA 94558
The contractor may stage equipment and supplies on the hardened surfaces of:
Eticuera Day Use Area 8600 Berryessa Knoxville Road Napa, CA 94558
The work will take place along 6 miles of East Side Road from its intersection with Berryessa Knoxville Road just north of Eticuera Day Use Area extending south to its intersection with the southern gate limiting public access to the Gunn Easement (38.632185835028, -122.23397247869522).
11.0 Deliverables
Biological Survey(s) – To be submitted to the Government for approval by TBD.
Seed Procurement Documentation – To be submitted to the Government for approval within 15 days after award.
Work Plan – To be submitted to the Government within 15 days after award.
Quality Control Plan – To be submitted to the Government within 15 days after award.
Daily logs - As requested.
Final Seeding Completion Report – To be submitted to the Government within 30 days after seeding is completed for the year.
12.0 Type of Contract
The Government intends to award a firm-fixed price service contract as a result of this solicitation.
13.0 Administrative Information
COR contact information:
13.1 Recognized Holidays
The Contractor is not required to work on the following Federal Holidays: