This is a draft minimum specifications document for two stand-up counterbalance forklifts required by Tobyhanna Army Depot. The specification references the UniCarriers Model SCX40N2 as the brand name or equivalent baseline, establishing the performance and operational standards that proposed equipment must meet or exceed. The document provides detailed technical requirements to ensure that any offered equipment is functionally equivalent to the named model in terms of capacity, dimensions, safety features, and operational capabilities.

Interested contractors must submit a capability statement by 12:00 PM EST on Monday, June 1st, 2026, to Purchasing Agent Alicia Piercy at alicia.a.piercy.civ@army.mil. This is a pre-solicitation phase, and the specification document serves as the foundational technical baseline for the subsequent formal solicitation. No specific pricing terms, contract vehicle type, or award date has been established at this stage. The requirement is a straightforward supply purchase of two units, with the Department of the Army as the procuring agency.

View the file

Other files

File Type Posted
B01 RFI Document_Stand-Up Counterbalance Forklifts.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOBYHANNA ARMY DEPOT

STATEMENT OF WORK/MINIMUM SPECIFICATIONS

FOR

STAND-UP COUNTERBALANCE FORKLIFTS

APRIL 2026

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

2. Description of Supply: This is a supply contract for the purchase and delivery of two (2) Stand-Up Counterbalance Forklifts to Tobyhanna Army Depot (TYAD), Pennsylvania.

3. Background: The forklifts are needed in support of establishing a new workload at TYAD. The forklifts will be used for material movement primarily in warehousing, distribution center, and manufacturing environments.

4. Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide the purchase and delivery of two (2) Stand-Up Counterbalance Forklifts to TYAD Pennsylvania.

5. Description of the Supplies:

· Functions to be performed: The item shall be a self-propelled, electric-powered industrial vehicle designed to perform the following functions, primarily in warehousing, distribution center, and manufacturing environments where maneuverability and frequent on/off operator tasks are common:

· Vertical Load Management: The item shall perform the function of lifting and lowering palletized and non-palletized goods to and from various heights, including storage racks, staging areas, and transport vehicles.

· Narrow-Aisle Transport: It shall transport loads through facility aisles and confined spaces that are too restrictive for larger, sit-down forklifts.

· High-Maneuverability Positioning: The forklift must perform tight-radius turns and pivot within its own axis to navigate congested work areas, loading docks, and production lines.

· Rapid-Cycle Load Handling: It shall perform functions that facilitate quick and efficient load handling cycles (picking, moving, and placing) by allowing the operator to frequently and safely step on and off the vehicle.

· Load Stabilization and Placement: It shall perform tilting functions (mast tilting forward and backward) to safely secure loads during transport and accurately place them at their destination.

· Fine Load Adjustment: The item must perform lateral (side-to-side) fork adjustments via a side-shifter function to allow for precise alignment with pallets and loads without repositioning the entire vehicle.

· Standing Operator Control: It shall provide a protected platform and integrated control system for a single standing operator to safely execute all travel, steering, and hydraulic functions.

· Signaling and Alerting: The forklift must perform the function of providing audible and visual warnings to nearby personnel, including a horn and an automatic reverse-movement alarm.

· Performance Required: The stand-up counterbalance electric forklift shall meet or exceed the following performance requirements under standard operating conditions (ambient temperature of 70°F on a level, dry concrete surface).

1. Load Capacity and Lift Performance

· Rated Load Capacity: Shall be not less than 4,000 lbs at a 24-inch load center.

· Maximum Lift Height: The forks shall reach a minimum height of 185 inches from the floor.

· Mast Type: The unit shall be equipped with a three-stage (FSV) mast.

· Collapsed Mast Height: The overall height of the forklift with the mast fully lowered shall not exceed 85 inches.

· Lift Speed:

· With rated load: Not less than 65 feet per minute.

· Without load: Not less than 90 feet per minute.

· Lowering Speed:

· With rated load: Not more than 95 feet per minute.

· Without load: Not more than 90 feet per minute.

· Mast Tilt Range: The mast shall be capable of tilting at least 5 degrees forward and 5 degrees backward.

· Side Shifter Range: The integrated side shifter shall provide a minimum of 3 inches of lateral travel to both the left and right of center.

2. Travel and Maneuverability Performance

· Maximum Travel Speed:

· With rated load: Not less than 6.0 mph.

· Without load: Not less than 7.0 mph.

· Gradeability (Incline Capability):

· With rated load: Shall be capable of ascending a 10% grade.

· Without load: Shall be capable of ascending a 15% grade.

· Outside Turning Radius: Shall not exceed 65 inches, demonstrating superior maneuverability for narrow-aisle operation.

3. Power System Performance

· Battery System: Shall utilize a 36-volt AC electric power system.

· Battery Type: Shall be a high-performance, sealed, maintenance-free Lithium-ion (Li-ion) or equivalent industrial battery. The battery must be designed for side-extraction.

· Operational Uptime: A single full charge must provide a minimum of 8 hours of continuous operation under a normal duty cycle.

· Recharge Time: The supplied charging system shall be capable of recharging the battery from 20% to 100% capacity in 2 hours or less.

· Charger Requirements: Shall operate on a standard 480V 3-phase electrical supply.

· Regenerative Braking: The system shall utilize regenerative braking to extend operational time by returning energy to the battery during deceleration and braking.

4. Safety and Operator Interface Performance

· Braking System: Shall be equipped with regenerative braking that automatically applies upon the operator releasing the travel controller. The forklift must come to a complete and controlled stop if the operator steps off the platform.

· Operator Presence Sensing: The forklift shall not travel or perform hydraulic functions unless the operator is properly positioned on the operator platform with their foot on the presence pedal.

· Audible Alarms:

· Horn: Shall produce a sound level of at least 90 dBA at 10 feet.

· Reverse Alarm: Shall automatically activate when traveling in reverse and produce a sound level of at least 85 dBA at 10 feet.

· Lighting: Shall be equipped with forward-facing dual LED headlights and a rear-facing blue LED pedestrian warning spotlight.

· Essential Physical Characteristics: The electric forklift shall possess the following physical characteristics. All dimensions and weights are approximate and represent the standard configuration required for narrow-aisle and high-throughput operations.

1. Overall Dimensions and Weight

· Chassis Length (without forks): Shall not exceed 80 inches to facilitate tight turning.

· Overall Width: Shall not exceed 42 inches.

· Overall Height (to top of overhead guard): Shall not exceed 85 inches.

· Service Weight (with battery): Approximately 7,500 to 9,000 lbs.

2. Forks and Carriage

· Fork Type: Standard pallet forks.

· Fork Length: 42 inches.

· Carriage Class: Class II, compatible with standard attachments.

3. Chassis and Frame

· Construction: Shall be of a heavy-duty, welded steel unibody frame construction designed to maximize rigidity and protect internal components in a compact footprint.

· Overhead Guard: A four-post, high-strength steel overhead guard compliant with ANSI/ITSDF B56.1 standards for operator protection is required.

· Tires:

· Type: Solid rubber or non-marking cushion tires.

· Front Tires: Dual drive tires.

· Rear Tires: Single steer tire.

4. Operator Compartment

· Configuration: Rear-entry, standing operator configuration for one operator.

· Platform: A suspended, cushioned operator platform with a non-slip floor mat is required to reduce shock and vibration. The platform shall incorporate an operator presence sensor that must be activated for the forklift to operate.

· Operator Backrest/Hip Pad: Shall feature a padded, non-protruding backrest and hip restraint for operator comfort and stability during travel and maneuvering.

· Controls: A single, multifunction control handle shall be provided for the operator's right hand, integrating controls for travel direction and speed (via twisting or thumb wheels), lift/lower functions, and the horn. A separate lever or control for tilt and side-shift functions shall be located within easy reach.

· Steering: A large-diameter control knob ("spinner knob") for the operator's left hand shall control the power steering system, allowing for 180° or 360° steering.

· Display: A multifunction digital display providing, at a minimum, the following information: battery state of charge (SOC), hour meter, performance mode indicator, and system diagnostic/warning indicators.

· Utility/Storage Features: Shall include a storage tray for tools, a clipboard holder, and a beverage holder.

5. Battery and Charging System

· Battery Compartment: The battery compartment shall be configured for side-extraction, allowing the battery to be removed from the side of the forklift using a pallet jack or specialized equipment.

· Charger: The unit shall be a standalone, wall-mountable charging station with appropriate connectors for the forklift's battery system.

· Unit of Issue: each (ea)

· Quantity Requested: 2

· Delivery Schedule: 140 days shipped After Receipt of Order (ARO)

· Ship to Address :

· Tobyhanna Army Depot 11 Hap Arnold Blvd , Tobyhanna PA 18466

· Special packing or marking information; Industry Standard

· Warranty requirement; Industry Standard

· For brand name or equal purchase descriptions:

· Preferred Brand Name and Model: Unicarriers SCX40N2-36 Volt (E) 4000 lb. 24" Load Center. Condition: New

· Equal item must meet function, performance, and essential physical characteristics listed above.

6. Deliveries to Tobyhanna Army Depot Instructions:

The Contracting Officer Representative (COR) will provide detailed delivery instructions, and points of contact will be provided post-award.

The contractor shall make an appointment for delivery and with the COR at least 72 hours before delivery, or up to two weeks in advance.

A background check and approval from TYAD Law Enforcement is required for all contractor and subcontractor personnel before on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time of their entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel before being granted access to TYAD. This security screening process may be time-consuming, and access may be delayed or denied. The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access.

The driver of the vehicle must have valid vehicle insurance, registration, a driver's license with proper endorsement for the size vehicle they are driving, a bill of lading/purchase order that shows the contractor/vendor company name, telephone number, point of contact, type of goods, and where the delivery is being made at TYAD.

7. Tobyhanna Army Depot On-Site Contractor and Visitor Restrictions

· Access and general protection/security policy and procedures: Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

· A background check and approval from TYAD Law Enforcement is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the contractor anticipates will be performing work or visiting on-site. This security screening process may be time consuming, and access may be delayed or denied. COR will provide specifics to the contractor after award and at least ten days prior to the expected visit date for completion. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. Ensure undocumented workers are not included in contracted work related to Army missions.

The company will ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

8. Standard Specifications for Projects Under the National Environmental Policy Act in Accordance with 32 CFR 651 Proponent ELTY-ISP-N

1. Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas. TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the COR.

2. Asbestos The contractor must ensure that all materials used in the performance of this contract are asbestos-free.

Unless specified in the contract, the contractor must not disturb any existing Asbestos-Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid encountering the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”

Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement. The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.

3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the COR.

4. Burning The contractor must not burn refuse and debris anywhere on TYAD.

5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification). Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223-9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.

6. Cultural Resources The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.

7. Demolition Notification If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700-FM-BAQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 82 13.00 10.

8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities. Any piping or additions added to the TYAD water system must be disinfected following “American Water Works Association circular C651-14 "Disinfecting Water Mains." Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.

9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.

10. Emergency/Spills All emergencies and spills must be reported to the TYAD Fire Department. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office. Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.

11. Energy Efficiency The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1. Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.

12. Environmental Automation and Control Systems The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangement have been made with EB. This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.

13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established. The contract COR will be responsible for management and control of the spoils disposal site.

14. Fluorescent and Mercury-Bearing Lamps The contractor is to collect, containerize, manage and recycle fluorescent and mercury-bearing lamps in accordance with 40 CFR 273, Standards for Universal Waste Management. A copy of the manifest/Bill of Lading must be given to the EB through the COR five days in advance of shipment by the contractor so that it can be reviewed for accuracy and completeness. The contractor must install low mercury bulbs when available.

15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.

16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste. If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review. The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.

17. ISO 14001

TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.

18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.

19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.

20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. As of June 1, 2015, all Material Safety Data Sheets (MSDS) must be replaced with new Safety Data Sheets (SDS). EB will no longer be accepting older legacy MSDS sheets and the contractor must submit the current SDS for the hazardous material. The contractor must keep a copy of all SDSs required for the project at the jobsite.

21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.

22. National Pollutant Discharge Elimination System (NPDES) Permits The contractor must not perform any work on existing NPDES structures or treatment units unless previously approved in writing by the Installation Planning and Maintenance Division certified operators and the Environmental Branch. This includes work within the sewage treatment plant, sewage lift stations, sewage conveyance pipes, Industrial Operations Facility pretreatment plant, and storm water sewer systems. If a permit is required, it will be the responsibility of the contractor to obtain all permits prior to work being performed. All permit application packages must first be reviewed by the Environmental Branch prior to being sent to any regulatory authority.

23. Net Zero Water The contractor will minimize the use of potable water during the construction project. Water used during the construction project will be monitored and measured using portable water meters if possible. Installed restroom equipment will consist of high-efficiency fixtures that use reduced volumes of water. Use of flow regulation devices must be approved by EB prior to installation. Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements. Automatic hands-free flushometers will not be used. Water-free urinals will not be used. Flushometers will be the piston variety that fail in the closed position. New building construction and renovations will include installation of a water meter that is capable of being read from the outside of the building.

24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.

25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified by an EPA-approved Section 608 program. The contractor must not use Class I or Class II ODS or install equipment that contains Class I or II ODS.

25. Paints The contractor must not use paints containing zinc chromate or strontium chromate pigments and paints must not contain a concentration of lead greater than 0.009 percent. Coatings used within permitted paint spray booths must not have a Volatile Organic Compound (VOC) content greater than 3.50 pounds per gallon.

26. Pest Management At no time during the execution of this contract must the contractor provide a food source or harborage for any pests. The contractor must coordinate through the COR to the EB prior to application any pesticide usage (PA state license is required for pesticide applications). Pesticides are required to be approved by the EB. The contractor must report all usage of pesticides through the COR to the EB. After completion of the contract, the contractor must ensure there is no passage for pests to enter facilities or structures related to work performed by the contractor.

27. Polychlorinated Biphenyls (PCBs) The contractor must not bring items containing PCBs onto TYAD. Light ballasts that are clearly marked "Contains no PCBs," or that are marked with a manufacture date after 1978 must be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as containing no PCBs that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, must be disposed of by the contractor at an approved and licensed facility for PCBs. The contractor must submit a shipping manifest and certificate of disposal of the PCB-containing items to the EB through the COR.

28. Recycling The contractor must comply with TYADs general recycling plan for recyclable materials such as aluminum, steel, cardboard, paper, plastic and wood. The contractor should contact the EB for additional information on the recycling of materials through the COR. The COR will coordinate with EB to have the contractor recycle metals, cardboard, etc., through TYADs recycling program. All Construction and Demolition (C&D) material transferred from a construction project into the TYAD recycling program must be segregated and material type and weights submitted to the project COR for consolidation. Any material entering the TYAD recycling program that is not documented and properly reported will be absorbed into the TYAD recycling program and not count towards the C&D requirement of the project. Clean wood shall be recycled by the contractor off TYAD property.

29. Refuse and Construction Demolition Debris Removal and Disposal During the performance of all construction, renovation and demolition projects, a minimum of 60 percent of all non-hazardous construction demolition debris shall be diverted from the landfill for reuse or recycling. The contractor shall provide written certification to the COR of the type and tonnage of debris reused or recycled from the contract. All refuse and the construction demolition debris not recovered for reuse or recycling shall be disposed of at a PADEP permitted and Monroe County Municipal Waste Management Authority authorized facility. The contractor shall comply with the Monroe County Solid Waste Management Plan and PA Act 90, including all licensing requirements. Monroe County has specific landfills that is must be transported to per Monroe County guidance which is available on the county website (http://www.thewasteauthority.com) and any contractors can call the Monroe County Municipal Waste Management Authority at (570) 643-6100. The contractor shall provide a disposal certificate or landfill weight slip to the COR for all solid waste disposed of during the performance of this contract. The COR will then provide copies of the disposal certificate or landfill weight slips with the quarterly consolidated C&D report from The Installation Planning and Maintenance Division to EB.

30. Removal Materials The contractor must remove from the site prior to the acceptance of work by the Government, all materials not identified to remain in place, including excess paints, building materials and equipment purchased by the contractor for the execution of this project.

31. Site Preservation and Restoration The contractor must ensure that the land resources associated under this contract be preserved in their present condition or be restored to a like condition after completion of construction. This post construction appearance will appear to be natural and not detract from the appearance of the project.

32. Trees and Shrubs Protection The contractor must be responsible for the protection of all trees and shrubs on site. The contractor must not allow any heavy equipment, vehicular traffic or stockpiling of materials within ten feet from the drip line of any tree. The contractor must not allow any toxic materials to be stored within 100 feet (35.5 meters) of the drip line of any tree. The contractor must not nail protective devices, signs, utility boxes or other objects to trees to be retained on the site.

33. Unexploded Ordnance (UXO) All work that is done in the UXO area must include the support and clearance by a UXO technician. In addition, all personnel entering the UXO area must have UXO recognition training. The COR will escort the contractor to the EB for UXO recognition training. The COR will provide a map of the UXO area to the contractor.

34. Water Quality The contractor shall not pollute streams, lakes or reservoirs. All work under this contract shall be performed in such a manner that pollution will not be created in streams, surface waters or underground water located within, or adjacent to the project area. The contractor shall not spill, emit, dump or otherwise discharge any hazardous, toxic, harmful or unauthorized pollutant, substance or material, including petroleum products, cleaning agents or paints, onto the ground, into the air or into any waters or nearby storm drain. The contractor shall execute any preventative measures required to prevent any hazardous, toxic or harmful material stored or used on the project site from entering any stormwater drain. Nothing shall be allowed to spill, emit, dump or otherwise discharge any hazardous, toxic or harmful material or pollutant into any sink, toilet, drain, utility or receptacle without written permission from the EB through the COR. The contractor shall protect streams, lakes and wetlands from sediment discharges caused by his activities.

File details come from the government source that posted it. Updated .